This document is a set of construction contract forms issued by the Seminole County Board of County Commissioners, containing 12 different standardized forms to be provided to contractors with their agreement. The forms include documents for various stages of a construction project, such as Application for Payment, Continuation Sheet, Change Order, Shop Drawing Submittals, Authorized Field Change, Certificates of Substantial and Final Completion, Contractor's Release, and various Waiver of Lien forms for both prime and subcontractors. These forms are designed to facilitate transparent documentation, payment processing, and project progression tracking throughout the duration of a construction project.
The forms cover critical administrative and financial aspects of construction contracts, including progress and final payments, change order management, work completion certification, and lien release mechanisms. Each form provides a structured template for documenting key project milestones, financial transactions, and legal releases. The documents include spaces for detailed information such as contract numbers, project names, payment amounts, and signatures from contractors, subcontractors, county representatives, and notaries. The forms are marked with a revision date of 100120 (October 1, 2020) and include a warning that any manipulation of these documents would be grounds for fraud and misrepresentation.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEMINOLE COUNTY BOARD OF COUNTY COMMISSIONERS
CONSTRUCTION FORMS
EXHIBIT TO THE AGREEMENT
TO BE PROVIDED TO THE CONTRACTOR WITH THE AGREEMENT
Application for Payment ..................................................................................................... C-01
Continuation Sheet for Application for Payment ................................................................. C-01 (2)
Change Order Form ............................................................................................................ C-02
Shop Drawing Submittals ................................................................................................... C-03
Authorized Field Change (AFC) ......................................................................................... C-04
Certificate of Substantial Completion ................................................................................ C-05
Certificate of Final Completion .......................................................................................... C-06
Contractor’s Release .......................................................................................................... C-07
Contractor’s Waiver of Lien (Partial) ................................................................................. C-08
Subcontractor’s Waiver of Lien (Partial) ........................................................................... C-09
Contractor’s Waiver of Lien (Final and Complete) ............................................................ C-10
Subcontractor’s Waiver and Release of Lien (Final) ........................................................ C-11
Consent of Surety to Final Payment .................................................................................. C-12
Any manipulations of these documents would be grounds for fraud and misrepresentation.
C-01 – Application for Payment (Rev 100120)
APPLICATION FOR PAYMENT
Contract for: _______________________________________ Payment Application No.: ____________
County Contract No.: _______________ CIP No.: __________
CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS
Total changes approved in previous months by County $ $
Total approved this month $ $
TOTAL $ $
NET CHANGES by Change Order $
1. ORIGINAL CONTACT SUM ………………………………………………………………. $ _________________
2. NET CHANGE BY CHANGE ORDER .…………………………………………………… $ _________________
3. CONTACT SUM TO DATE (Line 1 & Line 2) ……………………………………………. $ _________________
4. TOTAL COMPLETED AND STORED TO DATE.……………………………………….. $ _________________
5. RETAINAGE:
(a) ________ % of Completed Work ……………………………… $ _________________
(b) ________ % of Stored Material ……………………………… $ _________________
Total Retainage (Lines 5a + 5b, or Total in Column 1) ……………………………….. $ _________________
6. TOTAL EARNED LESS RETAINAGE .……………………………………………………. $ _________________
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT ……………………………………. $ _________________
(Line 6 from Prior Payment Application)
8. CURRENT PAYMENT DUE…………………………………………………………………. $ _________________
9. BALANCE TO FINISH INCLUDING RETAINAGE (Line 3 minus Line 6)………………. $ _________________
The undersigned Contractor certifies that (1) all previous payments for Work performed have been applied to discharge in full all obligations on the Contractor incurred in connection with Work covered by prior payment applications (1 through _____) under this Agreement; (2) all Materials and Equipment incorporated in the project are free and clear of liens, security interests and encumbrances; (3) all previous payments have been applied to pay in full, minus retainage, all amounts owed to its subcontractors and suppliers; (4) all information provided is true and accurate.
CONTRACTOR: ___________________________________ DATE: _______________
By: ________________________________ (Print) ___________________________ (Signature)
STATE OF FLORIDA
COUNTY OF
Sworn to (or affirmed) and subscribed before me by means of □ physical presence or □ online notarization, this day of ____________, 20___, by _______________________________________.(name of person making statement)
Signature of Notary Public – State of Florida Print/Type/Stamp Commissioned Name of Notary Public
Personally Known OR Produced Identification Identification Type: _______________________
COUNTY: In accordance with the Contract Documents, the undersigned recommend payment as presented.
Engineer: ____________________________________________ Date: _______________
Project Manager: ______________________________________ Date: _______________
APPLICATION DATE:
PERIOD TO:
PROJECT #
A B C D E F H I
MATERIALS
TOTAL
COMPLETED
% BALANCE RETAINAGE
FROM
PREVIOUS
PRESENTLY
STORED
AND STORED TO FINISH (IF VARIABLE
RATE)
APPLICATION NOT IN D OR E TO DATE (C - G)
(D + E) (D+E+F)
GRAND TOTALS
SEMINOLE COUNTY BOARD OF COUNTY COMMISSIONERS
Containing Contractor's signed certification is attached APPLICATION #:
WORK COMPLETED
G
UNIT SCHEDULED
VALUE
(original base bid value)
QTYITE
M #
CONTINUATION SHEET
DESCRIPTION OF WORK
THIS PERIOD (G / C)
APPLICATION AND CERTIFICATION FOR PAYMENT
C-01 (2) - Continuation Sheet - Application and Certification for Payment (Rev 100120)
C-01 (2) - Continuation Sheet - Application and Certification for Payment (Rev 100120)
C-02 - CHANGE ORDER FORM (Rev 100120)
CHANGE ORDER
CONSTRUCTION PROJECTS
CONTRACTOR: ________________________________________ Date: _________________
Contract No.: ____________________ Project Name: ___________________________________________________________
Change Order No.: _____________________ Work Order No.: (if applicable) _____________________
Original Contract / Work Order Amount: $ ________________
Amount prior to this Change Order, if different: $ ________________
Change Order Amount: Increase Decrease No Change $ ________________
Revised Contract / Work Order Amount including this Change Order: $ ________________
Change Order Time: Increase Decrease No Change ________________ Days
Date of Substantial Completion through this Change Order: ________________
Date of Final Completion through this Change Order: ________________
Waiver: This Change Order constitutes full and mutual accord and satisfaction for the adjustment of Contract / Work Order Price and Time as a result of increases or decreases in costs and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between the County and Contractor that the Change Order represents an equitable adjustment to the Agreement and that Contractor will waive all rights to file a contract claim of any nature on this Change Order. Execution of this Change Order constitutes Contractor’s acceptance and satisfaction that it is entitled to no more costs or time, direct, indirect, impact, etc., pursuant to this Change Order.
Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement not specifically changed by this Change Order; and it is expressly understood and agreed by the County and the Contractor that the approval of this Change Order will have no effect on the original Agreement other than matters expressly provided herein.
This Change Order _______ does or ______ does not involve changes to the design of the project, which would require the approval and signature of the Architect or Engineer of Record and County Project Manager.
County Project Manager: Architect / Engineer of Record: Contractor:
Name: _________________________ _____________________________ ____________________________
Address: _________________________ ______________________________ ____________________________
Sign: _________________________ ______________________________ ____________________________
Date: _________________________ ______________________________ ____________________________
PURCHASING AND CONTRACTS DIVISION:
Signature: __________________________________________ Date __________________________________ Procurement Administrator As authorized by Section 3.554, Seminole County Administrative Code
WITNESS: ______________________________________ WITNESS: ____________________________________
For Board approved Items: Meeting Date: _____________________ Item # ____________________
Seminole County Board of County Commissioners
C-03 - Shop Drawing Submittal (Rev 100120)
SHOP DRAWING SUBMITTALS
Date: ___________________________ Submittal #: ___________________
ENGINEER OF RECORD: CONTRACTOR:
Attention: __________________________ Project Manager
Project Name: ____________________________________________________________
Contract No.: ________________ CIP# _________ Contractor: ______________________
Item No.
Copies Description Previous
Submission No.
Specification
Section(s) Plan
Sheet No.
Contractor’s Authorized Representative: ___________________________________________
TO BE COMPLETED BY ENGINEER OF RECORD:
Item No.
Copies Resubmit
Yes No
Comments
Engineer of Record: _________________________ Date: __________________
C-04 - Authorized Field Change (AFC) (Rev. 100120)
AUTHORIZED FIELD CHANGE (AFC)
FIELD ORDER NO.:
AGREEMENT TITLE:
CONTRACT NO.:
CIP #:
CONTRACTOR:
ARCHITECT/ENGINEER:
AGREEMENT DATE:
CONTRACT DAY: ______ OF _____
Note: An AFC is not an instrument that amends the Contract Documents. This AFC issued by ENGINEER to CONTRACTOR authorizes minor variations in the Work and not a change in the Work. An AFC does not entitle CONTRACTOR to any adjustment in Contract Price or Contract Time. FINAL AS-BUILT PLANS WILL REFLECT
AFC.
I. Minor Variations Authorized:
II. Justification
III. Acknowledgements: Mutually agreed to by the CONTRACTOR and the COUNTY.
This AFC authorized by:
Includes ____ attachments:
ARCHITECT/ENGINEER
By: ________________________________________________
Date: __________________________
Receipt of this AFC:
Acknowledged By:
CONTRACTOR
By: ________________________________________________
Date: __________________________
2 Pages Form
C-05 - CERTIFICATE OF SUBSTANTIAL COMPLETION (Rev 100120)
CERTIFICATE OF SUBSTANTIAL COMPLETION
Construction Projects
Contractor: ___________________________________ Date: __________________
Contract No.: _____________ Project Name: ___________________________________
Master Agreement (if applicable): ___________________________________________________
CIP No.: ___________________________
This Certificate of Substantial Completion applies to all work under the Contract Documents or the following specified parts thereof:
To: ______________________________________________________ (Print) Architect/Engineer of Record
Contractor
The work to which this Certificate applies has been inspected by authorized representatives of CONTRACTOR, and ARCHITECT/ENGINEER, and that Work is hereby declared to be substantially completed in accordance with the Contract Documents on:
Date of Substantial Completion
A list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete and warrant all the Work in accordance with the Contract Documents. All items on the list shall be completed or corrected by CONTRACTOR within ________ calendar days of the above date of Substantial Completion.
C-05 - CERTIFICATE OF SUBSTANTIAL COMPLETION (Rev 100120)
This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR’s obligations to complete the Work in accordance with the Contract Documents, including “As-Built” drawings.
Executed by ARCHITECT/ENGINEER on the _______ day of _________________, 20____
ARCHITECT/ENGINEER:
Print Name
Signature
Accepted by CONTRACTOR on the _______ day of _________________, 20____
CONTRACTOR:
Executed by County’s PROJECT MANAGER on the _______ day of ________________, 20____
PROJECT MANAGER:
C-06 - CERTIFICATE OF FINAL COMPLETION (Rev 100120)
CERTIFICATE OF FINAL COMPLETION
Construction Projects
Contractor: ___________________________________ Date: __________________
Contract No.: _____________ Project Name: ___________________________________
Master Agreement (if applicable): ___________________________________________________
CIP No.: ___________________________
This Certificate of Final Completion applies to all work under the Contract Documents.
Architect/Engineer of Record
Contractor
To: Seminole County Board of County Commissioners or Designee
The Work to which this Certificate applies has been inspected on ________________ (date) by authorized representatives of CONTRACTOR, and ARCHITECT/ENGINEER, and that Work is hereby declared to be finally completed in accordance with the Contract Documents on:
Date of Final Completion
C-06 - CERTIFICATE OF FINAL COMPLETION (Rev 100120)
This Final Completion Certificate constitutes an acceptance of Work excepting latent defects, warranty work, maintenance, and other post Final Completion obligations of the CONTRACTOR under the Contract Documents.
Executed by ARCHITECT/ENGINEER on the _______ day of _________________, 20____
ARCHITECT/ENGINEER:
Accepted by CONTRACTOR on the _______ day of _________________, 20____
CONTRACTOR:
Accepted by SEMINOLE COUNTY on the _______ day of ________________, 20____
WITNESSES: BOARD OF COUNTY COMMISSIONERS
SEMINOLE COUNTY, FLORIDA
Procurement Administrator
As authorized by Section 3.554, Seminole County Administrative Code
C-07 - CONTRACTOR’S RELEASE (Rev 100120)
CONTRACTOR’S RELEASE
This Release must be submitted simultaneously with the Contractor’s request for Final Payment and Subcontractor Affidavits.
Agreement Title: County Contract No.:
Construction Contract # OR Master Services Agreement # & Work Order #
Contractor: ______ CIP No.:
BEFORE ME, the undersigned authority in said County and State, appeared
(Name of Affiant) who, being duly sworn and personally know to me, deposes and says that he/she is ___________________ (Title of Affiant) of ___ (Full Legal Company Name), a company and/or corporation authorized to do business under the laws of Florida, which is the CONTRACTOR on (Agreement Title), located in Seminole County, Florida, dated the _____ day of ___________, 20___, that the deponent is duly authorized to make this affidavit by resolution of the Board of Directors of said company and/or corporation; that deponent knows of their own knowledge that said Agreement has been complied with in every particular by said CONTRACTOR and that all parts of the Work have been approved by the COUNTY’s Architect/Engineer; that there are no bills remaining unpaid for labor, Materials, or otherwise, in connection with said Agreement and Word, and that there are no suits pending against the undersigned as CONTRACTOR or anyone in connection with the Work done and Materials furnished or otherwise under this Agreement.
Affiant further says that the final estimate in the amount of $ _______________ which has been submitted to the COUNTY simultaneously with the making of this affidavit constitutes all claims and demands against the COUNTY on account of said Agreement or otherwise, and that acceptance of the sum specified in said final estimate in the amount of $ ________________ will operate as a full and final release and discharge of the COUNTY from any further claims, demands or compensation by CONTRACTOR under the above Agreement.
Deponent further agrees that all guarantees under this Agreement shall start and be in full force from the date of this release as spelled out in the Contract Documents.
Affiant
State of Florida County of
Sworn to (or affirmed) and subscribed before me by means of □ physical presence OR □ online notarization, this __ day of , 20 , by .
(Name of Affiant)
Signature of Notary Public – State of Florida
Print, Type, Stamp Commissioned Name of Notary Public
Personally Known OR Produced Identification
Type of Identification Produced:
PRIME CONTRACTOR’S PARTIAL WAIVER AND RELEASE OF SEMINOLE COUNTY UPON
PROGRESS PAYMENT
Agreement Title: ______________
Seminole County Contract No:_________
Project Name: ___________________
Prime Contractor: ___________________
Payment Bond Surety: ___________________
Bond Number:___________________
Address of Payment Bond Surety: ___________________
STATE OF FLORIDA
COUNTY OF:____________
____________________________ (Affiant), being duly sworn according to law, deposes and states that he/she is the _______________________ (Title) of _______________________(Full Legal Name of Prime Contractor) under contract with Seminole County for the _________________ (Agreement Title) and that he/she is authorized to and does execute this partial Waiver and Release on behalf of the Prime Contractor.
The undersigned, in consideration of the progress payment in the amount of $_________, hereby waives and releases all claims against Seminole County, Florida for labor, services, and/or materials furnished to Seminole County, Florida on the above listed project through __________(Date).
IN WITNESS WHEREOF, the undersigned has signed this instrument this ____ day of _________, 20____.
Signature of Prime Contractor’s Representative Title
STATE OF FLORIDA
COUNTY OF:____________
The Foregoing instrument was acknowledged before me by means of � physical presence or � online notarization, this day of _________, 20____ , by___________as ___________ for _________________ .
(Signature of Notary Public - State of Florida)
(Print, Type, or Stamp Commissioned Name of Notary Public)
Personally Known ___ OR Produced Identification ___
Type of Identification Produced ___________________
SUB-CONTRACTOR’S / VENDOR’S PARTIAL WAIVER AND RELEASE OF SEMINOLE COUNTY,
PRIME CONTRACTOR, AND PAYMENT BOND SURETY UPON PROGRESS PAYMENT
Agreement Title: ______________
Seminole County Contract No:_________
Project Name: ___________________
Prime Contractor: ___________________
Payment Bond Surety: ___________________
Bond Number:___________________
Address of Payment Bond Surety: ___________________
STATE OF FLORIDA
COUNTY OF:____________
____________________________ (Affiant), being duly sworn according to law, deposes and states that he/she is the _______________________ (Title) of _______________________(Full Legal Name of Subcontractor/ Vendor) to the above Prime Contractor under contract with Seminole County for the _________________ (Agreement Title) and that he/she is authorized to and does execute this partial Waiver and Release on behalf of the Subcontractor/Vendor.
The undersigned, in consideration of the progress payment in the amount of $_________, hereby waives and releases all claims against Seminole County, Florida, Prime Contractor, and the Payment Bond Surety for labor, services, and/or materials furnished to Prime Contractor on the above listed project through __________(Date).
IN WITNESS WHEREOF, the undersigned has signed this instrument this ____ day of _________, 20____.
Signature of Subcontractor’s/Vendor’s Representative Title
STATE OF FLORIDA
COUNTY OF:____________
The Foregoing instrument was acknowledged before me by means of � physical presence or � online notarization, this day of _________, 20____ , by___________as ___________ for _________________ .
(Signature of Notary Public - State of Florida)
(Print, Type, or Stamp Commissioned Name of Notary Public)
PRIME CONTRACTOR’S FINAL WAIVER AND RELEASE OF SEMINOLE COUNTY UPON FINAL
PAYMENT
Agreement Title: ______________
Seminole County Contract No:_________
Project Name: ___________________
Prime Contractor: ___________________
Payment Bond Surety: ___________________
Bond Number:___________________
Address of Payment Bond Surety: ___________________
STATE OF FLORIDA
COUNTY OF:____________
____________________________ (Affiant), being duly sworn according to law, deposes and states that he/she is the _______________________ (Title) of _______________________(Full Legal Name of Prime Contractor) to the above contract with Seminole County for the _________________ (Agreement Title) and that he/she is authorized to and does execute this Final Waiver and Release on behalf of the Prime Contractor.
The undersigned, in consideration of the final payment in the amount of $_________, hereby finally waives and releases all claims against Seminole County, Florida for labor, services, and/or materials furnished to Seminole County, Florida on the above listed project.
IN WITNESS WHEREOF, the undersigned has signed this instrument this ____ day of _________, 20____.
Signature of Prime Contractor’s Representative Title
STATE OF FLORIDA
COUNTY OF:____________
The Foregoing instrument was acknowledged before me by means of � physical presence or � online notarization, this day of _________, 20____ , by___________as ___________ for _________________ .
(Signature of Notary Public - State of Florida)
(Print, Type, or Stamp Commissioned Name of Notary Public)
SUB-CONTRACTOR’S / VENDOR’S FINAL WAIVER AND RELEASE OF SEMINOLE COUNTY AND
PAYMENT BOND SURETY UPON FINAL PAYMENT
Agreement Title: ______________
Seminole County Contract No:_________
Project Name: ___________________
Prime Contractor: ___________________
Payment Bond Surety: ___________________
Bond Number:___________________
Address of Payment Bond Surety: ___________________
STATE OF FLORIDA
COUNTY OF:____________
____________________________ (Affiant), being duly sworn according to law, deposes and states that he/she is the _______________________ (Title) of _______________________(Full Legal Name of Subcontractor/ Vendor) to the above Prime Contractor under contract with Seminole County for the _________________ (Agreement Title) and that he/she is authorized to and does execute this Waiver and Release on behalf of the Subcontractor/Vendor.
The undersigned, in consideration of the final payment in the amount of $_________, hereby finally waives and releases all claims against Seminole County, Florida, Prime Contractor, and the Payment Bond Surety for labor, services, and/or materials furnished to Prime Contractor on the above listed project.
IN WITNESS WHEREOF, the undersigned has signed this instrument this ____ day of _________, 20____.
Signature of Subcontractor’s/Vendor’s Representative Title
STATE OF FLORIDA
COUNTY OF:____________
The Foregoing instrument was acknowledged before me by means of � physical presence or � online notarization, this day of _________, 20____ , by___________as ___________ for _________________ .
(Signature of Notary Public - State of Florida)
(Print, Type, or Stamp Commissioned Name of Notary Public)
C-12 - CONSENT OF SURETY TO FINAL PAYMENT (Rev 100120)
CONSENT OF SURETY TO FINAL PAYMENT
Agreement Title: County Contract No.: ________________________________
Construction Contract # OR Master Services Agreement # & Work Order #
Contractor: ____________________________________ CIP No.:______________________________
We, (Name of Surety), having heretofore executed Performance and
Payment Bonds for the above named Contractor covering the Project referenced above in the sum of
Dollars ($ ) hereby agree that the County may make full payment of the final estimate, including the retained percentage, to said Contractor. The Surety concurs that full payment to the Contractor is appropriate and the Surety expressly releases the County from all liability to Surety resulting from full payment to the Contractor.
It is fully understood that the granting of the right to the County to make payment of the final estimate to the Contractor and/or his assigns shall in no way relieve this Surety of its obligations under its bonds as set forth in the Contract Documents and Bonds pertaining to the above referenced Project. By execution of this Consent, Surety specifically acknowledges that, in the event it is discovered that the Contractor has failed to pay any subcontractors under this Project, the Surety will make such payments as are due, either in whole or in part, and hold the County harmless therefrom.
IN WITNESS WHEREOF, (Name of Surety) has caused this instrument to be executed on behalf of its and its duly authorized attorney-in-fact, and its corporate seal shall be affixed, on this _____ day of ___________________, 20 ___.
Signature – Surety’s Representative Signature – Attorney-in-Fact
*Power of Attorney must be attached if signed by Attorney-in-Fact
Printed Name & Title
STATE OF FLORIDA
COUNTY OF:
The Foregoing instrument was acknowledged before me by means of □ physical presence OR □ online notarization, on this day of , 20 , by (Name of Affiant), who is personally known to me or who has produced as identification.
Signature of Notary Public – State of Florida
Printed/Typed/Stamped Commissioned Name of Notary Public
Title or Rank
Serial Number (if any)
File details come from the government source that posted it. Updated .