COMBINED Front Ends_IVGID Tennis Center Reconstruction Project - 20261113.pdf

PDF 7 MB Posted

Attached to
IVGID Tennis Center Reconstruction Project
Solicitation number
148317
Issued by
Washoe County, Nevada

About this file

Summary

This is a bidding package and contract document for the IVGID Tennis Center Reconstruction Project issued by the Incline Village General Improvement District (IVGID) Public Works Department in Nevada. The project involves resurfacing tennis courts 3-7 with removal and replacement of asphalt and acrylic surfaces, scarifying and regrading the aggregate base, and installing new interior fencing. Additional work includes drainage improvements for all tennis courts, the parking lot, and driveway, encompassing flushing and camera inspection of existing drain pipes, installation of new inlets, and construction of five new drainage basins. The work must be phased to maintain a minimum of three tennis courts in operation at all times. Bid alternates include resurfacing courts 1 and 2 and installation of post-tension concrete for all courts. The project is located at 964 Tahoe Blvd in Incline Village, Washoe County, Nevada. Lump sum proposals were due via PlanetBids by 2:00 p.m. on December 17, 2026, with a non-mandatory pre-bid conference scheduled for December 1, 2026 at 10:00 a.m. at the project site. The anticipated Notice to Proceed is on or about May 1, 2027, with substantial completion required by October 14, 2027, and final completion by October 30, 2027, for a total project duration of approximately 150 calendar days. The project is estimated at $4,300,000 including add alternates.

The contract is awarded on a lump sum basis to the lowest responsible bidder. Progress payments will be made at 95 percent of completed work value with 5 percent retainage prior to substantial completion, increasing to 97.5 percent upon substantial completion. Owner will pay liquidated damages of $2,500 per day for delays beyond the substantial completion and final completion dates. A bid bond equal to five percent of the maximum bid price is required, along with performance and payment bonds. Contractors must meet specific qualifications including successful completion of three similar tennis court construction projects within the past five years with minimum costs of $2,500,000 and contract durations of 120 to 180 days, preferably in the Lake Tahoe basin. All subcontractors and suppliers providing more than 5 percent of the bid amount must be identified at time of bid, with additional subcontractor details required from the three lowest bidders within two hours of bid opening. This is a prevailing wage project subject to Nevada Revised Statutes Chapter 338, requiring compliance with apprenticeship utilization requirements and submission of a Public Works Bidder's Preference Affidavit for eligibility. Contractors must possess appropriate Nevada contractor licenses and maintain a Washoe County Business License prior to commencing work. Interest accrues at 6 percent annually on amounts not paid when due.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Documents for

TENNIS CENTER RECONSTRUCTION PROJECT

IVGID Project Number TENNISCRT

PWP No. WA-2027-073

Issued for Bidding November 13, 2026

Prepared for:

INCLINE VILLAGE GENERAL IMPROVEMENT DISTRICT

Public Works Department

Prepared by:

INCLINE VILLAGE GENERAL IMPROVEMENT DISTRICT

Engineering Division 1220 Sweetwater Road

Incline Village, Nevada 89451

TENNISCRT Tennis Center Reconstruction Project

TABLE OF CONTENTS

Contract Documents

Section Description Pages

1 Invitation to Bid

2 Instructions to Bidders

3 Bid Form

4 Bid Bond

5 Agreement

6 Performance Bond

7 Payment Bond

8 Application and Certificate for Payment

9 Standard General Conditions

10 Supplementary Conditions

11 Washoe County 2027 Prevailing Wage Rates

12 Technical Specifications .................................................. See Technical Table of Contents

13 Geotechnical Report

Section 1 – Invitation to Bid TENNISCRT – Tennis Center Reconstruction Project Page 1 of 1

ADVERTISEMENT FOR BIDS

Lump Sum Proposals via PlanetBids will be received by the Incline Village General Improvement District (IVGID or District) Public Works Department until 2:00 p.m. December 17, 2026, for:

Tennis Center Reconstruction Project IVGID Project Number TENNISCRT

Said Proposal shall include all labor, tools, implements, machinery, materials, and any incidentals necessary to complete the work in the manner and time prescribed, and in strict conformity with the Contract Documents, to the satisfaction of the District Engineer. The Project includes the following Work:

Base bid consists of resurfacing tennis courts 3-7 including removal and replacement of asphalt and acrylic surface, scarify and regrade aggregate base, and install new interior fencing. Improve drainage for all tennis courts, parking lot, and driveway including flushing and camera inspection of existing drain pipes, install new inlets, and 5 new drainage basins. Work shall be phased such that a minimum of 3 tennis courts remain open at all times. Bid Alternates consists of resurfacing tennis courts 1&2 (to same specifications as courts 3-7), and installation of post-tension concrete for all courts. The work site is located at 964 Tahoe Blvd in Incline Village, Washoe County, Nevada.

Owner anticipates that the Project’s total bid price including add alternates will be approximately $4,300,000. The Project has an expected duration of 150 calendar days.

The Bidders attention is directed to Nevada Revised Statutes 338.01165, which sets forth the requirements for the use of apprentices on public works and requires a contractor or subcontractor to comply with certain requirements relating to the use of apprentices on public works.

Digital copies of the plans, specifications and related documents are available through the District’s PlanetBids portal at https://pbsystem.planetbids.com/portal/30437/portal-home. Only those bidders who have registered as a vendor and are included in and appear on the prospective bidders list may submit a bid.

This is a Prevailing Wage project. In accordance with the provisions of NRS 338, the IVGID Board of Trustees has ascertained from the Labor Commissioner the general prevailing wage in the locality of the District for each craft and type of workman, and the CONTRACT will contain in express terms the hourly and daily rate of such prevailing wage. The PWP number for this project is WA-2027-073.

No proposal will be accepted from a Contractor who is not licensed in accordance with the laws of this State to perform the work herein described. IVGID reserves the right to reject any or all bids pursuant to Nevada Law; to award a contract for less than all the work if funds now available are insufficient for completion of the total project; to waive any informalities or irregularities therein; and/or to award the bid to the lowest responsible bidder.

A non-mandatory pre-bid conference will be held on December 1, 2027 at 10:00 AM at the project site, 964 Tahoe Blvd (AKA Incline Village Tennis & Pickleball Center) in Incline Village, Washoe County Nevada. The closest access is from 980 Incline Way. All potential bidders are urged to attend.

All questions and RFIs should be directed through the District’s Planet Bids portal. For assistance with Planet Bids or downloading of documents, contact the IVGID Engineering office at 775-832-1203.

https://pbsystem.planetbids.com/portal/30437/portal-home

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 1 of 14

INSTRUCTIONS TO BIDDERS

ARTICLE 1—DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.

ARTICLE 2—BIDDING DOCUMENTS

2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.

2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.

2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.

2.04 Plan rooms (including construction information subscription services, and electronic and virtual plan rooms) may distribute the Bidding Documents, or make them available for examination.

Those prospective bidders that obtain an electronic (digital) copy of the Bidding Documents from a plan room are encouraged to register as plan holders from the Bidding Documents Website.

Owner is not responsible for omissions in Bidding Documents or other documents obtained from plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.

2.05 Electronic Documents

A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified above.

1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version XI Standard or later. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 2 of 14

Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.

B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.05.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.

ARTICLE 3—QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within 48 hours of Owner’s request, Bidder must submit the following information:

A. Contractor is required to have successfully performed three (3) tennis court construction projects of similar scope within the last five (5) years, including a minimum project total cost of $2,500,000, contract time of 120 to 180 days, and preferably work performed in the Lake Tahoe basin

B. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.

C. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.

D. Washoe County Business License prior to commencing construction.

E. Such licenses as may be required by the laws of the State of Nevada for the performance of work specified in the Contract Documents. Such licenses are required at the time of submitting bid. One time raise in licensing monetary limits shall be approved by the State of Nevada prior to the time of submitting bid and shall be submitted with the bid.

F. Each Bidder submitting a Bid Proposal to the Owner on a public work project whose estimated cost exceeds $250,000 is responsible for ascertaining whether the Bidder intends to utilize the referenced statute for five percent (5%) preference and is also eligible for the bidder preference and other matters relating thereto provided in NRS Chapter 338.0117. The Bidder claiming the bid preference shall submit with their Bid Form:

1. Certificate of Eligibility: A valid “Certificate of Eligibility” issued by the State of Nevada

Contractor’s Board, and

2. Public Works Bidder’s Preference Affidavit: A fully-executed copy of the Public Works

Bidder’s Preference Affidavit as proof of the Contractor’s compliance with the provisions of NRS 338.

Failure to submit the Certificate of Eligibility and Affidavit with your Bid shall result in a waiver of any Bidder preference.

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 3 of 14

3.02 Bid Form:

A. Bidder is to submit the following information with its Bid, to demonstrate Bidder’s qualifications to perform the Work. Bids without such documentation included will be deemed Non-Responsive:

1. A list of all first-tier subcontractors, equipment, and materials suppliers that will supply more than five percent (5%) of the bid amount. If the Contractor intends to self-perform any portion of the Work exceeding five percent (5%) of the Bid Amount, the Contractor must also include the Contractor’s name and identify the labor or portion of the Work the Contractor will self-perform in the list, as required by NRS 338.141.

2. Within two (2) hours after the opening of Bids, those bidders submitting the three lowest Bids must submit the names of each first-tier subcontractor, equipment and material supplier that will supply more than 1% of the bid amount, or Fifty Thousand Dollars ($50,000), whichever is greater. If the Contractor intends to self-perform any portion of the Work exceeding one percent (1%) of the Bid Amount or Fifty Thousand Dollars ($50,000), whichever is greater, the Contractor must also include the Contractor’s name and identify the labor or portion of the Work the Contractor will self-perform in the list, as required by NRS 338.141.

3. A list of similar projects previously completed by Bidder, including contact person with their telephone number and email, and the date the project was completed.

a. Contractor is required to have successfully performed three (3) projects of similar scope within the last five (5) years, including a minimum project total cost of $2,000,000, contract time of 120 to 180 days, and preferably work performed in the Lake Tahoe basin.

4. Work history of Job Foreman/Superintendent, Pipe Foreman and Equipment Operator.

a. Contractor is required to staff project with a Job Foreman/Superintendent with minimum experience of five (5) years’ experience with similar project work and five

(5) projects within five (5) years greater than $2,000,000.

5. Bidder’s state or other contractor license number, if applicable.

3.03 A Bidder’s failure to submit required qualification information within the times indicated will result in the Bid being deemed Non-Responsive.

3.04 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

ARTICLE 4—PRE-BID CONFERENCE

4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference; however, attendance at this conference is not required to submit a Bid.

4.02 Information presented at the pre-bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 4 of 14 at the pre-bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.

ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

5.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

5.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:

a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.

b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.

c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

4. Geotechnical Baseline Report/Geotechnical Data Report: If necessary to the Work, the Bidding Documents will contain a Geotechnical Baseline Report (GBR) and Geotechnical Data Report (GDR).

a. As set forth in the Supplementary Conditions, the GBR describes certain select subsurface conditions that are anticipated to be encountered by Contractor during construction in specified locations (“Baseline Conditions”). The GBR is a Contract Document.

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 5 of 14

b. The Baseline Conditions in the GBR are intended to reduce uncertainty and the degree of contingency in submitted Bids. However, Bidders cannot rely solely on the Baseline Conditions. Bids should be based on a comprehensive approach that includes an independent review and analysis of the GBR, all other Contract Documents, Technical Data, other available information, and observable surface conditions. Not all potential subsurface conditions are baselined.

c. Nothing in the GBR is intended to relieve Bidders of the responsibility to make their own determinations regarding construction costs, bidding strategies, and Bid prices, nor of the responsibility to select and be responsible for the means, methods, techniques, sequences, and procedures of construction, and for safety precautions and programs incident thereto.

d. As set forth in the Supplementary Conditions, the GDR is a Contract Document containing data prepared by or for the Owner in support of the GBR.

B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.

5.03 Other Site-related Documents

A. In addition to the documents regarding existing Site conditions referred to in Paragraph 5.02.A, the following other documents relating to conditions at or adjacent to the Site are known to Owner and made available to Bidders for reference:

1. N/A

Owner will make copies of these other Site-related documents available to any Bidder on request.

B. Owner has not verified the contents of these other Site-related documents, and Bidder may not rely on the accuracy of any data or information in such documents. Bidder is responsible for any interpretation or conclusion Bidder draws from the other Site-related documents.

C. The other Site-related documents are not part of the Contract Documents.

D. Bidders are encouraged to review the other Site-related documents, but Bidders will not be held accountable for any data or information in such documents. The requirement to review and take responsibility for documentary Site information is limited to information in (1) the Contract Documents and (2) the Technical Data.

5.04 Site Visit and Testing by Bidders

A. It is recommended that Bidder visit the Site and become familiar with and satisfy Bidder as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.

B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 6 of 14 preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.

D. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

E. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

5.05 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.

5.06 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

6.01 Express Representations and Certifications in Bid Form, Agreement

A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.

B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.

ARTICLE 7—INTERPRETATIONS AND ADDENDA

7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.

7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer through Owner’s Planet Bids website.

7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 7 of 14

7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.

ARTICLE 8—BID SECURITY

8.01 A Bid must be accompanied by bid security made payable to Owner in an amount of five percent (5%) of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such bid bond will be issued in the form included in the Bidding Documents.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.

ARTICLE 9—CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.

9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS

10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.

10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 8 of 14 supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS

11.01 If the Instructions to Bidders require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall submit to Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required.

11.02 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

11.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.

Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.

11.04 Contractor shall not be required to employ any Subcontractor, Supplier, individual or entity against whom Contractor has reasonable objection.

ARTICLE 12—PREPARATION OF BID

12.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 9 of 14

12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.

12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.

12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.

12.06 A Bid by an individual must show the Bidder’s name and official address.

12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.

12.08 All names must be printed in ink below the signatures.

12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.

12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.

12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.

12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.

ARTICLE 13—BASIS OF BID

13.01 The basis of Bid is set in Section 3 – Bid Form. Description of the various basis of Bid are as follows:

A. If Bid is Lump Sum

1. Bidders must submit a Bid on a lump sum basis as set forth in the Bid Form.

B. If bid is a Base Bid with Alternates

1. Bidders must submit a Bid on a lump sum basis for the base Bid and include a separate price for each alternate described in the Bidding Documents and as provided for in the Bid Form. The price for each alternate will be the amount added to or deleted from the base Bid if Owner selects the alternate.

2. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form.

C. If bid is a Unit Price

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 10 of 14

1. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

2. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity,” which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”;

such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

3. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

ARTICLE 14—SUBMITTAL OF BID

14.01 The Bid Form is to be completed and submitted to the District’s Planet Bids portal on or before the date specified in the Invitation to Bid, together with a copy of the Bid security and any other documents required to be submitted under the terms of Article 2 of the Bid Form.

14.02 The original Bid security shall be submitted per Article 8 of these Instructions to Bidders.

14.03 The Bidder assumes the sole responsibility for timely delivery of its Bid. Bidders shall allow sufficient time for all bid files to transmit from Bidder’s server to the server of the District’s bid system. Bid files shall be completely transmitted to IVGID’s bid system prior to the time specified or the bid will be rejected by the bid system.

ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID

15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.

15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 11 of 14 and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.

ARTICLE 16—OPENING OF BIDS

16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

16.02 All Bids will remain subject to acceptance for sixty (60) days after the day of the Bid opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 17—EVALUATION OF BIDS AND AWARD OF CONTRACT

17.01 Owner reserves the right to reject any or all Bids pursuant to Nevada state law, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.

17.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.

17.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.

17.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.

17.05 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. If the Unit Bid Item prices and/or schedule of values of a prospective Bidder’s Bid are obviously unbalanced, either in excess or below the reasonable cost analysis values, the Bid may be rejected. All bids with separately-priced line items shall be analyzed to determine if the prices are unbalanced. A Bid may be rejected if Owner determines that the lack of balance poses an unacceptable risk to Owner. A Bid with unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more bid items is significantly over- or understated, as indicated by the application of cost or price analysis techniques. The greatest risks associated with unbalanced pricing occur when:

1. Overpricing of startup work, mobilization, or early items of work (“front-end loading”) would cause a Bidder to receive substantial up-front payment;

2. Base quantities and option quantities are separate line items;

3. The quantities as bid are incorrect and the contract cost will be increased when quantities are corrected; and/or

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 12 of 14

4. On items when the quantities may vary, if the anticipated variation in quantity would result in the lower Bidder not remaining as the low bidder.

C. More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.

D. In evaluating bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data as may be requested in the Bid Form or prior to the Notice of Award.

E. In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

F. Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

G. If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interest of the Project.

H. Owner reserves the right to reduce the Scope of Work up to twenty-five percent (25%) of the total Bid price by deleting items and/or reducing the Scope of Work without invalidating the Bid, if necessary, to reduce the cost of the project to within the Engineer’s Estimate and/or Owner’s budget.

I. Any Bidder which submitted a Bid to Owner may protest the recommendation of award in accordance with procedures as set forth in NRS 338.

ARTICLE 18—BONDS AND INSURANCE

18.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by one (1) copy of each of the required bonds and insurance documentation.

18.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.

ARTICLE 19—SIGNING OF AGREEMENT

19.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the other Contract Documents as identified in the Agreement. Within 10 business days thereafter, Successful Bidder must execute the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 20 business days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 13 of 14

Bidder, together with electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

ARTICLE 20—SALES AND USE TAXES

20.01 Owner is exempt from Nevada state sales and use taxes on materials and equipment to be incorporated in the Work (Exemption No. 88-760004K). Per Section 15, Chapter 338 of the NRS, each contractor, subcontractor and other person who provides labor, equipment, materials, supplies or services for the Work will comply with the requirements of all applicable state and local laws, including, without limitation, any applicable licensing requirements and requirements for the payment of sales and use taxes on equipment, materials and supplies provided for the Work. Said taxes must not be included in the Bid. Refer to Paragraph SC-7.10 of the Supplementary Conditions for additional information.

ARTICLE 21—NEVADA REVISED STATUTES

21.01 Each and every provision of Chapters 332, 338 and 339 of the Nevada Revised Statutes (NRS) and other laws required to be inserted in these Contract Documents shall be deemed to be inserted herein, and the Contract Documents shall be read and enforced as though they are included herein.

21.02 In accordance with NRS 338, the Successful Contractor shall report the name and address of each subcontractor to the Owner and Washoe County Labor Commissioner if the estimated total price of the Contract exceeds $100,000.

21.03 Apprenticeship Utilization Act: Bidder shall comply with the Apprenticeship Utilization Act (AUA) enacted by SB207 in the 2019 Nevada Legislative Session and modified by SB82 in 2022 Nevada Legislative Session as well as all statutes, regulations, and laws related thereto. Significant changes went into effect on January 1, 2024. Information related to the AUA including instructions related to the changes can be found at the Office of the Labor Commissioner’s website at the URL below.

http://labor.nv.gov/Apprenticeship_Utilization_Act/Apprenticeship_Utilization_Act/

ARTICLE 22—NONDISCRIMINATION IN EMPLOYMENT – NOT USED

ARTICLE 23—ANTI-KICKBACK AND MINIMUM WAGE RATES – NOT USED

ARTICLE 24—DISADVANTAGED BUSINESS ENTERPRISE (DBE) SOLICITATION – NOT USED

ARTICLE 25—HISTORICAL AND ARCHAEOLOGICAL

25.01 If, during the course of construction, evidence of deposits of historical or archaeological interest is found, the Contractor shall cease operation(s) affecting the find and shall notify the Owner. No https://linkprotect.cudasvc.com/url?a=http%3a%2f%2flabor.nv.gov%2fApprenticeship_Utilization_Act%2fApprenticeship_Utilization_Act%2f&c=E,1,DQqgym1Wjyx571-lGEVpDQF44xMX2cg6n7yMLNXufYm65nO7wBLp89ozrfWdkp5bjvRURiAloPzLAU7sC5hED2P5k1rtqDGlE88sKg3E&typo=1

Section 2 – Instructions to Bidders TENNISCRT – Tennis Center Reconstruction Project Page 14 of 14 further disturbance of the deposits shall ensue until the Owner has notified the Contractor that he may proceed.

ARTICLE 26—SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION

26.01 These construction documents are to be governed at all times by applicable provisions of the Federal Law, including but not limited to the latest amendment of the following:

A. Williams-Steiger Occupational Safety and Health Act of 1970, Public Law 94-596

B. Part 1910 -- Occupational Safety and Health Standards, Chapter XVII of Title 29, Code of Federal Regulations

C. Part 1926 -- Safety and Health Regulations for Construction, Chapter XVII of Title 29, Code of Federal Regulations.

ARTICLE 27—BUY AMERICAN PROVISIONS – NOT USED

END OF INSTRUCTIONS

Section 3 – Bid Form TENNISCRT – Tennis Center Reconstruction Project Page 1 of 10

SECTION 3 - BID FORM

The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 1—OWNER AND BIDDER

This Bid is submitted to:

Incline Village General Improvement District Public Works Department 1220 Sweetwater Road Incline Village NV 89451 775-832-1203

The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2—ATTACHMENTS TO THIS BID

The following documents are submitted with and made a condition of this Bid:

A. Required Bid security;

B. List of Proposed Subcontractors;

C. List of Proposed Suppliers;

D. Evidence of authority to do business in the state of Nevada, or a written covenant to obtain such authority within the time for acceptance of Bids;

E. Contractor’s license number as evidence of Bidder’s State Contractor’s License, or a covenant by Bidder to obtain said license within the time for acceptance of Bids;

F. Required Bidder Qualification Statement with supporting data; and

ARTICLE 3—BASIS OF BID—LUMP SUM BID AND UNIT PRICES

Bidder will complete the Work in accordance with the Contract Documents for the following Unit Price(s):

Section 3 – Bid Form TENNISCRT – Tennis Center Reconstruction Project Page 2 of 10

UNIT PRICE SCHEDULE – See Summary of Work in Technical Specs for more info

Item No. Description Estimated Quantity &

Unit Unit Price Total Price

1 Mobilization / Demobilization 1 Lump Sum $ $

2 SWPPP and Temp Erosion Controls / Tree Protection 1 LS $ $

3 Surveys and Staking 1 LS $ $

4 Traffic Control 1 LS $ $

5 Testing and Inspections 1 LS

6 Court Demolition (Courts 3-7) 1 LS $ $

7 Basin Demolition 1 LS $ $

8 Storm Drainage 1 LS $ $

9 Stormwater Basin Grading & Rip Rap Spillways 1 LS $ $

10 Stormwater Basin Restoration and Revegetation 1 LS $ $

Court Separator Chain Link Fencing and Net Posts (Courts 3-7)

1 LS $ $

12 Court Subbase Grading and Preparation (Courts 3-7) 1 LS $ $

13 Court Asphalt Pavement (Courts 3-7) 1 LS $ $

14 Court Surfacing & Striping (Courts 3-7) 1 LS $ $

15 Court Curb & Chain Link Fence Repairs (Courts 3-7) 1 LS $ $

TOTAL BASE BID IN

NUMBERS: $

TOTAL BASE BID IN WORDS:

Quantities are not guaranteed. Final Payment will be based upon actual quantity of work performed.

Section 3 – Bid Form TENNISCRT – Tennis Center Reconstruction Project Page 3 of 10

Item No. Description Estimated Quantity Unit Price Total Price

Alt A

Courts 3-7 Post Tension Concrete Tennis Courts With Court Surfacing & Striping

1 LS $ $

Alt B

Courts 1&2 Post Tension Concrete Tennis Courts with Court Surfacing & Striping

1 LS

Alt C

Reconstruction of Courts 1 & 2, Including Work Described in Bid Items 1-6 and 10-15

1 LS $ $

TOTAL BID, WITH ALTERNATE, IN NUMBERS: $

TOTAL BID, WITH ALTERNATE, IN WORDS:

A. Bidder acknowledges that:

1. Each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and

2. Estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Work will be based on actual quantities, determined as provided in the Contract Documents.

ARTICLE 4—TIME OF COMPLETION

Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

Bidder accepts the provisions of the Agreement as to liquidated damages.

ADD ALTERNATES

Section 3 – Bid Form TENNISCRT – Tennis Center Reconstruction Project Page 4 of 10

ARTICLE 5—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT OF

ADDENDA

Bid Acceptance Period

A. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

Instructions to Bidders

A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.

Receipt of Addenda

A. Bidder hereby acknowledges receipt of the following Addenda:

Addendum Number Addendum Date

ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

Bidder’s Representations

A. In submitting this Bid, Bidder represents the following:

1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.

2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.

4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface…