Combined Synopsis Solicitation.pdf
PDF 860 KB Posted
- Solicitation number
- 140R4021R0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 Statement of Work.pdf | ||
| Attachment 4 Subcontracting Plan Template.docx | DOCX document | |
| Attachment 3 Government Owned Equipment.pdf | ||
| Attachment 2 Sample Delivery Orders.xlsx | XLSX spreadsheet | |
| Attachment 5 Pricing Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Upper Colorado Basin
Heavy Equipment Rental IDIQ Contract
SOLICITATION NO. 140R4021R0005
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF RECLAMATION
UPPER COLORADO BASIN
SALT LAKE CITY, UTAH
Solicitation No. 140R4021R0005 – UCB Heavy Equipment Rental IDIQ
IMPORTANT INFORMATION
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in
Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a subsequent written solicitation will not be issued.
The solicitation document and incorporated provisions and clauses are those in effect through Federal
Acquisition Circular 2021-03.
Solicitation number 140R4021R0005 UCB Heavy Equipment Rental IDIQ is issued as a request for proposal (RFP) in accordance with FAR 12.603. This requirement is synopsized/solicited under full and open competition for a performance period of five (5) years.
The applicable NAICS code is 532412 with an associated small business size standard of $35.0M.
Solicitation Closing Date: March 29, 2021
Solicitation Closing Time: 12:00 PM (Mountain Daylight Time)
Only electronic proposals will be accepted and must be received by the Contracting Officer no later than 12:00 PM (MDT) on or before March 29, 2021 to be considered for award.
Electronic proposals must be clearly labeled with the following naming scheme:
*Proposal – Company Name 140R4021R0005 – UCB Heavy Equipment Rental IDIQ Contract*
Electronic proposals must contain the following documents:
Volume I – Representations and Certifications – (1) PDF
Volume II – Technical Proposal – (1) PDF
Volume III – Price Proposal and Sample Delivery Orders – (1) Excel
Note: Please read FAR 52.212-1 and Addendums for required information for proposal submission.
Note: Please read FAR 52.212-2 and Addendums for solicitation evaluation information.
All correspondence regarding this solicitation should reference *UCB Heavy Equipment Rental IDIQ
Solicitation No. 140R4021R0005* in the subject line.
Inquiries regarding this combined synopsis/solicitation should be made to:
Dwane D. Esplin, Contract Specialist / Contracting Officer /Email at desplin@usbr.gov
TABLE OF CONTENTS
Part Title Page
SCHEDULE OF SUPPLIES/SERVICES 1
COMMERCIAL CLAUSES 12
CONTRACT TERMS AND CONDITIONS –COMMERCIAL ITEMS 12
CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS – COMMERCIAL ITEMS
CLAUSES INCORPORATED BY REFERENCE 34
ORDERING 35
ORDERING LIMITATIONS 36
INDEFINITE QUANTITY 36
TASK ORDER AND DELIVERY-ORDER OMBUDSMAN 37
AUTHORIZED DEVIATIONS IN CLAUSES 37
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS 38
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM 38
AUTHORITIES AND DELEGATIONS 39
CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND
LIMITATIONS
ASBESTOS-FREE WARRANTY 41
SECURITY REQUIREMENTS – BUREAU OF RECLAMATION 43
2 CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS 52
SOLICITATION PROVISIONS 53
SOLICITATION PROVISIONS INCORPORATED BY REFERENCE 53
COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING 55
INSTRUCTIONS TO OFFERORS 59
GENERAL PROPOSAL INSTRUCTIONS 60
TECHNICAL PROPOSAL INSTRUCTIONS 62
PRICING PROPOSAL INSTRUCTIONS 64
CONTRACT TYPE 64
SERVICE OF PROTEST DEPARTMENT OF THE INTERIOR 64
AUTHORIZED DEVIATIONS IN PROVISIONS 64
USE AND DISCLOSURE OF PROPOSAL INFORMATION-DEPARTMENT OF
INTERIOR
NOTICE OF WORLD TRADE ORGANIZATION GOVERNMENT
PROCUREMENT AGREEMENT EVALUATIONS-BUREAU OF
RECLAMATION
EVALUATION-COMMERCIAL ITEMS 66
EVALUATION FACTORS FOR AWARD – LOWEST PRICE TECHNICALLY
ACCEPTABLE SOURCE SELECTION PROCESS
OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL
ITEMS
REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
INFORMATION REGARDING RESPONSIBILITY MATTERS 91
CONTINUATION OF SCHEDULE OF SUPPLIES/SERVICES
CONTRACT TYPE
Firm Fixed Price (FFP) – Commercial Supply
Time and Materials (T&M) – Repair Services
Indefinite Delivery/Indefinite Quantity – Pricing for each period below is based on estimated award date of
05/15/2021.
- Base Period – Estimated 05/15/2021 through 05/14/2022
- Ordering Period I – Estimated 05/15/2022 through 05/14/2023
- Ordering Period II – Estimated 05/15/2023 through 05/14/2024
- Ordering Period III – Estimated 05/15/2024 through 05/14/2025
- Ordering Period IV – Estimated 05/15/2025 through 05/14/2026
The total minimum value is $250.00 and the total maximum value of the contract is $15,000,000.00 over the five-year ordering period.
DELIVERY/TASK ORDERS
The contract type for delivery order requirements listed in the contract Statement of Work (SOW) under paragraphs
3.1 and 3.2, are firm-fixed-price. All delivery/task orders shall be issued in accordance with the procedures outlined in FAR 52.216-18 - Ordering. Service Wage Determinations will be a separate attachment to each competed task order based on place of performance.
Each delivery/task order will define the work to be performed, the location of the work, and period of performance.
In addition, each CLIN awarded at the delivery/task order level will be identified as firm-fixed-price or time-and-materials. Per FAR 16.601(d)(2), each task order with elements of time-and-materials will include a ceiling price;
contractors who exceed this ceiling price do so at their own risk.
All post-award delivery/task orders will be awarded in accordance with FAR 16.505(b) Orders under multiple-award contracts.
Only Bureau of Reclamation, Upper Colorado Basin, Contracting Officers can issue delivery/task orders against this contract.
The contractor shall not be compensated for any changes or updates to equipment or the purchase of new equipment for the life of this contract.
PRICING SCHEDULE
The following schedule defines the line item(s) and pricing for each of the contract years of this contract:
(a) Definitions:
(1) CLIN – Contract Line Item Number
(2) FR – Frequently Required Equipment. Historically represents approximately 60% of
PAO FA rental expenditures.
(3) MR – Moderately Required Equipment. Historically, represents approximately 30% of PAO FA rental expenditures.
(4) RR – Rarely Required Equipment. Historically, represents 10% of PAO FA rental expenditures
Force Account crews work a schedule consisting of 10 days on, followed by 4 days off. This amounts to 20 working days per month (4 weeks). Consequently, the monthly (4-week) rate shall only include 20 working days. For delivery orders greater than 1-month (4 weeks) that include a partial month, contractor shall prorate the partial month at the monthly (4 week) rate. For delivery orders less than 1 month (4 weeks), contractor shall prorate the partial week at the weekly rate. Formulas for calculating prorated amounts are shown below:
Monthly Prorate = ( 𝑀𝑜𝑛𝑡ℎ𝑙𝑦 𝑟𝑎𝑡𝑒
20 𝑑𝑎𝑦𝑠 ) × (𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑑𝑎𝑦𝑠) Weekly Prorate = (
𝑊𝑒𝑒𝑘𝑙𝑦 𝑟𝑎𝑡𝑒
5 𝑑𝑎𝑦𝑠 ) × (𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑑𝑎𝑦𝑠)
Freight Cost shall include cost per mile for delivery and pick-up (up to 300 miles each way) of all equipment, except in cases as described in paragraph 2.1 of the PWS. For purposes of this solicitation, offerors shall enter their proposed fully burdened rate (e.g. direct labor, indirect costs, applicable taxes, profit, etc.) for each CLIN, in all of the five (5) contract years, on the following pages:
CLIN
Item Frequency FFP or T&M ($)/Mile ($)/Week ($)/Month
001 FR FFP
002 FR FFP
003 FR FFP
004 FR FFP
005 FR FFP
006 FR FFP
007 RR FFP
008 RR FFP
009 FR FFP
010 FR FFP
011 MR FFP
012 MR FFP
013 MR FFP
014 MR FFP
015 MR FFP
016 MR FFP
017 MR FFP
018 RR FFP
019 RR FFP
020 RR FFP
021 RR FFP
022 RR FFP
023 RR FFP
024 RR FFP
025 MR FFP
026 FR FFP
027 FR FFP
028 FR FFP
029 RR FFP
030 RR FFP
031 RR FFP
032 RR FFP
033 RR FFP
034 RR FFP
035 RR FFP
Description
Cat 623K Elevating Scraper, or Equal
Base Period
Cat 627K Open Bowl Scraper,, or Equal
Cat 745 Articulated Rock Truck, or Equal
CAT 120 Motor Grader, or Equal
CAT 140M AWD Motor Grader, or Equal
CAT 140M AWD Trimble Tech Ready Motor Grader, or Equal
2000 Gal Water Truck. Salient Characteristics
4000 Gal Water Truck. Salient Characteristics, or Equal
54” Krypto Klaw Bucket and Thumb Excavator Attachment
Thompson 6’ Trailer Mounted Trash Pump or Equal
Cat 613 Water Wagon, or Equal
Cat 611 Water Wagon, or Equal
CAT D8T Dozer, or Equal
D6N Dozer, V-Pat Blade
Cat 305E CR Excavator, or Equal
Cat D4K Dozer, or Equal
Cat D5K LGP Dozer, or Equal
CAT D6T LGP Dozer, or Equal
Cat D6T Dozer, Trimble Tech Ready
CAT D7E Dozer, or Equal
Cat D5K Dozer, or Equal
Blade Rake to fit D6T Dozer
Cat 740 Articulated Rock Truck, or Equal
Cat 621 Water Wagon, or Equal
Cat 735 Articulated Rock Truck, or Equal
Cat 730 Articulated Rock Truck, or Equal
Cat 725 Articulated Rock Truck, or Equal
Dump Truck 6yd. Salient Characteristics
Dump Truck 10yd., or Equal
John Deere 250 D 5,000 gallon Water Truck, or Equal
John Deere 300 D 6,000 gallon Water Truck or Equal
John Deere 400 D 8,000 gallon Water Truck, or Equal
12000 gal Stand Tank, or Equal
Cat 308CR Excavator, or Equal
Cat 312EL Excavator, or Equal
Item Frequency FFP or T&M ($)/Mile ($)/Week ($)/Month Description
Base Period
036 FR FFP
037 MR FFP
038 FR FFP
039 RR FFP
040 RR FFP
041 RR FFP
042 MR FFP
043 MR FFP
044 MR FFP
045 RR FFP
046 RR FFP
047 FR FFP
048 RR FFP
049 RR FFP
050 RR FFP
051 MR FFP
052 MR FFP
053 RR FFP
054 RR FFP
055 RR FFP
056 RR FFP
057 MR FFP
058 MR FFP
059 MR FFP
060 RR FFP
061 RR FFP
062 MR FFP
063 RR FFP
064 RR FFP
065 FR FFP
066 FR FFP
067 FR FFP
068 RR FFP
069 RR FFP
070 RR FFP
071 MR FFP
072 MR FFP
073 MR FFP
074 N/A FFP
075 N/A T&M
076 N/A T&M
077 N/A FFP
078 N/A FFP
Multiquip DCA70USI Generator, or Equal
Cat CS56 Vibratory Roller, or Equal
Cat 815 Soil Compactor, or Equal
Cat 825 Soil Compactor, or Equal
Wacker RT82 Trench Compactor, or Equal
Cat 246 Skid Steer Loader, or Equal
Cat 272 Skid Steer Loader, or Equal
Cat 315CR Excavator, or Equal
Cat 320EL RR Excavator, or Equal
CAT 325FL CR Excavator, or Equal
Cat 325FL CR Excavator, or Equal Trimble Tech Ready
Cat 249 Compact Track Loader, or Equal
Cat 330FL Excavator, or Equal
Cat 336FL Excavator, or Equal
Cat CS44 Vibratory Roller, or Equal
Cat 349 FL Excavator, or Equal Trimble Tech Ready
Cat 326 FL Long Reach Excavators, or Equal
Cat 938 Wheel loader, or Equal
Cat 950 Wheel loader, or Equal
Specialty Re-Rent Equipment or Unlisted Specialty Equipment
Mechanic and Field Service (Cost/Hour)
Cat CP34 Vibratory Roller, or Equal
Cat CP44 Vibratory Roller, or Equal
Cat CP56 Vibratory Roller, or Equal
Cat CS34 Vibratory Roller, or Equal
MS12 Material Separator, or Equal
4 x 1,000 Watt, 30' height, Manual Mast Light Tower, Trailer Mounted
Thumb Attachment Option for Excavators (in percent of carrier equipment rate)
Hydraulic Hammer Option for Excavators (in percent of carrier rate)
Mechanic and Shop Service (Cost/Hour)
Equipment Damage
CAT 982 Wheel loader, or Equal
Multiquip DCA45USI Generator, or Equal
CAT 972 Wheel loader, or Equal
CAT 349 DL Excavator, or Equal
Initial Contract Kick-off Meeting $250.00
CAT 966 Wheel loader, or Equal
Cat 279 Compact Track Loader, or Equal
Cat 299 Compact Track Loader, or Equal
Multiquip DCA25USI Generator, or Equal
To Be Negotiated on an Order Level Basis
Fully Burdened Hourly Rate $
Fully Burdened Hourly Rate $
To Be Negotiated on an Order Level Basis
Multiquip DCA125USI Generator, or Equal
Cat TL642 Telescopic Handler, or Equal
Cat TL1055 Telescopic Handler, or Equal
101 FR FFP
102 FR FFP
103 FR FFP
104 FR FFP
105 FR FFP
106 FR FFP
107 RR FFP
108 RR FFP
109 FR FFP
110 FR FFP
111 MR FFP
112 MR FFP
113 MR FFP
114 MR FFP
115 MR FFP
116 MR FFP
117 MR FFP
118 RR FFP
119 RR FFP
120 RR FFP
121 RR FFP
122 RR FFP
123 RR FFP
124 RR FFP
125 MR FFP
126 FR FFP
127 FR FFP
128 FR FFP
129 RR FFP
130 RR FFP
131 RR FFP
132 RR FFP
133 RR FFP
134 RR FFP
135 RR FFP
136 FR FFP
137 MR FFP
138 FR FFP
139 RR FFP
140 RR FFP
141 RR FFP
142 MR FFP
143 MR FFP
144 MR FFP
Ordering Period I
Cat 730 Articulated Rock Truck, or Equal
Description
Cat 623K Elevating Scraper, or Equal
Cat 627K Open Bowl Scraper,, or Equal
Cat 745 Articulated Rock Truck, or Equal
Cat 740 Articulated Rock Truck, or Equal
Cat 735 Articulated Rock Truck, or Equal
4000 Gal Water Truck. Salient Characteristics, or Equal
Cat 725 Articulated Rock Truck, or Equal
Dump Truck 6yd. Salient Characteristics
Dump Truck 10yd., or Equal
John Deere 250 D 5,000 gallon Water Truck, or Equal
John Deere 300 D 6,000 gallon Water Truck or Equal
John Deere 400 D 8,000 gallon Water Truck, or Equal
12000 gal Stand Tank, or Equal
Cat 613 Water Wagon, or Equal
Cat 611 Water Wagon, or Equal
Cat 621 Water Wagon, or Equal
2000 Gal Water Truck. Salient Characteristics
D6N Dozer, V-Pat Blade
54” Krypto Klaw Bucket and Thumb Excavator Attachment
Thompson 6’ Trailer Mounted Trash Pump or Equal
CAT 120 Motor Grader, or Equal
CAT 140M AWD Motor Grader, or Equal
CAT 140M AWD Trimble Tech Ready Motor Grader, or Equal
Cat D4K Dozer, or Equal
Cat D5K LGP Dozer, or Equal
Cat D5K Dozer, or Equal
CAT D6T LGP Dozer, or Equal
Blade Rake to fit D6T Dozer
Cat D6T Dozer, Trimble Tech Ready
CAT 349 DL Excavator, or Equal
CAT D7E Dozer, or Equal
CAT D8T Dozer, or Equal
Cat 305E CR Excavator, or Equal
Cat 308CR Excavator, or Equal
Cat 312EL Excavator, or Equal
Cat 315CR Excavator, or Equal
Cat 320EL RR Excavator, or Equal
CAT 325FL CR Excavator, or Equal
Cat 325FL CR Excavator, or Equal Trimble Tech Ready
Cat 330FL Excavator, or Equal
Cat 336FL Excavator, or Equal
Cat 349 FL Excavator, or Equal Trimble Tech Ready
Cat 326 FL Long Reach Excavators, or Equal
Ordering Period I
Description
145 RR FFP
146 RR FFP
147 FR FFP
148 RR FFP
149 RR FFP
150 RR FFP
151 MR FFP
152 MR FFP
153 RR FFP
154 RR FFP
155 RR FFP
156 RR FFP
157 MR FFP
158 MR FFP
159 MR FFP
160 RR FFP
161 RR FFP
162 MR FFP
163 RR FFP
164 RR FFP
165 FR FFP
166 FR FFP
167 FR FFP
168 RR FFP
169 RR FFP
170 RR FFP
171 MR FFP
172 MR FFP
173 MR FFP
174 N/A FFP
175 N/A T&M
176 N/A T&M
177 N/A FFP
To Be Negotiated on an Order Level Basis
Fully Burdened Hourly Rate $
Fully Burdened Hourly Rate $
To Be Negotiated on an Order Level Basis
Cat CS44 Vibratory Roller, or Equal
Cat 938 Wheel loader, or Equal
Cat 950 Wheel loader, or Equal
CAT 966 Wheel loader, or Equal
CAT 972 Wheel loader, or Equal
CAT 982 Wheel loader, or Equal
Cat CP34 Vibratory Roller, or Equal
Cat CP44 Vibratory Roller, or Equal
Cat CP56 Vibratory Roller, or Equal
Cat CS34 Vibratory Roller, or Equal
Multiquip DCA70USI Generator, or Equal
Cat CS56 Vibratory Roller, or Equal
Cat 815 Soil Compactor, or Equal
Cat 825 Soil Compactor, or Equal
Wacker RT82 Trench Compactor, or Equal
Cat 246 Skid Steer Loader, or Equal
Cat 272 Skid Steer Loader, or Equal
Cat 249 Compact Track Loader, or Equal
Cat 279 Compact Track Loader, or Equal
Cat 299 Compact Track Loader, or Equal
Multiquip DCA25USI Generator, or Equal
Multiquip DCA45USI Generator, or Equal
Hydraulic Hammer Option for Excavators (in percent of carrier rate)
Equipment Damage
Multiquip DCA125USI Generator, or Equal
Cat TL642 Telescopic Handler, or Equal
Cat TL1055 Telescopic Handler, or Equal
MS12 Material Separator, or Equal
4 x 1,000 Watt, 30' height, Manual Mast Light Tower, Trailer Mounted
Thumb Attachment Option for Excavators (in percent of carrier equipment rate)
Specialty Re-Rent Equipment or Unlisted Specialty Equipment
Mechanic and Field Service (Cost/Hour)
Mechanic and Shop Service (Cost/Hour)
201 FR FFP
202 FR FFP
203 FR FFP
204 FR FFP
205 FR FFP
206 FR FFP
207 RR FFP
208 RR FFP
209 FR FFP
210 FR FFP
211 MR FFP
212 MR FFP
213 MR FFP
214 MR FFP
215 MR FFP
216 MR FFP
217 MR FFP
218 RR FFP
219 RR FFP
220 RR FFP
221 RR FFP
222 RR FFP
223 RR FFP
224 RR FFP
225 MR FFP
226 FR FFP
227 FR FFP
228 FR FFP
229 RR FFP
230 RR FFP
231 RR FFP
232 RR FFP
233 RR FFP
234 RR FFP
235 RR FFP
236 FR FFP
237 MR FFP
238 FR FFP
239 RR FFP
240 RR FFP
241 RR FFP
242 MR FFP
243 MR FFP
244 MR FFP
Ordering Period II
Cat 730 Articulated Rock Truck, or Equal
Description
Cat 623K Elevating Scraper, or Equal
Cat 627K Open Bowl Scraper,, or Equal
Cat 745 Articulated Rock Truck, or Equal
Cat 740 Articulated Rock Truck, or Equal
Cat 735 Articulated Rock Truck, or Equal
4000 Gal Water Truck. Salient Characteristics, or Equal
Cat 725 Articulated Rock Truck, or Equal
Dump Truck 6yd. Salient Characteristics
Dump Truck 10yd., or Equal
John Deere 250 D 5,000 gallon Water Truck, or Equal
John Deere 300 D 6,000 gallon Water Truck or Equal
John Deere 400 D 8,000 gallon Water Truck, or Equal
12000 gal Stand Tank, or Equal
Cat 613 Water Wagon, or Equal
Cat 611 Water Wagon, or Equal
Cat 621 Water Wagon, or Equal
2000 Gal Water Truck. Salient Characteristics
D6N Dozer, V-Pat Blade
54” Krypto Klaw Bucket and Thumb Excavator Attachment
Thompson 6’ Trailer Mounted Trash Pump or Equal
CAT 120 Motor Grader, or Equal
CAT 140M AWD Motor Grader, or Equal
CAT 140M AWD Trimble Tech Ready Motor Grader, or Equal
Cat D4K Dozer, or Equal
Cat D5K LGP Dozer, or Equal
Cat D5K Dozer, or Equal
CAT D6T LGP Dozer, or Equal
Blade Rake to fit D6T Dozer
Cat D6T Dozer, Trimble Tech Ready
CAT 349 DL Excavator, or Equal
CAT D7E Dozer, or Equal
CAT D8T Dozer, or Equal
Cat 305E CR Excavator, or Equal
Cat 308CR Excavator, or Equal
Cat 312EL Excavator, or Equal
Cat 315CR Excavator, or Equal
Cat 320EL RR Excavator, or Equal
CAT 325FL CR Excavator, or Equal
Cat 325FL CR Excavator, or Equal Trimble Tech Ready
Cat 330FL Excavator, or Equal
Cat 336FL Excavator, or Equal
Ordering Period II
Description
245 RR FFP
246 RR FFP
247 FR FFP
248 RR FFP
249 RR FFP
250 RR FFP
251 MR FFP
252 MR FFP
253 RR FFP
254 RR FFP
255 RR FFP
256 RR FFP
257 MR FFP
258 MR FFP
259 MR FFP
260 RR FFP
261 RR FFP
262 MR FFP
263 RR FFP
264 RR FFP
265 FR FFP
266 FR FFP
267 FR FFP
268 RR FFP
269 RR FFP
270 RR FFP
271 MR FFP
272 MR FFP
273 MR FFP
274 N/A FFP
275 N/A T&M
276 N/A T&M
277 N/A FFP
To Be Negotiated on an Order Level Basis
Fully Burdened Hourly Rate $
Fully Burdened Hourly Rate $
To Be Negotiated on an Order Level Basis
Cat CS44 Vibratory Roller, or Equal
Cat 938 Wheel loader, or Equal
Cat 950 Wheel loader, or Equal
CAT 966 Wheel loader, or Equal
CAT 972 Wheel loader, or Equal
CAT 982 Wheel loader, or Equal
Cat CP34 Vibratory Roller, or Equal
Cat CP44 Vibratory Roller, or Equal
Cat CP56 Vibratory Roller, or Equal
Cat CS34 Vibratory Roller, or Equal
Multiquip DCA70USI Generator, or Equal
Cat CS56 Vibratory Roller, or Equal
Cat 815 Soil Compactor, or Equal
Cat 825 Soil Compactor, or Equal
Wacker RT82 Trench Compactor, or Equal
Cat 246 Skid Steer Loader, or Equal
Cat 272 Skid Steer Loader, or Equal
Cat 249 Compact Track Loader, or Equal
Cat 279 Compact Track Loader, or Equal
Cat 299 Compact Track Loader, or Equal
Multiquip DCA25USI Generator, or Equal
Multiquip DCA45USI Generator, or Equal
Hydraulic Hammer Option for Excavators (in percent of carrier rate)
Equipment Damage
Multiquip DCA125USI Generator, or Equal
Cat TL642 Telescopic Handler, or Equal
Cat TL1055 Telescopic Handler, or Equal
MS12 Material Separator, or Equal
4 x 1,000 Watt, 30' height, Manual Mast Light Tower, Trailer Mounted
Thumb Attachment Option for Excavators (in percent of carrier equipment rate)
Specialty Re-Rent Equipment or Unlisted Specialty Equipment
301 FR FFP
302 FR FFP
303 FR FFP
304 FR FFP
305 FR FFP
306 FR FFP
307 RR FFP
308 RR FFP
309 FR FFP
310 FR FFP
311 MR FFP
312 MR FFP
313 MR FFP
314 MR FFP
315 MR FFP
316 MR FFP
317 MR FFP
318 RR FFP
319 RR FFP
320 RR FFP
321 RR FFP
322 RR FFP
323 RR FFP
324 RR FFP
325 MR FFP
326 FR FFP
327 FR FFP
328 FR FFP
329 RR FFP
330 RR FFP
331 RR FFP
332 RR FFP
333 RR FFP
334 RR FFP
335 RR FFP
336 FR FFP
337 MR FFP
338 FR FFP
339 RR FFP
340 RR FFP
341 RR FFP
342 MR FFP
343 MR FFP
344 MR FFP
Ordering Period III
Cat 730 Articulated Rock Truck, or Equal
Description
Cat 623K Elevating Scraper, or Equal
Cat 627K Open Bowl Scraper,, or Equal
Cat 745 Articulated Rock Truck, or Equal
Cat 740 Articulated Rock Truck, or Equal
Cat 735 Articulated Rock Truck, or Equal
4000 Gal Water Truck. Salient Characteristics, or Equal
Cat 725 Articulated Rock Truck, or Equal
Dump Truck 6yd. Salient Characteristics
Dump Truck 10yd., or Equal
John Deere 250 D 5,000 gallon Water Truck, or Equal
John Deere 300 D 6,000 gallon Water Truck or Equal
John Deere 400 D 8,000 gallon Water Truck, or Equal
12000 gal Stand Tank, or Equal
Cat 613 Water Wagon, or Equal
Cat 611 Water Wagon, or Equal
Cat 621 Water Wagon, or Equal
2000 Gal Water Truck. Salient Characteristics
D6N Dozer, V-Pat Blade
54” Krypto Klaw Bucket and Thumb Excavator Attachment
Thompson 6’ Trailer Mounted Trash Pump or Equal
CAT 120 Motor Grader, or Equal
CAT 140M AWD Motor Grader, or Equal
CAT 140M AWD Trimble Tech Ready Motor Grader, or Equal
Cat D4K Dozer, or Equal
Cat D5K LGP Dozer, or Equal
Cat D5K Dozer, or Equal
CAT D6T LGP Dozer, or Equal
Blade Rake to fit D6T Dozer
Cat D6T Dozer, Trimble Tech Ready
CAT 349 DL Excavator, or Equal
CAT D7E Dozer, or Equal
CAT D8T Dozer, or Equal
Cat 305E CR Excavator, or Equal
Cat 308CR Excavator, or Equal
Cat 312EL Excavator, or Equal
Cat 315CR Excavator, or Equal
Cat 320EL RR Excavator, or Equal
CAT 325FL CR Excavator, or Equal
Cat 325FL CR Excavator, or Equal Trimble Tech Ready
Cat 330FL Excavator, or Equal
Cat 336FL Excavator, or Equal
Ordering Period III
Description
345 RR FFP
346 RR FFP
347 FR FFP
348 RR FFP
349 RR FFP
350 RR FFP
351 MR FFP
352 MR FFP
353 RR FFP
354 RR FFP
355 RR FFP
356 RR FFP
357 MR FFP
358 MR FFP
359 MR FFP
360 RR FFP
361 RR FFP
362 MR FFP
363 RR FFP
364 RR FFP
365 FR FFP
366 FR FFP
367 FR FFP
368 RR FFP
369 RR FFP
370 RR FFP
371 MR FFP
372 MR FFP
373 MR FFP
374 N/A FFP
375 N/A T&M
376 N/A T&M
377 N/A FFP
To Be Negotiated on an Order Level Basis
Fully Burdened Hourly Rate $
Fully Burdened Hourly Rate $
To Be Negotiated on an Order Level Basis
Cat CS44 Vibratory Roller, or Equal
Cat 938 Wheel loader, or Equal
Cat 950 Wheel loader, or Equal
CAT 966 Wheel loader, or Equal
CAT 972 Wheel loader, or Equal
CAT 982 Wheel loader, or Equal
Cat CP34 Vibratory Roller, or Equal
Cat CP44 Vibratory Roller, or Equal
Cat CP56 Vibratory Roller, or Equal
Cat CS34 Vibratory Roller, or Equal
Multiquip DCA70USI Generator, or Equal
Cat CS56 Vibratory Roller, or Equal
Cat 815 Soil Compactor, or Equal
Cat 825 Soil Compactor, or Equal
Wacker RT82 Trench Compactor, or Equal
Cat 246 Skid Steer Loader, or Equal
Cat 272 Skid Steer Loader, or Equal
Cat 249 Compact Track Loader, or Equal
Cat 279 Compact Track Loader, or Equal
Cat 299 Compact Track Loader, or Equal
Multiquip DCA25USI Generator, or Equal
Multiquip DCA45USI Generator, or Equal
Hydraulic Hammer Option for Excavators (in percent of carrier rate)
Equipment Damage
Multiquip DCA125USI Generator, or Equal
Cat TL642 Telescopic Handler, or Equal
Cat TL1055 Telescopic Handler, or Equal
MS12 Material Separator, or Equal
4 x 1,000 Watt, 30' height, Manual Mast Light Tower, Trailer Mounted
Thumb Attachment Option for Excavators (in percent of carrier equipment rate)
Specialty Re-Rent Equipment or Unlisted Specialty Equipment
401 FR FFP
402 FR FFP
403 FR FFP
404 FR FFP
405 FR FFP
406 FR FFP
407 RR FFP
408 RR FFP
409 FR FFP
410 FR FFP
411 MR FFP
412 MR FFP
413 MR FFP
414 MR FFP
415 MR FFP
416 MR FFP
417 MR FFP
418 RR FFP
419 RR FFP
420 RR FFP
421 RR FFP
422 RR FFP
423 RR FFP
424 RR FFP
425 MR FFP
426 FR FFP
427 FR FFP
428 FR FFP
429 RR FFP
430 RR FFP
431 RR FFP
432 RR FFP
433 RR FFP
434 RR FFP
435 RR FFP
436 FR FFP
437 MR FFP
438 FR FFP
439 RR FFP
440 RR FFP
441 RR FFP
442 MR FFP
443 MR FFP
444 MR FFP
Ordering Period IV
Cat 730 Articulated Rock Truck, or Equal
Description
Cat 623K Elevating Scraper, or Equal
Cat 627K Open Bowl Scraper,, or Equal
Cat 745 Articulated Rock Truck, or Equal
Cat 740 Articulated Rock Truck, or Equal
Cat 735 Articulated Rock Truck, or Equal
4000 Gal Water Truck. Salient Characteristics, or Equal
Cat 725 Articulated Rock Truck, or Equal
Dump Truck 6yd. Salient Characteristics
Dump Truck 10yd., or Equal
John Deere 250 D 5,000 gallon Water Truck, or Equal
John Deere 300 D 6,000 gallon Water Truck or Equal
John Deere 400 D 8,000 gallon Water Truck, or Equal
12000 gal Stand Tank, or Equal
Cat 613 Water Wagon, or Equal
Cat 611 Water Wagon, or Equal
Cat 621 Water Wagon, or Equal
2000 Gal Water Truck. Salient Characteristics
D6N Dozer, V-Pat Blade
54” Krypto Klaw Bucket and Thumb Excavator Attachment
Thompson 6’ Trailer Mounted Trash Pump or Equal
CAT 120 Motor Grader, or Equal
CAT 140M AWD Motor Grader, or Equal
CAT 140M AWD Trimble Tech Ready Motor Grader, or Equal
Cat D4K Dozer, or Equal
Cat D5K LGP Dozer, or Equal
Cat D5K Dozer, or Equal
CAT D6T LGP Dozer, or Equal
Blade Rake to fit D6T Dozer
Cat D6T Dozer, Trimble Tech Ready
CAT 349 DL Excavator, or Equal
CAT D7E Dozer, or Equal
CAT D8T Dozer, or Equal
Cat 305E CR Excavator, or Equal
Cat 308CR Excavator, or Equal
Cat 312EL Excavator, or Equal
Cat 315CR Excavator, or Equal
Cat 320EL RR Excavator, or Equal
CAT 325FL CR Excavator, or Equal
Cat 325FL CR Excavator, or Equal Trimble Tech Ready
Cat 330FL Excavator, or Equal
Cat 336FL Excavator, or Equal
Ordering Period IV
Description
445 RR FFP
446 RR FFP
447 FR FFP
448 RR FFP
449 RR FFP
450 RR FFP
451 MR FFP
452 MR FFP
453 RR FFP
454 RR FFP
455 RR FFP
456 RR FFP
457 MR FFP
458 MR FFP
459 MR FFP
460 RR FFP
461 RR FFP
462 MR FFP
463 RR FFP
464 RR FFP
465 FR FFP
466 FR FFP
467 FR FFP
468 RR FFP
469 RR FFP
470 RR FFP
471 MR FFP
472 MR FFP
473 MR FFP
474 N/A FFP
475 N/A T&M
476 N/A T&M
477 N/A FFP
To Be Negotiated on an Order Level Basis
Fully Burdened Hourly Rate $
Fully Burdened Hourly Rate $
To Be Negotiated on an Order Level Basis
Cat CS44 Vibratory Roller, or Equal
Cat 938 Wheel loader, or Equal
Cat 950 Wheel loader, or Equal
CAT 966 Wheel loader, or Equal
CAT 972 Wheel loader, or Equal
CAT 982 Wheel loader, or Equal
Cat CP34 Vibratory Roller, or Equal
Cat CP44 Vibratory Roller, or Equal
Cat CP56 Vibratory Roller, or Equal
Cat CS34 Vibratory Roller, or Equal
Multiquip DCA70USI Generator, or Equal
Cat CS56 Vibratory Roller, or Equal
Cat 815 Soil Compactor, or Equal
Cat 825 Soil Compactor, or Equal
Wacker RT82 Trench Compactor, or Equal
Cat 246 Skid Steer Loader, or Equal
Cat 272 Skid Steer Loader, or Equal
Cat 249 Compact Track Loader, or Equal
Cat 279 Compact Track Loader, or Equal
Cat 299 Compact Track Loader, or Equal
Multiquip DCA25USI Generator, or Equal
Multiquip DCA45USI Generator, or Equal
Hydraulic Hammer Option for Excavators (in percent of carrier rate)
Equipment Damage
Multiquip DCA125USI Generator, or Equal
Cat TL642 Telescopic Handler, or Equal
Cat TL1055 Telescopic Handler, or Equal
MS12 Material Separator, or Equal
4 x 1,000 Watt, 30' height, Manual Mast Light Tower, Trailer Mounted
Thumb Attachment Option for Excavators (in percent of carrier equipment rate)
Specialty Re-Rent Equipment or Unlisted Specialty Equipment
PART 1 - COMMERCIAL CLAUSES
52.212-4 - CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS - (OCT
2018)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act
(31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The
Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_1 https://www.acquisition.gov/far/part-52#FAR_52_202_1 dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include-
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice;
and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-
33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
https://www.acquisition.gov/far/part-52#FAR_52_232_33 https://www.acquisition.gov/far/part-52#FAR_52_232_33 https://www.acquisition.gov/far/part-52#FAR_52_232_34
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C.3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.-
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt
Payment Act (31 U.S.C.3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see
52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting
Officer.
(6) Interest.
http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_212_5
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41
U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in
(i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the
Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by
33.211 if–
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting
Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-33#FAR_33_211 https://www.acquisition.gov/far/part-32#FAR_32_607_2 https://www.acquisition.gov/far/part-32#FAR_32_608_2
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the
Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the
Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with
31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work
Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with
Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) [Reserved]
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_212_5 https://www.gsa.gov/forms-library/solicitationcontractorder-commercial-items through an "I agree" click box or other comparable mechanism (e.g., "click-wrap" or "browse-wrap" agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of clause)
Alternate I (Jan 2017). When a time-and-materials or labor-hour contract is contemplated, substitute the following paragraphs (a), (e), (i), (l), and (m) for those in the basic clause.
(a) Inspection/Acceptance. (1) The Government has the right to inspect and test all materials furnished and services performed under this contract, to the extent practicable at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government will perform inspections and tests in a manner that will not unduly delay the work.
(2) If the Government performs inspection or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.
(3) Unless otherwise specified in the contract, the Government will accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they will be presumed accepted 60 days after the date of delivery, unless accepted earlier.
(4) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in paragraph (a)(6) of this clause, the cost of replacement or correction shall be determined under paragraph (i) of this clause, but the "hourly rate" for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. Unless otherwise specified below, the portion of the "hourly rate" attributable to profit shall be 10 percent. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken.
(5)(i) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may-
(A) By contract or otherwise, perform the replacement or correction, charge to the
Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract; or
(B) Terminate this contract for cause.
(ii) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute under the Disputes clause of the contract.
(6) Notwithstanding paragraphs (a)(4) and (5) above, the Government may at any time require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to-
(i) Fraud, lack of good faith, or willful misconduct on the part of the Contractor's managerial personnel; or
(ii) The conduct of one or more of the Contractor’s employees selected or retained by the Contractor after any of the Contractor’s managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.
(7) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.
(8) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.
(9) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to
Government property.
(e) Definitions. (1) The clause at FAR 52.202-1, Definitions, is incorporated herein by reference. As used in this clause-
(i) "Direct materials" means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.
(ii) "Hourly rate" means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualifications of a labor category specified in the contract that are-https://www.acquisition.gov/far/52.202-1#FAR_52_202_1
(A) Performed by the contractor;
(B) Performed by the subcontractors; or
(C) Transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
(iii) "Materials" means-
(A) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the contractor under a common control;
(B) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;
(C) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.);
(D) There are not any subcontracts for services which are specifically excluded from the hourly rate; and
(E) Indirect costs specifically provided for in this clause.
(iv) "Subcontract" means any contract, as defined in FAR subpart 2.1, entered into with a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract including transfers between divisions, subsidiaries, or affiliates of a contractor or subcontractor. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.
(i) Payments. (1) Work performed. The Government will pay the Contractor as follows upon the submission of commercial invoices approved by the Contracting Officer:
(i) Hourly rate.
(A) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the contract by the number of direct labor hours performed. Fractional parts of an hour shall be payable on a prorated basis.
(B) The rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract. Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by individuals that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.
(C) Invoices may be submitted once each month (or at more frequent intervals, if approved by the Contracting Officer) to the Contracting Officer or the authorized representative.
https://www.acquisition.gov/far/subpart-2.1#FAR_Subpart_2_1
(D) When requested by the Contracting Officer or the authorized representative, the Contractor shall substantiate invoices (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment, individual daily job timecards, records that verify the employees meet the qualifications for the labor categories…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .