Consolidated_SOW__San_Diego_Landscaping_FY27.docx

DOCX document 30 KB Posted

Attached to
UPDATE 01 SEPTEMBER 2026: Grounds Maintenance Services - USCG SECTOR SAN DIEGO - UPDATED PWS, AERIAL IMAGES, SUBJECT TO AVAILABILITY OF FUNDS
Solicitation number
37250PR260000106
Issued by

About this file

This is a Statement of Work (SOW) for Grounds Maintenance Services at two U.S. Coast Guard facilities in San Diego, California. The contractor shall maintain approximately 22 acres of grounds divided between U.S. Coast Guard Sector San Diego (16 acres at 2710 N. Harbor Drive) and Point Loma Senior Housing Quarters (6 acres, with 3 acres improved, at 2465 Cabrillo Road). The contract period runs from September 1, 2026, through September 1, 2027, subject to availability of funds. Current funding is available only through December 2026, with full-year pricing established contingent on future appropriations. The solicitation is issued under FAR Part 12 (Commercial Services), and an Industry Day/Site Visit is scheduled for Wednesday, August 26, 2026, from 10:00 to 15:00 PST, requiring REAL ID, passport, or Common Access Card for base access.

The primary contract locations include Sector San Diego, home to Coast Guard operational assets including two 87-foot Patrol Boats, four Jayhawk H-60 helicopters, and a Joint Harbor Operations Center, and the Point Loma location, which contains three historic homes (including a Lighthouse) and ancillary buildings designated as historical landmarks built in 1892 within Cabrillo National Park grounds. Points of contact for the solicitation are Larune Valentine (909-275-9264) and LT Philip Rogers (206-827-5173 or 856-776-8989). The statement of work references detailed performance requirements, schedules, and specifications necessary for comprehensive grounds maintenance across both geographically separated sites.

View the file

Other files

File Type Posted
Consolidated_SOW__San_Diego_Landscaping_FY27_Final.docx DOCX document
Technical Drawings for Landscaping.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Grounds Maintenance Services USCG Sector San Diego, CA

1.0 INTRODUCTION

The United States Coast Guard is procuring Grounds Maintenance Services as described herein for the U.S. Coast Guard Sector San Diego and the Point Loma Senior Housing Quarters in San Diego, California. The Statement of Work (SOW) describes the attributes for a measurable and results-oriented performance standard.

PERIOD OF PERFORMANCE: September 2026 – September 2027 (Full Year)

2.0 SPECIAL CONTRACT REQUIREMENTS & FAR CLAUSES

2.1 Commercial Services Override (FAR 12)

FAR Part 12 Request for Offer (RFO)/overhaul overrides all previous associated clauses related to commercial services within this contract.

2.2 Availability of Funds (FAR 52.232-18)

Funding for this contract is subject to availability. Note: Current funding is only available through December; however, this contract and the associated pricing schedule are established for a full year of performance from September 2026 through September 2027.

2.3 Evaluation Criteria (FAR 52.212-2)

Award will be made on a best-value trade-off basis. The Government will evaluate offers based on the following factors, listed in descending order of importance:

Relevant Past Performance: Specifically for maintaining large-scale compounds and similar facilities.

Technical Approach: The offeror's methodology for fulfilling the requirements of this SOW, including coordination with the facilities team.

Price: Evaluated for reasonableness and realism.

3.0 GENERAL REQUIREMENTS

3.1 Mission & Location: The Contractor shall be responsible for maintaining approximately twenty-two (22) acres of grounds divided between two locations 8 miles apart:

U.S. Coast Guard Sector San Diego: 2710 N. Harbor Drive. Sixteen (16) acres of improved grounds.

Point Loma Senior Housing Quarters: 2465 Cabrillo Rd. Six (6) acres, three (3) acres of which are improved grounds.

3.2 Hours of Operation: All services for Sector San Diego shall be provided between 7:00 a.m. and 3:00 p.m., Monday through Friday.

4.0 PERFORMANCE REQUIREMENTS

The Contractor shall provide all personnel, management, supervision, materials, supplies, tools, transportation, and equipment to perform all grounds maintenance services.

4.1 Mowing, Edging, and Trimming: Maintain a uniform grass height range of 2” to 4”. Edging and trimming shall be completed to coincide with lawn cutting operations. Trim ground cover from around trees, shrubs, fences, and fixed objects to the height of the adjacent ground cover.

4.2 Tree & Shrub Maintenance: Prune trees on an annual pruning cycle in accordance with industry (ANSI Z1331 – 1994) standards. Trim the tall, assorted Palm trees (28 each), Ficus trees (11), Juniper trees (28), Pine trees (1), Cypress trees (3), and Magnolia trees (3). All palms shall be trimmed in a “Y” method.

4.3 Irrigation & Facilities Team Coordination:

The Contractor shall work closely with the Sector San Diego COR and must coordinate directly with the USCG facilities team to maintain the system, ensure adequate irrigation, and meet the requirements of improved areas. The contractor shall be responsible for the maintenance, repair, replacement, and upkeep of all irrigation system components with the facilities team, including valve boxes, timers, sprinkler heads, and branch lines.

4.4 Weed Control & Fertilization: Prevent the encroachment of weeds into established landscapes, flight lines, and paved surfaces. Apply a balanced commercial fertilizer to all improved ground cover areas according to manufacturer’s recommendations.

4.5 Debris & Police Grounds: Perform general litter patrol and debris removal in all identified areas, including the removal of natural debris, tree limbs, dry brush, and man-made debris.

5.0 PRICING SCHEDULE

Offerors shall provide a firm-fixed monthly price for the entire scope of work across both locations (U.S. Coast Guard Sector San Diego and Point Loma Senior Housing Quarters) for the 12-month base period (September 2026 - August/September 2027).

CLIN
Performance Period
Description
Monthly Price
0001
Month 1 (September 2026)
Grounds Maintenance - Entire Project
$
0002
Month 2 (October 2026)
Grounds Maintenance - Entire Project
$
0003
Month 3 (November 2026)
Grounds Maintenance - Entire Project
$
0004
Month 4 (December 2026)
Grounds Maintenance - Entire Project
$
0005
Month 5 (January 2027)
Grounds Maintenance - Entire Project
$
0006
Month 6 (February 2027)
Grounds Maintenance - Entire Project
$
0007
Month 7 (March 2027)
Grounds Maintenance - Entire Project
$
0008
Month 8 (April 2027)
Grounds Maintenance - Entire Project
$
0009
Month 9 (May 2027)
Grounds Maintenance - Entire Project
$
0010
Month 10 (June 2027)
Grounds Maintenance - Entire Project
$
0011
Month 11 (July 2027)
Grounds Maintenance - Entire Project
$
0012
Month 12 (August 2027)
Grounds Maintenance - Entire Project
$
TOTAL
Estimated Annual Cost

6.0 DELIVERABLES & QUALITY CONTROL

The Contractor shall submit a Quality Control Plan (QCP) and Potential Schedule of Services prior to the start of the contract. The Government will evaluate the Contractor's performance based on valid customer concerns and periodic inspections by the Contracting Officer Representative (COR).

File details come from the government source that posted it. Updated .