Combined Specs.pdf
PDF 7 MB Posted
- Solicitation number
- 36C24621R0041
About this file
This presolicitation notice announces a requirement for renovation services at the W.G. Bill Hefner VA Medical Center in Salisbury, North Carolina. The project scope involves renovating Building 3 to improve Primary Care Access Teams implementation and address facility condition assessment deficiencies. The period of performance is 729 calendar days from notice to proceed. The estimated construction cost is between $5 million and $10 million. The procurement will be a service-disabled veteran-owned small business set-aside. The specifications, drawings and amendments will be posted on the website on or about March 1, 2021. Proposals will be due 30 days after solicitation issuance. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The point of contact is Guy Brooks at the listed email and phone.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2019 Salisbury VAMC Asbestos Survey.pdf | ||
| 36C24621R0041 0002.docx | DOCX document | |
| 20210511_19-080_Rev 1_ A-002.pdf | ||
| 36C24621R0041 0002.pdf | ||
| 36C24621R0041 0001.pdf | ||
| Bldg.3 Pact Sign in Sheet_2021.pdf | ||
| 36C24621R0041 0001.docx | DOCX document | |
| Attachment A - Itemized Schedule of Values Cost Breakdown.xlsx | XLSX spreadsheet | |
| 36C24621R0041.docx | DOCX document | |
| Combined Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SPECIFICATIONS
Department of Veterans Affairs W.G. Hefner VAMC
Reno Bldg. 3, for PACT Implementation/FCA Deficiencies
VA Project No. 659-18-103
Construction Documents October 6, 2020
Prepared by:
Apogee Consulting Group, PA
1151 Kildaire Farm Road Cary, NC 27511
W.G. Hefner VAMC October 6, 2020 Reno Bldg. 3, for PACT Implementation/FCA Deficiencies 100% Construction Documents Salisbury, NC Project No. 659-18-103
Jeffery A Brooks, RA Architect
Michael G. Talbot, PE Mechanical Engineer
John Kevin Mason, PE Electrical Engineer
DocuSign Envelope ID: AC303A51-04D0-4DE9-85AC-FEBFD20C152C
10/7/2020
10/7/2020 10/7/2020
00 01 10 - 1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 12-18 Salisbury VAMC Design and Construction Manual 12-19 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 09-19 01 45 29 Testing Laboratory Services 11-18 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17
DIVISION 02 – EXISTING CONDITIONS
02 41 19 Selective Demolition 06-14 02 82 13.13 Glovebag Asbestos Abatement 09-15 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15 02 83 33.13 Lead-Based Paint Removal and Disposal 08-16
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 07-19
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 02-16 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 40 00 Cold-Formed Metal Framing 05-16 05 50 00 Metal Fabrications 08-18
00 01 10 - 2
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 06 00 Resin Panels 1-20 06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 10-17 07 60 00 Flashing and Sheet Metal 07-14 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 02-16
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 31 13 Access Doors and Frames 02-16 08 71 00 Door Hardware 10-19 08 71 13 Automatic Door Operators 02-16 08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 06-18 09 23 00 Gypsum Plastering 10-15 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 68 00 Carpeting 10-15 09 72 00 Rigid Vinyl Wallcovering 12-19 09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
10 21 23 Cubicle Curtain Tracks 05-15 10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework 09-15 12 36 00 Countertops 12-18
00 01 10 - 3
12 51 16.19 Plastic Laminate Casework Modular
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 33 00 Electric Domestic Water Heaters 09-15 22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 08-17 23 05 41 Noise and Vibration Control for HVAC Piping & Equipment 02-15 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 11-16 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 08-17 23 21 23 Hydronic Pumps 08-17 23 22 13 Steam and Condensate Heating Piping 08-17 23 25 00 HVAC Water Treatment 02-15 23 31 00 HVAC Ducts and Casings 03-13 23 37 00 Air Outlets and Inlets 02-15 23 82 00 Convection Heating and Cooling Units 04-11
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 09 23 Lighting Controls 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 51 00 Interior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18
00 01 10 - 4
27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Telecommunications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 41 31 Master Antenna Television Equipment and Systems 06-15 27 51 16 Public Address and Mass Notification Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors & Cables for Electronic Safety and Security 10-18 28 05 26 Grounding & Bonding for Electronic Safety and Security 09-11 28 05 28.33 Conduits & Backboxes for Electronic Safety and Security 09-11 28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
G-001 COVER AND INDEX OF DRAWINGS 1 7
G-002 GENERAL INFORMATION 2 7
G-003 INFECTION CONTROL RISK ASSESSMENT (ICRA) 3 7
G-004 ICRA DETAILS 4 7
GC101 PHASING PLANS 5 7
LS101 CODE DATA, LIFE SAFETY PLAN - THIRD FLOOR 6 7
LS102 CODE DATA, LIFE SAFETY PLAN - FOURTH FLOOR 7 7
ARCHITECTURAL
A-001 ARCHITECTURAL LEGEND, ABBREVIATIONS, NOTES 1 20
A-002 PARTITION TYPES AND DETAILS 2 20
AD101 THIRD FLOOR DEMOLITION PLAN - AREA A 3 20
AD102 THIRD FLOOR DEMOLITION PLAN - AREA B 4 20
AD103 FOURTH FLOOR DEMOLITION PLAN - AREA A 5 20
AD104 FOURTH FLOOR DEMOLITION PLAN - AREA B 6 20
AD111 THIRD FLOOR REFLECTED CEILING DEMOLITION PLAN 7 20
AD112 FOURTH FLOOR REFLECTED CEILING DEMOLITION PLAN 8 20
AE101 THIRD FLOOR PLAN - AREA A 9 20
AE102 THIRD FLOOR DIMENSION PLAN - AREA A 10 20
AE103 THIRD FLOOR DIMENSION & NOTES PLAN - AREA B 11 20
AE104 FOURTH FLOOR PLAN - AREA A 12 20
AE105 FOURTH FLOOR DIMENSION PLAN - AREA A 13 20
AE106 FOURTH FLOOR DIMENSION & NOTES PLAN - AREA B 13 20
AC101 THIRD FLOOR REFLECTED CEILING PLAN - AREA A 15 20
AC102 THIRD FLOOR REFLECTED CEILING PLAN - AREA B 16 20
AC103 FOURTH FLOOR REFLECTED CEILING PLAN - AREA A 17 20
AC104 FOURTH FLOOR REFLECTED CEILING PLAN - AREA B 18 20
AE601 DOOR SCHEDULE, TYPES, DETAILS 19 20
AE602 DOOR DETAILS 20 20
INTERIORS
I-001 FINISH SCHEDULE 1 31
I-101 THIRD FLOOR FINISH PLAN 2 31
I-102 FOURTH FLOOR FINISH PLAN 3 31
I-110 THIRD FLOOR PATTERN PLAN 4 31
I-11 FOURTH FLOOR PATTERN PLAN 5 31
00 01 15 - 2
I-120 THIRD FLOOR WALL PROTECTION PLAN 6 31
I-130 FOURTH FLOOR WALL PROTECTION PLAN 7 31
I-201 CASEWORK ELEVATIONS 8 31
I-202 CASEWORK DETAILS 9 31
I-203 INTERIOR ELEVATIONS 10 31
I-204 INTERIOR ELEVATIONS 11 31
I-205 INTERIOR ELEVATIONS 12 31
I-206 INTERIOR ELEVATIONS 13 31
I-401 THIRD FLOOR OVERALL EQUIPMENT PLAN 14 31
I-402 THIRD FLOOR ENLARGED EQUIPMENT PLANS 15 31
I-403 THIRD FLOOR ENLARGED EQUIPMENT PLANS 16 31
I-404 THIRD FLOOR ENLARGED EQUIPMENT PLAN 17 31
I-405 ENLARGED TYPICAL FLOOR PLANS 18 31
I-406 ENLARGED TYPICAL FLOOR PLANS 19 31
I-407 ENLARGED TYPICAL FLOOR PLANS 20 31
I-408 FOURTH FLOOR OVERALL EQUIPMENT PLAN 21 31
I-409 FOURTH FLOOR ENLARGED EQUIPMENT FLOOR PLAN 22 31
I-410 FOURTH FLOOR ENLARGED EQUIPMENT FLOOR PLAN 23 31
I-411 FOURTH FLOOR ENLARGED EQUIPMENT FLOOR PLAN 24 31
I-412 ENLARGED RESTROOM PLANS AND ELEVATIONS 25 31
I-413 ENLARGED RESTROOM PLANS AND ELEVATIONS 26 31
I-414 ENLARGED RESTROOM PLANS AND ELEVATIONS 27 31
I-601 EQUIPMENT SCHEDULE 28 31
I-602 EQUIPMENT SCHEDULE 29 31
I-603 EQUIPMENT SCHEDULE 30 31
I-604 EQUIPMENT SCHEDULE 31 31
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 9
PP101 THIRD FLOOR PLUMBING - AREA A 2 9
PP102 THIRD FLOOR PLUMBING - AREA B 3 9
PP103 FOURTH FLOOR PLUMBING - AREA A 4 9
PP104 FOURTH FLOOR PLUMBING - AREA B 5 9
PD101 THIRD FLOOR PLUMBING DEMOLITION PLAN AREA A 6 9
PD102 THIRD FLOOR PLUMBING DEMOLITION PLAN AREA B 7 9
PD103 FOURTH FLOOR PLUMBING DEMOLITION PLAN AREA A 8 9
PD104 FOURTH FLOOR PLUMBING DEMOLITION PLAN AREA A 9 9
MECHANICAL
M001 MECHANICAL GENERAL INFORMATION 1 20
MD101 THIRD FLOOR MECHANICAL DEMOLITION PLAN AREA A 2 20
MD102 THIRD FLOOR MECHANICAL DEMOLITION AREA B 3 20
MD103 FOURTH FLOOR MECHANICAL DEMOLITION PLAN AREA A 4 20
00 01 15 - 3
MD104 FOURTH FLOOR MECHANICAL DEMOLITION PLAN AREA B 5 20
MH101 THIRD FLOOR HVAC PLAN AREA A 6 20
MH102 THIRD FLOOR HVAC PLAN AREA B 7 20
MH103 FOURTH FLOOR HVAC PLAN AREA A 8 20
MH104 FOURTH FLOOR HVAC PLAN AREA B 9 20
MP101 THIRD FLOOR MECHANICAL PIPING PLAN AREA A 10 20
MP102 THIRD FLOOR MECHANICAL PIPING PLAN AREA B 11 20
MP103 FOURTH FLOOR MECHANICAL PIPING PLAN AREA A 12 20
MP104 FOURTH FLOOR MECHANICAL PIPING PLAN AREA B 13 20
MP105 PARTIAL GROUND FLOOR MECHANICAL PLAN - AREA A 14 20
MP106 PARTIAL GROUND FLOOR MECHANICAL PLAN - AREA B 15 20
M-501 MECHANICAL DETAILS 16 20
M-502 MECHANICAL DETAILS 17 20
M-503 MECHANICAL CONTROLS 18 20
M-505 HOT WATER HEATING PIPING SCHEMATIC 19 20
M-601 MECHANICAL SCHEDULES 20 20
ELECTRICAL
E-001
ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND
ABBREVIATIONS 1 22
ED101 THIRD FLOOR ELECTRICAL DEMOLITION PLAN - AREA A 2 22
ED102 THIRD FLOOR ELECTRICAL DEMOLITION PLAN - AREA B 3 22
ED103 FOURTH FLOOR ELECTRICAL DEMOLITION PLAN - AREA A 4 22
ED104 FOURTH FLOOR ELECTRICAL DEMOLITION PLAN - AREA B 5 22
EP101 THIRD FLOOR POWER PLAN - AREA A 6 22
EP102 THIRD FLOOR POWER PLAN - AREA B 7 22
EP103 FOURTH FLOOR POWER PLAN - AREA A 8 22
EP104 FOURTH FLOOR POWER PLAN - AREA B 9 22
EM101 THIRD FLOOR MECHANICAL PLAN - AREA A 10 22
EM102 THIRD FLOOR MECHANICAL PLAN - AREA B 11 22
EM103 FOURTH FLOOR MECHANICAL POWER PLAN - AREA A 12 22
EM104 FOURTH FLOOR MECHANICAL POWER PLAN - AREA B 13 22
EL101 THIRD FLOOR LIGHTING PLAN - AREA A 14 22
EL102 THIRD FLOOR LIGHTING PLAN - AREA B 15 22
EL103 FOURTH FLOOR LIGHTING PLAN - AREA A 16 22
EL104 FOURTH FLOOR LIGHTING PLAN - AREA B 17 22
E-401 ELECTRICAL ENLARGEMENTS 18 22
E-501 ELECTRICAL DETAILS 18 22
E-601 SINGLE-LINE DIAGRAM AND EQUIPMENT CONDUCTOR SCHEDULE 19 22
E-602 ELECTRICAL SCHEDULES 21 22
E-603 ELECTRICAL SCHEDULES 22 22
TECHNOLOGY
T-001
TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND
ABBREVIATIONS 1 12
00 01 15 - 4
TD101 THIRD FLOOR TECHNOLOGY DEMOLITION PLAN – AREA A 2 12
TD102 THIRD FLOOR TECHNOLOGY DEMOLITION PLAN – AREA B 3 12
TD103 FOURTH FLOOR TECHNOLOGY DEMOLITION PLAN – AREA A 4 12
TD104 FOURTH FLOOR TECHNOLOGY DEMOLITION PLAN – AREA B 5 12
TK101 THIRD FLOOR TECHNOLOGY PLAN - AREA A 6 12
TK102 THIRD FLOOR TECHNOLOGY PLAN - AREA B 7 12
TK103 FOURTH FLOOR TECHNOLOGY PLAN - AREA A 8 12
TK104 FOURTH FLOOR TECHNOLOGY PLAN - AREA B 9 12
T-401 TECHNOLOGY ENLARGEMENTS 10 12
T-501 TECHNOLOGY DETAILS 11 12
T-502 TECHNOLOGY DETAILS 12 12
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 9
FD101 THIRD FLOOR FIRE ALARM DEMOLITION PLAN – AREA A 2 9
FD102 THIRD FLOOR FIRE ALARM DEMOLITION PLAN – AREA B 3 9
FD103 FOURTH FLOOR FIRE ALARM DEMOLITION PLAN – AREA A 4 9
FD104 FOURTH FLOOR FIRE ALARM DEMOLITION PLAN – AREA B 5 9
FA101 THIRD FLOOR FIRE ALARM PLAN - AREA A 6 9
FA102 THIRD FLOOR FIRE ALARM PLAN - AREA B 7 9
FA103 FOURTH FLOOR FIRE ALARM PLAN - AREA A 8 9
FA104 FOURTH FLOOR FIRE ALARM PLAN - AREA B 9 9
- - - E N D - - -
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing elements, and furnish the labor and materials and perform work to renovate the existing primary care space on the third and fourth floors of Building 3 to improve PACT implementation. In addition to Primary Care Improvements, this project includes substantial improvements to the HVAC system, accessibility issues, and restroom upgrades. Renovate as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
Contracting Officer’s Representative (COR).
C. Offices of Apogee Consulting Group, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work-days unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, and necessary removal of existing building elements and new construction to renovate the existing primary care space on the third and fourth floors of Building 3 to improve PACT implementation.
In addition to Primary Care Improvements, this project includes
01 00 00 - 2 substantial improvements to the HVAC system, accessibility issues, and restroom upgrades.
BID DEDUCT #1:
Omit the following work on the east side of the fourth floor in building 3, as indicated on the drawings.
This shall include the following items in the designated area:
1. Omit work for demolition of existing partitions, finishes and fixtures in the area indicated.
2. Omit work for repair/replacement of flooring, walls, base, ceiling finishes and bulkheads, and doors & frames in the area indicated.
3. Omit work for furnishings and equipment in the area indicated.
4. Omit work for plumbing, mechanical, electrical, low voltage, fire alarm work and ceiling-mounted devices in the area indicated.
Bidder shall provide a separate bid price for this work. If the alternate bid deduct is not accepted, the area will be renovated per drawings and specifications.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
B. See Salisbury VAMC Design and Construction Manual -12/2/2019 for additional specification requirements. The information in this document supersedes the requirements in the specification section(s) that it references.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
01 00 00 - 3
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Guards: N/A
D. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR)for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section
08 71 00, DOOR HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
01 00 00 - 4
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. There is no specific Contractor parking areas. You are not permitted to park in the garage, but they can park in any other general parking area.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
01 00 00 - 5
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
D. Working space and space available for storing materials shall be as shown on the drawings. as determined by the COR.
E. Workmen are subject to rules of Medical Center applicable to their conduct.
E*. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work-days. Provide unobstructed access to Medical Center areas required to remain in operation.
01 00 00 - 6
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
F*. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by the COR. All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
G. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing and dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing and dates to insure accomplishment of this work in successive phases mutually agreeable to the COR and Contractor, as follows:
H. Building(s) No.(s) 3 will be occupied during performance of work, but immediate areas of alterations will be vacated.
Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and
01 00 00 - 7 affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of
Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting, etc. to facilitate patient and staff access.
Coordinate alteration work in areas occupied by Department of
Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while alterations are performed.
I. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C
(40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
J. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any
01 00 00 - 8 energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
K. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
L. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
01 00 00 - 9
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
M. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of building 3 and areas of building in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces are required to be altered throughout affected areas of building 3.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
01 00 00 - 10
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR
852.236-88).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of building elements, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
01 00 00 - 11
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl (PCB) transformers and capacitors . The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the
Environmental Protection Agency (EPA) and the Department of
Transportation (DOT) as outlined in Code of Federal Regulation
(CFR), Titled 40 and 49 respectively. The EPA's Toxic Substance
Control Act (TSCA) Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-
7 also apply. Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the Uniform Hazardous Waste
Manifest (EPA Form 8700-22), along with the Uniform Hazardous Waste
Manifest Continuation Sheet (EPA Form 8700-22A) shall be returned to the Contracting Officer who will annotate the contract file and transmit the Manifest to the COR.
a. Copies of the following listed CFR titles may be obtained from the Government Printing Office:
40 CFR 261........Identification and Listing of Hazardous Waste
40 CFR 262........Standards Applicable to Generators of Hazardous
Waste
40 CFR 263........Standards Applicable to Transporters of
Hazardous Waste
40 CFR 761........PCB Manufacturing, Processing, Distribution in
Commerce, and use Prohibitions
49 CFR 172........Hazardous Material tables and Hazardous
Material Communications Regulations
49 CFR 173........Shippers - General Requirements for Shipments and Packaging
49 CRR 173........Subpart A General
49 CFR 173........Subpart B Preparation of Hazardous Material for
Transportation
01 00 00 - 12
49 CFR 173........Subpart J Other Regulated Material; Definitions and Preparation
TSCA..............Compliance Program Policy Nos. 6-PCB-6 and 6-
PCB-7
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge
Elimination System (NPDES) permit is required for this project. The
Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical
01 00 00 - 13 center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.
Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the
Contractor's method of operations and operations planning and the
Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
- Designating areas for equipment maintenance and repair;
- Providing waste receptacles at convenient locations and provide regular collection of wastes;
- Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and
- Providing adequately maintained sanitary facilities.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services
01 00 00 - 14 or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR
52.236-2).
1.11 PHYSICAL DATA
A. Data and information furnished or referred to below is for the
Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Apogee
Consulting Group.
(FAR 52.236-4)
B. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of
Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
(FAR 52.236-17)
1.12 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR's review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
01 00 00 - 15
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.13 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit two sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the
Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
01 00 00 - 16
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and Maintenance manuals.
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance Bond: The Performance Bond must remain effective throughout the construction period.
1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.
2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.
01 00 00 - 17
3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.
C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for
Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for
Contractor response, and other details deemed necessary by the
Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.
This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.
D. Contractor’s Response to Construction Warranty Service Requirements:
Following oral or written notification by the Contracting Officer, the
Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.
Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the
Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.
1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.
01 00 00 - 18
2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.
3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.
4. The “Construction Warranty Service Priority List” is as follows:
Code 1-Life Safety Systems
a. Fire suppression systems.`
b. Fire alarm system(s).
Code 1-Air Conditioning Systems
a. Air conditioning leak in part of the building, if causing damage.
b. Air conditioning system not cooling properly.
Code 1 Doors
a. Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.
Code 3-Doors
a. Interior/exterior personnel doors or hardware not functioning properly.
Code 1-Electrical
a. Power failure (entire area or any building operational after 1600 hours).
b. Security lights.
c. Smoke detectors.
Code 2-Electrical
a. Power failure (no power to a room or part of building).
b. Receptacles and lights not operational (in a room or part of building).
Code 1-Gas
a. Leaks and pipeline breaks.
Code 1-Heat
a. Power failure affecting heat.
Code 1-Plumbing
a. Hot water heater failure.
b. Leaking water supply pipes.
Code 2-Plumbing
a. Flush valves not operating properly
b. Fixture drain, supply line or any water pipe leaking.
01 00 00 - 19
c. Toilet leaking at base.
Code 3- Plumbing
a. Leaky faucets.
Code 3-Interior
a. Floors damaged.
b. Paint chipping or…