Combined Synopsis Solication.pdf
PDF 9 MB Posted
- Solicitation number
- W9127S26QA008
About this file
This is a Combined Synopsis/Solicitation for a 100% Small Business Set-Aside (NAICS 561210, Facilities Support Services, $47M size standard) issued by the U.S. Army Corps of Engineers Little Rock District for park, electrical, and plumbing maintenance services at Greers Ferry Lake. The solicitation (W9127S26QA008) seeks quotes for an Indefinite Delivery/Indefinite Quantity contract with a base period running from contract award through January 31, 2027, followed by four optional one-year periods extending through January 31, 2031. The guaranteed minimum is $2,500 for the base year only. Three separate schedules may be awarded to different contractors: Schedule A (Park Maintenance), Schedule B (Electrical Maintenance), and Schedule C (Plumbing Maintenance). Quotes are due by February 23, 2026 at 1:00 PM CST via email to Shelby.m.henson@usace.army.mil. A mandatory site visit is scheduled for February 10, 2026 at 10:00 AM CST at the Greers Ferry Project Office in Heber Springs, Arkansas. Award will be based on price alone.
The contract requires the contractor to furnish all necessary personnel, equipment, supplies, materials, and supervision to perform maintenance services across 13 parks and related facilities. Services include general park maintenance (site cleanup, topsoil placement, concrete work, debris removal, equipment rental); electrical maintenance (service calls, preseason checks, excavation for electrical lines, utility crossings); and plumbing maintenance (service calls, water leak repairs, sewer system work, water line installation, hydrant replacement, and system inspections). Bid schedules include estimated quantities for various line items with unit pricing, including service calls (60–130 estimated annually), emergency calls (20–30 estimated), unscheduled labor hours (300–650 estimated), materials costs ($80,000–$120,000 estimated), and task-specific items such as concrete placement, equipment rental, and utility work. The contractor must maintain comprehensive insurance ($500,000 general liability, $200,000/$500,000 vehicle liability), obtain required state licenses (electrician, plumber, CDL), submit quality control and accident prevention plans within two weeks of award, and conduct daily quality control inspections with weekly reporting. Required deliverables include the Quality Control Plan, daily QC inspection reports, work schedules, accident prevention plan, insurance proof, and monthly invoices. The contract operates Monday–Friday, 8:00 AM–5:00 PM, excluding federal holidays unless approved for emergency work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Agenda.pdf | ||
| Site Visit Sign in Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart
12.6 as supplemented with additional information in this notice. This announcement constitutes the only solicitation, quotes are being requested and a written solicitation will not be issued.
***PLEASE READ THESE INSTRUCTIONS CAREFULLY***
Solicitation number W9127S26QA008 is issued as a request for quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-06.
Set Aside, NAICS Code & Size Standard: This solicitation is being procured as a 100% Small Business Set- Aside.
The NAICS Code is 561210, Facilities Support Services, which has an applicable size standard of $47M.
Description of requirements for the items to be acquired: The intent of this contract is to provide park maintenance, electrical maintenance, and plumbing maintenance services at Greers Ferry Lake. Services include but not limited to general park maintenance, performing electrical and plumbing repairs and installation.
Minimum Guarantee: The guaranteed minimum is $2500 and is for the base period only. There is no guaranteed minimum for the option periods, if exercised.
Place(s) and date(s) of performance:
Within the geographic boundaries of the U.S. Army Corps of Engineers (USACE) Greers Ferry Project Office Dates of performance will be as follows:
Base Period – Date of Contract Award – 31 January 2027 Option Period 1 - 01 February 2027 - 31 January 2028 Option Period 2 - 01 February 2028 - 31 January 2029 Option Period 3 - 01 February 2029 - 31 January 2030 Option Period 4 - 01 February 2030 - 31 January 2031
Quotes are due no later than Monday February 23, 2026 at 1:00 PM CST.
Only quotes submitted via email will be accepted. Submission format shall be .pdf form and emailed to Shelby.m.henson@usace.army.mil. Please ensure the solicitation number, W9127S26QA008, is written in the subject line of your email.
Required Documents to Submit:
1. Request for Quotation cover page (signed).
2. Completed (filled in) Provisions, as applicable.
3. Completed bid schedule(s) A, B, and/or C with unit prices and total prices. Multiple awards may result from this solicitation.
4. Signed Amendments, as applicable
SITE VISIT: Participants will meet at Greers Ferry Project Office, 700 Heber Springs Road North, Heber Springs AR, 72543 on Tuesday, February 10, 2026 at 10:00 AM CST
If you have any questions regarding this solicitation, please contact Shelby Henson at either 501.340.1249 or Shelby.m.henson@usace.army.mil
The provision at 52.212-1, Instructions to Offerors – Commercial, applies to this acquisition and a statement regarding any addenda to the provision.
The provision at 52.212-2, Evaluation – Commercial Items, is not applicable to this solicitation. Award will be based on price only.
Offerors are required to include a completed copy of the provision at 52.212-3 (DEV)(RMBO), Offeror Representations and Certifications – Commercial Items, with its quote.
The clause at 52.212-4, Contract Terms and Conditions – Commercial Items, applies to this acquisition.
The clause at 52.212-5 (DEV)(RMBO), Contract Terms and Conditions Required To Implement Statutes Or Executive Orders – Commercial Items, applies to this acquisition.
*Please see the Clauses Incorporated by Reference section for additional FAR Clauses applicable to this acquisition.
REQUEST FOR QUOTATION COVER PAGE
US Army Corps of Engineers, Little Rock District Contracting Division, Attention: Shelby Henson, Shelby.m.henson@usace.army.mil
W9127S26QA008,
IDIQ Park, Electrical, Plumbing Maintenance
Greers Ferry Project Office
Quote Submitted by:
Offeror Name:
Offeror Address:
Offeror Telephone:
Offeror Email Address:
Offeror Point of Contact:
Offeror Tax Identification Number (TIN):
Offeror UEI:
Offeror Cage Code:
Offeror Signature:
Date:
EST. UNIT EST.
ITEM # DESCRIPTION QUANT UNIT PRICE $Amt.
0001 Service Call 60 EA
0002 Emergency Service Call 20 EA
0003 Unscheduled Labor Hours 400 HR
0004 Materials Cost 120000 US Dollar $1.00 120,000.00$
0005 Place/Spread Topsoil 300 CY
0006 Place/Spread Fill Material 300 CY
0007 Place/Spread Screenings 300 TN
0008 Place/Spread Aggregate Base Material 500 TN
0009 Place/Spread Sand 500 TN
0010 Place/Spread Quarry Run Stone 300 TN
0011 Place/Spread B-Stone 300 TN
0012 Place 4" Concrete Slab 2500 SF
0013 Place 6" Concrete Slab 2000 SF
0014 Place Launch Ramp Concrete 2000 SF
0015 Cleanup Storm/Highwater Debris 1000 CY
0016 Dump Truck with Driver 400 HR
0017 Backhoe with Operator 500 HR
0018 Bulldozer with Operator 500 HR
0019 Vibratory Plate Compactor with Operator 40 HR
0020 Vibratory Roller with Operator 100 HR
0021 Concrete/Asphalt Saw with Operator 20 HR
SCHEDULE A - BASE PERIOD - LINE ITEM 0001 - 0028 TOTAL:
SCHEDULE A PARK MAINTENANCE - GREERS FERRY PROJECT OFFICE
BASE PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement, at Greers Ferry Lake for the period of 01 February 2026, or date of award whichever is later, through 31 January 2027.
1001 Service Call 60 EA
1002 Emergency Service Call 20 EA
1003 Unscheduled Labor Hours 400 HR
1004 Materials Cost 120000 US Dollar $1.00 120,000.00$
1005 Place/Spread Topsoil 300 CY
1006 Place/Spread Fill Material 300 CY
1007 Place/Spread Screenings 300 TN
1008 Place/Spread Aggregate Base Material 500 TN
1009 Place/Spread Sand 500 TN
1010 Place/Spread Quarry Run Stone 300 TN
1011 Place/Spread B-Stone 300 TN
1012 Place 4" Concrete Slab 2500 SF
1013 Place 6" Concrete Slab 2000 SF
1014 Place Launch Ramp Concrete 2000 SF
1015 Cleanup Storm/Highwater Debris 1000 CY
1016 Dump Truck with Driver 400 HR
1017 Backhoe with Operator 500 HR
1018 Bulldozer with Operator 500 HR
1019 Vibratory Plate Compactor with Operator 40 HR
1020 Vibratory Roller with Operator 100 HR
1021 Concrete/Asphalt Saw with Operator 20 HR
SCHEDULE A PARK MAINTENANCE - GREERS FERRY PROJECT OFFICE
FIRST OPTION PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., for the period of 01 February 2027, or date of award whichever is later, through 31 January 2028.
SCHEDULE A - FIRST OPTION PERIOD - LINE ITEM 1001 - 1028 TOTAL:
2001 Service Call 60 EA
2002 Emergency Service Call 20 EA
2003 Unscheduled Labor Hours 400 HR
2004 Materials Cost 120000 US Dollar $1.00 120,000.00$
2005 Place/Spread Topsoil 300 CY
2006 Place/Spread Fill Material 300 CY
2007 Place/Spread Screenings 300 TN
2008 Place/Spread Aggregate Base Material 500 TN
2009 Place/Spread Sand 500 TN
2010 Place/Spread Quarry Run Stone 300 TN
2011 Place/Spread B-Stone 300 TN
2012 Place 4" Concrete Slab 2500 SF
2013 Place 6" Concrete Slab 2000 SF
2014 Place Launch Ramp Concrete 2000 SF
2015 Cleanup Storm/Highwater Debris 1000 CY
2016 Dump Truck with Driver 400 HR
2017 Backhoe with Operator 500 HR
2018 Bulldozer with Operator 500 HR
2019 Vibratory Plate Compactor with Operator 40 HR
2020 Vibratory Roller with Operator 100 HR
2021 Concrete/Asphalt Saw with Operator 20 HR for the period of 01 February 2028, or date of award whichever is later, through 31 January 2029.
SCHEDULE A - SECOND OPTION PERIOD - LINE ITEM 1001 - 1028 TOTAL:
SECOND OPTION PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., 3001 Service Call 60 EA
3002 Emergency Service Call 20 EA
3003 Unscheduled Labor Hours 400 HR
3004 Materials Cost 120000 US Dollar $1.00 120,000.00$
3005 Place/Spread Topsoil 300 CY
3006 Place/Spread Fill Material 300 CY
3007 Place/Spread Screenings 300 TN
3008 Place/Spread Aggregate Base Material 500 TN
3009 Place/Spread Sand 500 TN
3010 Place/Spread Quarry Run Stone 300 TN
3011 Place/Spread B-Stone 300 TN
3012 Place 4" Concrete Slab 2500 SF
3013 Place 6" Concrete Slab 2000 SF
3014 Place Launch Ramp Concrete 2000 SF
3015 Cleanup Storm/Highwater Debris 1000 CY
3016 Dump Truck with Driver 400 HR
3017 Backhoe with Operator 500 HR
3018 Bulldozer with Operator 500 HR
3019 Vibratory Plate Compactor with Operator 40 HR
3020 Vibratory Roller with Operator 100 HR
3021 Concrete/Asphalt Saw with Operator 20 HR
SCHEDULE A - THIRD OPTION PERIOD - LINE ITEM 3001 - 3028 TOTAL:
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., for the period of 01 February 2029, through 31 January 2030.
THIRD OPTION PERIOD - BID SHEET
4001 Service Call 60 EA
4002 Emergency Service Call 20 EA
4003 Unscheduled Labor Hours 400 HR
4004 Materials Cost 120000 US Dollar $1.00 120,000.00$
4005 Place/Spread Topsoil 300 CY
4006 Place/Spread Fill Material 300 CY
4007 Place/Spread Screenings 300 TN
4008 Place/Spread Aggregate Base Material 500 TN
4009 Place/Spread Sand 500 TN
4010 Place/Spread Quarry Run Stone 300 TN
4011 Place/Spread B-Stone 300 TN
4012 Place 4" Concrete Slab 2500 SF
4013 Place 6" Concrete Slab 2000 SF
4014 Place Launch Ramp Concrete 2000 SF
4015 Cleanup Storm/Highwater Debris 1000 CY
4016 Dump Truck with Driver 400 HR
4017 Backhoe with Operator 500 HR
4018 Bulldozer with Operator 500 HR
4019 Vibratory Plate Compactor with Operator 40 HR
4020 Vibratory Roller with Operator 100 HR
4021 Concrete/Asphalt Saw with Operator 20 HR
SCHEDULE A BASE, FIRST, SECOND, THIRD, AND FOURTH OPTION PERIOD - TOTAL:
SCHEDULE A - FOURTH OPTION PERIOD - LINE ITEM 4001 - 4028 TOTAL:
FOURTH OPTION PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., for the period of 01 February 2030, through 31 January 2031.
0022 Service Call 130 EA
0023 Emergency Service Call 20 EA
0024 Unscheduled Labor Hours 650 HR
0025 Materials Cost 100000 US Dollar $1.00 100,000.00$
0026 Park Preseason Electrical Check 1 EA
0027 Excavation for Electrical Lines 5000 LF
0028 Excavation for Utility Company Lines 1000 LF
0029 Utility Road Crossing 500 LF
0030 Rock Excavation for Utility Lines 500 LF
0031 Sewer Lift Station Electrical Check 25 EA
BASE PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement, at Greers Ferry Lake for the period of 01 February 2026, or date of award whichever is later, through 31 January 2027.
SCHEDULE B - BASE PERIOD - LINE ITEM 0029 - 0045 TOTAL:
SCHEDULE B ELECTRICAL MAINTENANCE
GREERS FERRY PROJECT OFFICE
1022 Service Call 130 EA
1023 Emergency Service Call 20 EA
1024 Unscheduled Labor Hours 650 HR
1025 Materials Cost 100000 US Dollar $1.00 100,000.00$
1026 Park Preseason Electrical Check 1 EA
1027 Excavation for Electrical Lines 5000 LF
1028 Excavation for Utility Company Lines 1000 LF
1029 Utility Road Crossing 500 LF
1030 Rock Excavation for Utility Lines 500 LF
1031 Sewer Lift Station Electrical Check 25 LF
SCHEDULE B - FIRST OPTION PERIOD - LINE ITEM 1029 - 1045 TOTAL:
GREERS FERRY PROJECT OFFICE
FIRST OPTION PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., for the period of 01 February 2027 through 31 January 2028.
2022 Service Call 130 EA
2023 Emergency Service Call 20 EA
2024 Unscheduled Labor Hours 650 HR
2025 Materials Cost 100000 US Dollar $1.00 100,000.00$
2026 Park Preseason Electrical Check 1 EA
2027 Excavation for Electrical Lines 5000 LF
2028 Excavation for Utility Company Lines 1000 LF
2029 Utility Road Crossing 500 LF
2030 Rock Excavation for Utility Lines 500 LF
2031 Sewer Lift Station Electrical Check 25 EA for the period of 01 February 2028, or date of award whichever is later, through 31 January 2029.
SCHEDULE B - SECOND OPTION PERIOD - LINE ITEM 2029 - 2045 TOTAL:
GREERS FERRY PROJECT OFFICE
SECOND OPTION PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., 3022 Service Call 130 EA
3023 Emergency Service Call 20 EA
3024 Unscheduled Labor Hours 650 HR
3025 Materials Cost 100000 US Dollar $1.00 100,000.00$
3026 Park Preseason Electrical Check 1 EA
3027 Excavation for Electrical Lines 5000 LF
3028 Excavation for Utility Company Lines 1000 LF
3029 Utility Road Crossing 500 LF
3030 Rock Excavation for Utility Lines 500 LF
3031 Sewer Lift Station Electrical Check 25 EA to provide maintenance services as described in the Performance Work Statement, at Greers Ferry Lake for the period of 01 February 2029, or date of award whichever is later, through 31 January 2030.
SCHEDULE B -THIRD OPTION PERIOD - LINE ITEM 3029 - 3045 TOTAL:
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., 4022 Service Call 130 EA
4023 Emergency Service Call 20 EA
4024 Unscheduled Labor Hours 650 HR
4025 Materials Cost 100000 US Dollar $1.00 100,000.00$
4026 Park Preseason Electrical Check 1 EA
4027 Excavation for Electrical Lines 5000 LF
4028 Excavation for Utility Company Lines 1000 LF
4029 Utility Road Crossing 500 LF
4030 Rock Excavation for Utility Lines 500 LF
4031 Sewer Lift Station Electrical Check 25 LF
FOURTH OPTION PERIOD - BID SHEET
SCHEDULE B - FOURTH OPTION PERIOD - LINE ITEM 4029 - 4045 TOTAL:
SCHEDULE B BASE, FIRST, SECOND, THIRD, AND FOURTH OPTION PERIOD - TOTAL:
SCHEDULE B ELECTRICAL MAINTENANCE
GREERS FERRY PROJECT OFFICE
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., for the period of 01 February 2030 through 31 January 2031.
0032 Service Call 100 EA
0033 Emergency Service Call 30 EA
0034 Unscheduled Labor Hours 300 HR
0035 Materials Cost 80000 US Dollar $1.00 80,000.00$
0036 Repair Water Leak 20 EA
0037 Unplug Sewer System 12 EA
0038 Replace Sewer Pump 12 EA
0039 Start Up Water System Phase 1 1 EA
0040 Start Up Water System Phase 2 1 EA
0041 Shut Down Water System 1 LF
0042 Replace/Install Underground Water Line 3/4 - 2" 5000 LF
0043 Replace/Install Underground Water Line 2 - 4" 1000 LF
0044 Replace/Install Underground sewer line 2 - 4" 500 LF
0045 Utility Road Crossing 500 LF
0046 Rock Excavation for Utility Lines 500 EA
0047 Replace Freeze Reistant Water Hydrant 40 EA
0048 Sewer System Inspection 10 EA
0049 Inspect Reduce Pressure Zone Assembly 20 EA
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., SCHEDULE C PLUMBING MAINTENANCE
GREERS FERRY PROJECT OFFICE
BASE PERIOD - BID SHEET
to provide maintenance services as described in the Performance Work Statement, at Greers Ferry Lake for the period of 01 February 2026 through 31 January 2027.
SCHEDULE C - BASE PERIOD - LINE ITEM 0046 - 0063 TOTAL:
1032 Service Call 100 EA
1033 Emergency Service Call 30 EA
1034 Unscheduled Labor Hours 300 HR
1035 Materials Cost 80000 US Dollar $1.00 80,000.00$
1036 Repair Water Leak 20 EA
1037 Unplug Sewer System 12 EA
1038 Replace Sewer Pump 12 EA
1039 Start Up Water System Phase 1 1 EA
1040 Start Up Water System Phase 2 1 EA
1041 Shut Down Water System 1 LF
1042 Replace/Install Underground Water Line 3/4 - 2" 5000 LF
1043 Replace/Install Underground Water Line 2 - 4" 1000 LF
1044 Replace/Install Underground sewer line 2 - 4" 500 LF
1045 Utility Road Crossing 500 LF
1046 Rock Excavation for Utility Lines 500 EA
1047 Replace Freeze Reistant Water Hydrant 40 EA
1048 Sewer System Inspection 10 EA
1049 Inspect Reduce Pressure Zone Assembly 20 EA
FIRST OPTION PERIOD - BID SHEET
SCHEDULE C PLUMBING MAINTENANCE
to provide maintenance services as described in the Performance Work Statement, at Greers Ferry Lake for the period of 01 February 2027 through 31 January 2028.
SCHEDULE C - FIRST OPTION PERIOD - LINE ITEM 1046 - 1063 TOTAL:
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., 2032 Service Call 100 EA
2033 Emergency Service Call 30 EA
2034 Unscheduled Labor Hours 300 HR
2035 Materials Cost 80000 US Dollar $1.00 80,000.00$
2036 Repair Water Leak 20 EA
2037 Unplug Sewer System 12 EA
2038 Replace Sewer Pump 12 EA
2039 Start Up Water System Phase 1 1 EA
2040 Start Up Water System Phase 2 1 EA
2041 Shut Down Water System 1 LF
2042 Replace/Install Underground Water Line 3/4 - 2" 5000 LF
2043 Replace/Install Underground Water Line 2 - 4" 1000 LF
2044 Replace/Install Underground sewer line 2 - 4" 500 LF
2045 Utility Road Crossing 500 LF
2046 Rock Excavation for Utility Lines 500 EA
2047 Replace Freeze Reistant Water Hydrant 40 EA
2048 Sewer System Inspection 10 EA
2049 Inspect Reduce Pressure Zone Assembly 20 EA for the period of 01 February 2028 through 31 January 2029.
SCHEDULE C - SECOND OPTION PERIOD - LINE ITEM 2046 - 2063 TOTAL:
SCHEDULE C PLUMBING MAINTENANCE
SECOND OPTION PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., 3032 Service Call 100 EA
3033 Emergency Service Call 30 EA
3034 Unscheduled Labor Hours 300 HR
3035 Materials Cost 80000 US Dollar $1.00 80,000.00$
3036 Repair Water Leak 20 EA
3037 Unplug Sewer System 12 EA
3038 Replace Sewer Pump 12 EA
3039 Start Up Water System Phase 1 1 EA
3040 Start Up Water System Phase 2 1 EA
3041 Shut Down Water System 1 LF
3042 Replace/Install Underground Water Line 3/4 - 2" 5000 LF
3043 Replace/Install Underground Water Line 2 - 4" 1000 LF
3044 Replace/Install Underground sewer line 2 - 4" 500 LF
3045 Utility Road Crossing 500 LF
3046 Rock Excavation for Utility Lines 500 EA
3047 Replace Freeze Reistant Water Hydrant 40 EA
3048 Sewer System Inspection 10 EA
3049 Inspect Reduce Pressure Zone Assembly 20 EA
SCHEDULE C PLUMBING MAINTENANCE
for the period of 01 February 2029 through 31 January 2030.
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., SCHEDULE C - THIRD OPTION PERIOD - LINE ITEM 3046 - 3063 TOTAL:
4032 Service Call 100 EA
4033 Emergency Service Call 30 EA
4034 Unscheduled Labor Hours 300 HR
4035 Materials Cost 80000 US Dollar $1.00 80,000.00$
4036 Repair Water Leak 20 EA
4037 Unplug Sewer System 12 EA
4038 Replace Sewer Pump 12 EA
4039 Start Up Water System Phase 1 1 EA
4040 Start Up Water System Phase 2 1 EA
4041 Shut Down Water System 1 LF
4042 Replace/Install Underground Water Line 3/4 - 2" 5000 LF
4043 Replace/Install Underground Water Line 2 - 4" 1000 LF
4044 Replace/Install Underground sewer line 2 - 4" 500 LF
4045 Utility Road Crossing 500 LF
4046 Rock Excavation for Utility Lines 500 EA
4047 Replace Freeze Reistant Water Hydrant 40 EA
4048 Sewer System Inspection 10 EA
4049 Inspect Reduce Pressure Zone Assembly 20 EA
SCHEDULE C PLUMBING MAINTENANCE
GREERS FERRY PROJECT OFFICE
FOURTH OPTION PERIOD - BID SHEET
Furnish all necessary management, personnel, incidental materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in the Performance Work Statement, at Greers Ferry Lake for the period of 01 February 2030 through 31 January 2031.
SCHEDULE C - FOURTH OPTION PERIOD - LINE ITEM 4046 - 4063 TOTAL:
TOTAL CONTRACT VALUE - ALL SCHEDULES
SCHEDULE C BASE, FIRST, SECOND, THIRD, AND FOURTH OPTION PERIOD - TOTAL:
Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-3 Gratuities. 1984-04
52.204-13 System for Award Management Maintenance.
2018-10
52.204-18 Commercial and Government Entity Code Maintenance.
2020-08
52.204-21 Basic Safeguarding of Covered Contractor Information Systems.
2021-11
52.212-4 Contract Terms and Conditions- Commercial Products and Commercial Services.
2023-11
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7004 Antiterrorism Awareness Training for Contractors.
2023-01
252.205-7000 Provision of Information to Cooperative Agreement Holders.
2024-10
252.225-7012 Preference for Certain Domestic 2022-04
Commodities.
252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns.
2023-01
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
252.232-7010 Levies on Contract Payments. 2006-12
252.243-7002 Requests for Equitable Adjustment. 2022-12
252.244-7000 Subcontracts for Commercial Products or Commercial Services.
2023-11
252.247-7023 Transportation of Supplies by Sea. 2024-10
FAR Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.219-14 Limitations on Subcontracting
(DEVIATION 2021-O0008)
2022-10 Deviation 2021-O0008
2023-02
LIMITATIONS ON SUBCONTRACTING (FEB 2023) (DEVIATION 2021-O0008)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) , as used in this clause, means a first-tierDefinition. Similarly situated entity subcontractor, including an independent contractor, that--
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) This clause applies only to--Applicability.
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are--
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are--
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii);
and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) An independent contractor shall be considered aIndependent contractors.
subcontractor.
(e) By submission of an offer and execution of a contract,Limitations on subcontracting.
the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for--
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. The following services may be excluded from the 50 percent limitation:
(i) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code 562910), cloud computing services, or mass media purchases.
(ii) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause--
By the end of the base term of the contract and then by the end of each subsequent option period; or
X By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protege in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
(End of clause)
Contract Terms and Conditions Required To Implement Statutes or Executive Orders — Commercial Products and Commercial Services
FAR Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Products and Commercial Services. (DEVIATION 2025-O0003 and 2025-O0004)
2025-10 Deviation 2025- O0004
2025-03
Contract Terms and Conditions Required To Implement Statutes or Executive Orders- Commercial Products and Commercial Services (MAR 2025) (DEVIATION 2025-O0003 and 2025-O0004)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (section 743 of Division E, Title VII, of the Consolidated and Further(Jan 2017) Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Section 1634 of Pub. L. 115-91).(Dec 2023)
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Section 889(a)(1)(A) of Pub. L. 115-232).(Nov 2021)
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations .(Nov 2015)
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar (31 U.S.C. 3903 and 10 U.S.C. 3801).2023)
(6) 52.233-3, Protest After Award (31 U.S.C. 3553).(Aug 1996)
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Public Laws 108-77(Oct 2004) and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
52.203-6, Restrictions on Subcontractor Sales to the Government with X (1) (Jun 2020), (41 U.S.C. 4704 and 10 U.S.C. 4655).Alternate I (Nov 2021)
52.203-13, Contractor Code of Business Ethics and Conduct (41 U.S.(2) (Nov 2021) C. 3509)).
52.203-15, Whistleblower Protections under the American Recovery and Reinvestment(3) Act of 2009 (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the(Jun 2010) American Recovery and Reinvestment Act of 2009.)
52.203-17, Contractor Employee Whistleblower Rights (41 U.S.C. 4712); this(4) (Nov 2023) clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community-see FAR 3.900(a).
52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards X (5) (Jun (Pub. L. 109-282) ( 31 U.S.C. 6101 note).2020)
[Reserved].(6)
52.204-14, Service Contract Reporting Requirements (Pub. L. 111-117,(7) (Oct 2016) section 743 of Div. C).
52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts(8) (Pub. L. 111-117, section 743 of Div. C).(Oct 2016)
52.204-27, Prohibition on a ByteDance Covered Application (Section 102 of X (9) (Jun 2023) Division R of Pub. L. 117-328).
52.204-28, Federal Acquisition Supply Chain Security Act Orders-Federal Supply(10) Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) (Pub. L. 115-390, title II).
(11)
X (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders-Prohibition. (Dec (Pub. L. 115-390, title II).2023)
Alternate I of 52.204-30.(ii) (Dec 2023)
X (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. ( Jan 2025) (31 U.S.C. 6101 note).
52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters X (13) (41 U.S.C. 2313).(Oct 2018)
[Reserved].(14)
52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award ( ) (15 U.S.(15) Oct 2022 C. 657a).
52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns(16) ( ) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.Oct 2022 S.C. 657a).
[Reserved](17)
(18)
X (i) 52.219-6, Notice of Total Small Business Set-Aside (15 U.S.C. 644).(Nov 2020)
Alternate I of 52.219-6.(ii) (Mar 2020)
(19)
(i) 52.219-7, Notice of Partial Small Business Set-Aside (15 U.S.C. 644).(Nov 2020)
Alternate I of 52.219-7.(ii) (Mar 2020)
52.219-8, Utilization of Small Business Concerns (15 U.S.C. 637(d)(2) and X (20) ( )Jan 2025 (3)).
(21)
(i) 52.219-9, Small Business Subcontracting Plan (15 U.S.C. 637(d)(4)).( )Jan 2025
Alternate I of 52.219-9.(ii) (Nov 2016)
Alternate II of 52.219-9.(iii) (Nov 2016)
Alternate III of 52.219-9.(iv) (Jun 2020)
Alternate IV of 52.219-9.(v) ( )Jan 2025
(22)
(i) 52.219-13, Notice of Set-Aside of Orders (15 U.S.C. 644(r)).(Mar 2020)
Alternate I of 52.219-13.(ii) (Mar 2020)
52.219-14, Limitations on Subcontracting ( ) (15 U.S.C. 657s).(23) Oct 2022
52.219-16, Liquidated Damages-Subcontracting Plan (15 U.S.C. 637(d)(4)(24) (Sep 2021) (F)(i)).
52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-(25) Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb
) (15 U.S.C. 657f).2024
(26)
X (i) 52.219-28, Small Business Program Rerepresentation (15 U.S.Postaward ( )Jan 2025 C. 632(a)(2)).
Alternate I of 52.219-28.(ii) (Mar 2020)
52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically(27) Disadvantaged Women-Owned Small Business Concerns ( ) (15 U.S.C. 637(m)).Oct 2022
52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small(28) Business Concerns Eligible Under the Women-Owned Small Business Program ( )Oct 2022 (15 U.S.C. 637(m)).
52.219-32, Orders Issued Directly Under Small Business Reserves (15 U.S.(29) (Mar 2020) C. 644(r)).
52.219-33, Nonmanufacturer Rule (15 U.S.C. 637(a)(17)).(30) (Sep 2021)
52.222-3, Convict Labor (E.O.11755).X (31) (Jun 2003)
(32) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (E.O.(Jan 2025) 13126).
[Reserved](33)
[Reserved](34)
(35)
X (i) 52.222-35, Equal Opportunity for Veterans (38 U.S.C. 4212).(Jun 2020)
Alternate I of 52.222-35.(ii) (Jul 2014)
(36)
X (i) 52.222-36, Equal Opportunity for Workers with Disabilities (29 U.S.C. 793).(Jun 2020)
Alternate I of 52.222-36.(ii) (Jul 2014)
52.222-37, Employment Reports on Veterans ( ) (38 U.S.C. 4212).X (37) Jun 2020
52.222-40, Notification of Employee Rights Under the National Labor Relations Act X (38) (E.O. 13496).(Dec 2010)
(39)
X (i) 52.222-50, Combating Trafficking in Persons (22 U.S.C. chapter 78 and E.(Nov 2021) O. 13627).
Alternate I of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).(ii) (Mar 2015)
X (40) 52.222-54, Employment Eligibility Verification (Executive Order 12989). (Jan 2025) (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
(41)
X (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
Alternate I of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the(ii) (May 2008) acquisition of commercially available off-the-shelf items.)
52.223-11, Ozone-Depleting Substances and High Global Warming Potential(42) Hydrofluorocarbons (42 U.S.C. 7671, ).(May 2024) et seq.
52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and(43) Air Conditioners (42 U.S.C. 7671, ).(May 2024) et seq.
52.223-20, Aerosols (42 U.S.C. 7671, ).(44) (May 2024) et seq.
52.223-21, Foams (42 U.S.C. 7671, ).(45) (May 2024) et seq.
52.223-23, Sustainable Products and Services (MAR 2025) (DEVIATION 2025-X (46) O0004)) (7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).
(47)
(i) 52.224-3 Privacy Training (5 U.S.C. 552 a).(Jan 2017)
Alternate I of 52.224-3.(ii) (Jan 2017)
(48)
(i) 52.225-1, Buy American-Supplies (41 U.S.C. chapter 83).(Oct 2022)
Alternate I of 52.225-1.(ii) (Oct 2022)
(49)
(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (19 U.S.C.(NOV 2023) 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C.
chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
Alternate I [Reserved].(ii)
Alternate II of 52.225-3.(iii) (Jan 2025)
Alternate III of 52.225-3.(iv) (Feb 2024)
Alternate IV (Oct 2022) of 52.225-3.(v)
52.225-5, Trade Agreements (19 U.S.C. 2501, ., 19 U.S.C. 3301(50) (NOV 2023) et seq note).
52.225-13, Restrictions on Certain Foreign Purchases (E.O.'s, X (51) (Feb 2021) proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
52.225-26, Contractors Performing Private Security Functions Outside the United States(52) (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).(53)
52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (54) (Nov (42 U.S.C. 5150).2007)
52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving X (55) (May (E.O. 13513).2024)
52.229-12, Tax on Certain Foreign Procurements .X (56) (Feb 2021)
52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial(57) Services (41 U.S.C. 4505, 10 U.S.C. 3805).(Nov 2021)
52.232-30, Installment Payments for Commercial Products and Commercial Services(58) (41 U.S.C. 4505, 10 U.S.C. 3805).(Nov 2021)
52.232-33, Payment by Electronic Funds Transfer-System for Award Management X (59) (31 U.S.C. 3332).(Oct2018)
52.232-34, Payment by Electronic Funds Transfer-Other than System for Award(60) Management (Jul 2013) (31 U.S.C. 3332).
52.232-36, Payment by Third Party (31 U.S.C. 3332).(61) (May 2014)
52.239-1, Privacy or Security Safeguards (5 U.S.C. 552a).(62) (Aug 1996)
52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by X (63) American Security Drone Act-Covered Foreign Entities (Sections 1821-1826, (Nov 2024) Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
52.242-5, Payments to Small Business Subcontractors (15 U.S.C. 637(d)(64) (Jan 2017) (13)).
(65)
(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (46(Nov 2021) U.S.C. 55305 and 10 U.S.C. 2631).
Alternate I of 52.247-64.(ii) (Apr 2003)
Alternate II of 52.247-64.(iii) (Nov 2021)
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
52.222-41, Service Contract Labor Standards (41 U.S.C. chapter67).X (1) (Aug 2018)
52.222-42, Statement of Equivalent Rates for Federal Hires (29 U.S.C. 206 X (2) (May 2014) and 41 U.S.C. chapter 67).
52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price(3) Adjustment (Multiple Year and Option Contracts) (29 U.S.C. 206 and 41 U.S.(Aug 2018) C. chapter 67).
52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price(4) Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).
52.222-51, Exemption from Application of the Service Contract Labor Standards to(5) Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
52.222-53, Exemption from Application of the Service Contract Labor Standards to(6) Contracts for Certain Services-Requirements (41 U.S.C. chapter 67).(May 2014)
52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 X (7) .(Jan 2022)
52.222-62, Paid Sick Leave Under Executive Order 13706 (E.O. 13706).X (8) (Jan 2022)
52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.(9) S.C. 1792).
52.247-69, Reporting Requirement for U.S.-Flag Air Carriers Regarding Training to(10) Prevent Human Trafficking (49 U.S.C. 40118(g)).(Jan 2025)
(d) . The Contractor shall comply with theComptroller General Examination of Record provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)
(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (41 U.S.C. 3509).(Nov 2021)
(ii) 52.203-17, Contractor Employee Whistleblower Rights (41 U.S.C. 4712).(Nov 2023)
(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iv) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Section 1634 of Pub. L. 115-91).(Dec 2023)
(v) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Section 889(a)(1)(A) of Pub. L. 115-232).(Nov 2021)
(vi) 52.204-27, Prohibition on a ByteDance Covered Application (Section 102 of(Jun 2023) Division R of Pub. L. 117-328).
(vii)
(A) 52.204-30, Federal Acquisition Supply Chain Security Act Orders-Prohibition. (Dec 2023) (Pub. L. 115-390, title II).
(B) Alternate I of 52.204-30.(Dec 2023)
(viii) 52.219-8, Utilization of Small Business Concerns (15 U.S.C. 637(d)(2) and( )Jan 2025 (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(ix) [Reserved]
(x) [Reserved]
(xi) 52.222-35, Equal Opportunity for Veterans (38 U.S.C. 4212).(Jun 2020)
(xii) 52.222-36, Equal Opportunity for Workers with Disabilities (29 U.S.C. 793).(Jun 2020)
(xiii) 52.222-37, Employment Reports on Veterans (38 U.S.C. 4212).(Jun 2020)
(xiv) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR(Dec 2010) clause 52.222-40.
(xv) 52.222-41, Service Contract Labor Standards (41 U.S.C. chapter 67).(Aug 2018)
(xvi)
(A) 52.222-50, Combating Trafficking in Persons (22 U.S.C. chapter 78 and E.O(Nov 2021) 13627).
(B) Alternate I of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).(Mar 2015)
(xvii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(xviii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (41 U.S.C. chapter 67).(May 2014)
(xix) 52.222-54, Employment Eligibility Verification (E.O. 12989).(Jan 2025)
(xx) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan .2022)
(xxi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (E.O. 13706).(Jan 2022)
(xxii)
(A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
(B) Alternate I of 52.224-3.(Jan 2017)
(xxiii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Section 862, as amended, of the National Defense Authorization Act for(Oct 2016) Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
(xxiv) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxv) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801). Flow down required in accordance with paragraph (c) of 52.232-40.
(xxvi) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Sections 1821-1826,(Nov 2024) Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
(xxvii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov (46 U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with2021) paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
Addendum to Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-12 Limitation on Payments to Influence Certain Federal Transactions.
2020-06
52.204-19 Incorporation by Reference of Representations and Certifications.
2014-12
52.223-5 Pollution Prevention and Right-to- Know Information.
2024-05
52.223-10 Waste Reduction Program.
(DEVIATION 2025-O0004)
2024-05 Deviation 2025- O0004
2025-03
52.228-5 Insurance-Work on a Government Installation.
1997-01
52.232-23 Assignment of Claims. 2014-05
52.232-39 Unenforceability of Unauthorized Obligations.
2013-06
52.237-2 Protection of Government Buildings, Equipment, and Vegetation.
1984-04
52.242-13 Bankruptcy. 1995-07
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. 1991-12
252.204-7003 Control of Government Personnel Work Product.
1992-04
252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.
2019-05
252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements.
2023-01
252.225-7048 Export-Controlled Items. 2013-06
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.
2023-01
252.243-7001 Pricing of Contract Modifications. 1991-12
FAR Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.216-18 Ordering. 2020-08
Ordering (Aug 2020)
Any supplies and services to be furnished under this contract shall be ordered by(a) issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of contract award through 31 January 2031.
All delivery orders or task orders are subject to the terms and conditions of this contract.(b) In the event of conflict between a delivery order or task order and this contract, the contract shall control.
A delivery order or task order is considered "issued" when-(c)
If sent by mail (includes transmittal by U.S. mail or private delivery service), the(1) Government deposits the order in the mail;
If sent by fax, the Government transmits the order to the Contractor's fax number; or(2)
If sent electronically, the Government either-(3)
Posts a copy of the delivery order or task order to a Government document access(i) system, and notice is sent to the Contractor; or
Distributes the delivery order or task order via email to the Contractor's email address.(ii)
Orders may be issued by methods other than those enumerated in this clause only if(d) authorized in the contract.
(End of clause)
52.216-19 Order Limitations. 1995-10
Order Limitations (Oct 1995)
. When the Government requires supplies or services covered by this(a) Minimum order contract in an amount of less than , the Government is not obligated to purchase, nor$2,500 is the Contractor obligated to furnish, those supplies or services under the contract.
. The Contractor is not obligated to honor-(b) Maximum order
Any order for a single item in excess of (1) quantities available during a single ordering period.
Any order for a combination of items in excess of (2) quantities available during a single ordering period.
A series of orders from the same ordering office within that together call for(3) five (5) years quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
If this is a requirements contract ( includes the Requirements clause at subsection(c) i.e., 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any(d) order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within days after issuance, withseven (7) calendar written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
52.216-22 Indefinite Quantity. 1995-10
Indefinite Quantity (Oct 1995)
This is an indefinite-quantity contract for the supplies or services specified, and effective(a) for the period stated, in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .