This document is a Questions and Answers file for the AFRL/DO Camera Array System as Virtual Tower for SkyVision Test Site federal contract opportunity. The document provides critical technical details about facility infrastructure and installation requirements at Springfield-Beckley Airport, specifically addressing cabling, power, server rack availability, structural considerations, and display configurations for the virtual tower project.
Key technical details include: fiberoptic cabling availability between Control Tower, NAAMCE, and TACAN Station; standard 120V and available 240V power; server rack space in NAAMCE and Control Tower; cable routing through a 6-story tower cable chase; requirements for potential tower modifications including FAA approvals for 20-foot height additions, lightning protection standards, and structural load analysis. The document confirms two walls are available for Virtual Tower Display and recommends contractors budget for potential structural assessments by engineers like Woolpert. Any new equipment broadcasting frequencies will require FCC licensing and FAA Form 7460 submittal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 20250725.docx | DOCX document | |
| COMBO-AFRL-PZLEQ-2025-0015.docx | DOCX document | |
| Statement of Work (SOW).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
1. What kind of cabling is required throughout the facility?
Plenum-rated cables or new conduit are required in the space above the ceiling tiles in
NAAMCE/AMOC.
2. What is the availability of fiberoptic or communication cabling at Springfield?
Fiberoptic cabling is available between the Control Tower, NAAMCE, and TACAN Station at
Springfield-Beckley Airport?
3. How is cabling fed through the Control Tower?
The Control Tower has direct access from the base of the tower to the floor of tower cab (6 stories) via a cable chase. From the floor of the cab, there is conduit into the cab and up to the room of the tower. Access panels on the roof of the tower are available to connect cabling to the system.
4. What is the availability for server racks to be installed in the NAAMCE and Control Tower?
Space is available in the NAAMCE for server racks in the existing server room. There are multiple locations within the Control Tower for server rack installation.
5. What is the power availability at the NAAMCE and Control Tower?
Standard 120V power is available throughout the NAAMCE and Control Tower. 240V power is available and would be made available as required.
6. Will a load of 600 lbs spread over a 10 ft x 10 ft area require any additional load analysis for installation on the tower?
Unknown. As the owner of the tower, the City of Springfield doesn’t have the information or expertise to answer that question and that each contractor would have to work with a building engineer to make that determination. The City of Springfield has used Woolpert in the past to perform similar assessments. It is recommended, that contractors cost an option to perform the required structural analysis and subsequent permits.
7. Will 20 feet of additional tower on top of the Control tower require any additional approvals (FAA or City of Springfield).
Yes, an additional height of 20 feet will require approval from the FAA through a 7460. Any additional height above the tallest antenna will require this submittal. Also, any new equipment broadcasting a new broadcasting frequency will require an FCC License with a 7460 submittal.
8. Will we be required to meet certain lightning protection standards if we are above the currently existing lightning protection rods.
Yes.
9. Is it acceptable for us to utilize more than just the side wall for displays? We were considering using the back wall as well and spanning across the corner of the room.
Yes, 2 walls are available for Virtual Tower Display.