The construction plans are for the Orange County Convention Center West Building Fountain Eco-Friendly Sustainability Upgrade project, prepared by Hanson Professional Services Inc. The project involves replacing standard height drinking fountains with bottle fillers in 46 locations throughout the West Concourse Building. The existing fountains will be updated with bottle fillers while maintaining the ADA fountain in place, and some circuit breakers will be updated to GFCI breakers. The project is part of Orange County, Florida's initiative to improve water fountain sustainability, with construction documents dated July 10, 2023, and prepared under County Project No. 0966-52.

The project will utilize various bottle filling stations from manufacturers like Elkay, Oasis, and Halsey Taylor, with models including ezH2O bottle filling station retrofit kits and Aqua Pointe contactless electronic bottle fillers. The estimated project cost is $684,523.00, with electronic bid submissions due by September 28, 2023, through the ProcureNow OpenGov e-Procurement Platform. The water fountains will be upgraded with features such as antimicrobial coating, green tickers, hands-free operation, laminar flow electronic bottle filling, and in some cases, chilled water capabilities. The project appears to be funded through Orange County's infrastructure improvement budget, with a focus on enhancing sustainability and user convenience in the convention center.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :2

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

COVER SHEET

G-001

07/10/2023

22G0120

LMW

MB

PLH

100% CD

DRAWING INDEX

SHEET NO. SHEET NAME

G-001 COVER SHEET

P-001 PLUMBING NOTES, LEGENDS, AND ABBREVIATIONS

P-101 FIRST FLOOR OVERALL PLUMBING PLAN

P-102 SECOND FLOOR OVERALL PLUMBING PLAN

P-103 THIRD FLOOR OVERALL PLUMBING PLAN

P-104 FOURTH FLOOR OVERALL PLUMBING PLAN

P-201 ENLARGED PLUMBING PLANS

P-202 ENLARGED PLUMBING PLANS

P-203 ENLARGED PLUMBING PLANS

P-204 ENLARGED PLUMBING PLANS

P-501 DETAILS

P-601 SCHEDULES

P-602 SCHEDULES

P-603 SCHEDULES

P-604 SCHEDULES

P-605 SCHEDULES

E-001 ELECTRICAL NOTES AND SCHEDULES

9800 International Dr, Orlando, FL 32819

100% CD

July 10, 2023

WEST BUILDING FOUNTAIN ECO-FRIENDLY SUSTAINABILITY UPGRADE

HANSON PROFESSIONAL SERVICES INC.

2300 Maitland Center Pkwy, Suite 310

Maitland, FL. 32751

(321) 788-4906

CODES IN EFFECT AT TIME OF DRAWING SUBMITTAL

FLORIDA BUILDING CODE, SEVENTH EDITION (2020)

FLORIDA ENERGY CONSERVATION CODE, SEVENTH EDITION (2020)

FLORIDA FIRE PREVENTION CODE, SEVENTH EDITION (2020)

FLORIDA PLUMBING CODE, SEVENTH EDITION (2020)

NFPA 1 FIRE CODE, 2018 EDITION

NFPA 101 (LIFE SAFETY CODE) 2018 EDITION WITH FL AMENDMENTS

NEC (NFPA 70) 2017 EDITION

TO THE BEST OF THE ENGINEER'S KNOWLEDGE, THE PLANS AND

SPECIFICATIONS COMPLY WITH THE 2020 FLORIDA BUILDING CODE

WITH ALL CURRENT AMENDMENTS.

PROJECT INFORMATION

SCOPE OF WORK

THE ORANGE COUNTY CONVENTION CENTER (OCCC) IS

REPLACING THE STANDARD HEIGHT DRINKING FOUNTAINS WITH

A BOTTLE FILLER IN 46 LOCATIONS IN THE WEST CONCOURSE

BUILDING.

THE EXISTING FOUNTAINS WILL BE UPDATED WITH A BOTTLE

FILLER AS INDICATED ON THE PLANS. BOTTLE FILLERS WILL BE IN

THE STANDARD HEIGHT DRINKING FOUNTAIN LOCATION WHILE

THE ADA FOUNTAIN REMAINS IN PLACE. SOME FOUNTAINS WILL

HAVE THE ASSOCIATED CIRCUIT BREAKERS UPDATED TO A GFCI

BREAKER.

MEP ENGINEERS

PROJECT LOCATION

COUNTY PROJECT No. 0966-52

ORANGE COUNTY MAYOR

Jerry L. Demings

DISTRICT 1 COMMISSIONER

Nicole H. Wilson

DISTRICT 2 COMMISSIONER

Christine Moore

DISTRICT 5 COMMISSIONER

Emily Bonilla

DISTRICT 6 COMMISSIONER

Michael "Mike" Scott

DISTRICT 4 COMMISSIONER

Maribel Gomez Cordero

DISTRICT 3 COMMISSIONER

Mayra Uribe

SANITARY OR WASTE LINE (SAN)

PLUMBING PIPING DESIGNATIONS

COLD WATER (CW)

LINETYPE DESCRIPTION

TEE - DOWN, BRANCH OUT OF BOTTOM

TEE - UP, BRANCH OUT OF TOP

PLUMBING SYMBOLS

DESCRIPTION

ELBOW - UP

PLUMBING ABBREVIATIONS

ABOVE FINISHED FLOOR

SANITARY

CLEANOUTCO

SAN

SYMBOL

AFF

DESCRIPTION

BALL VALVE

CAP ON END OF PIPE

SLEEVE THRU WALL

RISE OR DROP IN PIPING

ELBOW - DOWN

EQUIPMENT/FIXTURE TAGS (XX = MARKS BELOW)

Y = WHERE DETAIL OR SECTION IS SHOWN

KEYED NOTES ON DRAWINGS & SCHEDULES

X = SECTION [LETTER] OR DETAIL [NUMBER]

PLUMBING SYMBOLS (GENERAL)

REVISIONS

ROOM NUMBERS

XX-1

SYMBOL DESCRIPTION

SYMBOL

NEW TO EXISTING CONNECTION

COLD WATERCW

X

Y

X

XXX

VENT

WATER FOUNTAINWF

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :2

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

PLUMBING NOTES,

LEGENDS, AND

ABBREVIATIONS

P-001

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

1. BEFORE SUBMITTING BID, CONTRACTOR SHALL VISIT THOSE PORTIONS OF

THE BUILDING AND SITE AFFECTED BY THIS WORK SO AS TO BECOME

FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIES THAT MAY

AFFECT EXECUTION OF THE WORK. SUBMISSION OF A BID DENOTES THAT

SUCH EXAMINATION HAS BEEN MADE AND CLAIMS FOR LABOR, EQUIPMENT

OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED MAY

NOT BE RECOGNIZED. SUBMIT ANY QUESTIONS REQUIRED TO CLARIFY

SCOPE PRIOR TO BID. INCLUDE ALL REQUIRED WORK IN BID PRICE.

2. UNFORESEEN SITE CONDITIONS MAY EXIST AND EXISTING UTILITIES MAY

NOT BE FIELD LOCATED EXACTLY AS SHOWN ON THE DRAWINGS.

COOPERATION WITH OTHER TRADES IN ROUTING AND/OR BURIAL DEPTHS

AS DETERMINED DURING CONSTRUCTION AND AS DIRECTED BY THE

ARCHITECT/ENGINEER MAY BE NECESSARY. IT IS INTENDED THAT SUCH

DEVIATIONS SHALL BE CONSIDERED AS PART OF THIS CONTRACT. SUCH

DEVIATIONS MAY NOT BE CONSIDERED AS PART OF THIS CONTRACT WHEN

PROPERLY DOCUMENTED IN WRITING.

3. WORK SHALL BE PERFORMED IN COMPLIANCE WITH THE ESTABLISHED

WORK SCHEDULE SET FORTH BY OWNER. GENERAL CONTRACTOR TO

COORDINATE ALL WORK WITH THE OCCC PROJECT MANAGER.

4. UNLESS OTHERWISE NOTED, ALL CONCRETE PATCHING, WALL PATCHING,

CEILING REPAIR, FENCE WORK AND OTHER GENERAL CONSTRUCTION

WORK REQUIRED FOR INSTALLING MECHANICAL/PLUMBING OR FIRE

PROTECTION SYSTEMS SHALL BE PROVIDED BY THE RESPECTIVE

VENTILATION, HEATING, PLUMBING, OR FIRE PROTECTION CONTRACTOR

RESPONSIBLE FOR SAID WORK. THAT CONTRACTOR SHALL FULLY

COORDINATE THAT WORK WITH GENERAL CONTRACTOR USING THE

APPROPRIATE CONSTRUCTION TRADES.

5. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND SHALL BE UL LISTED

WHERE APPLICABLE.

6. PENETRATION OF THE ROOF DECK WILL NOT BE ACCEPTABLE FOR

SUPPORT OF PIPING, EQUIPMENT, OR ANY OTHER DEVICES. ALL

SUPPORTS SHALL SPAN BETWEEN THE STRUCTURAL ELEMENTS TO

SUPPORT THE PLUMBING EQUIPMENT.

7. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND SHOULD NOT BE SCALED.

COORDINATE EXACT LOCATION OF ALL CEILING MOUNTED EQUIPMENT SO

ALL SERVICEABLE COMPONENTS CAN BE EASILY ACCESSED BY REMOVING

CEILING TILES ONLY. REMOVAL OR RELOCATION OF LIGHTING FIXTURES

FOR SERVICE ACCESS IS NOT ACCEPTABLE. THE CONTRACTOR SHALL

REINSTALL EQUIPMENT THAT HAS INADEQUATE OR UNSAFE

ACCESSIBILITY. LOCATE ALL OTHER EQUIPMENT WITH MANUFACTURER

RECOMMENDED ACCESS FOR OPERATION AND MAINTENANCE. INSTALL

EQUIPMENT WITH PROPER ELECTRICAL CODE CLEARANCES.

8. WHENEVER A REFERENCE IS MADE TO A STANDARD, THE WORK SHALL

COMPLY WITH THE LATEST PUBLISHED EDITION OF THE STANDARD AT THE

TIME THE PROJECT IS BID UNLESS OTHERWISE SPECIFIED.

9. ALL MATERIAL STORED ON SITE SHALL BE PROPERLY PROTECTED FROM

DAMAGE OR DETERIORATION. MATERIAL SHALL NOT BE STORED IN

CONTACT WITH THE GROUND.

10. REFER TO DIVISION 22 SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND ALL REQUIREMENTS NOT INDICATED ON THE DRAWINGS. IF THERE

ARE ANY APPARENT CONFLICTS BETWEEN THE SPECIFICATIONS AND

DRAWINGS, THE MORE STRINGENT REQUIREMENTS SHALL APPLY. NOTIFY

THE ARCHITECT/ENGINEER OF ANY CONFLICTS PRIOR TO PURCHASING

EQUIPMENT AND PRIOR TO CUTTING OPENINGS.

11. ALL EQUIPMENT, PIPING, AND VALVES SHALL HAVE IDENTIFICATION LABELS

AND TAGS PER SPECIFICATION SECTION 22 05 53.

12. ALL WORK, AT A MINIMUM, SHALL BE IN ACCORDANCE WITH OSHA, NFPA

STANDARDS, THE PLUMBING CODE, AND THE LOCAL GOVERNING

AUTHORITIES. THE DRAWINGS AND SPECIFICATIONS DO NOT ATTEMPT TO

INDICATE ALL WORK REQUIRED BY THE CODES AND AUTHORITIES. DO NOT

INSTALL WORK THAT DOES NOT MEET THE MINIMUM REQUIREMENTS. IF

NECESSARY, REQUEST CLARIFICATION FROM A/E PRIOR TO PROCEEDING.

13. CONTRACTOR SHALL NOT CONCEAL ANY WORK UNTIL INSPECTED BY

PLUMBING INSPECTOR AND/OR THE WORK IS OBSERVED BY THE

ARCHITECT/ENGINEER. CONTRACTOR SHALL NOTIFY THE A/E OF A

SCHEDULED INSPECTION/REVIEW TIME WITHIN 72 HOURS. GENERAL

CONTRACTOR SHALL NOT CONCEAL WORK UNTIL INSPECTED AND

OBSERVED, REGARDLESS OF SCHEDULE.

14. CONTRACTOR SHALL MAINTAIN A MARKED-UP SET OF RECORD DRAWINGS

WHICH INDICATE VARIATIONS IN THE ACTUAL INSTALLATION FROM THE

ORIGINAL DESIGN. SUBMIT DRAWINGS TO OWNER AND A/E UPON

COMPLETION FOR REVIEW.

15. PIPE INSTALLATION HEIGHTS WHEREVER PROVIDED ON THE DRAWINGS

ARE INTENDED FOR GUIDANCE PURPOSES ONLY. RESPECTIVE

CONTRACTORS SHALL BE RESPONSIBLE FOR SHOP DRAWINGS, PROPER

INSTALLATION OF SYSTEM AND COORDINATION AMONG TRADES.

16. INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH

MANUFACTURER’S RECOMMENDATIONS UNLESS SPECIFICALLY INDICATED

OTHERWISE OR WHERE LOCAL CODES OR REGULATIONS TAKE

PRECEDENCE.

17. REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE TO MATCH NEW AND

EXISTING CONSTRUCTION WITH NO NOTICEABLE DIFFERENCE IN

CONTINUITY, APPEARANCE, OR FUNCTION.

18. LOCATION AND SIZE OF EXISTING PLUMBING PIPING SYSTEMS SHOWN IN

THE PROJECT CONSTRUCTION DRAWINGS IS BASED UPON INFORMATION

GATHERED FROM EXISTING BUILDING DRAWINGS AND FIELD

OBSERVATIONS. THE ACCURACY OF THIS INFORMATION CANNOT BE

ASSURED. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD

VERIFICATION PRIOR TO THE PROCUREMENT OF NEW PLUMBING SYSTEM

MATERIALS.

19. SUPPORT FOR ALL PLUMBING FIXTURES SHALL BE PROVIDED BY THE

PLUMBING CONTRACTOR. COORDINATE INSTALLATION WITH OTHER

TRADES INVOLVED.

GENERAL NOTES

xx

1 2 7 8 9 10 11 12 13 14

3 5

R

AM

P T

O L

E

VEL

TUNNEL

TUNNEL

T U

N N

E L x x xxx x x x x x

BOTTOMBOTTOMWF 100A-B WF 104A-B

WF 106A-B

WF 102A-B

WF 103A-B

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :2

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

FIRST FLOOR

OVERALL PLUMBING

PLAN

P-101

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

1. REFER TO PLUMBING GENERAL NOTES ON SHEET P-001.

2. REFER TO SPECIFICATIONS.

3. WATER FOUNTAIN LOCATIONS SHOWN FOR REFERENCE. SEE SHEETS P-201

AND P-202 FOR DETAILS.

GENERAL SHEET NOTES

SCALE: 1" = 80'-0"1

FIRST FLOOR OVERALL PLUMBING PLAN

D O W N

D O W N

FDC

FE

FE

FE

FE

FDC

FE

FE

FE

FE

F D C

FE

FE

F D C

FDC

FDC

F H C

FE

FE

F D C

FDC

FDC

FE

F E

FE

F D C

FE

FDC

FE

F D C

FDC

FDC

FE

F D C

FDC FDC

FDC

FE FE

F E

F E

F E

F E

F E

FDC

FE

FE

F E

FE FE

F E

FE

F E

FE

FE

FDC

F E

FE FE FDC

FE FE

FE FE

FEFE

F

E FE

F E

F E

F E

F E

FE

F E

FE FE

F E

F E

FDC

F E

F E

F E

F E

F E

F E

FE

FE

FDCFE

F E

FE

FE

F E

FE

FE

F D C

F D C

FDC

FE

FDC

FDC

FE

FE

FE

FEF

D C

FDC

FE

FE

FDC FE

FE FE FE FE FE

FE FE FE

FEF

E

F E

F E

F

E FE

F E

F E

F E

F E

F E

F E

F E

F E F

E

F E

F E

F E

FE

FDC FEFDCFEFDC

FDCFDC

F D C

FE

F D C

F D C

F D C

F D C

FDC

F D C

F D C

F D C

F D C

FDC

FDC

F D C

F D C

FDC

FDC

F D C

FDC

UP

H.C.

H.C.

H.C. H.C.

H.C. H.C.

H.C.

E.F.H.

H.C. H.C.

H.C.

H.C. H.C.

H.C.

H.C. H.C.

E.F.H.

UP

E.F.H.

E.F.H.

H.C.

U P

H.C.

H.C.

H.C.

H.C.

E.F.H.

E.F.H.

H.C.

H.C. H.C.

H.C.

H.C.

H.C.

H.C.

H.C.

H.C.

H.C.

H.C.

H.C. H.C. H.C. H.C.15 16

18 19 20

R

AM

P D O

W N do or 3:0 do or 3:0

8"

0" d oor

4:0 do or 3:0 do or 3:0

8"

0" w al l = 0.5 000 00

WF 211A-B

WF 213A-B WF 215A-B WF 217AA-AB WF 218A-B

WF 220A-B WF 222A-B

WF 256A-B

WF 258A-B

WF 204A-B

WF 242A-B WF 240A-B WF 238A-B WF 236A-B WF 232A-B WF 230A-B

WF 284A-B

WF 202A-B

WF 206A-B

WF 208A-B

WF 259A-B WF 260A-B

WF 263A-B

WF 272A-C

WF 269A-B

WF 268A-B

WF 273A-B

WF 275A-C

WF 277A-B

WF 278A-B

WF 280A-B

WF 279A-B

WF 282A-B

WF 281A-B

WF 226A-B

WF 243A-B

WF 241A-B WF 239A-B WF 237A-B

WF 212A-B WF 214A-B WF 216A-B

WF 276A-C

WF 217BA-BB 2

WF 234A-B

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :4

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

SECOND FLOOR

OVERALL PLUMBING

PLAN

P-102

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

GENERAL SHEET NOTES

SCALE: 1" = 80'-0"1

SECOND FLOOR OVERALL PLUMBING PLAN

SHEET KEYNOTES

FOUNTAIN 217AA-AB IS THE WATER FOUNTAIN COMBINATION IN FRONT OF

WOMEN'S RESTROOM 217A ON THE EXHIBIT FLOOR.

FOUNTAIN 217BA-BB IS THE WATER FOUNTAIN COMBINATION IN FRONT OF

MEN'S RESTROOM 217B ON THE EXHIBIT FLOOR.

1 1. REFER TO PLUMBING GENERAL NOTES ON SHEET P-001.

2. REFER TO SPECIFICATIONS.

3. WATER FOUNTAIN LOCATIONS SHOWN FOR REFERENCE. SEE SHEETS P-201

AND P-202 FOR DETAILS.

GALLERY

DN

UP

DN

UP.

DN.

DN

DN

R.D.R.D.

WF 328A-B

WF 325A-B

WF 323A-B

WF 301A-B

WF 312A-B

WF 313A-B

WF 320AAU-BAU

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :4

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

THIRD FLOOR

OVERALL PLUMBING

PLAN

P-103

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

SCALE: 1" = 80'-0"1

THIRD FLOOR OVERALL PLUMBING PLAN

GENERAL SHEET NOTES

1. REFER TO PLUMBING GENERAL NOTES ON SHEET P-001.

2. REFER TO SPECIFICATIONS.

3. WATER FOUNTAIN LOCATIONS SHOWN FOR REFERENCE. SEE SHEETS P-201

BOTTOM

WF 415A-B

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :4

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

FOURTH FLOOR

OVERALL PLUMBING

PLAN

P-104

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

SCALE: 1" = 80'-0"1

FOURTH FLOOR OVERALL PLUMBING PLAN

GENERAL SHEET NOTES

1. REFER TO PLUMBING GENERAL NOTES ON SHEET P-001.

2. REFER TO SPECIFICATIONS.

3. WATER FOUNTAIN LOCATIONS SHOWN FOR REFERENCE. SEE SHEETS P-201

D3

D2

D1

EXISTING TO

REMAIN

2" SAN

2" VENT

1 1/4" SAN

1/2" CW

1 1/4" SAN

1 1/4" SAN

1/2" CW

2" VENT

D5

D6

3/8" CW

2" VENT

2" SAN

2" SAN

2" VENT

1/2" CW

2" VENT

2" SAN

2" VENT

2" VENT

2" SAN

2" SAN

2" VENT

2" VENT

CO

VARIOUS SIZED SANVARIOUS SIZED SAN

2" VENT

EXISTING

FILTER

1/2" CW

EXISTING

FILTER

EXISTING WATER

FOUNTAIN TO REMAIN

D2 D3

D4

D1

D2

D5

D6

D7 D8

1 1/4" SAN

1 1/4" SAN

1 1/4" SAN

1/2" CW

2" VENT

3/8" CW

R1

R2

R3

1 1/2" SAN

1/2" CW

2" VENT

3/8" CW

2" VENT

2" VENT

1 1/2" SAN

1 1/2" SAN

2" SAN

1/2" CW

2" VENT

2" VENT

2" VENT 1/2" CW

2" VENT

2" SAN

CO

VARIOUS SIZED SANVARIOUS SIZED SAN

R2

R1

EXISTING TO

REMAIN

R3

R1

1/2" CW 2" VENT

1 1/4" SAN

2" VENT

1/2" CW

1 1/2" SAN

R2 R1

R2

R3

EXISTING

FILTER

2" VENT

1/2" CW

2" SAN

1 1/4" SAN

1 1/4" SAN

D2

D1 D3

D8

D5 D6

D7

1 1/2" SAN

1/2" CW

2" VENT

2" SAN

1/4" CW

R1 R2

R2

R3

R1

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :0

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

ENLARGED

PLUMBING PLANS

P-201

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

SCALE: 1/4" = 1'-0"1

TYPICAL FIRST FLOOR QUAD WATER FOUNTAIN

DEMOLITION PLAN - EXISTING ELKAY OR

HALSEY-TAYLOR FOUNTAIN

SCALE: 1/2" = 1'-0"2

TYPICAL FIRST FLOOR QUAD WATER FOUNTAIN

DEMOLITION PLAN - EXISTING ELKAY OR

HALSEY-TAYLOR FOUNTAIN

SCALE: 1/4" = 1'-0"3

TYPICAL FIRST FLOOR QUAD WATER FOUNTAIN

RENOVATION PLAN - EXISTING ELKAY OR

HALSEY-TAYLOR FOUNTAIN

SCALE: 1/2" = 1'-0"4

TYPICAL FIRST FLOOR QUAD WATER FOUNTAIN

RENOVATION PLAN - EXISTING ELKAY OR

HALSEY-TAYLOR FOUNTAIN

1. REFER TO PLUMBING GENERAL NOTES ON SHEET P-001.

2. REFER TO SPECIFICATIONS.

3. PROVIDE NEW SHUT-OFF BALL VALVE IN COLD WATER LINE AT ALL FOUNTAIN

LOCATIONS.

GENERAL SHEET NOTESRENO SHEET KEYNOTES

ADA WATER FOUNTAIN AND CONNECTED CHILLER EXISTING TO REMAIN.

CONTRACTOR TO CAP CHILLER INLET AND OUTLET TO KEEP FREE OF DUST

DURING CONSTRUCTION.

FOR EXISTING WATER FOUNTAINS THAT ARE HARDWIRED, RETAIN EXISTING

SWITCH, CIRCUIT, AND CONDUIT IN GENERAL AREA FOR REUSE. REFER TO

SHEET E-001 FOR MORE INFORMATION.

FOR EXISTING WATER FOUNTAINS THAT HAVE RECEPTACLES, DISCONNECT

WATER FOUNTAIN, RETAIN EXISTING RECEPTACLE, CIRCUIT, AND CONDUIT

FOR REUSE. REFER TO SHEET E-001 FOR MORE INFORMATION.

D6

SCALE: 1/4" = 1'-0"5

TYPICAL DOUBLE WATER FOUNTAIN - RIGHT HAND

DRAINAGE DEMOLITION PLAN - EXISTING ELKAY

OR HALSEY-TAYLOR FOUNTAIN

SCALE: 1/4" = 1'-0"7

TYPICAL DOUBLE WATER FOUNTAIN - RIGHT HAND

DRAINAGE RENOVATION PLAN - EXISTING ELKAY

OR HALSEY-TAYLOR FOUNTAIN

SCALE: 1/2" = 1'-0"6

TYPICAL DOUBLE WATER FOUNTAIN - RIGHT HAND

DRAINAGE DEMOLITION SECTION - EXISTING

ELKAY OR HALSEY-TAYLOR FOUNTAIN

SCALE: 1/2" = 1'-0"8

TYPICAL DOUBLE WATER FOUNTAIN - RIGHT HAND

DRAINAGE RENOVATION SECTION - EXISTING

ELKAY OR HALSEY-TAYLOR FOUNTAIN

R1 CONTRACTOR TO CONNECT 1/2" COLD WATER TO CHILLER INLET. CONNECT

COLD WATER OUTLET TO THE CONNECTIONS OF THE FOUNTAIN AND BOTTLE

FILLER AS SHOWN IN DETAIL 1 ON SHEET P-501.

CONTRACTOR TO CONNECT NEW 1-1/2" SANITARY LINE FROM BOTTLE FILLER

TO EXISTING 2" SANITARY LINE AS SHOWN.

CONTRACTOR TO INSTALL NEW BOTTLE FILLER AS INSTRUCTED BY

MANUFACTURER - INCLUDING THE NEW ADA FOUNTAIN UPPER PANEL,

LOWER PANEL, AND BOTTLE FILLER FRAME.

R2

TYPICAL FOR

WATER FOUNTAIN

GROUPING

102A-B & 103A-B.

TYPICAL FOR

WATER FOUNTAIN

GROUPING

104A-B, 106A-B, 272A, 276A, 279A, & 280A

0 2' 4' 8'

0 2' 4' 8'

0 1' 2' 4'

0 1' 2' 4'

0 2' 4' 8'

0 1' 2' 4'

0 2' 4' 8'

0 1' 2' 4'

R3

DEMO SHEET KEYNOTES

CONTRACTOR SHALL DEMOLISH EXISTING STANDARD HEIGHT DRINKING

FOUNTAIN FROM STANDARD-ADA PAIRED FOUNTAIN ARRANGEMENT.

CONTRACTOR TO DISCONNECT EXISTING 2" SANITARY AND VENT PIPING AS

SHOWN TO ALLOW FOR NEW BOTTLE FILLER OUTLET LOCATION AT 23-5/16"

A.F.F. AND A PIPE SLOPING OF 1/4" PER FOOT TO EXISTING SANITARY DRAIN

LOCATION.

CONTRACTOR TO DISCONNECT EXISTING 3/8" AND 1/4" COLD WATER FLEX

PIPING TO THE CHILLER AFTER THE SHUT OFF VALVE AND TO BOTH WATER

FOUNTAINS AS SHOWN.

CONTRACTOR SHALL DEMOLISH EXISTING WATER FOUNTAIN ASSEMBLY,

INCLUDING UPPER PANEL, LOWER PANEL, AND STANDARD HEIGHT FOUNTAIN

FRAME.

IF THE DRINKING FOUNTAIN HAS AN EXISTING WATER FILTER, CONTRACTOR

IS TO REMOVE WATER FILTER. SEE SHEETS P-601 TO P-605 FOR

INFORMATION ON WHICH FOUNTAINS HAVE EXISTING FILTERS.

D1

D2

D3

D4

D5

D7

D8

2" VENT

1" CW

4" SAN 1" CW

1 1/4" SAN

1 1/4" SAN

CO

3/8" CW

1/2" CW

D3

D2

D1 D5

D4

D6

D8D7

2" VENT

1 1/4" SAN

1 1/4" SAN

2" SAN

4" SAN

1" CW

D2

D3

D2

D1

D4

EXISTING WATER

CLOSET CARRIER

D5

EXISTING

CLEANOUT

D7

D3

D6

D8

2" VENT

4" SAN 1" CW

1 1/2" SAN1 1/4" SAN

3/8" CW

R1

R2

R3

4" SAN

1" CW

2" VENT

4" SAN

2" VENT

2" VENT

1 1/2" SAN

1 1/4" SAN

1/2" CW

1" CW

4" SAN

1" CW 2" VENT

CO

4" SAN

R1 R2

R2

R1

EXISTING WATER

CLOSET CARRIER

EXISTING

CLEANOUT

R3

2" VENT

1 1/4" SAN

1/2" CW

3/8" CW

3/8" CW

D2 D3

D4

D5

D1

1 1/4" SAN

D8 D6

D7

1 1/2" SAN

3/8" CW

3/8" CW

2" VENT

1/2" CW

R1

R1

R2

R3

2" SAN

1/2" CW

2" VENT

1 1/4" SAN

D5

D2

D2

D1

D3

D4

D6

D3

D7

1 1/4" SAN

D8

2" VENT 1/2" CW

2" SAN

1 1/2" SAN

R2 R1

R1

R2

R3

CAP EXISTING

SANITARY

CONNECTION.

D3

D2

D4

1/2" CW

2" VENT

1 1/4" SAN

1 1/4" SAN

D3 D5

3/8" CW

D1

D6

D7 D8

D3

D1

D3

D2

D4

D5

1 1/4" SAN

1/2" CW

2" SAN

1 1/4" SAN

D7

D6

D6

D8

R1

R2

R1

R3

1 1/4" SAN

3/8" CW

1/2" CW

2" VENT

3/8" CW

2" VENT

2" SAN

2" SAN

R1

R2

R1

R3

1 1/2" SAN

1/2" CW

1 1/4" SAN

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :5

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

ENLARGED

PLUMBING PLANS

P-202

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

1. REFER TO PLUMBING GENERAL NOTES ON SHEET P-001.

2. REFER TO SPECIFICATIONS.

3. PROVIDE NEW SHUT-OFF BALL VALVE IN COLD WATER LINE AT ALL FOUNTAIN

LOCATIONS.

GENERAL SHEET NOTES

RENO SHEET KEYNOTES

R1

DEMO SHEET KEYNOTES

D1

D2

D3

SCALE: 1/4" = 1'-0"1

TYPICAL DOUBLE WATER FOUNTAIN - WET VENT

DEMOLITION PLAN - EXISTING ELKAY OR

HALSEY-TAYLOR FOUNTAIN

SCALE: 1/2" = 1'-0"2

TYPICAL DOUBLE WATER FOUNTAIN - WET VENT

DEMOLITION SECTION - EXISTING ELKAY OR

HALSEY-TAYLOR FOUNTAIN

SCALE: 1/4" = 1'-0"3

TYPICAL DOUBLE WATER FOUNTAIN - WET VENT

RENOVATION PLAN - EXISTING ELKAY OR

HALSEY-TAYLOR FOUNTAIN

SCALE: 1/2" = 1'-0"4

TYPICAL DOUBLE WATER FOUNTAIN - WET VENT

RENOVATION SECTION - EXISTING ELKAY OR

HALSEY-TAYLOR FOUNTAIN

D4

SCALE: 1/4" = 1'-0"5

TYPICAL DOUBLE WATER FOUNTAIN -CENTER

DRAINAGE DEMOLITION PLAN - EXISTING ELKAY

OR HALSEY-TAYLOR FOUNTAIN

SCALE: 1/4" = 1'-0"7

TYPICAL DOUBLE WATER FOUNTAIN -CENTER

DRAINAGE RENOVATION PLAN - EXISTING ELKAY

OR HALSEY-TAYLOR FOUNTAIN

SCALE: 1/2" = 1'-0"6

TYPICAL DOUBLE WATER FOUNTAIN - CENTER

DRAINAGE DEMOLITION PLAN - EXISTING ELKAY

OR HALSEY-TAYLOR FOUNTAIN

SCALE: 1/2" = 1'-0"8

TYPICAL DOUBLE WATER FOUNTAIN - CENTER

DRAINAGE RENOVATION SECTION - EXISTING

ELKAY OR HALSEY-TAYLOR FOUNTAIN

R2

CONTRACTOR SHALL DEMOLISH EXISTING STANDARD HEIGHT DRINKING

FOUNTAIN FROM STANDARD-ADA PAIRED FOUNTAIN ARRANGEMENT.

CONTRACTOR TO DISCONNECT EXISTING 2" SANITARY AND VENT PIPING AS

SHOWN TO ALLOW FOR NEW BOTTLE FILLER OUTLET LOCATION AT 23-5/16"

A.F.F. AND A PIPE SLOPING OF 1/4" PER FOOT TO EXISTING SANITARY DRAIN

LOCATION.

CONTRACTOR TO DISCONNECT EXISTING 3/8" AND 1/4" COLD WATER FLEX

PIPING TO THE CHILLER AFTER THE SHUT OFF VALVE AND TO BOTH WATER

FOUNTAINS AS SHOWN.

CONTRACTOR SHALL DEMOLISH EXISTING WATER FOUNTAIN ASSEMBLY,

INCLUDING UPPER PANEL, LOWER PANEL, AND STANDARD HEIGHT FOUNTAIN

FRAME.

IF THE DRINKING FOUNTAIN HAS AN EXISTING WATER FILTER, CONTRACTOR

IS TO REMOVE WATER FILTER. SEE SHEETS P-601 TO P-605 FOR

INFORMATION ON WHICH FOUNTAINS HAVE EXISTING FILTERS.

ADA WATER FOUNTAIN AND CONNECTED CHILLER EXISTING TO REMAIN.

CONTRACTOR TO CAP CHILLER INLET AND OUTLET TO KEEP FREE OF DUST

DURING CONSTRUCTION.

FOR EXISTING WATER FOUNTAINS THAT ARE HARDWIRED, RETAIN EXISTING

SWITCH, CIRCUIT, AND CONDUIT IN GENERAL AREA FOR REUSE. REFER TO

SHEET E-001 FOR ADDITIONAL INFORMATION.

FOR EXISTING WATER FOUNTAINS THAT HAVE RECEPTACLES, DISCONNECT

WATER FOUNTAIN, RETAIN EXISTING RECEPTACLE, CIRCUIT, AND CONDUIT

FOR REUSE. REFER TO SHEET E-001 FOR ADDITIONAL INFORMATION.

D5

TYPICAL FOR WATER FOUNTAIN GROUPING

211A-B, 212A-B, 213A-B, 215A-B, 216A-B, 217AA-

AB, & 217BA-BB

0 2' 4' 8'

0 1' 2' 4'

0 2' 4' 8'

0 1' 2' 4'

0 2' 4' 8'

0 1' 2' 4'

0 2' 4' 8'

0 1' 2' 4'

TYPICAL FOR WATER FOUNTAIN GROUPING

100A-B, 218A-B, 220A-B, 222A-B, 226A-B, 236A-B, 238A-B, 240A-B, 242A-B, 256A-B, 258A-B, 259A-B, 260A-B, 263A-B, 268A-B, 269A-B, 273, 275A-B, 281A-B, 282A-B, 284A-B, & 301A- B, 323A-B, 325A-B, 328A-B, & 416A-B

R3

D6

CONTRACTOR TO CONNECT 1/2" COLD WATER TO CHILLER INLET. CONNECT

COLD WATER OUTLET TO THE CONNECTIONS OF THE FOUNTAIN AND BOTTLE

FILLER AS SHOWN IN DETAIL 1 ON SHEET P-501.

CONTRACTOR TO CONNECT NEW 1-1/2" SANITARY LINE FROM BOTTLE FILLER

TO EXISTING 2" SANITARY LINE AS SHOWN.

CONTRACTOR TO INSTALL NEW BOTTLE FILLER AS INSTRUCTED BY

MANUFACTURER - INCLUDING THE NEW ADA FOUNTAIN UPPER PANEL,

LOWER PANEL, AND BOTTLE FILLER FRAME.

D7

SCALE: 1/4" = 1'-0"9

TYPICAL DOUBLE WATER FOUNTAIN - LEFT HAND

DRAINAGE DEMOLITION PLAN - EXISTING ELKAY

OR HALSEY-TAYLOR FOUNTAIN

SCALE: 1/2" = 1'-0"10

TYPICAL DOUBLE WATER FOUNTAIN - LEFT HAND

DRAINAGE DEMOLITION SECTION - EXISTING

ELKAY OR HALSEY-TAYLOR FOUNTAIN

SCALE: 1/4" = 1'-0"11

TYPICAL DOUBLE WATER FOUNTAIN - LEFT HAND

DRAINAGE RENOVATION PLAN - EXISTING ELKAY

OR HALSEY-TAYLOR FOUNTAIN

SCALE: 1/2" = 1'-0"12

TYPICAL DOUBLE WATER FOUNTAIN - LEFT HAND

DRAINAGE RENOVATION SECTION - EXISTING

ELKAY OR HALSEY-TAYLOR FOUNTAIN

TYPICAL FOR WATER FOUNTAIN GROUPING

214A-B, 237A-B, 239A-B, 241A-B, & 243A-B

0 2' 4' 8'

0 1' 2' 4'

0 2' 4' 8'

0 1' 2' 4'

D8

D3 D5

D1

D7

D6

2" VENT

1 1/4" SAN

1 1/4" SAN

1/2" CW

3/8" CW

D8 D9

R3

R1

R2

R4

1 1/4" SAN

1 1/2" SAN

2" VENT

1/2" CW

1/2" CW

D7

D3

D3

D1

D5

D6

2" VENT 1/2" CW

1 1/4" SAN

1 1/4" SAN

2" SAN

2" SAN

3/8" CW

D8 D9

R1

R2

R3

R4

R1

2" VENT 1/2" CW

2" SAN

1 1/4" SAN

1 1/2" SAN

R2

R3

R2

2" SAN

2" VENT

1/2" CW

1 1/4" SAN

1 1/2" SAN

2" SAN

2" VENT

1/2" CW1 1/2" SAN

D2

D4

D5

D6D9D8

1 1/2" SAN

2" VENT1/2" CW

1 1/2" SAN

1 1/2" SAN

2" SAN

2" SAN

D6

D4

D5

D2

D8 D9 D4

D4

D4

2" SAN

2" VENT1/2" CW

1 1/2" SAN

R5

R1

R2

R3

R3

1 1/4" SAN

1/2" CW

2" VENT

1 1/2" SAN

1 1/2" SAN

1/2" CW

2" VENT

1/2" CW

2" SAN

1 1/2" SAN

1 1/2" SAN

2" SAN

1/2" CW

D3

D4 D9

D6 D9

D2

D2

1/2" CW

2" VENT

1 1/2" SAN 1 1/4" SAN

1/2" CW

1 1/4" SAN

2" SAN

2" SAN

1 1/2" SAN

2" VENT

1/2" CW

1/2" CW

R4

R2

R5

R5

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :0

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

ENLARGED

PLUMBING PLANS

P-203

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

TYPICAL FOR WATER FOUNTAIN GROUPING

232A-B & 277A-B

SCALE: 1/4" = 1'-0"1

TYPICAL DOUBLE WATER FOUNTAIN -CENTER

DRAINAGE DEMOLITION PLAN - EXISTING OTHER

FOUNTAIN

SCALE: 1/4" = 1'-0"3

TYPICAL DOUBLE WATER FOUNTAIN -CENTER

DRAINAGE RENOVATION PLAN - EXISTING OTHER

FOUNTAIN

1. REFER TO PLUMBING GENERAL NOTES ON SHEET P-001.

2. REFER TO SPECIFICATIONS.

3. PROVIDE NEW SHUT-OFF BALL VALVE IN COLD WATER LINE AT ALL FOUNTAIN

LOCATIONS.

GENERAL SHEET NOTES

SCALE: 1/2" = 1'-0"2

TYPICAL DOUBLE WATER FOUNTAIN - CENTER

DRAINAGE DEMOLITION PLAN - EXISTING OTHER

FOUNTAIN

SCALE: 1/2" = 1'-0"4

TYPICAL DOUBLE WATER FOUNTAIN - CENTER

DRAINAGE RENOVATION SECTION - EXISTING

OTHER FOUNTAIN

0 2' 4' 8'

0 1' 2' 4'

0 2' 4' 8'

0 1' 2' 4'

RENO SHEET KEYNOTES

R1

DEMO SHEET KEYNOTES

D1

D2

D3

D4

R2

CONTRACTOR SHALL DEMOLISH EXISTING COMBINATION STANDARD HEIGHT

AND STANDARD-ADA PAIRED FOUNTAIN.

CONTRACTOR SHALL DEMOLISH EXISTING STANDARD HEIGHT FOUNTAIN AND

CONNECTED CHILLER. ADA WATER FOUNTAIN EXISTING TO REMAIN.

CONTRACTOR TO CAP CHILLER INLET AND OUTLET TO KEEP FREE OF DUST

DURING CONSTRUCTION.

CONTRACTOR TO DISCONNECT EXISTING 2" SANITARY AND VENT PIPING AS

SHOWN TO ALLOW FOR NEW BOTTLE FILLER OUTLET LOCATION AT 23-5/16"

A.F.F. AND A PIPE SLOPING OF 1/4" PER FOOT TO EXISTING SANITARY DRAIN

LOCATION.

CONTRACTOR TO DISCONNECT EXISTING 2" SANITARY AND VENT PIPING AS

SHOWN TO ALLOW FOR NEW BOTTLE FILLER OUTLET LOCATION AT 24-27/32"

A.F.F. AND A PIPE SLOPING OF 1/4" PER FOOT TO EXISTING SANITARY DRAIN

LOCATION.

CONTRACTOR TO DISCONNECT EXISTING 3/8" AND 1/4" COLD WATER FLEX

PIPING AFTER THE SHUT OFF VALVE AND TO BOTH WATER FOUNTAINS AS

SHOWN.

CONTRACTOR SHALL DEMOLISH EXISTING WATER FOUNTAIN ASSEMBLY,

INCLUDING UPPER PANEL, LOWER PANEL, AND FOUNTAIN FRAMES.

IF THE DRINKING FOUNTAIN HAS AN EXISTING WATER FILTER, CONTRACTOR

TO REMOVE WATER FILTER. SEE SHEETS P-601 TO P-605 FOR INFORMATION

ON WHICH FOUNTAINS HAVE EXISTING FILTERS.

FOR EXISTING WATER FOUNTAINS THAT ARE HARDWIRED, DISCONNECT

EXISTING WATER FOUNTAIN FOR REMOVAL. RETAIN EXISTING SWITCH,

CIRCUIT, AND CONDUIT IN GENERAL AREA FOR REUSE. REFER TO SHEETS

E-001 FOR ADDITIONAL INFORMATION.

FOR EXISTING WATER FOUNTAINS THAT HAVE RECEPTACLES, DISCONNECT

WATER FOUNTAIN, RETAIN EXISTING RECEPTACLE, CIRCUIT, AND CONDUIT

FOR REUSE. REFER TO SHEET E-001 FOR ADDITIONAL INFORMATION.

D5

R3

D6

CONTRACTOR TO CONNECT 1/2" COLD WATER TO CHILLER INLET. CONNECT

COLD WATER OUTLET TO THE CONNECTIONS OF THE FOUNTAIN AND BOTTLE

FILLER AS SHOWN IN DETAIL 1 ON SHEET P-501.

CONTRACTOR TO CONNECT NEW 1-1/2" SANITARY LINE FROM BOTTLE FILLER

TO EXISTING 2" SANITARY LINE AS SHOWN.

CONTRACTOR TO CONNECT NEW 1-1/4" SANITARY LINE FROM WATER

FOUNTAIN TO EXISTING 2" SANITARY LINE AS SHOWN.

CONTRACTOR TO INSTALL NEW BOTTLE FILLER AND WATER FOUNTAIN AS

INSTRUCTED BY MANUFACTURER.

CONTRACTOR TO CAP EXISTING SANITARY TEE.

D7

R4

D8

SCALE: 1/4" = 1'-0"7

TYPICAL DOUBLE WATER FOUNTAIN - RIGHT HAND

DRAINAGE RENOVATION PLAN - EXISTING OASIS

FOUNTAIN

SCALE: 1/4" = 1'-0"5

TYPICAL DOUBLE WATER FOUNTAIN - RIGHT HAND

DRAINAGE DEMOLITION PLAN - EXISTING OASIS

FOUNTAIN

SCALE: 1/2" = 1'-0"6

TYPICAL DOUBLE WATER FOUNTAIN - RIGHT HAND

DRAINAGE DEMOLITION PLAN - EXISTING OASIS

FOUNTAIN

SCALE: 1/2" = 1'-0"8

TYPICAL DOUBLE WATER FOUNTAIN - RIGHT HAND

DRAINAGE RENOVATION PLAN - EXISTING OASIS

FOUNTAIN

SCALE: 1/4" = 1'-0"9

TYPICAL DOUBLE WATER FOUNTAIN - LEFT HAND

DRAINAGE DEMOLITION PLAN - EXISTING OASIS

FOUNTAIN

SCALE: 1/2" = 1'-0"10

TYPICAL DOUBLE WATER FOUNTAIN - LEFT HAND

DRAINAGE DEMOLITION PLAN - EXISTING OASIS

FOUTAIN

SCALE: 1/4" = 1'-0"11

TYPICAL DOUBLE WATER FOUNTAIN - LEFT HAND

DRAINAGE RENOVATION PLAN - EXISTING OASIS

FOUNTAIN

SCALE: 1/2" = 1'-0"12

TYPICAL DOUBLE WATER FOUNTAIN - LEFT HAND

DRAINAGE RENOVATION SECTION - EXISTING

OASIS FOUNTAIN

0 2' 4' 8'

0 2' 4' 8'

0 1' 2' 4'

0 1' 2' 4'

TYPICAL FOR WATER FOUNTAIN GROUPING

202B & 312B

TYPICAL FOR WATER FOUNTAIN GROUPING

206A-B, 208A-B, 313A-B, 320AAU-BAU (CHAPIN THEATER)

0 2' 4' 8'

0 2' 4' 8'

0 1' 2' 4'

0 1' 2' 4'

D9

R5

R4

R2

R5

2" VENT

1/2" CW

1 1/2" SAN

1 1/2" SAN

D2

D1

D3

D4 D5 D6

2" VENT

1 1/2" SAN

1/2" CW

1 1/2" SAN

R4 R1

R2

1/2" CW

2" VENT

1 1/2" SAN

1 1/2" SAN

2" SAN

D2 D4

D5 D6

D3

D1

D2

1 1/2" SAN

2" SAN

2" VENT

1/2" CW

1 1/2" SAN

R5

R1

R2

R4

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :0

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

ENLARGED

PLUMBING PLANS

P-204

07/10/2023

22G0120

Designer

Author

100% CD

1. REFER TO PLUMBING GENERAL NOTES ON SHEET P-001.

2. REFER TO SPECIFICATIONS.

3. PROVIDE NEW SHUT-OFF BALL VALVE IN COLD WATER LINE AT ALL FOUNTAIN

LOCATIONS.

GENERAL SHEET NOTES

SCALE: 1/4" = 1'-0"1

TYPICAL DOUBLE WATER FOUNTAIN - CENTER

DRAINAGE DEMOLITION PLAN - EXISTING OASIS

FOUNTAIN

SCALE: 1/4" = 1'-0"3

TYPICAL DOUBLE WATER FOUNTAIN - CENTER

DRAINAGE RENOVATION PLAN - EXISTING OASIS

FOUNTAIN

SCALE: 1/2" = 1'-0"2

TYPICAL DOUBLE WATER FOUNTAIN - CENTER

DRAINAGE DEMOLITION PLAN - EXISTING OASIS

FOUNTAIN

SCALE: 1/2" = 1'-0"4

TYPICAL DOUBLE WATER FOUNTAIN - CENTER

DRAINAGE RENOVATION PLAN - EXISTING OASIS

FOUNTAIN

TYPICAL FOR WATER FOUNTAIN GROUPING

204A-B, 230A-B, 234A-B, 278A-B, & 415A-B

RENO SHEET KEYNOTES

R1

DEMO SHEET KEYNOTES

D1

D2

D3

D4

R2

CONTRACTOR SHALL DEMOLISH EXISTING STANDARD HEIGHT FOUNTAIN AND

CONNECTED CHILLER. ADA WATER FOUNTAIN EXISTING TO REMAIN.

CONTRACTOR TO CAP CHILLER INLET AND OUTLET TO KEEP FREE OF DUST

DURING CONSTRUCTION.

CONTRACTOR TO DISCONNECT EXISTING 2" SANITARY AND VENT PIPING AS

SHOWN TO ALLOW FOR NEW BOTTLE FILLER OUTLET LOCATION AT 24-27/32"

A.F.F. AND A PIPE SLOPING OF 1/4" PER FOOT TO EXISTING SANITARY DRAIN

LOCATION.

CONTRACTOR TO DISCONNECT EXISTING 3/8" AND 1/4" COLD WATER FLEX

PIPING AFTER THE SHUT OFF VALVE AND TO BOTH WATER FOUNTAINS AS

SHOWN.

CONTRACTOR SHALL DEMOLISH EXISTING WATER FOUNTAIN ASSEMBLY,

INCLUDING UPPER PANEL, LOWER PANEL, AND FOUNTAIN FRAMES.

FOR EXISTING WATER FOUNTAINS THAT ARE HARDWIRED, DISCONNECT

EXISTING WATER FOUNTAIN FOR REMOVAL. RETAIN EXISTING SWITCH,

CIRCUIT, AND CONDUIT IN GENERAL AREA FOR REUSE. REFER TO SHEETS

E-001 FOR ADDITIONAL INFORMATION.

FOR EXISTING WATER FOUNTAINS THAT HAVE RECEPTACLES, DISCONNECT

WATER FOUNTAIN, RETAIN EXISTING RECEPTACLE, CIRCUIT, AND CONDUIT

FOR REUSE. REFER TO SHEET E-001 FOR ADDITIONAL INFORMATION.

D5

R3

CONTRACTOR TO CONNECT 1/2" COLD WATER TO CHILLER INLET. CONNECT

COLD WATER OUTLET TO THE CONNECTIONS OF THE FOUNTAIN AND BOTTLE

FILLER AS SHOWN IN DETAIL 1 ON SHEET P-501.

CONTRACTOR TO CONNECT NEW 1-1/2" SANITARY LINE FROM BOTTLE FILLER

TO EXISTING 2" SANITARY LINE AS SHOWN.

CONTRACTOR TO CONNECT NEW 1-1/4" SANITARY LINE FROM WATER

FOUNTAIN TO EXISTING 2" SANITARY LINE AS SHOWN.

CONTRACTOR TO INSTALL NEW BOTTLE FILLER AND WATER FOUNTAIN AS

INSTRUCTED BY MANUFACTURER.

CONTRACTOR TO CAP EXISTING SANITARY TEE.

R4

R5

D6

TO BUBBLER

TO BOTTLE

FILLER

CHILLER OUTLET

STRAINER

CHILLER INLET

NOTES:

1. STRAINER IS PROVIDED BY MANUFACTURER FOR UNITS WITH NEW CHILLERS.

2. CONTRACTOR TO PROVIDE NEW STRAINERS FOR WATER FOUNTAINS BEING

REPLACED WITH RETROFITTED BOTTLE FILLERS. SEE SHEETS P-601 TO P-606

FOR INFORMATION ON WHICH UNITS ARE BEING RETROFITTED.

No. 90175

STATE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :1

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

DETAILS

P-501

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

SCALE:NTS1

DOMESTIC WATER PIPING DIAGRAM

SCALE:NTS2

EXISTING WET VENT EXAMPLE DETAIL

SCALE:NTS3

EXISTING RIGHT HAND DRAINAGE EXAMPLE

DETAIL

SCALE:NTS4

EXISTING LEFT HAND DRAINAGE EXAMPLE DETAIL

SCALE:NTS5

EXISTING CENTER DRAINAGE EXAMPLE DETAIL

SCALE:NTS6

EXISTING QUAD EXAMPLE DETAIL

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :1

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

SCHEDULES

P-601

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

WF 216A High Restroom 216M in Hall A3 (Lobby

Side) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/1-4

WF 215A High Restroom 215F in Hall A3 (Lobby

Side) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler.

115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/1-4

WF 214A High Restroom 214M in Hall A2 (Lobby

Side) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler.

115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/9-12

WF 213A High Restroom 213F in Hall A2 (Lobby

Side) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler.

115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/1-4

WF 212A High Restroom 212M in Hall A1 (Lobby

Side) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler.

115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/ 1-4

WF 211A High Restroom 211F in Hall A1 (Lobby

Side) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/

1Ph.

P-202/1-4

WF 208B High Restroom 208M Next to FedEx 2" 1-1/2" 1-1/2" 1/2" Oasis

Aqua Pointe Contactless Electronic Bottle Filler

MW8EBF Stainless Steel N/A

Aqua Pointe contactless electronic bottle filler. 8 GPH of 50F drinking water with chiller.

Antimicrobial coating, filter monitor, bottle counter, hands free, laminar flow electronic bottle filler. 115V/ 60 Hz/1 Ph. In-wall mount.

P-203/9-12

WF 206B High Restroom 206M in Central Lobby next to Food Court C 2" 1-1/2" 1-1/2" 1/2"

Oasis Aqua Pointe Contactless

Electronic Bottle Filler MW8EBF Stainless Steel N/A

Aqua Pointe contactless electronic bottle filler. 8 GPH of 50F drinking water with chiller.

Antimicrobial coating, filter monitor, bottle counter, hands free, laminar flow electronic bottle filler. 115V/ 60 Hz/1 Ph. In-wall mount.

P-203/9-12

WF 204B High Restroom 204M Next to Meeting

Room W207A 2" 1-1/2" 1-1/2" 1/2"

Oasis Aqua Pointe Contactless

Electronic Bottle Filler MWEBF Stainless Steel N/A

Aqua Pointe contactless electronic bottle filler.

Non-refrigerated drinking water. Antimicrobial coating, filter monitor, bottle counter, hands free, laminar flow electronic bottle filler. 115V/ 60 Hz/1

Ph. In-wall mount.

P-204/1-4

WF 202B High Restroom 202M Next to Meeting

Room W204C 2" 1-1/2" 1-1/2" 1/2"

Oasis Aqua Pointe Contactless

Electronic Bottle Filler MWEBF Stainless Steel N/A

Aqua Pointe contactless electronic bottle filler.

Non-refrigerated drinking water. Antimicrobial coating, filter monitor, bottle counter, hands free, laminar flow electronic bottle filler. 115V/ 60 Hz/1

Ph. In-wall mount.

P-203/5-8

WF 106A High Restroom 106M Bottom of Ramp

Next to B Reg 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-201/5-8

WF 104A High Restroom 104M Between Food

Court A & B 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-201/5-8

WF 103A High Restroom 103F in 100 Meeting

Room Level 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-201/1-4

WF 102A High Restroom 102M in 100 Meeting

Room Level 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-201/1-4

WF 100A High Restroom 100M Next to Reg A

(West Side of Building) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/5-8

Equipment Name Area Served Soil or Waste

Min.

Vent Trap

Cold Water Manuf. / Make Model No. Color Accessories (Provide & Install) Remarks Detail Reference

WEST BUILDING WATER FOUNTAIN REPLACEMENT SCHEDULE

OF

P A

UL

L. HOLLOW

A

YL I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

This item has been digitally signed and sealed by Paul L Holloway, PE on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:4 :1

P

M

C

U s e rs

\w ilk

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R lw ilk L N

Q G

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

SCHEDULES

P-602

07/10/2023

22G0120

LMW

LMW

PLH

100% CD

WF 239A High Restroom 239F in Hall A3 (Dock

Side) Dock 12 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/ 9-12

WF 238A High Restroom 238M in Hall A3 (Dock

Side) Dock 12 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/ 5-8

WF 237A High Restroom 237F in Hall A4 (Dock

Side) Dock 11 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/ 9-12

WF 236A High Restroom 236M in Hall A4 (Dock

Side) Dock 11 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/ 5-8

WF 234B High Restroom 234M in Hall B1 (Dock

Side) Dock 10 2" 1-1/2" 1-1/2" 1/2"

Oasis Aqua Pointe Contactless

Electronic Bottle Filler MW8EBF Stainless Steel N/A

Aqua Pointe contactless electronic bottle filler. 8 GPH of 50F drinking water with chiller.

Antimicrobial coating, filter monitor, bottle counter, hands free, laminar flow electronic bottle filler. 115V/ 60 Hz/1 Ph. In-wall mount.

P-204/1-4

WF 232B High Restroom 232M in Hall B3 (Dock

Side) Dock 9 2" 1-1/2" 1-1/2" 1/2"

Elkay ADA Height ezH2O

SwirlFlo fountain

WF 232A Low Restroom 232M in Hall B3 (Dock

Side) Dock 9 2" 1-1/2" 1-1/4" 1/2"

Elkay ezH2O bottle filling station

EZWS-SFGRN8K Stainless Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station and SwirlFlo single fountain. 8 GPH of 50F drinking water.

Antimicrobial coating, Green Ticker, hands free, laminar flow electronic bottle filler. 115V/ 60 Hz/1

Ph. In-wall mount.

P-203/ 1-4

WF 230B High Restroom 230M in Hall B4 (Dock

Side) Dock 8 2" 1-1/2" 1-1/2" 1/2"

Oasis Aqua Pointe Contactless

Electronic Bottle Filler MW8EBF Stainless Steel N/A

Aqua Pointe contactless electronic bottle filler. 8 GPH of 50F drinking water with chiller.

Antimicrobial coating, filter monitor, bottle counter, hands free, laminar flow electronic bottle filler. 115V/ 60 Hz/1 Ph. In-wall mount.

P-204/1-4

WF 226A High Restroom 226M in Hall C (Lobby

Side) under North Walkover 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF

Stainless

Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/ 5-8

WF 222A High Restroom 222M in Hall B4 (Lobby

Side) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF

Stainless

Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/ 5-8

WF 220A High Restroom 220M in Hall B2 (Lobby

Side) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF

Stainless

Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/ 5-8

WF 218A High Restroom 218M in Hall B1 (Lobby

Side) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF

Stainless

Steel Access Panel for Bi-level Fountains:

ACCESS12X38-5

ezH2O bottle filling station retro-fit kit with antimicrobial coating, green ticker, hands free, laminar flow electronic bottle filler. 115V/60 Hz/ 1Ph. Existing unit has filter to be removed per enlarged view notes.

P-202/ 5-8

WF 217BA High Restroom 217F (B) in Hall A4 (Lobby

Side) 2" 1-1/2" 1-1/2" 1/2"

Elkay ezH2O bottle filling station Retro-Fit Kit

EZWS-ERPB8-RF

Stainless

Steel Access Panel for Bi-level Fountains:

ACCESS12…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .