This solicitation is for a project to replace the roof of the Honor Annex building at the Veterans Affairs Medical Center campus in Kansas City, Missouri. The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 15 is seeking proposals to remove the existing roof system and install a new thermoplastic polyolefin (TPO) fully adhered roofing system. The scope of work includes removal and disposal of the existing roof, insulation, and flashings. Bidders must provide all necessary labor, equipment, and materials to install tapered insulation, a new membrane roof system, flashings, and accessories. The deadline for responses is July 15, 2022. The period of performance is 180 calendar days following award.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL
ELECTRICAL
ARCHITECT
NAGEL Architects + Engineers 13890 Bishops Drive, suite 250 Brookfield, WI 53005 Phone: 262.641.0746 Contact: Ken Shane E-mail: ken.shane@nagel.us
IMEG
1600 Baltimore Ave, #300 Kansas City, MO 64108 Phone: 816-842-8437 Contact: Bruce Hart E-mail: bruce.e.hart@imegcorp.com
Kansas City VAMC 4251 Northern Avenue, MO 64133
CONTACT:
James Higdon james.higdon@va.gov 816 - 672 - 9747
PROJECT
LOCATION
DWIGHT D. EISENHOWER HWY
E. US HIGHWAY 40
E 43RD STREET
S T
E R
LI
N
G A
V E
SHEET # SHEET NAME
00 - GENERAL - G
G001 COVER SHEET
G002 ARCHITECTURAL ABBREVIATIONS AND SYMBOLS
06 - STRUCTURAL - S
S001 STRUCTURAL ABBREVIATIONS AND GENERAL NOTES
S100 UPPER LEVEL FRAMING PLAN
S101 ROOF FRAMING PLAN
S102 UPPER ROOF FRAMING PLAN
07 - ARCHITECTURAL - A
AD103 ROOF PLAN - ARCHITECTURAL DEMOLITION
A102 SECOND FLOOR PLAN - ARCHITECTURAL
A103 ROOF PLAN - ARCHITECTURAL
A501 EXTERIOR DETAILS - ARCHITECTURAL
A502 EXTERIOR DETAILS - ARCHITECTURAL
A900 EXISTING PHOTOS
A901 EXISTING PHOTOS
A902 EXISTING PHOTOS
11 - PLUMBING - P
P000 PLUMBING COVERSHEET
PD100 FIRST FLOOR DEMOLITION - PLUMBING
PD101 SECOND FLOOR DEMOLITION - PLUMBING
P100 FIRST FLOOR - PLUMBING
P101 SECOND FLOOR - PLUMBING
13 - MECHANICAL - M
M000 MECHANICAL COVERSHEET
MPD104 ROOF - MECH/PLUMB DEMOLITION
MP104 ROOF - MECHANICAL/PLUMBING
M001 PLUMBING AND MECHANICAL SCHEDULES
14 - ELECTRICAL - E
E000 ELECTRICAL COVERSHEET
ED104 ROOF - ELECTRICAL DEMOLITION
E104 ROOF - ELECTRICAL
13890 bishops drive, suite 250 brookfield, wi 53005
DEPARTMENT OF VETERANS AFFAIRS
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
NAGEL A+E PROJECT NUMBER:VA PROJECT NUMBER:
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Project NumberProject TitleDrawing Title Phase
NAGEL
project number:
C :\U se rs
\r ya nb \D oc um en ts
\2
-K
C H on or
A nn ex R oo f R ep la ce m en t_
R ya n.
bo ur la nd .r vt 2/
8/
:0 5:
A
M
REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
22009589-22-105
G001
COVER SHEET REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023 ES RB
FULLY SPRINKLERED
BID DOCUMENTS
22009
SHEET INDEX
PROJECT LOCATION MAP
STATION INFORMATION
PERSPECTIVE
(INCLUDED FOR INFORMATION ONLY.)
Revisions: Date:
35% SCHEMATIC DESIGN 7/22/2022
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
95%R CONSTRUCTION DOCUMENTS 1/12/2023
100% CONSTRUCTION DOCUMENTS 2/2/2023
2-2-2023
2-2-2023
DESIGNER LIST AND STAMPS
IMEG
1600 Baltimore Ave, #300 Kansas City, MO 64108 Phone: 816-842-8437 Contact: Bruce Hart E-mail: bruce.e.hart@imegcorp.com
PLUMBING
IMEG
1600 Baltimore Ave, #300 Kansas City, MO 64108 Phone: 816-842-8437 Contact: Bruce Hart E-mail: bruce.e.hart@imegcorp.com
2-2-2023
, Kansas City, NORTH ARROW
ELEVATION REFERENCE
SYMBOL
ELEVATION REFERENCE
SYMBOL
SECTION REFERENCE
SYMBOL
ENLARGED AREA
REFERENCE SYMBOL
REVISION TAG
ROOM TAG
COLUMN REFERENCE
SYMBOL
Name Elevation
A101
A101
SIM
A101
SIM
NORTH
PARTITION TAG
A36C G11C
ARCHITECTURAL SYMBOLS___
ROOM NAME
EQUIPMENT TAGX####
A101
SIM DETAIL REFERENCE
SYMBOL
AREA NOT IN CONTRACT
WALL TAG1iEX1
FINISH WOOD
CONCRETE MASONRY UNIT (CMU)
CONCRETE, CAST-IN-PLACE
CONCRETE, PRE-CAST
FILL - PER NOTE
INTERMITTENT BLOCKING
CONT. ROUGH FRAMING
STEEL
EARTH
RIGID INSULATION
BATT INSULATION
GYPSUM BOARD
MARBLE/GRANITE/STONE
TILE/TERRAZZO
GLASS
LARGE SCALE
SECTIONS
BRICK
PLYWOOD
MATERIAL
MATERIAL LEGEND_________
EARTH, COMPACT
ALUMINUM
FILL, POROUS
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C :\U se rs
\r ya nb \D oc um en ts
\2
-K
C H on or
A nn ex R oo f R ep la ce m en t_
R ya n.
bo ur la nd .r vt 2/
8/
:0 5:
A
M
G002
ARCHITECTURAL ABBREVIATIONS
AND SYMBOLS
REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023 ES RB
BID DOCUMENTS
FULLY SPRINKLERED
22009
UNFIN UNFINISHED
UNO(U.N.O) UNLESS NOTED OTHERWISE
UR URINAL
UTIL UTILITY
V
VA VETERAN'S AFFAIRS, DEPARTMENT OF
VAR VARNISH
VCT VINYL COMPOSITION TILE
VEH VEHICLE
VERT VERTICAL
VF VINYL FABRIC
VG VERTICAL GRAIN
VIN VINYL
VJ V-JOINT(ED)
VNR VENEER
VT VINYL TILE
W
W WEST
W WIDTH, WIDE
W/ WITH
W/D WASHER & DRYER
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WIRED GLASS
WH WALL HUNG
WHS WHEEL STOP
WI WROUGHT IRON
WM WIRE MESH
WP WATER PROOFING
WPT WORKING POINT
WR WATER REPELLANT
WSCT WAINSCOT
WT WEIGHT
WTW WALL-TO-WALL
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
SCHED SCHEDULE
SCN SCREEN
SD STORM DRAIN
SEC SECTION
SF SQUARE FEET
SFG SAFETY GLASS
SH SHELF, SHELVING
SHR SHEER
SHT SHEET
SHTG SHEATHING
SHV SHELVES
SI SQUARE INCHES
SIM SIMILAR
SL SLEEVE
SNT SEALANT
SP STANDPIPE
SP SOUNDPROOF
SPEC SPECIFICATION
SPK SPEAKER
SPKLR SPRINKLER
SPL SPECIAL
SQ SQUARE
SS STAINLESS STEEL
SSEW SANITARY SEWER
STA STATION
STC SOUND TRANSMISSION CLAS
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUS SUSPENDED
SUSP SUSPENSION
SYM SYMMETRICAL, SYMMETRY
SYN SYNTHETIC
SYS SYSTEM
T
T&G TONGUE & GROOVE
T/O(T.O.) TOP OF
TB TOWEL BAR
TC TERRA COTTA
TEL TELEPHONE
TEMP TEMPORARY
THK THICKNESS
THR THRESHOLD
THRU THROUGH
TOL TOLERANCE
TOT TOTAL
TOW(T.O.W.) TOP OF WALL
TPD TOILET PAPER DISPENSER
TR TREAD
TRM TRANSOM
TV TELEVISION
TYP TYPICAL
TZ TERRAZZO
U
UC UNDERCUT
PL PROPERTY LINE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLF POUNDS PER LINEAR FOOT
PNL PANEL
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PRF PREFORMED
PROJ PROJECT
PRT PROPERTY
PSC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PTC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PWD PLYWOOD
Q
QRT QUARRY TILE
QT QUARTZ TILE
QTY QUANTITY
R
RA RETURN AIR
RAD RADIUS
RB RUBBER BASE
RBT RABBET, REBATE
RC RESILIENT CHANNEL
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE REINFORCE(D)(ING)
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCED
REM REMOVE
REQ'D REQUIRED
RESIL RESILIENT
REV REVISION
RFG ROOFING
RFH ROOF HATCH
RFL REFLECT(ED)(IVE)(OR)
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RS RISER
RT RETURN
RWC RAINWATER CONDUCTOR
S
S SOUTH
SC SOLID CORE
M.R. MOISTURE RESISTANT
MAS MASONRY
MAX MAXIMUM
MBR MEMBER
MC MEDICINE CABINET
MECH MECHANIC(AL)
MED MEDIUM
MEMB MEMBRANE
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINUTE, MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MLD MO(U)LDING
MOD MODULAR
MOV MOVABLE
MT MOUNT(ED)(ING)
MTL MATERIAL
MULL MULLION
MWK MILLWORK
N
N NORTH
N/A NOT APPLICABLE
NAT NATURAL
NI NICKEL
NIC NOT IN CONTRACT
NO. NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR
INSTALLED
OPER OPERABLE
OPNG OPENING
OPP OPPOSITE
OPPHD OPPOSITE HAND
OVHD OVERHEAD
OWJ OPEN-WEB JOIST
P
P, PT PAINT
PAR PARALLEL
PB PANIC BAR
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PFN PREFINISHED
PG PLATE GLASS
PKG PARKING
GPT GYPSUM TILE
GRN GRANITE
GS(S) GALVANIZED STEEL (SHEET)
GST GLAZED STRUCTURAL TILE
GT GROUT
GWB GYPSUM WALL BOARD
GYP GYPSUM
H
HB HOSE BIBB
HBD HARDBOARD
HC HANDICAPPED
HDR HEADER
HDWD HARDWOOD
HDWR HARDWARE
HGT HEIGHT
HJT HEAD JOINT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HTG HEATING
HTR HEATER
HVAC HEAT, VENTILATION, & AIR CONDITIONING
HWH HOT WATER HEATER
I
ICRA INFECTION CONTROL RISK ASSESSMENT
ID INSIDE DIAMETER
IN INCH
INC INCLUDING
INSUL INSULATE(D)(ION)
INT INTERIOR
INV INVERT
J
JC JANITOR'S CLOSET
JT JOINT
K
KIT KITCHEN
KO KNOCKOUT
KP KICK PLATE
L
LAB LABORATORY
LAD LADDER
LAV LAVATORY
LB POUND
LB LAG BOLT
LBL LABEL
LH LEFT HAND
LL LIVE LOAD
LMS LIMESTONE
LP LIGHT PROOF
LPT LOW POINT
LT LIGHT
LTG LIGHTING
LTL LINTEL
LVR LOUVER
LW LIGHTWEIGHT
M
M.O. MASONRY OPENING
ENCL ENCLOSE
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
ESC ESCALATOR
ESMT EASEMENT
EST ESTIMATE
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
F
F/O FACE OF
FAS FASTEN(ER)
FBD FIBERBOARD
FBO FURNISHED BY OTHERS
FD FLOOR DRAIN
FDN FIRE DEPARTMENT
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FACTORY FINISH
FG FIBERGLASS
FIN FINISH(ED)
FLR FLOOR
FN FENCE
FOB FACE OF BRICK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FPL FIREPLACE
FR FRAME(D)(ING)
FRA FRESH AIR
FRC FIRE-RESISTANT COATING
FRT FIRE-RETARDANT
FS FULL SIZE
FT FOOT
FTG FOOTING
FUR FURRED(ING)
FURN FURNITURE
FUT FUTURE
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT(OR)
GCMU GLAZED CONC. MASONRY UNITS
GEN GENERAL
GF GROUND FACE
GKT GASKET(ED)
GL GLASS
GLU LAM GLUE LAMINATED
GOVT GOVERNMENT
GP GALVANIZED PIPE
GPL GYPSUM LATH
GPPL GYPSUM PLASTER
CLS CLOSURE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
COMPO COMPOSITION
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACT
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CPT CARPET
CRS COURSE(S)
CS COUNTERSINK
CSMT CASEMENT
CST CAST STONE
CT CERAMIC TILE
CTRL(S) CONTROL(S)
CYD CUBIC YARD
D
D DRAIN
DA DOUBLE ACTING
DEG DEGREE
DEMO DEMOLISH, DEMOLITION
DEP DEPRESSED
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIM DIMENSION
DL DEAD LOAD
DMT DEMOUNTABLE
DN DOWN
DP DAMP PROOFING
DPR DAMPER
DR DOOR
DRW DRYWALL
DS DOWNSPOUT
DT DRAIN TILE
DTL DETAIL
DW DUMBWAITER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRAWER
E
E EAST
EA. EACH
EF EXHAUST FAN
EIFS EXTERIOR INSULATION & FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
A/C AIR CONDITIONING
AB ANCHOR BOLT
ABV ABOVE
AC ACOUSTICAL
ACC ACCESS
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJUSTABLE, ADJACENT
AFF(A.F.F.) ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE
ANC ANCHOR, ANCHORAGE
ANOD ANODIZED
AP ACCESS PANEL
APX APPROXIMATE
ARCH ARCHITECT(URAL)
ASB ASBESTOS
ASC ABOVE SUSPENDED CEILING
AUTO AUTOMATIC
B
B/O(B.O.) BOTTOM OF
BD BOARD
BELOW BEL
BET BETWEEN
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BRK BRICK
BS BOTH SIDES
BSMT BASEMENT
BUR BUILT-UP ROOFING
BVL BEVELED
BW BOTH WAYS
C
C-C CENTER TO CENTER
CAB CABINET
CALC CALCULATION
CB CATCH BASIN
CEM CEMENT
CFL COUNTER FLASH(ING)
CFT CUBIC FOOT
CHAM CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE CONCRETE
CIR CIRCLE
CIRC CIRCUMFERENCE
CJ CONTROL JOINT
CK CAULK(ING)
CL CENTER LINE
CLG CEILING
CLR CLEAR
ARCHITECTURAL ABBREVIATIONS
Revisions: Date:
35% SCHEMATIC DESIGN 7/22/2022
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
95%R CONSTRUCTION DOCUMENTS 1/12/2023
100% CONSTRUCTION DOCUMENTS 2/2/2023
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C :\U se rs
\r ya nb \D oc um en ts
\2
-K
C H on or
A nn ex R oo f R ep la ce m en t_
R ya n.
bo ur la nd .r vt 2/
8/
:0 6:
A
M
S001
STRUCTURAL ABBREVIATIONS
AND GENERAL NOTES
REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023
BID DOCUMENTS
FULLY SPRINKLERED
22009
Revisions: Date:
35% SCHEMATIC DESIGN 7/22/2022
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
95%R CONSTRUCTION DOCUMENTS 1/12/2023
100% CONSTRUCTION DOCUMENTS 2/2/2023
1. THESE DRAWINGS ARE NOT PRODUCED BY NAGEL ARCHITECTS +
ENGINEERS AND ARE TO BE USED AS REFERENCE MATERIAL ONLY.
GENERAL NOTES - STRUCTURAL ROOF FRAMING PLAN
ES RB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C :\U se rs
\r ya nb \D oc um en ts
\2
-K
C H on or
A nn ex R oo f R ep la ce m en t_
R ya n.
bo ur la nd .r vt 2/
8/
:0 6:
A
M
S100
UPPER LEVEL FRAMING PLAN REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023
BID DOCUMENTS
FULLY SPRINKLERED
22009
Revisions: Date:
35% SCHEMATIC DESIGN 7/22/2022
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
95%R CONSTRUCTION DOCUMENTS 1/12/2023
100% CONSTRUCTION DOCUMENTS 2/2/2023
1. THESE DRAWINGS ARE NOT PRODUCED BY NAGEL ARCHITECTS +
ENGINEERS AND ARE TO BE USED AS REFERENCE MATERIAL ONLY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C :\U se rs
\r ya nb \D oc um en ts
\2
-K
C H on or
A nn ex R oo f R ep la ce m en t_
R ya n.
bo ur la nd .r vt 2/
8/
:0 6:
A
M
S101
ROOF FRAMING PLAN REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023
BID DOCUMENTS
FULLY SPRINKLERED
22009
Revisions: Date:
35% SCHEMATIC DESIGN 7/22/2022
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
95%R CONSTRUCTION DOCUMENTS 1/12/2023
100% CONSTRUCTION DOCUMENTS 2/2/2023
1. THESE DRAWINGS ARE NOT PRODUCED BY NAGEL ARCHITECTS +
ENGINEERS AND ARE TO BE USED AS REFERENCE MATERIAL ONLY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C :\U se rs
\r ya nb \D oc um en ts
\2
-K
C H on or
A nn ex R oo f R ep la ce m en t_
R ya n.
bo ur la nd .r vt 2/
8/
:0 6:
A
M
S102
UPPER ROOF FRAMING PLAN REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023
BID DOCUMENTS
FULLY SPRINKLERED
22009
Revisions: Date:
35% SCHEMATIC DESIGN 7/22/2022
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
95%R CONSTRUCTION DOCUMENTS 1/12/2023
100% CONSTRUCTION DOCUMENTS 2/2/2023
1. THESE DRAWINGS ARE NOT PRODUCED BY NAGEL ARCHITECTS +
ENGINEERS AND ARE TO BE USED AS REFERENCE MATERIAL ONLY.
LEGEND - DEMOLITION PLAN
EXISTING ELEMENT TO BE REMOVED
EXISTING ELEMENT TO REMAIN
DEMOLISH EXISTING ROOF DRAIN
DEMOLISH EXISTING ROOF FAN
DEMOLISH EXISTING PLUMBING EXHAUST PIPE
ROOFING ON METAL DECK
ROOFING ON CONCRETE DECK
A. EXISTING ROOF TO BE DEMOLISHED DOWN TO STRUCTURAL DECK.
B. ALL ITEMS NOT SHOWN TO BE REMOVED WILL REMAIN IN PLACE.
ROOF DEMOLITION AND NEW WORK WILL TAKE PLACE WITH
EQUIPMENT IN PLACE.
C. REMOVE EXISTING PITCH POCKET FILL FOR ALL MECHANICAL SCREEN
COLUMNS.
D. ALL WORK TO OCCUR AFTER HOURS AND BE READY FOR USE THE
NEXT BUSINESS DAY.
E. INSPECT ALL ROOF DRAINS, AND OTHER WATER REMOVAL
INFRASTUCTURE IF APPLICABLE; REPAIR AND/OR REPLACE WHERE
NEEDED TO ENSURE A 20-YEAR TOTAL SYSTEM WARRANTY.
F. ALL BUILDING SERVICE EQUIPMENT (BSE) SHALL REMAIN IN
OPERATION THROUGHOUT PROJECT DURATION.
G. BOTH ROOFTOPS SHALL NOT LEAK DURING CONSTRUCTION.
GENERAL NOTES - DEMOLITION PLAN
A A
B B
C C
D D
E E
F F
G G
RA RA
RB RB
H H
R1
R8
R7
R6
R5
R4
R3
R2
AA
BB
CC
DD
AHU #2
AHU #1
AHU #3
EXISTING
AHU SCREEN
KEYNOTES - DEMOLITION PLAN
1 REMOVE EXISTING ROOFING ASSEMBLY TO METAL DECK
2 REMOVE EXISTING ROOFING ASSEMBLY TO CONCRETE DECK
3 REMOVE EXISTING ROOF HATCH AND PULL DOWN LADDER
4 REMOVE EXISTING EIFS ASSEMBLY TO SHEATING SUBSTRATE
5 REMOVE SERVICE PLATFORM AND STAIRS DURING DEMO PHASE,
TO BE REINSTALLED AFTER THE ROOF INSTALLATION
6 REMOVE EXISTING ROOF DRAINS, OVERFLOW DRAINS, AND
BELOW-DECK HORIZONTAL DRAIN PIPING TO THE RISER PIPE. SEE
PLUMBING DRAWINGS FOR MORE DETAIL.
7 REMOVE EXISTING GUTTER, DOWNSPOUTS, AND SPLASH BLOCKS.
8 ALL EXISTING COPING, FLASHING, AND FIBERGLASS FACED
GYPSUM TO BE REMOVED
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
n a g e l-d c \c o m p a n y \P ro je c ts
\2 K
C H o n o r
A n n e x R o o f R e p la c e m e n t\
D e s ig n D o c u m e n ts
\4
D M o d e lin g \2
-K
C H o n o r
A n n e x R o o f R e p la c e m e n t.
rv t
/1
/2
:1 :2
P
M
AD103
ROOF PLAN - ARCHITECTURAL
DEMOLITION
REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023 ES RB
BID DOCUMENTS
FULLY SPRINKLERED
22009
1/8" = 1'-0" F2
ROOF PLAN - ARCHITECTURAL DEMOLITION 0' 4' 8' 16'
NO
RTH
Revisions: Date:
35% SCHEMATIC DESIGN 7/22/2022
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
STAIRWELL
CORRIDOR
CARE UNIT
C
CHILD
WAITING
CORRIDOR
STORAGE
TELECOM.
LONG EYE LANE
LONG EYE
LANE
CORRIDOR
EXAM
EXAM
NURSE /
TONOMETRY
MEDICINE
PREPARATION
OFFICE OFFICE OFFICE OFFICE OFFICE
EQUIPMENT
CLEAN
UTILITY
SOILED
UTILITY
TOILET
NURSE
STATION NURSE
STATION
CORRIDOR
CORRIDOR
OBSERVATION
EXAM
EXAM
EXAM
EXAM
EXAM
CORRIDOR
EXAM
TOILET
OFFICE
EXAM
OFFICE,
SUPERVISOR
AUDIO
EXAM
EXAM
CORRIDOR
OFFICE
OFFICE
OFFICE
OBSERVATION
EXAM NURSE
STATION
CLEAN
UTILITY
NURSE
STATION
CORRIDOR
OFFICE
OFFICE
EXAM
EXAM
MEDICINE
PREPARATION
EQUIPMENT
EXAM
EXAM
SPECIAL
PROCEDURE
EXAM
EXAM
SPECIAL
RESPIRATORY
ISOLATION
ROOM
SOILED
UTILITY
CORRIDOR
CORRIDOR
OFFICE
TOILET
COFFEE
OBSERVATION
ROOM
COATS /
LOCKERS
EXAM OFFICE
EXAMEXAM
CORRIDOR
EXAM
WORK
TOILET
OBSERVATION OFFICE
CORRIDOR
CORRIDOR
NURSE
STATION
PREPARATIONEQUIPMENTJAN.
CLOSET OFFICE
CORRIDOR
NURSE
STATION
OFFICE
OFFICE
EXAMTOILETWORK
CLEAN
UTILITY
SOILED
UTILITY
TOILET
CORRIDOR
EXAMEXAMEXAMEXAMEXAM
TELECOM.
STORAGE
STAIRWELL
CORRIDOR
GREETER
WAITING
CHILD
WAITING
TOILET,
FEMALE
ELEC.
ROOM
PROCEDURE
TOILET
OFFICE
CORRIDOR
CORRIDOR
VESTIBULE BIO
STORAGE
GREETER
OFFICE
TOILET,
MALE
WAITING
WAITING
WAITING
VIDEO
ELEVATOR
PROCEDURE
ROOM
ELEC.
ROOM
ELEVATOR
COFFEE
CORRIDOR
DN
DN
DN
OFFICE
TOILET,
MALE
VIDEO
PROCEDURE
ELEC.
ROOM
ELEVATOR
A A
B B
C C
D D
E E
F F
G G
RA RA
RB RB
H H
R1
R7
R5
R4
R3
R2
AA
BB
CC
DD
DD
A102
C9
E5
A502
E5
A502
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
n a g e l-d c \c o m p a n y \P ro je c ts
\2 K
C H o n o r
A n n e x R o o f R e p la c e m e n t\
D e s ig n D o c u m e n ts
\4
D M o d e lin g \2
-K
C H o n o r
A n n e x R o o f R e p la c e m e n t.
rv t
/1
/2
:1 :0
P
M
A102
SECOND FLOOR PLAN -
ARCHITECTURAL
REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023 ES RB
BID DOCUMENTS
FULLY SPRINKLERED
22009
1/8" = 1'-0" F2
SECOND FLOOR PLAN - ARCHITECTURAL 0' 4' 8' 16'
NO
RTH
1/4" = 1'-0" C9
ENLARGED SECOND FLOOR PLAN - ARCHITECTURAL
Revisions: Date:
95%R CONSTRUCTION DOCUMENTS 1/12/2023
100% CONSTRUCTION DOCUMENTS 2/2/2023
R6
R8
1. INSTALL ACCORDING TO MANUFACTURER'S SPECIFICATIONS TO
ACHIEVE WARRANTY.
2. NEW ROOF MEMBRANE TO BE OF SBS CONSTRUCTION.
3. CONTRACTOR SHALL COORDINATE ROOFING INSTALLATION WITH
MECHANICAL DRAWINGS. PROVIDE CURBING AND FLASHING AS
REQUIRED AT ROOF PENETRATIONS TO MAINTAIN INTEGRITY OF
ROOF MEMBRANE.
4. REFILL PITCH POCKETS & INSTALL NEW STORM COLLARS.
5. ALL WORK TO OCCUR AFTER HOURS AND BE READY FOR USE THE
NEXT BUSINESS DAY.
6. ROOF DRAINS NEED TO COMPLY WITH 20-YEAR WARRANTY.
7. THESE DETAILS ARE NOT INTENDED TO ITEMIZE ALL WORK TASKS
REQUIRED TO COMPLETE THE REQUIREMENTS OF THIS PROJECT.
THESE DETAILS ARE OFFERED AS AN OVERVIEW OF TASK
MILESTONES.
8. PROVIDE FULL-TIME JOB-SITE INSPECTION THROUGHOUT THE
PROJECT.
GENERAL NOTES - ROOF PLAN
A
A A
B B
C C
D D
E E
F F
G G
RA RA
RB RB
H H
R1
R8
R7
R6
R5
R4
R3
R2
AA
BB
CC
DD
AHU #2
AHU #1
AHU #3
B1
A501
B1
A501
B1
A501
B1
A501
B1
A501
F7
A501
D3
A501
E5
A502
D5
A501
D5
A501
D5
A501
EXISTING
AHU SCREEN
1. INSTALL ACCORDING TO MANUFACTURER'S SPECIFICATIONS TO ACHIEVE
WARRANTY.
2. NEW ROOF MEMBRANE TO BE OF SBS CONSTRUCTION.
3. CONTRACTOR SHALL COORDINATE ROOFING INSTALLATION WITH
MECHANICAL DRAWINGS. PROVIDE CURBING AND FLASHING AS REQUIRED
AT ROOF PENETRATIONS TO MAINTAIN INTEGRITY OF ROOF MEMBRANE.
4. REFILL PITCH POCKETS & INSTALL NEW STORM COLLARS.
5. ALL WORK TO OCCUR AFTER HOURS AND BE READY FOR USE THE NEXT
BUSINESS DAY.
6. ROOF DRAINS NEED TO COMPLY WITH 20-YEAR WARRANTY.
7. THESE DETAILS ARE NOT INTENDED TO ITEMIZE ALL WORK TASKS
REQUIRED TO COMPLETE THE REQUIREMENTS OF THIS PROJECT. THESE
DETAILS ARE OFFERED AS AN OVERVIEW OF TASK MILESTONES.
8. PROVIDE FULL-TIME JOB-SITE INSPECTION THROUGHOUT THE PROJECT.
GENERAL NOTES - ROOF PLAN
VENT FAN
ROOF SLOPE, 1/4" / 12" MIN.
ROOF DRAIN
LEGEND - ROOF PLAN
PLUMBING EXHAUST PIPE
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
n a g e l-d c \c o m p a n y \P ro je c ts
\2 K
C H o n o r
A n n e x R o o f R e p la c e m e n t\
D e s ig n D o c u m e n ts
\4
D M o d e lin g \2
-K
C H o n o r
A n n e x R o o f R e p la c e m e n t.
rv t
/1
/2
:1 :0
P
M
A103
ROOF PLAN - ARCHITECTURAL REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023 ES RB
BID DOCUMENTS
FULLY SPRINKLERED
22009
0' 4' 8' 16'
NO
RTH1/8" = 1'-0"
F2
ROOF PLAN - ARCHITECTURAL
KEYNOTES - ROOF PLAN
1 SPLASH BLOCK TO BE PROVIDED FOR DOWNSPOUT ON NEW GUTTER SYSTEM
2 SLOPE ROOF AWAY FROM EXISTING MECHANICAL UNIT
3 REINSTALL METAL STAIRS REMOVED DURING THE DEMOLITION PHASE
4 NEW ROOF-MOUNTED HOSE BIBB, SEE MECHANICAL DRAWINGS
5 NEW STEEL ROOF HATCH WITH STEEL SHIPS LADDER
6 NEW LOW RISE FOAM INSULATION ROOF ON CONCRETE DECK. SEE E8/A502
7 NEW LOW RISE FOAM INSULATION ROOF ON STEEL DECK. SEE C8/A502
Revisions: Date:
35% SCHEMATIC DESIGN 7/22/2022
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
RIGID INSULATION TO FILL CAVITY
AS NEEDED
3/4" EXTERIOR
PLYWOOD SHEATHING
SLOPE
EXISTING FOIL FACED FIBERGLASS BATT
INSULATION CLIPPED TO FRAME
2X TREATED WD.
BLOCKING
NOTE: PROVIDE ELECTROSTATIC ISOLATION
BETWEEN ALUMINUM AND STEEL
2 LAYERS OF BOARD INSULATION W/
JOINTS STAGGERED VERTICALLY &
HORIZONTALLY
FULLY ADHEARED AIR CONTROL
BARRIER
ROOF SHEATHING
COVERBOARD
CANT. STRIP
SBS ROOFING SYSTEM
PREFINISHED ALUMINUM COPING
AND FLASHING
EXISTING ALUMINUM AND GLASS
CURTAIN WALL SYSTEM
SPECIFIED DRAWBAND AND SEALANT
METAL PITCH POCKET MINIMUM 4"
HEIGHT W/ METAL HOOD
TOP OFF W/ SEALANT
TWO-PLY
STRIPPING
PRIME INTERIOR OF PITCH
POCKET AND FILL 1" FROM
TOP W/ NON-SHRINK GROUT
SEAL PIPE BASE TO
PREVENT GROUT
LEAKAGE INTO BUILDING
FLANGE SET IN SPECIFIED
ASPHALT CEMENT,
MECHANICALLY FASTENED 3"
O.C., STAGGERED PRIME METAL
FLANGE BEFORE STRIPPING
WOOD NAILER SECURED TO
DECK W/ APPROPRIATE
FASTENERS, 2 ROWS
STAGGERED EACH ROW 24" O.C.
EXISTING ROOF DECK
SPECIFIED INSULATION
SPECIFIED BUR MEMBRANE
UNDER PRIME METAL FLANGE
SOFT METAL CAP 1"
DOWN INTO PIPE
FOR PLUMBING VENTS WITH
DIAMETERS LESS THAN 2"
USE SOFT METAL CAPS
ROLLED SOFT METAL
FLASHING 1" DOWN INTO PIPE
OPTIONAL SOLDER STAINLESS STEEL SCREEN
PLUMBING VENT STACK
TWO TARGET PLIES ADHERED
IN SPECIFIED ADHESIVE
PLUMBING VENT STACK
MASTIC SEAL
" M
IN
. F
L A
N G
E
SET FLANGE IN
SPECIFIED MASTIC
SPECIFIED BUR MEMBRANE
SPECIFIED INSULATION
EXISTING ROOF DECK
NOTES
SOFT METAL FLASHINGS
1. SHEET LEAD: MINIMUM 4LB. (20kg /m) PER SQ. FT.
2. SHEET COPPER: MINIMUM 16 OZ. IF COPPER FLASHING IS INSTALLED OVER AN
IRON OR STEEL PIPE, WRAP AS ASHPALT COATED ROOFING FELT TO PREVENT TO
DIRECT CONTACT BETWEEN TWO DISSIMILAR METALS.
2"
EXISTING ROOF
DECK
INSULATION
SPECIFIED CANT
SPECIFIED BUR MEMBRANE
TWO-PLY STRIPPING
" M
IN
BASE FLASHING AS SPECIFIED
FLASHING MEMBRANE INSTALLED
OVER NAILER
ATTACH NAILER TO WALL
REFER TO FACTORY MUTUAL
DATA SHEET I-49
CONTINUOUS CLEAT
FASTENED 16" O.C.
NEOPRENE GASKETED
FASTENER 24" O.C.
SEALANT BETWEEN METAL SECTIONS
TURN ENDS DOWN 45°
ANGLE
A
A
SECTION A-A
10'-0
MAX.
EXISTING ROOFING
EXTEND NEW
ROOFING 12" ONTO
PREPARED AREA
SEAL EDGE WITH
REINFORCING MESH
AND ASPHALT
MASTIC
SPECIFIED BUR
MEMBRANE
12" AND 18" PLY
SHEETS ADHERED
IN SPECIFIED
ADHESIVE
REMOVE
EMBEDDED
GRAVEL / DEBRIS
MINIMUM 18"
EXISTING ROOF
DECK
NOTES
1. BEFORE NEXT DAY'S WORK, REMOVE TEMPORARY
TIE-IN AND INSULATION FILLERS
RE-USE EXISTING AIR TERMINAL
FLAT SURFACE BASE ADHERE
TO ROOF MEMBRANE WITH
POLY ROOF SF
CABLE PLATE ADHESIVE
ADHERE TO ROOF MEMBRANE
WITH POLY ROOF SF
RE-USE EXISTING LIGHTNING CONDUCTOR
NOTES
1. PRIME ALL METAL SURFACES PRIOR TO CONTACT WITH SPECIFIED PRIMER
TWO-PLY STRIPPING
GRAVEL RETAINER
24 INCHES SQUARE
SPECIFIED BUR
MEMBRANE
SPECIFIED INSULATION
DECK CLAMP
STRAINER/DOME
CLAMPING RING
TWO-PLY STRIPPING
LEAD / METAL FLASHING
EXISTING ROOF DECK
NOTES
1. PRIME ALL METAL SURFACES THAT WILL COME INTO
CONTACT WITH ADHESIVES.
TWO-PLY STRIPPING
METAL FLANGE SET IN
SPECIFIED ASPHALT
CEMENT PRIME FLANGE
BEFORE STRIPPING
FASTEN 3IN. O.C.
STAGGERED 2 ROWS
SPECFIED BUR
MEMBRANE
SPECIFIED INSULATION
EXISTING ROOF DECK
ATTACH NAILER TO
WALL
DRY SHEET
FELT ENVELOPE
IF SPECIFIED
GUTTER STRAP
36 IN. O.C.
GUTTER BRACKET
36 IN. O.C.
NOTES
1. SLOPE GUTTER TO DOWNSPOUTS 1/4 IN./FT.
MINIMUM
6"
/2
4" - 6"
NOTES
1. RUBBER TRIANGLE BLOCKS ARE USED FOR ROOFTOP
SUPPORT FOR STEEL PIPE, ELECTRICAL CONDUIT, AND
COPPER TUBING TO PROVIDE SUPPORT FOR THESE LINES
ON NEW AND EXISTING ROOF SURFACES.
SUBCONTRACTOR SHALL CHECK LOCAL BUILDING CODES
FOR SPACING REQUIREMENTS.
EXISTING METAL
COUNTERFLASHING
NEW GROMMETED FASTENERS 8 IN. O.C.
INSTALL NEW METAL COUNTERFLASHING
ELASTOMERIC BASE FLASHING
ADHERED WITH SPECIFIED
SHEET ADHESIVE
TWO-PLY STRIPPING
SPECIFIED BUR MEMBRANE
SPECIFIED INSULATION
EXISTING ROOF DECK
SPECIFIED CANT
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
n a g e l-d c \c o m p a n y \P ro je c ts
\2 K
C H o n o r
A n n e x R o o f R e p la c e m e n t\
D e s ig n D o c u m e n ts
\4
D M o d e lin g \2
-K
C H o n o r
A n n e x R o o f R e p la c e m e n t.
rv t
/1
/2
:1 :0
P
M
A501
EXTERIOR DETAILS -
ARCHITECTURAL
REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023 ES RB
BID DOCUMENTS
FULLY SPRINKLERED
22009
1 1/2" = 1'-0" F7
PARAPET AT CURTAINWALL
NTS
B7
HOT/COLD PITCH POCKET WITH GROUT
NTS
B5
PLUMBING VENT
NTS
B1
LIGHT METAL PARAPET CAP
NTS
D1
DAILY TIE IN
NTS
B9
ADHESIVE AIR TERMINAL
NTS
B3
ROOF DRAIN WITH GRAVEL GUARD
NTS
D3
ROOF EDGE WITH GUTTER
3" = 1'-0" F1
RUBBER TRIANGLE PIPE BLOCKING
NTS
D5
SLIP METAL SKIRT FLASHING
Revisions: Date:
35% SCHEMATIC DESIGN 7/22/2022
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
METAL FLASHING
SBS ROOFING SYSTEM
STEEL ACCESS HATCH PER
SPECIFICATION 077200
STEEL SHIPS LADDER PER
SPECIFICATION 055100
ROOF
129'-8"
SECOND FLOOR
114'-8"
EXISTING SYSTEMS PANEL
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
n a g e l-d c \c o m p a n y \P ro je c ts
\2 K
C H o n o r
A n n e x R o o f R e p la c e m e n t\
D e s ig n D o c u m e n ts
\4
D M o d e lin g \2
-K
C H o n o r
A n n e x R o o f R e p la c e m e n t.
rv t
/1
/2
:1 :0
P
M
A502
EXTERIOR DETAILS -
ARCHITECTURAL
REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023 ES RB
BID DOCUMENTS
FULLY SPRINKLERED
22009
NTS
E8
LOW RISE FOAM INSULATION ON CONCRETE DECK
NTS
C8
LOW RISE FOAM INSULATION ON STEEL DECK
NTS
E5
ROOF HATCH LADDER
Revisions: Date:
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C :\U se rs
\r ya nb \D oc um en ts
\2
-K
C H on or
A nn ex R oo f R ep la ce m en t_
R ya n.
bo ur la nd .r vt 2/
8/
:0 4:
A
M
A900
EXISTING PHOTOS REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023 ES MC
BID DOCUMENTS
FULLY SPRINKLERED
22009
1" = 30'-0"
EXISTING PHOTO KEY PLAN 1
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17
18 19 20 21 22
Revisions: Date:
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
95%R CONSTRUCTION DOCUMENTS 1/12/2023
100% CONSTRUCTION DOCUMENTS 2/2/2023
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
RA
RB
H
R1
R8
R7
R6
R5
R4
R3
R2
AA
BB
CC
DD
15 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C :\U se rs
\r ya nb \D oc um en ts
\2
-K
C H on or
A nn ex R oo f R ep la ce m en t_
R ya n.
bo ur la nd .r vt 2/
8/
:0 5:
A
M
A901
EXISTING PHOTOS REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023 ES MC
BID DOCUMENTS
FULLY SPRINKLERED
22009
1" = 30'-0"
EXISTING PHOTO KEY PLAN 2
23 24 25 26 27 28
29 30 31 32 33 34
35 36 37 38 39
40 41 42 43 44
INTERIOR PHOTO
Revisions: Date:
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
95%R CONSTRUCTION DOCUMENTS 1/12/2023
100% CONSTRUCTION DOCUMENTS 2/2/2023
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
RA
RB
H
R1
R8
R7
R6
R5
R4
R3
R2
AA
BB
CC
DD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
C :\U se rs
\r ya nb \D oc um en ts
\2
-K
C H on or
A nn ex R oo f R ep la ce m en t_
R ya n.
bo ur la nd .r vt 2/
8/
:0 5:
A
M
A902
EXISTING PHOTOS REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
02 FEBRUARY 2023 ES MC
BID DOCUMENTS
FULLY SPRINKLERED
22009
1" = 30'-0"
EXISTING PHOTO KEY PLAN 3
45 46 47 48 49 50
51 52
INTERIOR PHOTO INTERIOR PHOTO
Revisions: Date:
75% DESIGN DEVELOPMENT 11/3/2022
95% CONSTRUCTION DOCUMENTS 12/08/2022
95%R CONSTRUCTION DOCUMENTS 1/12/2023
100% CONSTRUCTION DOCUMENTS 2/2/2023
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
RA
RB
H
R1
R8
R7
R6
R5
R4
R3
R2
AA
BB
CC
DD
PLUMBING SYMBOL LIST
SYMBOL: DESCRIPTION:
PIPE SERVING FIXTURE ON FLOOR ABOVE
(EXAMPLE: FD = FLOOR DRAIN)FD
PITCH PIPE IN DIRECTION
RD-1
6"(1000)
ROOF DRAIN PROPERTIES SYMBOL
SIZE (ROOF SQ. FT.)
DIELECTRIC CONNECTION
UNION/FLANGE
BALANCING VALVE (NUMBER INDICATES GPM)
GPM
CHECK VALVE
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
METERM
ALIGNMENT GUIDE
PIPE ANCHOR
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
COLD WATER - POTABLECW
HOT WATER - POTABLEHW
HOT WATER CIRCULATING - POTABLEHWC
HOT WATER - POTABLE NUMBER INDICATES TEMPHW140
HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140
SANITARY DRAINAGESAN
SOFT COLD WATERSCW
SOFT HOT WATERSHW
STORM DRAINAGEST
STS STORM DRAINAGE (SECONDARY)
VENTV
WASTE ANETHESIA GAS DISPOSALWAGD
COMPRESSED AIRCA
DRAIND
NOT ALL SYMBOLS MAY APPLY.
PRESSURE REDUCING VALVE (LIQUID/GAS)
LAB VACUUMVAC
SOLENOID VALVE
SAFETY/RELIEF VALVE
VACUUM BREAKER
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
TEMPERATURE SENSOR WITH WELL
T
THERMOMETER WITH WELL (DIAL TYPE)T
THERMOMETER WITH WELL (FILLED TYPE)
PUMP
INSTRUMENT AIRIA
MEDICAL AIRMA
MEDICAL VACUUMMV
NITROGENN
NITROUS OXIDENO
OXYGENO
PIPE CONTINUATION
PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P
ROUTE TO DRAIN
"WYE" - STRAINER
"WYE" - STRAINER W/SHUTOFF VALVE
AND HOSE CONNECTION WITH CAP
FLEXIBLE CONNECTION
MANUAL AIR VENT
DRAIN VALVE WITH HOSE CONNECTION AND CAP
EA MEDICAL EQUIPMENT AIR
VALVE BOX
MEDICAL GAS OUTLET (MGO)
ALARM PANEL
HEADWALL
SINGLE GAS OUTLET (AIR)A
SINGLE GAS OUTLET (OXYGEN)O
SINGLE GAS OUTLET (VACUUM)V
NITROGEN PRESSURE CONTROL CABINET
PRESSURE TRANSDUCER WITH ALARM WIRING
CO2 CARBON DIOXIDE
DRAIN - MEDICAL GASDMG
BACKFLOW PREVENTER
MEDIUM PRESSURE GASMPG
EXPANSION JOINT
#.#" IS THE EXPANSION TRAVEL INCHESEJ-#
AIR ADMITTANCE VALVE
PLUMBING ABBREVIATION KEY
BATHTUBBT
CO CLEANOUT
CLINICAL SINKCS
DRINKING FOUNTAINDF
EMERGENCY EYEWASHEE
FLOOR CLEANOUTFCO
FLOOR DRAINFD
FLOOR SINKFS
GARBAGE DISPOSERGD
GREASE INTERCEPTORGI
HOSE BIBBHB
I.E. INVERT ELEVATION (FOR REFERENCE ONLY)
LAVATORYLAV
MOP BASINMB
MH MANHOLE
MIXING VALVEMV
NEUTRALIZATION TANKNT
OIL SEPARATOROS
ROOF DRAINRD
SHOWERSH
SINKSK
SERVICE SINKSS
TRENCH DRAINTD
TRAP PRIMERTP
URINALUR
WATER CLOSETWC
WALL CLEANOUTWCO
WASH FOUNTAINWF
WATER HEATERWH
WASHING MACHINE FIXTUREWMF
YARD CLEANOUTYCO
EMERGENCY SHOWERES
EMERGENCY SHOWER/EYEWASHESE
ELECTRIC WATER COOLEREWC
VENT THROUGH ROOFVTR
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
BFP BACKFLOW PREVENTER
NOT IN CONTRACTNIC
ABBR: DESCRIPTION:
TYPICALTYP
UNLESS OTHERWISE NOTESUON
EXISTINGE
FLOW METERFM
WATER SOFTENERWS
WATER METERWM
DIALYSIS BOXDB
CATCH BASINCB
CAST IRONCI
DUCTILE IRONDI
UTILITY BOXUB
SHORT CIRCUIT CURRENT RATINGSCCR
OVERFLOW ROOF DRAINORD
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO
THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN
THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE
BASIS OF DESIGN.
3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL
APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.
4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874
5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY
ALL ELEVATIONS BEFORE BEGINNING WORK.
6. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO
PLUMBING FIXTURES.
7. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN
DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT
BE CONSIDERED SHUTOFF VALVES.
8. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL
SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR
ADDITIONAL DEMOLITION INFORMATION.
9. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK
UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL
INFORMATION.
10. ALL STORM AND OVERFLOW STORM DRAINAGE PIPING SHALL BE CAST IRON AND SHALL BE
SUPPORTED AS SPECIFIED IN SECTION 22 14 00.
PLUMBING GENERAL NOTES:
PLUMBING SLOPE REQUIREMENTS:
INTERIOR:
STORM (GRAVITY): 1/8” PER FOOT
DOMESTIC WATER: NO SPECIFIC PITCH, PITCH TO FIXTURES
BASED ON PLUMBING CODE: [IPC-2018]
PLUMBING SHEET INDEX
P000 PLUMBING COVERSHEET
P100 FIRST FLOOR - PLUMBING
P101 SECOND FLOOR - PLUMBING
PD100 FIRST FLOOR DEMOLITION - PLUMBING
PD101 SECOND FLOOR DEMOLITION - PLUMBING
GRAND TOTAL: 5
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
BID DOCUMENTS
2-2-2023
B
IM
/1
.0
V
A
K C
H o n o r A n n e x R o o f R e p la c e
/M E
P
.0
V
A -K
C -H o n o r
A n n e x R o o f R e p la c e
C .r v t
/7
/2
:1
:5
A
M
P000
PLUMBING COVERSHEET REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
2 FEBRUARY 2023 BEH
BID DOCUMENTS
FULLY SPRINKLERED
22009
1600 BALTIMORE
SUITE 300
KANSAS CITY, MO 64108
P: 816.842.8437 www.imegcorp.com
Missouri Certificate of Authority #F001325536
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2022 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
PROJECT #18001588.05Revisions: Date:
FAP
FE
FAP
FAP FE
FAP
FE
FAP
FE
FAP
FAP
FE
FAP
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
GROUP
TOILET
OFFICE
WORK FILE
GROUP
OFFICE
COFFEE
OFFICE
OFFICE, CHIEF
OFFICE
OFFICE
MAINTENANCE
ELEC. ROOM
MECH. ROOM
EXAM
JAN. CLOSET /
STORAGE
SPECIMEN
PROCESS
BIO
STORAGE
EXAM
1039A
LIEDOWN
SPECIMEN
COLLECTION
BLOOD DRAW
TOILET
TOILET
RADIOLOGY
RECEIVING
DARK ROOM
CHEMICAL
STORAGE
DRESSING
ROOM
DRESSING
ROOM
TOMOGRAPHY
MAMMOGRAPHY
OFFICE
CONFERENCE
TOILET, FEMALE
COURIER MAIL /
COPY
EQUIPMENT
GREETER
ELEVATOR
ELEVATOR
ELEC. ROOM
TOILET, MALE
PUMP ROOM
TELECOM.
CASH
GREETER
VESTIBULE
WAITING
WILL CALL
RECEIVE
STORAGE
CONSULT
WORK
REFILL
INPUT
BIOMED
NETWORK
CLOSET
OFFICE
FILL
INVENTORY
COMPENSATION
TOILET
LOUNGE
CHILD WAITING
LOBBY
VESTIBULE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
WAITING
STAIRWELL
CORRIDOR
RECEPTION
WAITING
CORRIDOR
STAIRWELL
OFFICE
CLOSET
1044A
UP
UP
UP
H
RB
RA
G
F
E
D
C
B
A
1 2 3 4 R8 5 6 7 8
DD
CC
BB
AA
R2
R3
R4
R5
R7
R6
"S
T S
8"STS
"S
T S
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
BID DOCUMENTS
2-2-2023
B
IM
/1
.0
V
A
K C
H o n o r A n n e x R o o f R e p la c e
/M E
P
.0
V
A -K
C -H o n o r
A n n e x R o o f R e p la c e
C .r v t
/7
/2
:1
:1
A
M
PD100
FIRST FLOOR DEMOLITION -
PLUMBING
REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
2 FEBRUARY 2023 BEH
BID DOCUMENTS
FULLY SPRINKLERED
22009
1600 BALTIMORE
SUITE 300
KANSAS CITY, MO 64108
P: 816.842.8437 www.imegcorp.com
Missouri Certificate of Authority #F001325536
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2022 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
PROJECT #18001588.05
N O R
HT
1/8" = 1'-0"
LEVEL 01 DEMOLITION - PLUMBING
SHEET NOTES:
1. SEE SHEET P000 FOR GENERAL NOTES AND
SYMBOLS.
2. WORK SHOWN DARK AND DASHED IS WORK
TO BE REMOVED.
3. NOT ALL DEMOLITION WORK MAY BE SHOWN.
CONTRACTOR SHALL DISCONNECT AND
REMOVE ALL ITEMS NOT REQUIRED TO
REMAIN.
Revisions: Date:
FE
FE
FAP
FAP
FE
FE
FE
STAIRWELL
CORRIDOR
CARE UNIT C
CHILD WAITING
CORRIDOR
STORAGE
TELECOM.
LONG EYE LANE
LONG EYE LANE
CORRIDOR
EXAM
EXAM
NURSE /
TONOMETRY
MEDICINE
PREPARATION
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
EQUIPMENT
CLEAN UTILITY
SOILED UTILITY
TOILET
NURSE STATION
NURSE STATION
CORRIDOR
CORRIDOR
OBSERVATION
EXAM
EXAM
EXAM
EXAM
EXAM
CORRIDOR
EXAM
TOILET
OFFICE
EXAM
OFFICE,
SUPERVISOR
AUDIO
EXAM
EXAM
CORRIDOR
OFFICE
OFFICE
OFFICE
OBSERVATION
EXAM
NURSE STATION
CLEAN UTILITY
NURSE STATION
CORRIDOR
OFFICE
OFFICE
EXAM
EXAM
MEDICINE
PREPARTAION
2066EQUIPMENT
EXAM
EXAM
SPECIAL
PROCEDURE
2016EXAM
EXAM
SPECIAL
RESPIRATORY
ISOLATION
ROOM
SOILED UTILITY
CORRIDOR
CORRIDOR
OFFICE
TOILET
COFFEE
OBSERVATION
ROOM
COATS /
LOCKERS
EXAM
OFFICE
EXAM
EXAM
CORRIDOR
EXAM
WORK
2080A
TOILET
OBSERVATION
OFFICE
CORRIDOR
CORRIDOR
NURSE STATION
PREPARATION
EQUIPMENT
JAN. CLOSET
OFFICE
CORRIDOR
NURSE STATION
OFFICE
OFFICE
EXAM
TOILET
WORK
CLEAN UTILITY
SOILED UTILITY
TOILET
CORRIDOR
EXAM
EXAM
EXAM
EXAM
EXAM
STORAGE
STAIRWELL
CORRIDOR
GREETER
WAITING
CHILD WAITING
TOILET, FEMALE
ELEC. ROOM
PROCEDURE
TOILET
OFFICE
CORRIDOR
CORRIDOR
VESTIBULE
BIO
STORAGE
GREETER
OFFICE
TOILET, MALE
WAITING
WAITING
WAITING
VIDEO
ELEVATOR
PROCEDURE
ROOM
ELEC. ROOM
2112 ELEVATOR
TELECOM.
COFFEE
CORRIDOR
C
C
C C
SM
SM
EM
DN
DN
DN
H
RB
RA
G
F
E
D
C
B
A
1 2 3 4 R8 5 6 7 8
DD
CC
BB
AA
R1
R2
R3
R4
R5
R7
R6
REMOVE COLD
WATER PIPING UP
TO HOSE BIBB.
C W
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
BID DOCUMENTS
2-2-2023
B
IM
/1
.0
V
A
K C
H o n o r A n n e x R o o f R e p la c e
/M E
P
.0
V
A -K
C -H o n o r
A n n e x R o o f R e p la c e
C .r v t
/7
/2
:1
:1
A
M
PD101
SECOND FLOOR DEMOLITION -
PLUMBING
REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
2 FEBRUARY 2023 BEH
BID DOCUMENTS
FULLY SPRINKLERED
22009
1600 BALTIMORE
SUITE 300
KANSAS CITY, MO 64108
P: 816.842.8437 www.imegcorp.com
Missouri Certificate of Authority #F001325536
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2022 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
PROJECT #18001588.05
N O R
HT
1/8" = 1'-0"
LEVEL 02 DEMOLITION - PLUMBING
KEYNOTES:
1. REMOVE EXISTING HORIZONTAL DOWNSPOUT
PIPING.
SHEET NOTES:
1. SEE SHEET P000 FOR GENERAL NOTES AND
SYMBOLS.
2. WORK SHOWN DARK AND DASHED IS WORK
TO BE REMOVED.
3. NOT ALL DEMOLITION WORK MAY BE SHOWN.
CONTRACTOR SHALL DISCONNECT AND
REMOVE ALL ITEMS NOT REQUIRED TO
FE
FAP
FAP FE
FAP
FE
FAP
FE
FAP
FAP
FE
FAP
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
GROUP
TOILET
OFFICE
WORK FILE
GROUP
OFFICE
COFFEE
OFFICE
OFFICE, CHIEF
OFFICE
OFFICE
MAINTENANCE
ELEC. ROOM
MECH. ROOM
EXAM
JAN. CLOSET /
STORAGE
SPECIMEN
PROCESS
BIO
STORAGE
EXAM
1039A
LIEDOWN
SPECIMEN
COLLECTION
BLOOD DRAW
TOILET
TOILET
RADIOLOGY
RECEIVING
DARK ROOM
CHEMICAL
STORAGE
DRESSING
ROOM
DRESSING
ROOM
TOMOGRAPHY
MAMMOGRAPHY
OFFICE
CONFERENCE
TOILET, FEMALE
COURIER MAIL /
COPY
EQUIPMENT
GREETER
ELEVATOR
ELEVATOR
ELEC. ROOM
TOILET, MALE
PUMP ROOM
TELECOM.
CASH
GREETER
VESTIBULE
WAITING
WILL CALL
RECEIVE
STORAGE
CONSULT
WORK
REFILL
INPUT
BIOMED
NETWORK
CLOSET
OFFICE
FILL
INVENTORY
COMPENSATION
TOILET
LOUNGE
CHILD WAITING
LOBBY
VESTIBULE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
WAITING
STAIRWELL
CORRIDOR
RECEPTION
WAITING
CORRIDOR
STAIRWELL
OFFICE
CLOSET
1044A
UP
UP
UP
H
RB
RA
G
F
E
D
C
B
A
1 2 3 4 R8 5 6 7 8
DD
CC
BB
AA
R1
R2
R3
R4
R5
R7
R6 CONNECT TO EXISTING 8"
OVERFLOW DRAIN DN.
CONNECT TO EXISTING 8"
OVERFLOW DRAIN UP.
"S
T S
EXISTING 4"
DOWNSPOUT
UP AND DOWN
TO REMAIN.
EXISTING 6"
DOWNSPOUT
UP AND DOWN
TO REMAIN.
EXISTING 6"
DOWNSPOUT
UP AND DOWN
TO REMAIN.
EXISTING 10"
DOWNSPOUT
UP AND DOWN
TO REMAIN.
EXISTING 8"
DOWNSPOUT
UP AND DOWN
TO REMAIN.
"S
T S
CONNECT TO EXISTING 6"
OVERFLOW DRAIN DN.
CONNECT TO EXISTING 6"
OVERFLOW DRAIN UP.
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
BID DOCUMENTS
2-2-2023
B
IM
/1
.0
V
A
K C
H o n o r A n n e x R o o f R e p la c e
/M E
P
.0
V
A -K
C -H o n o r
A n n e x R o o f R e p la c e
C .r v t
/7
/2
:1
:1
A
M
P100
FIRST FLOOR - PLUMBING REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
2 FEBRUARY 2023 BEH
BID DOCUMENTS
FULLY SPRINKLERED
22009
1600 BALTIMORE
SUITE 300
KANSAS CITY, MO 64108
P: 816.842.8437 www.imegcorp.com
Missouri Certificate of Authority #F001325536
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2022 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
PROJECT #18001588.05
N O R
HT
1/8" = 1'-0"
LEVEL 01 - PLUMBING
SHEET NOTES:
1. SEE SHEET P000 FOR GENERAL NOTES AND
SYMBOLS.
2. WORK SHOWN DARK AND DASHED IS WORK
TO BE REMOVED.
3. NOT ALL DEMOLITION WORK MAY BE SHOWN.
CONTRACTOR SHALL DISCONNECT AND
REMOVE ALL ITEMS NOT REQUIRED TO
FE
FE
FAP
FAP
FE
FE
FE
STAIRWELL
CORRIDOR
CARE UNIT C
CHILD WAITING
CORRIDOR
STORAGE
TELECOM.
LONG EYE LANE
LONG EYE LANE
CORRIDOR
EXAM
EXAM
NURSE /
TONOMETRY
MEDICINE
PREPARATION
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
EQUIPMENT
CLEAN UTILITY
SOILED UTILITY
TOILET
NURSE STATION
NURSE STATION
CORRIDOR
CORRIDOR
OBSERVATION
EXAM
EXAM
EXAM
EXAM
EXAM
CORRIDOR
EXAM
TOILET
OFFICE
EXAM
OFFICE,
SUPERVISOR
AUDIO
EXAM
EXAM
CORRIDOR
OFFICE
OFFICE
OFFICE
OBSERVATION
EXAM
NURSE STATION
CLEAN UTILITY
NURSE STATION
CORRIDOR
OFFICE
OFFICE
EXAM
EXAM
MEDICINE
PREPARTAION
2066EQUIPMENT
EXAM
EXAM
SPECIAL
PROCEDURE
2016EXAM
EXAM
SPECIAL
RESPIRATORY
ISOLATION
ROOM
SOILED UTILITY
CORRIDOR
CORRIDOR
OFFICE
TOILET
COFFEE
OBSERVATION
ROOM
COATS /
LOCKERS
EXAM
OFFICE
EXAM
EXAM
CORRIDOR
EXAM
WORK
2080A
TOILET
OBSERVATION
OFFICE
CORRIDOR
CORRIDOR
NURSE STATION
PREPARATION
EQUIPMENT
JAN. CLOSET
OFFICE
CORRIDOR
NURSE STATION
OFFICE
OFFICE
EXAM
TOILET
WORK
CLEAN UTILITY
SOILED UTILITY
TOILET
CORRIDOR
EXAM
EXAM
EXAM
EXAM
EXAM
STORAGE
STAIRWELL
CORRIDOR
GREETER
WAITING
CHILD WAITING
TOILET, FEMALE
ELEC. ROOM
PROCEDURE
TOILET
OFFICE
CORRIDOR
CORRIDOR
VESTIBULE
BIO
STORAGE
GREETER
OFFICE
TOILET, MALE
WAITING
WAITING
WAITING
VIDEO
ELEVATOR
PROCEDURE
ROOM
ELEC. ROOM
2112 ELEVATOR
TELECOM.
COFFEE
CORRIDOR
C
C
C C
SM
SM
EM
DN
DN
DN
H
RB
RA
G
F
E
D
C
B
A
1 2 3 4 R8 5 6 7 8
DD
CC
BB
AA
R1
R2
R3
R4
R5
R7
R6
"S
T S
4"STS
4"ST
CONNECT TO EXISTING
6" DOWNSPOUT DOWN
UP TO NEW 6"
ROOF DRAIN
UP TO NEW 6"
OVERFLOW
ROOF DRAIN
CONNECT TO
EXISTING 8"
OVERFLOW
DOWNSPOUT
DOWN
"S
T S
CONNECT TO EXISTING 4"
DOWNSPOUT DOWN
UP TO NEW 4"
ROOF DRAIN
UP TO NEW 4"
OVERFLOW
ROOF DRAIN
UP TO NEW 6"
ROOF DRAIN
UP TO NEW 6"
OVERFLOW
ROOF DRAIN
"S
T S
"S
T
6"STS
4"ST
6"STS
"S
T S
"S
T
UP TO NEW 6"
ROOF DRAIN
UP TO NEW 6"
OVERFLOW
ROOF DRAIN
CONNECT TO EXISTING 6"
OVERFLOW DRAIN DOWN
CONNECT TO EXISTING 6"
DOWNSPOUT DRAIN DOWN
CONNECT TO EXISTING 8"
DOWNSPOUT DRAIN DOWN
8"S T
UP TO NEW 8"
ROOF DRAIN
UP TO NEW 8"
OVERFLOW
ROOF DRAIN
8"S
TS
"S
TS
CONNECT TO EXISTING 10"
OVERFLOW DRAIN DOWN
UP TO NEW 6"
OVERFLOW
ROOF DRAIN
UP TO NEW 6"
ROOF DRAIN
6"S T
CONNECT TO EXISTING 6"
DOWNSPOUT DRAIN DOWN
3/4"CW
1/2"D1
NEW 3/4" COLD WATER
UP TO ROOF HYDRANT.
13890 bishops drive, suite 250 brookfield, wi 53005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NAGEL
project number:
BID DOCUMENTS
2-2-2023
B
IM
/1
.0
V
A
K C
H o n o r A n n e x R o o f R e p la c e
/M E
P
.0
V
A -K
C -H o n o r
A n n e x R o o f R e p la c e
C .r v t
/7
/2
:1
:1
A
M
P101
SECOND FLOOR - PLUMBING REPLACE HONOR ANNEX ROOF
4251 NORTHERN AVE, KANSAS CITY, MO, 64133
589-22-105
2 FEBRUARY 2023 BEH
BID DOCUMENTS
FULLY SPRINKLERED
22009
1600 BALTIMORE
SUITE 300
KANSAS CITY, MO 64108
P: 816.842.8437 www.imegcorp.com
Missouri Certificate of Authority #F001325536
IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,
TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND
SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT
WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF
IMEG CORP. ©2022 IMEG CORP.
REF. SCALE IN INCHES
0 1 2 3
PROJECT #18001588.05
N O R
HT
1/8" = 1'-0"
LEVEL 02 - PLUMBING
SHEET NOTES:
1. SEE SHEET P000 FOR GENERAL NOTES AND
SYMBOLS.
2. WORK SHOWN DARK AND DASHED IS WORK
TO BE REMOVED.
3. NOT ALL DEMOLITION WORK MAY BE SHOWN.
CONTRACTOR SHALL DISCONNECT AND
REMOVE ALL ITEMS NOT REQUIRED TO
REMAIN.
KEYNOTES:
1. PROVIDE 1-1/2" AIR GAP FITTING FOR ROOF
HYDRANT DRAIN. CONNECT TO EXISTING
WASTE PIPING IN CHASE.
MTR
PRESSURE SWITCHPS
ELECTRICAL TO PNEUMATIC VALVEEP
C COMMON
MECHANICAL ABBREVIATION KEY
ABBR: DESCRIPTION:
DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")
DIFFERENTIAL PRESSURE SWITCHDPS
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
NOT IN CONTRACTNIC
CFSD CONTROL/FIRE/SMOKE DAMPER
EA EXHAUST/RELIEF AIR
FD FIRE DAMPER
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FSD FIRE/SMOKE DAMPER
MA MIXED AIR
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
SD SMOKE DAMPER
TRANSFER DUCTTD
UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)
ECFSD EXISTING CONTROL FIRE SMOKE DAMPER
EFD EXISTING FIRE DAMPER
EFSD EXISTING FIRE SMOKE DAMPER
ESD EXISTING SMOKE DAMPER
TERMINAL AIR BOXTAB
TYPICALTYP
UON UNLESS OTHERWISE NOTES
NORMALLY CLOSEDN.C.
NORMALLY OPENN.O.
BFP BACKFLOW PREVENTER
CO CLEANOUT
CLINICAL SINKCS
DRINKING FOUNTAINDF
EMERGENCY EYEWASHEE
FLOOR CLEANOUTFCO
FLOOR SINKFS
GARBAGE DISPOSERGD
GREASE INTERCEPTORGI
HOSE BIBBHB
I.E. INVERT ELEVATION (FOR REFERENCE ONLY)
LAVATORYLAV
MOP BASINMB
MH MANHOLE
MIXING VALVEMV
NEUTRALIZATION TANKNT
OIL SEPARATOROS
ROOF DRAINRD
SHOWERSH
SINKSK
SERVICE SINKSS
TRAP PRIMERTP
URINALUR
WATER CLOSETWC
WALL CLEANOUTWCO
WASH FOUNTAINWF
WATER HEATERWH
WASHING MACHINE FIXTUREWMF
YARD CLEANOUTYCO
EMERGENCY SHOWERES
EMERGENCY SHOWER/EYEWASHESE
ELECTRIC WATER COOLEREWC
VENT THROUGH ROOFVTR
EXISTINGE
FLOW METERFM
WATER SOFTENERWS
WATER METERWM
DIALYSIS BOXDB
CATCH BASINCB
CAST IRONCI
DUCTILE IRONDI
UTILITY BOXUB
BATHTUBBT
SCCR SHORT CIRCUIT CURRENT RATING
FAN
MOTOR
MECHANICAL SYMBOL LIST
SYMBOL: DESCRIPTION:
NOT ALL SYMBOLS MAY APPLY.
ACTUATOR
DOOR SWITCH
DIFFERENTIAL PRESSURE SWITCH
CURRENT SWITCH
VIBR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .