This is a geotechnical investigation report prepared by Black Eagle Consulting, Inc. for the Incline Village General Improvement District (IVGID) in Nevada regarding the Tennis Center Court Surface Improvements project. The report provides findings and recommendations for the removal and replacement of asphalt pavement and playing surfaces on Courts 3 through 7 at the Incline Village Tennis and Pickleball Center. The investigation was conducted on September 21, 2023, and included field exploration through four pavement core holes combined with hand excavation to expose subsurface soils, as well as laboratory testing of representative soil samples. The courts, originally constructed approximately 50 years ago, exhibit full-depth cracking, differential movement, ponding in localized areas, and deterioration attributed partly to tree root heaving. The maximum depth of exploration was 2 feet below the existing pavement surface, with findings documented through boring logs and soil classification charts in accordance with ASTM standards.

The geotechnical recommendations address subgrade soil preparation, structural section design, and construction procedures. Key recommendations include complete reconstruction of the tennis courts with removal of existing asphalt and aggregate base; moisture conditioning and densification of remaining soils to specified compaction percentages; mechanical stabilization measures if construction occurs during winter or spring snowmelt when soils exceed optimum moisture content; placement of aggregate base and asphalt concrete to minimum specified thicknesses; avoidance of water ponding through proper grading; and adherence to American Concrete Institute procedures for any concrete placement. The report emphasizes the need for geotechnical engineer review of final plans and specifications, a pre-job conference with all relevant parties, and on-site observation throughout construction to ensure compliance with recommendations and verify that geotechnical conditions remain consistent with field exploration findings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ms. Bree Waters

Incline Village General Improvement District

1220 Sweetwater Road

Incline Village, NV 89451

Project No.: 2017-06-1

October 20, 2023

1345 Capital Boulevard, Suite A Tel: 775/359-6600 Fax: 775/359-7766

Reno, Nevada 89502-7140 Email: mail@blackeagleconsulting.com

RE: Geotechnical Investigation

Tennis Center Court Surface Improvements

Incline Village, Nevada

Dear Ms. Waters:

Black Eagle Consulting, Inc. (BEC) is pleased to present our evaluation of subgrade soils and surfacing replacement recommendations for the proposed tennis courts rehabilitation project at the Incline Village

Tennis and Pickleball Center (IVTPC) in Incline Village, Nevada. The findings and conclusions in this report are in regards to the existing tennis court structural sections and the subgrade soil conditions encountered during our subsurface exploration.

The area covered by this report is shown on Plate 1 (Plot Plan) and includes Courts 3 through 7. Our investigation included field exploration, laboratory testing, and engineering analysis to determine the physical and mechanical properties of the various on-site materials. Results of our field exploration and testing programs are included in this report and form the basis for all conclusions and recommendations.

Project Description and Site Conditions

The project will involve the removal and replacement of the asphalt pavement and playing surface of

Courts 3 through 7 at the IVTPC. The courts were constructed nearly 50 years ago and the pavement has begun to deteriorate, with full-depth cracking visible in most of these courts. Players are reporting “dead” spots on the playing surface, indicating the need for rehabilitation.

The project site is located near the center of the IVTPC. Courts 3 and 4 are immediately adjacent to and west of the Pro Shop and Sun Deck area. Courts 5, 6 and 7 are located due north of Courts 3 and 4. The

IVTPC is located immediately west of the Incline Village Recreation Center, northeast of Incline Way, and southwest of Tahoe Boulevard.

The pavement of these courts exhibits full-depth cracks and some areas of differential movement.

Localized low areas show signs of sediment from ponded water. The ground surface slopes away from the courts in adjacent areas. Several mature trees are present in close proximity to the courts, and their roots have extended into the subgrade soils, heaving the pavement in areas.

Field Exploration

The asphalt concrete paved areas in Courts 3 through 7 were explored on September 21, 2023, by advancing 4 pavement core holes combined with hand excavation advancement to expose the subsurface soils. The locations of the exploration are shown on Plate 1. Core holes were advanced through the existing asphalt concrete surfacing using an 8-inch-diameter core barrel. A digging bar and hand scoop were then used to extend the core holes through the aggregate base material and subgrade soils. The maximum depth of exploration was 2 feet below the existing pavement surface.

A geotechnical engineer examined and classified all soils in the field in accordance with American Society for Testing and Materials (ASTM) D2488. During hand excavation, representative bulk samples were placed in sealed plastic bags and returned to our Reno, Nevada, laboratory for analysis. Additional soil classification was subsequently performed in accordance with ASTM D2487 (Unified Soil Classification

System [USCS]) upon completion of laboratory testing, as described in the Laboratory Testing section.

Logs of the pavement core holes are presented as Plate 2 (Boring Logs), and a USCS chart has been included as Plate 3 (USCS Soil Classification Chart).

Laboratory Testing

All soils testing performed in the BEC soils laboratory is conducted in general accordance with the standards and methodologies described in Volumes 4.08 and 4.09 of the ASTM Standards. Samples of each significant soil type were analyzed to determine the in-situ moisture content (ASTM D2216), grain size distribution (ASTM D6913), and plasticity index (ASTM D4318). The results of these tests are shown on Plate 4 (Index Test Results). Test results were used to classify the soils according to ASTM D2487 and to verify field logs, which were then updated as appropriate, as well as in developing appropriate pavement and geotechnical recommendations for the project.

General Soil Conditions

The site is overlain by an approximately 4.0- to 6.25-inch-thick layer of asphalt concrete pavement which includes an overlay ranging from 2.25 to 3.25 inches in thickness. The asphalt is underlain by an approximately 5- to 6-inch-thick layer of aggregate base. The aggregate base is then underlain by silty sand with gravel to the maximum explored depth of 2.0 feet.

The aggregate base is described as a silty sand with gravel which is light brown, slightly moist, dense, and contains approximately 25 percent non-plastic fines, 55 percent fine to coarse sand, and 20 percent subangular gravel up to 1.5 inches in diameter. The silty sand with gravel is described as brown, slightly moist, very dense, and as containing 15 to 20 percent non-plastic fines, 50 to 65 percent fine to coarse sand, and 15 to 31 percent subangular gravel up to 2 inches in diameter.

Discussion and Recommendations

The subgrade materials associated with the tennis courts are granular sand and gravel soils which will provide adequate subgrade support when properly prepared. The following are geotechnical recommendations with respect to site and subgrade soil preparation for the project:

1. The tennis courts need to be completely reconstructed. The existing asphalt concrete and underlying aggregate base should be removed as part of this reconstruction. Aggregate base may be reused as part of the structural section or left in place if it is sufficient for the structural section (which is to be designed by others). If the intent is to reconstruct the tennis courts with the same asphalt concrete thickness, the existing asphalt can be removed and a new asphalt concrete pavement can be placed on the existing aggregate. For this, the aggregate base should be moisture conditioned and densified to at least 95 percent relative compaction as determined per ASTM D1557. Where exposed, the subgrade soils shall be moisture conditioned to near optimum moisture content and densified to at least 90 percent relative compaction (ASTM D1557). The existing asphalt pavement can be pulverized and recycled for asphalt production.

2. If construction takes place during winter or spring snowmelt runoff, localized site soils will be well over optimum moisture content and difficult to compact to the specified levels. In some situations, moisture-conditioning may be possible by scarifying the top 12 inches of subgrade and allowing it to air-dry to near optimum moisture prior to compaction. Where this procedure is ineffective or where construction schedules preclude delays, mechanical stabilization will be necessary. Mechanical stabilization may be achieved by over-excavating the unstable soils through 12 to 18 inches depth and backfilling the over-excavation with a geotextile/gravel system. The lightly compacted, over-excavated grade shall be covered with a geotextile, such as Mirafi® 160N or an approved equal, followed by aggregate base

(Standard Specifications for Public Works Construction [SSPWC], 2016), Class C or D drain rock (SSPWC, 2016), or approved pit-run gravels. The stabilizing gravel should be densified until a firm and unyielding grade is achieved. Depending on the severity of the unstable conditions, additional depth of over-excavation may be necessary. We recommend mechanical stabilization be performed on a test section to evaluate its effectiveness in providing a stable grade.

3. The maximum particle size in trench backfill should be 4 inches. Bedding and initial backfill

12 inches over the pipe will require import of Class A bedding sand (SSPWC, 2016) and should conform to the requirements of the utility having jurisdiction. Bedding and initial backfill should be densified to at least 90 percent relative compaction.

4. All structural fill shall be moisture conditioned to near optimum moisture content, spread in maximum 8-inch-thick loose lifts, and densified to 90 percent relative compaction. Excavated existing aggregate base and native soils will be suitable to use as structural fill. If imported structural fill is necessary, we recommend it satisfy the Structural Fill specifications of the

SSPWC (2016). Other granular, non-expansive materials may also be used for imported structural fill with the geotechnical engineer’s approval.

5. If planned as part of the rehabilitation project, all exterior concrete curbs, concrete slabs, and asphalt pavements shall be directly underlain by a minimum of 6 inches of Type 2, Class B aggregate base (SSPWC, 2016). Aggregate base courses shall be densified to at least 95 percent relative compaction (ASTM D1557).

6. While we recommend a minimum asphalt concrete thickness of 3 inches underlain by a minimum of 6 inches of Type 2, Class B aggregate base (SSPWC, 2016), it is assumed the structural section design for the tennis courts reconstruction will be provided by a specialty court construction contractor. Athletic court construction requires special considerations beyond a typical pavement design. A specialty asphalt mix design for smooth surfaces will be required.

7. Ponding of water on or near asphalt concrete pavements associated with the tennis courts should be avoided via proper grading. The paving surface shall be smooth, with no depressions.

8. All placement and curing of concrete should be performed in accordance with procedures outlined by the American Concrete Institute (2019) and this report. Concrete should not be placed on frozen in-place soils.

9. Specialty court surface coatings shall be installed in accordance with the manufacturer’s recommendations.

Closing

1. The recommendations presented in this report are based on the assumption that sufficient field testing and construction review will be provided during all phases of construction. We should review the final plans and specifications for conformance with the intent of our recommendations. Prior to construction, a pre-job conference should be scheduled to include, but not be limited to, the owner, design engineer, general contractor, building official, and geotechnical engineer. The conference will allow parties to review the project plans, specifications, and recommendations presented in this report and discuss applicable material quality and mix design requirements. All quality control reports should be submitted to and reviewed by the geotechnical engineer.

2. During construction, we should have the opportunity to provide sufficient on-site observation of site preparation, grading, and paving. These observations would allow us to verify that the geotechnical conditions are as anticipated and that the contractor’s work is in conformance with the approved plans and specifications.

3. This report has been prepared with generally accepted geotechnical practices. The analyses and recommendations submitted are based upon field exploration performed at the locations described in this report. This report does not reflect soils or groundwater variations that may become evident during the construction period, at which time re-evaluation of the recommendations may be necessary. We recommend our firm be retained to perform construction observation in all phases of the project related to geotechnical factors to ensure compliance with our recommendations.

PLATES

NORTH

Overall Scale: 1” = ~ 100’

LEGEND

B-01 APPROXIMATE BORING LOCATION

Base map provided by Google Earth.

VICINITY MAP

NOT TO SCALE

INCLINE VILLAGE GENERAL IMPROVEMENT DISTRICT

PLOT PLAN

TENNIS CENTER COURT SURFACE IMPROVEMENTS

INCLINE VILLAGE, NEVADA

Black Eagle Consulting, Inc.

Project No. 2017-06-1

Plate 1

PROJECT LOCATION

B-01

B-02

B-03

B-04

Tennis Center Court Surface Improvements

Incline Village, Nevada

2017-06-1

0.0010.010.1110100

PI Cc

NP

NP

NP

NP

NP

NP

CuLL PL

NP

NP

NP

SAND

GRAIN SIZE IN MILLIMETERS

coarse fine

SILTY SAND with GRAVEL(SM)

SILTY SAND with GRAVEL(SM)

SILTY SAND with GRAVEL(SM)

Classification

D100 D60 D30

GRAIN SIZE DISTRIBUTION

D10 %Gravel

1.671

0.778

2.285

B-01

B-02

B-04 coarse

SILT OR CLAY

finemedium

10.0

1.0

11.0

%Sand %Silt %Clay

0.208

0.16

0.242

29.4

15.6

30.7

52.5

64.3

51.7

BOREHOLE DEPTH

BOREHOLE DEPTH

COBBLES

GRAVEL

18.2

20.0

17.6

3 100

B-01

B-02

B-04

24 16 30

1 2006 10 501/2

HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

1403 4 20 406 601.5 8 143/4 3/8

10.0

1.0

11.0

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

PLATE: 4a

Black Eagle Consulting, Inc.

1345 Capital Blvd., Suite A

Reno, Nevada 89502-7140

Telephone: (775) 359-6600

Project: Tennis Center Court Surface Improvements

Location: Incline Village, Nevada

Project Number: 2017-06-1

G R

A

IN

S

IZ

E

.G

P J

G

IN

T S

T D

U S

L A

B .G

D T

0/

9/

0 20 40 60 80 100

B-01

B-02

B-04

ML

CL

MH

CH

CL-ML

P L A S T I C I T Y

I N D E X

LIQUID LIMIT

Fines Classification

NP

NP

NP

NP

NP

NP

SILTY SAND with GRAVEL(SM)

SILTY SAND with GRAVEL(SM)

SILTY SAND with GRAVEL(SM)

LL PL PI

NP

NP

NP

10.0

1.0

11.0

BOREHOLE DEPTH

ATTERBERG LIMITS RESULTS

PLATE: 4b

Black Eagle Consulting, Inc.

1345 Capital Blvd., Suite A

Reno, Nevada 89502-7140

Telephone: (775) 359-6600

Project: Tennis Center Court Surface Improvements

Location: Incline Village, Nevada

Project Number: 2017-06-1

A T

T E

R B

E R

G L

IM

IT

S

.G

P J

G

IN

T S

T D

U S

L A

B .G

D T

0/

9/

B-01 10.0 NP NP NP 50 18 SM 9.6

B-02 1.0 NP NP NP 25 20 SM 7.9

B-04 11.0 NP NP NP 37 18 SM 3.5

SUMMARY OF LABORATORY RESULTS

Plastic Limit

Plasticity Index

Maximum Size (mm)

%<#200 Sieve

Liquid Limit

Satur-ation

Void Ratio

Class-ification

Water Content

Dry Density

(pcf) DepthBorehole

CLIENT Incline Village G.I.D.

PROJECT NUMBER 2017-06-1

PROJECT NAME Tennis Center Court Surface Improvements

PROJECT LOCATION Incline Village, Nevada

LA

B

S U

M M

A R

Y

.G

P J

G

IN

T S

T D

U S

L A

B .G

D T

0/

9/

Black Eagle

CRobison Typewriter Plate 4c

IVGID.Tennis Court.geo.rpt
Project Description and Site Conditions
Field Exploration
Laboratory Testing
General Soil Conditions
Discussion and Recommendations
Closing
References
PLATES.div
Plate 1_Plot Plan_11X17
pl 2
Plate 3
plate 4

File details come from the government source that posted it. Updated .