Combined_QUALRQMT.pdf
PDF 5 MB Posted
- Attached to
- Repair of AN/APG 68 F-16 C/D Multi SRU Repair
- Solicitation number
- FA825125R0005
About this file
These are Repair Qualification Requirements documents for multiple components of the AN/APG-68 Radar used in F-16 C/D aircraft. The documents outline detailed qualification criteria for potential repair sources of various radar subassemblies, including Receiver Assembly, Reference Oscillator, Controller Analog Board, Controller Interface Board, Controller CPU Board, Sample Data Board, Frequency Synthesizer, and multiple digital and electronic modules.
The qualification process requires offerors to demonstrate capabilities through comprehensive testing, including facility inspections, data verification, repair process validation, and submission of pre-contract qualification articles. Each component requires approximately $5,000-$8,500 in testing costs, with a 180-day qualification completion estimate. The documents are part of a five-year requirements contract for radar repairs issued by the Department of the Air Force Materiel Command Air Force Sustainment Center, with a Firm Fixed Price structure. Potential repair sources must meet stringent technical, quality, and documentation requirements specified by Northrop Grumman Corporation engineering specifications to be considered for contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA825125R0005 Amendment 1.pdf | ||
| CDRLs.pdf | ||
| WD.pdf | ||
| Section_L_Proposal_Instructions_SRUs.pdf | ||
| Section_M_Evaluation_Factors_for_Award_SRUs.pdf | ||
| Combined_ITMDESC_Report.pdf | ||
| Combined_QAIRQMT_Report.pdf | ||
| SOW.pdf | ||
| PACKAGING REQUIREMENTS.pdf | ||
| Combined_RDL_Report.pdf | ||
| TRNSPDATA_REPORT.pdf | ||
| Combined_UIIEC_Report.pdf | ||
| Special_Packaging_Instruction.pdf | ||
| PWS.pdf | ||
| FA825125R0005.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR QUALIFICATION REQUIREMENTS
NSN: 1270-01-194-5732
P/N: 690R935G01 Noun: Receiver Assembly Application: APG68 Radar
28 Oct 2024 Section C 1/3
SECTION C:
1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
a. Prequalification Notice: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Receiver Assembly.
b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to repair, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
c. Data Verification: The offeror must verify that they have a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 690R935G01. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
d. Repair Process Verification: The offeror must repair this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 416 SCMS/GUEAA. The offeror shall also identify its sources for materials and its standards for internally used processes.
e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 416 SCMS/GUEAA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 690R935G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of Drawing 690R935G01. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the
P/N: 690R935G01
28 Oct 2024 Section C 2/3 repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 60 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award.
g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified are $5000.00.
h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 180 days. This is based on complexity of the Receiver Assembly and other factors.
i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.
j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved repair source for this item. Approval, however, does not guarantee subsequent contract award.
P/N: 690R935G01
28 Oct 2024 Section C 3/3
2. SOURCE QUALIFICATION WAIVER REQUIREMENTS
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:
a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).
b. QWC2: N/A
c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.
d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.
e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.
f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the repair process.
NSN: 1270-01-208-8409
P/N: 758R570G01 Noun: Refrence Oscillator
28 Oct 2024 Section C 1/3 contracting office, of intent to qualify as a source for this Refrence Oscillator.
including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 758R570G01. The offeror may also be required to offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 758R570G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract of the requirements of Drawing 758R570G01. This article shall be subjected to a form, fit, and
P/N: 758R570G01
28 Oct 2024 Section C 2/3 repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 60 days of submitting a product for of the Refrence Oscillator and other factors.
contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 758R570G01
28 Oct 2024 Section C 3/3
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, NSN: 5998-01-195-8634
P/N: 756R222G01 Noun: Controller Analog Board
30 Oct 2024 Section C 1/3 contracting office, of intent to qualify as a source for this Controller Analog Board.
including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 756R222G01. The offeror may also be required to offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 756R222G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract of the requirements of Drawing 756R222G01. This article shall be subjected to a form, fit, and
P/N: 756R222G01
30 Oct 2024 Section C 2/3 repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 60 days of submitting a product for of the Controller Analog Board and other factors.
contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 756R222G01
30 Oct 2024 Section C 3/3
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, NSN: 5998-01-232-5232 & 5998-01-431-4658
P/N: 756R912G01 & 785R772G01 Noun: Controller Interface Board
4 Nov 2024 Section C 1/3 contracting office, of intent to qualify as a source for this Controller Interface Board.
including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 756R912G01 & 785R772G01. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 756R912G01 & 785R772G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract of the requirements of Drawing 756R912G01 & 785R772G01. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to
P/N: 756R912G01 & 785R772G01
4 Nov 2024 Section C 2/3 evaluate the repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 60 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award.
of the Controller Interface Board and other factors.
contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 756R912G01 & 785R772G01
4 Nov 2024 Section C 3/3
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, P/N: 756R912G01 & 785R772G01 contracting office, of intent to qualify as a source for this Controller Interface Board.
including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 756R912G01 & 785R772G01. The offeror may also be offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 756R912G01 & 785R772G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract of the requirements of Drawing 756R912G01 & 785R772G01. This article shall be subjected to a
P/N: 756R912G01 & 785R772G01 qualification article passed or failed the required qualification testing within 60 days of of the Controller Interface Board and other factors.
contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 756R912G01 & 785R772G01
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, NSN: 5998-01-278-6462 & 5998-01-298-9139
P/N: 762R613G01 & 765R886G01 Noun: Controller CPU Board
6 Nov 2024 Section C 1/3 contracting office, of intent to qualify as a source for this Controller CPU Board.
including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 762R613G01 & 765R886G01. The offeror may also be offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 762R613G01 & 765R886G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract of the requirements of Drawing 762R613G01 & 765R886G01. This article shall be subjected to a
P/N: 762R613G01 & 765R886G01
6 Nov 2024 Section C 2/3 qualification article passed or failed the required qualification testing within 60 days of of the Controller CPU Board and other factors.
contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 762R613G01 & 765R886G01
6 Nov 2024 Section C 3/3
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, P/N: 762R613G01 & 765R886G01
6 Nov 2024 Section C 1/3 contracting office, of intent to qualify as a source for this Controller CPU Board.
including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 762R613G01 & 765R886G01. The offeror may also be offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 762R613G01 & 765R886G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract of the requirements of Drawing 762R613G01 & 765R886G01. This article shall be subjected to a
P/N: 762R613G01 & 765R886G01
6 Nov 2024 Section C 2/3 qualification article passed or failed the required qualification testing within 60 days of of the Controller CPU Board and other factors.
contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 762R613G01 & 765R886G01
6 Nov 2024 Section C 3/3
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, NSN: 5998-01-439-0667 & 5998-01-465-7637 & 5998-01-278-5983 & 5998-01-196-3759
P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01 Noun: Sample Data Board contracting office, of intent to qualify as a source for this Sample Data Board.
including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 792R027G01 & 792R689 & 762R031G01 & 750R962G01.
The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 792R027G01 & 792R689 & 762R031G01 & 750R962G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract
P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01 of the requirements of Drawing 792R027G01 & 792R689 & 762R031G01 & 750R962G01. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 60 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award.
of the Sample Data Board and other factors.
contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01 including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 792R027G01 & 792R689 & 762R031G01 & 750R962G01.
offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 792R027G01 & 792R689 & 762R031G01 & 750R962G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract
P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01 article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01 including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 792R027G01 & 792R689 & 762R031G01 & 750R962G01.
offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 792R027G01 & 792R689 & 762R031G01 & 750R962G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract
P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01 article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01 including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 792R027G01 & 792R689 & 762R031G01 & 750R962G01.
offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 792R027G01 & 792R689 & 762R031G01 & 750R962G01. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract
P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01 article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 792R027G01 & 792R689 & 762R031G01 & 750R962G01
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, NSN: 6625-01-126-0097
P/N: 12609799 Noun: Frequency Synthesizer
30 Oct 2024 Section C 1/3 contracting office, of intent to qualify as a source for this Frequency Synthesizer.
including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Corp. (cage 97942) drawing 12609799. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 12609799. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract of the requirements of Drawing 12609799. This article shall be subjected to a form, fit, and
P/N: 12609799
30 Oct 2024 Section C 2/3 repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 60 days of submitting a product for of the Frequency Synthesizer and other factors.
contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 12609799
30 Oct 2024 Section C 3/3
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written is currently with the requester and that the requester has the same or equivalent facilities, NSN: 5989-01-203-1936
P/N: 772R025G01 Noun: RF Controller Application: F-16 C/D AN/APG-68 Radar Dual Mode Transmitter
13 Jun 2019 Section C 1/3 contracting office, of intent to qualify as a source for this RF Controller.
including change notices, in the offeror’s possession including, at a minimum Northrop Grumman(97942) drawings 772R025G01, T320A44, T363A98. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawings T320A44, T363A98.
After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract of the requirements of Drawing T320A44, T363A98. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate
P/N: 772R025G01
13 Jun 2019 Section C 2/3 the repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 90 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.
which will be incurred by the potential offering party to become qualified are $5000 that completion of this qualification effort should require 270 days. This is based on complexity of the RF Controller and other factors.
contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed stated, in writing, in the qualification requirement before the date specified for award of the
P/N: 772R025G01
13 Jun 2019 Section C 3/3
Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify
b. QWC2: NA
c. QWC3: A source qualifi
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .