Combined Drawings 589-22-210 Honor Roof (26 pages).pdf

PDF 32 MB Posted

Attached to
Z2DA--589-22-105, Replace Honor Annex Roof BLG 55, KC, (VA-23-00050710)
Solicitation number
36C25523R0074
Issued by

About this file

This solicitation is for a project to replace the roof of the Honor Annex building at the Veterans Affairs Medical Center campus in Kansas City, Missouri. The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 15 is seeking proposals to remove the existing roof system and install a new thermoplastic polyolefin (TPO) fully adhered roofing system. The scope of work includes removal and disposal of the existing roof, insulation, and flashings. Bidders must provide all necessary labor, equipment, and materials to install tapered insulation, a new membrane roof system, flashings, and accessories. The deadline for responses is July 15, 2022. The period of performance is 180 calendar days following award.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL

ELECTRICAL

ARCHITECT

NAGEL Architects + Engineers 13890 Bishops Drive, suite 250 Brookfield, WI 53005 Phone: 262.641.0746 Contact: Ken Shane E-mail: ken.shane@nagel.us

IMEG

1600 Baltimore Ave, #300 Kansas City, MO 64108 Phone: 816-842-8437 Contact: Bruce Hart E-mail: bruce.e.hart@imegcorp.com

Kansas City VAMC 4251 Northern Avenue, MO 64133

CONTACT:

James Higdon james.higdon@va.gov 816 - 672 - 9747

PROJECT

LOCATION

DWIGHT D. EISENHOWER HWY

E. US HIGHWAY 40

E 43RD STREET

S T

E R

LI

N

G A

V E

SHEET # SHEET NAME

00 - GENERAL - G

G001 COVER SHEET

G002 ARCHITECTURAL ABBREVIATIONS AND SYMBOLS

06 - STRUCTURAL - S

S001 STRUCTURAL ABBREVIATIONS AND GENERAL NOTES

S100 UPPER LEVEL FRAMING PLAN

S101 ROOF FRAMING PLAN

S102 UPPER ROOF FRAMING PLAN

07 - ARCHITECTURAL - A

AD103 ROOF PLAN - ARCHITECTURAL DEMOLITION

A102 SECOND FLOOR PLAN - ARCHITECTURAL

A103 ROOF PLAN - ARCHITECTURAL

A501 EXTERIOR DETAILS - ARCHITECTURAL

A502 EXTERIOR DETAILS - ARCHITECTURAL

A900 EXISTING PHOTOS

A901 EXISTING PHOTOS

A902 EXISTING PHOTOS

11 - PLUMBING - P

P000 PLUMBING COVERSHEET

PD100 FIRST FLOOR DEMOLITION - PLUMBING

PD101 SECOND FLOOR DEMOLITION - PLUMBING

P100 FIRST FLOOR - PLUMBING

P101 SECOND FLOOR - PLUMBING

13 - MECHANICAL - M

M000 MECHANICAL COVERSHEET

MPD104 ROOF - MECH/PLUMB DEMOLITION

MP104 ROOF - MECHANICAL/PLUMBING

M001 PLUMBING AND MECHANICAL SCHEDULES

14 - ELECTRICAL - E

E000 ELECTRICAL COVERSHEET

ED104 ROOF - ELECTRICAL DEMOLITION

E104 ROOF - ELECTRICAL

13890 bishops drive, suite 250 brookfield, wi 53005

DEPARTMENT OF VETERANS AFFAIRS

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

NAGEL A+E PROJECT NUMBER:VA PROJECT NUMBER:

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT Project NumberProject TitleDrawing Title Phase

NAGEL

project number:

C :\U se rs

\r ya nb \D oc um en ts

\2

-K

C H on or

A nn ex R oo f R ep la ce m en t_

R ya n.

bo ur la nd .r vt 2/

8/

:0 5:

A

M

REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

22009589-22-105

G001

COVER SHEET REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023 ES RB

FULLY SPRINKLERED

BID DOCUMENTS

22009

SHEET INDEX

PROJECT LOCATION MAP

STATION INFORMATION

PERSPECTIVE

(INCLUDED FOR INFORMATION ONLY.)

Revisions: Date:

35% SCHEMATIC DESIGN 7/22/2022

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

95%R CONSTRUCTION DOCUMENTS 1/12/2023

100% CONSTRUCTION DOCUMENTS 2/2/2023

2-2-2023

2-2-2023

DESIGNER LIST AND STAMPS

IMEG

1600 Baltimore Ave, #300 Kansas City, MO 64108 Phone: 816-842-8437 Contact: Bruce Hart E-mail: bruce.e.hart@imegcorp.com

PLUMBING

IMEG

1600 Baltimore Ave, #300 Kansas City, MO 64108 Phone: 816-842-8437 Contact: Bruce Hart E-mail: bruce.e.hart@imegcorp.com

2-2-2023

, Kansas City, NORTH ARROW

ELEVATION REFERENCE

SYMBOL

ELEVATION REFERENCE

SYMBOL

SECTION REFERENCE

SYMBOL

ENLARGED AREA

REFERENCE SYMBOL

REVISION TAG

ROOM TAG

COLUMN REFERENCE

SYMBOL

Name Elevation

A101

A101

SIM

A101

SIM

NORTH

PARTITION TAG

A36C G11C

ARCHITECTURAL SYMBOLS___

ROOM NAME

EQUIPMENT TAGX####

A101

SIM DETAIL REFERENCE

SYMBOL

AREA NOT IN CONTRACT

WALL TAG1iEX1

FINISH WOOD

CONCRETE MASONRY UNIT (CMU)

CONCRETE, CAST-IN-PLACE

CONCRETE, PRE-CAST

FILL - PER NOTE

INTERMITTENT BLOCKING

CONT. ROUGH FRAMING

STEEL

EARTH

RIGID INSULATION

BATT INSULATION

GYPSUM BOARD

MARBLE/GRANITE/STONE

TILE/TERRAZZO

GLASS

LARGE SCALE

SECTIONS

BRICK

PLYWOOD

MATERIAL

MATERIAL LEGEND_________

EARTH, COMPACT

ALUMINUM

FILL, POROUS

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

C :\U se rs

\r ya nb \D oc um en ts

\2

-K

C H on or

A nn ex R oo f R ep la ce m en t_

R ya n.

bo ur la nd .r vt 2/

8/

:0 5:

A

M

G002

ARCHITECTURAL ABBREVIATIONS

AND SYMBOLS

REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023 ES RB

BID DOCUMENTS

FULLY SPRINKLERED

22009

UNFIN UNFINISHED

UNO(U.N.O) UNLESS NOTED OTHERWISE

UR URINAL

UTIL UTILITY

V

VA VETERAN'S AFFAIRS, DEPARTMENT OF

VAR VARNISH

VCT VINYL COMPOSITION TILE

VEH VEHICLE

VERT VERTICAL

VF VINYL FABRIC

VG VERTICAL GRAIN

VIN VINYL

VJ V-JOINT(ED)

VNR VENEER

VT VINYL TILE

W

W WEST

W WIDTH, WIDE

W/ WITH

W/D WASHER & DRYER

W/O WITHOUT

WB WOOD BASE

WC WATER CLOSET

WD WOOD

WDW WINDOW

WG WIRED GLASS

WH WALL HUNG

WHS WHEEL STOP

WI WROUGHT IRON

WM WIRE MESH

WP WATER PROOFING

WPT WORKING POINT

WR WATER REPELLANT

WSCT WAINSCOT

WT WEIGHT

WTW WALL-TO-WALL

WWF WELDED WIRE FABRIC

WWM WELDED WIRE MESH

SCHED SCHEDULE

SCN SCREEN

SD STORM DRAIN

SEC SECTION

SF SQUARE FEET

SFG SAFETY GLASS

SH SHELF, SHELVING

SHR SHEER

SHT SHEET

SHTG SHEATHING

SHV SHELVES

SI SQUARE INCHES

SIM SIMILAR

SL SLEEVE

SNT SEALANT

SP STANDPIPE

SP SOUNDPROOF

SPEC SPECIFICATION

SPK SPEAKER

SPKLR SPRINKLER

SPL SPECIAL

SQ SQUARE

SS STAINLESS STEEL

SSEW SANITARY SEWER

STA STATION

STC SOUND TRANSMISSION CLAS

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUS SUSPENDED

SUSP SUSPENSION

SYM SYMMETRICAL, SYMMETRY

SYN SYNTHETIC

SYS SYSTEM

T

T&G TONGUE & GROOVE

T/O(T.O.) TOP OF

TB TOWEL BAR

TC TERRA COTTA

TEL TELEPHONE

TEMP TEMPORARY

THK THICKNESS

THR THRESHOLD

THRU THROUGH

TOL TOLERANCE

TOT TOTAL

TOW(T.O.W.) TOP OF WALL

TPD TOILET PAPER DISPENSER

TR TREAD

TRM TRANSOM

TV TELEVISION

TYP TYPICAL

TZ TERRAZZO

U

UC UNDERCUT

PL PROPERTY LINE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLF POUNDS PER LINEAR FOOT

PNL PANEL

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATED

PRELIM PRELIMINARY

PRF PREFORMED

PROJ PROJECT

PRT PROPERTY

PSC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PTC POST-TENSIONED CONCRETE

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PTR PAPER TOWEL RECEPTACLE

PWD PLYWOOD

Q

QRT QUARRY TILE

QT QUARTZ TILE

QTY QUANTITY

R

RA RETURN AIR

RAD RADIUS

RB RUBBER BASE

RBT RABBET, REBATE

RC RESILIENT CHANNEL

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE REINFORCE(D)(ING)

REF REFERENCE

REFR REFRIGERATOR

REG REGISTER

REINF REINFORCED

REM REMOVE

REQ'D REQUIRED

RESIL RESILIENT

REV REVISION

RFG ROOFING

RFH ROOF HATCH

RFL REFLECT(ED)(IVE)(OR)

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RS RISER

RT RETURN

RWC RAINWATER CONDUCTOR

S

S SOUTH

SC SOLID CORE

M.R. MOISTURE RESISTANT

MAS MASONRY

MAX MAXIMUM

MBR MEMBER

MC MEDICINE CABINET

MECH MECHANIC(AL)

MED MEDIUM

MEMB MEMBRANE

MET METAL

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MIN MINUTE, MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

MLD MO(U)LDING

MOD MODULAR

MOV MOVABLE

MT MOUNT(ED)(ING)

MTL MATERIAL

MULL MULLION

MWK MILLWORK

N

N NORTH

N/A NOT APPLICABLE

NAT NATURAL

NI NICKEL

NIC NOT IN CONTRACT

NO. NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NTS NOT TO SCALE

O

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED CONTRACTOR

INSTALLED

OPER OPERABLE

OPNG OPENING

OPP OPPOSITE

OPPHD OPPOSITE HAND

OVHD OVERHEAD

OWJ OPEN-WEB JOIST

P

P, PT PAINT

PAR PARALLEL

PB PANIC BAR

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PED PEDESTAL

PERF PERFORATED

PERIM PERIMETER

PERM PERMANENT

PERP PERPENDICULAR

PFN PREFINISHED

PG PLATE GLASS

PKG PARKING

GPT GYPSUM TILE

GRN GRANITE

GS(S) GALVANIZED STEEL (SHEET)

GST GLAZED STRUCTURAL TILE

GT GROUT

GWB GYPSUM WALL BOARD

GYP GYPSUM

H

HB HOSE BIBB

HBD HARDBOARD

HC HANDICAPPED

HDR HEADER

HDWD HARDWOOD

HDWR HARDWARE

HGT HEIGHT

HJT HEAD JOINT

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR

HTG HEATING

HTR HEATER

HVAC HEAT, VENTILATION, & AIR CONDITIONING

HWH HOT WATER HEATER

I

ICRA INFECTION CONTROL RISK ASSESSMENT

ID INSIDE DIAMETER

IN INCH

INC INCLUDING

INSUL INSULATE(D)(ION)

INT INTERIOR

INV INVERT

J

JC JANITOR'S CLOSET

JT JOINT

K

KIT KITCHEN

KO KNOCKOUT

KP KICK PLATE

L

LAB LABORATORY

LAD LADDER

LAV LAVATORY

LB POUND

LB LAG BOLT

LBL LABEL

LH LEFT HAND

LL LIVE LOAD

LMS LIMESTONE

LP LIGHT PROOF

LPT LOW POINT

LT LIGHT

LTG LIGHTING

LTL LINTEL

LVR LOUVER

LW LIGHTWEIGHT

M

M.O. MASONRY OPENING

ENCL ENCLOSE

EP ELECTRICAL PANELBOARD

EQ EQUAL

EQUIP EQUIPMENT

ESC ESCALATOR

ESMT EASEMENT

EST ESTIMATE

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

F

F/O FACE OF

FAS FASTEN(ER)

FBD FIBERBOARD

FBO FURNISHED BY OTHERS

FD FLOOR DRAIN

FDN FIRE DEPARTMENT

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FACTORY FINISH

FG FIBERGLASS

FIN FINISH(ED)

FLR FLOOR

FN FENCE

FOB FACE OF BRICK

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUD

FPL FIREPLACE

FR FRAME(D)(ING)

FRA FRESH AIR

FRC FIRE-RESISTANT COATING

FRT FIRE-RETARDANT

FS FULL SIZE

FT FOOT

FTG FOOTING

FUR FURRED(ING)

FURN FURNITURE

FUT FUTURE

G

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACT(OR)

GCMU GLAZED CONC. MASONRY UNITS

GEN GENERAL

GF GROUND FACE

GKT GASKET(ED)

GL GLASS

GLU LAM GLUE LAMINATED

GOVT GOVERNMENT

GP GALVANIZED PIPE

GPL GYPSUM LATH

GPPL GYPSUM PLASTER

CLS CLOSURE

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL COLUMN

COMB COMBINATION

COMPO COMPOSITION

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACT

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CORR CORRIDOR

CPT CARPET

CRS COURSE(S)

CS COUNTERSINK

CSMT CASEMENT

CST CAST STONE

CT CERAMIC TILE

CTRL(S) CONTROL(S)

CYD CUBIC YARD

D

D DRAIN

DA DOUBLE ACTING

DEG DEGREE

DEMO DEMOLISH, DEMOLITION

DEP DEPRESSED

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DIA DIAMETER

DIM DIMENSION

DL DEAD LOAD

DMT DEMOUNTABLE

DN DOWN

DP DAMP PROOFING

DPR DAMPER

DR DOOR

DRW DRYWALL

DS DOWNSPOUT

DT DRAIN TILE

DTL DETAIL

DW DUMBWAITER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRAWER

E

E EAST

EA. EACH

EF EXHAUST FAN

EIFS EXTERIOR INSULATION & FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC

ELEV ELEVATOR

EMER EMERGENCY

A/C AIR CONDITIONING

AB ANCHOR BOLT

ABV ABOVE

AC ACOUSTICAL

ACC ACCESS

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADDL ADDITIONAL

ADH ADHESIVE

ADJ ADJUSTABLE, ADJACENT

AFF(A.F.F.) ABOVE FINISH FLOOR

AGG AGGREGATE

ALT ALTERNATE

ANC ANCHOR, ANCHORAGE

ANOD ANODIZED

AP ACCESS PANEL

APX APPROXIMATE

ARCH ARCHITECT(URAL)

ASB ASBESTOS

ASC ABOVE SUSPENDED CEILING

AUTO AUTOMATIC

B

B/O(B.O.) BOTTOM OF

BD BOARD

BELOW BEL

BET BETWEEN

BITUM BITUMINOUS

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BOT BOTTOM

BRG BEARING

BRK BRICK

BS BOTH SIDES

BSMT BASEMENT

BUR BUILT-UP ROOFING

BVL BEVELED

BW BOTH WAYS

C

C-C CENTER TO CENTER

CAB CABINET

CALC CALCULATION

CB CATCH BASIN

CEM CEMENT

CFL COUNTER FLASH(ING)

CFT CUBIC FOOT

CHAM CHAMFER

CI CAST IRON

CIP CAST-IN-PLACE CONCRETE

CIR CIRCLE

CIRC CIRCUMFERENCE

CJ CONTROL JOINT

CK CAULK(ING)

CL CENTER LINE

CLG CEILING

CLR CLEAR

ARCHITECTURAL ABBREVIATIONS

Revisions: Date:

35% SCHEMATIC DESIGN 7/22/2022

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

95%R CONSTRUCTION DOCUMENTS 1/12/2023

100% CONSTRUCTION DOCUMENTS 2/2/2023

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

C :\U se rs

\r ya nb \D oc um en ts

\2

-K

C H on or

A nn ex R oo f R ep la ce m en t_

R ya n.

bo ur la nd .r vt 2/

8/

:0 6:

A

M

S001

STRUCTURAL ABBREVIATIONS

AND GENERAL NOTES

REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023

BID DOCUMENTS

FULLY SPRINKLERED

22009

Revisions: Date:

35% SCHEMATIC DESIGN 7/22/2022

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

95%R CONSTRUCTION DOCUMENTS 1/12/2023

100% CONSTRUCTION DOCUMENTS 2/2/2023

1. THESE DRAWINGS ARE NOT PRODUCED BY NAGEL ARCHITECTS +

ENGINEERS AND ARE TO BE USED AS REFERENCE MATERIAL ONLY.

GENERAL NOTES - STRUCTURAL ROOF FRAMING PLAN

ES RB

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

C :\U se rs

\r ya nb \D oc um en ts

\2

-K

C H on or

A nn ex R oo f R ep la ce m en t_

R ya n.

bo ur la nd .r vt 2/

8/

:0 6:

A

M

S100

UPPER LEVEL FRAMING PLAN REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023

BID DOCUMENTS

FULLY SPRINKLERED

22009

Revisions: Date:

35% SCHEMATIC DESIGN 7/22/2022

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

95%R CONSTRUCTION DOCUMENTS 1/12/2023

100% CONSTRUCTION DOCUMENTS 2/2/2023

1. THESE DRAWINGS ARE NOT PRODUCED BY NAGEL ARCHITECTS +

ENGINEERS AND ARE TO BE USED AS REFERENCE MATERIAL ONLY.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

C :\U se rs

\r ya nb \D oc um en ts

\2

-K

C H on or

A nn ex R oo f R ep la ce m en t_

R ya n.

bo ur la nd .r vt 2/

8/

:0 6:

A

M

S101

ROOF FRAMING PLAN REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023

BID DOCUMENTS

FULLY SPRINKLERED

22009

Revisions: Date:

35% SCHEMATIC DESIGN 7/22/2022

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

95%R CONSTRUCTION DOCUMENTS 1/12/2023

100% CONSTRUCTION DOCUMENTS 2/2/2023

1. THESE DRAWINGS ARE NOT PRODUCED BY NAGEL ARCHITECTS +

ENGINEERS AND ARE TO BE USED AS REFERENCE MATERIAL ONLY.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

C :\U se rs

\r ya nb \D oc um en ts

\2

-K

C H on or

A nn ex R oo f R ep la ce m en t_

R ya n.

bo ur la nd .r vt 2/

8/

:0 6:

A

M

S102

UPPER ROOF FRAMING PLAN REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023

BID DOCUMENTS

FULLY SPRINKLERED

22009

Revisions: Date:

35% SCHEMATIC DESIGN 7/22/2022

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

95%R CONSTRUCTION DOCUMENTS 1/12/2023

100% CONSTRUCTION DOCUMENTS 2/2/2023

1. THESE DRAWINGS ARE NOT PRODUCED BY NAGEL ARCHITECTS +

ENGINEERS AND ARE TO BE USED AS REFERENCE MATERIAL ONLY.

LEGEND - DEMOLITION PLAN

EXISTING ELEMENT TO BE REMOVED

EXISTING ELEMENT TO REMAIN

DEMOLISH EXISTING ROOF DRAIN

DEMOLISH EXISTING ROOF FAN

DEMOLISH EXISTING PLUMBING EXHAUST PIPE

ROOFING ON METAL DECK

ROOFING ON CONCRETE DECK

A. EXISTING ROOF TO BE DEMOLISHED DOWN TO STRUCTURAL DECK.

B. ALL ITEMS NOT SHOWN TO BE REMOVED WILL REMAIN IN PLACE.

ROOF DEMOLITION AND NEW WORK WILL TAKE PLACE WITH

EQUIPMENT IN PLACE.

C. REMOVE EXISTING PITCH POCKET FILL FOR ALL MECHANICAL SCREEN

COLUMNS.

D. ALL WORK TO OCCUR AFTER HOURS AND BE READY FOR USE THE

NEXT BUSINESS DAY.

E. INSPECT ALL ROOF DRAINS, AND OTHER WATER REMOVAL

INFRASTUCTURE IF APPLICABLE; REPAIR AND/OR REPLACE WHERE

NEEDED TO ENSURE A 20-YEAR TOTAL SYSTEM WARRANTY.

F. ALL BUILDING SERVICE EQUIPMENT (BSE) SHALL REMAIN IN

OPERATION THROUGHOUT PROJECT DURATION.

G. BOTH ROOFTOPS SHALL NOT LEAK DURING CONSTRUCTION.

GENERAL NOTES - DEMOLITION PLAN

A A

B B

C C

D D

E E

F F

G G

RA RA

RB RB

H H

R1

R8

R7

R6

R5

R4

R3

R2

AA

BB

CC

DD

AHU #2

AHU #1

AHU #3

EXISTING

AHU SCREEN

KEYNOTES - DEMOLITION PLAN

1 REMOVE EXISTING ROOFING ASSEMBLY TO METAL DECK

2 REMOVE EXISTING ROOFING ASSEMBLY TO CONCRETE DECK

3 REMOVE EXISTING ROOF HATCH AND PULL DOWN LADDER

4 REMOVE EXISTING EIFS ASSEMBLY TO SHEATING SUBSTRATE

5 REMOVE SERVICE PLATFORM AND STAIRS DURING DEMO PHASE,

TO BE REINSTALLED AFTER THE ROOF INSTALLATION

6 REMOVE EXISTING ROOF DRAINS, OVERFLOW DRAINS, AND

BELOW-DECK HORIZONTAL DRAIN PIPING TO THE RISER PIPE. SEE

PLUMBING DRAWINGS FOR MORE DETAIL.

7 REMOVE EXISTING GUTTER, DOWNSPOUTS, AND SPLASH BLOCKS.

8 ALL EXISTING COPING, FLASHING, AND FIBERGLASS FACED

GYPSUM TO BE REMOVED

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

n a g e l-d c \c o m p a n y \P ro je c ts

\2 K

C H o n o r

A n n e x R o o f R e p la c e m e n t\

D e s ig n D o c u m e n ts

\4

D M o d e lin g \2

-K

C H o n o r

A n n e x R o o f R e p la c e m e n t.

rv t

/1

/2

:1 :2

P

M

AD103

ROOF PLAN - ARCHITECTURAL

DEMOLITION

REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023 ES RB

BID DOCUMENTS

FULLY SPRINKLERED

22009

1/8" = 1'-0" F2

ROOF PLAN - ARCHITECTURAL DEMOLITION 0' 4' 8' 16'

NO

RTH

Revisions: Date:

35% SCHEMATIC DESIGN 7/22/2022

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

STAIRWELL

CORRIDOR

CARE UNIT

C

CHILD

WAITING

CORRIDOR

STORAGE

TELECOM.

LONG EYE LANE

LONG EYE

LANE

CORRIDOR

EXAM

EXAM

NURSE /

TONOMETRY

MEDICINE

PREPARATION

OFFICE OFFICE OFFICE OFFICE OFFICE

EQUIPMENT

CLEAN

UTILITY

SOILED

UTILITY

TOILET

NURSE

STATION NURSE

STATION

CORRIDOR

CORRIDOR

OBSERVATION

EXAM

EXAM

EXAM

EXAM

EXAM

CORRIDOR

EXAM

TOILET

OFFICE

EXAM

OFFICE,

SUPERVISOR

AUDIO

EXAM

EXAM

CORRIDOR

OFFICE

OFFICE

OFFICE

OBSERVATION

EXAM NURSE

STATION

CLEAN

UTILITY

NURSE

STATION

CORRIDOR

OFFICE

OFFICE

EXAM

EXAM

MEDICINE

PREPARATION

EQUIPMENT

EXAM

EXAM

SPECIAL

PROCEDURE

EXAM

EXAM

SPECIAL

RESPIRATORY

ISOLATION

ROOM

SOILED

UTILITY

CORRIDOR

CORRIDOR

OFFICE

TOILET

COFFEE

OBSERVATION

ROOM

COATS /

LOCKERS

EXAM OFFICE

EXAMEXAM

CORRIDOR

EXAM

WORK

TOILET

OBSERVATION OFFICE

CORRIDOR

CORRIDOR

NURSE

STATION

PREPARATIONEQUIPMENTJAN.

CLOSET OFFICE

CORRIDOR

NURSE

STATION

OFFICE

OFFICE

EXAMTOILETWORK

CLEAN

UTILITY

SOILED

UTILITY

TOILET

CORRIDOR

EXAMEXAMEXAMEXAMEXAM

TELECOM.

STORAGE

STAIRWELL

CORRIDOR

GREETER

WAITING

CHILD

WAITING

TOILET,

FEMALE

ELEC.

ROOM

PROCEDURE

TOILET

OFFICE

CORRIDOR

CORRIDOR

VESTIBULE BIO

STORAGE

GREETER

OFFICE

TOILET,

MALE

WAITING

WAITING

WAITING

VIDEO

ELEVATOR

PROCEDURE

ROOM

ELEC.

ROOM

ELEVATOR

COFFEE

CORRIDOR

DN

DN

DN

OFFICE

TOILET,

MALE

VIDEO

PROCEDURE

ELEC.

ROOM

ELEVATOR

A A

B B

C C

D D

E E

F F

G G

RA RA

RB RB

H H

R1

R7

R5

R4

R3

R2

AA

BB

CC

DD

DD

A102

C9

E5

A502

E5

A502

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

n a g e l-d c \c o m p a n y \P ro je c ts

\2 K

C H o n o r

A n n e x R o o f R e p la c e m e n t\

D e s ig n D o c u m e n ts

\4

D M o d e lin g \2

-K

C H o n o r

A n n e x R o o f R e p la c e m e n t.

rv t

/1

/2

:1 :0

P

M

A102

SECOND FLOOR PLAN -

ARCHITECTURAL

REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023 ES RB

BID DOCUMENTS

FULLY SPRINKLERED

22009

1/8" = 1'-0" F2

SECOND FLOOR PLAN - ARCHITECTURAL 0' 4' 8' 16'

NO

RTH

1/4" = 1'-0" C9

ENLARGED SECOND FLOOR PLAN - ARCHITECTURAL

Revisions: Date:

95%R CONSTRUCTION DOCUMENTS 1/12/2023

100% CONSTRUCTION DOCUMENTS 2/2/2023

R6

R8

1. INSTALL ACCORDING TO MANUFACTURER'S SPECIFICATIONS TO

ACHIEVE WARRANTY.

2. NEW ROOF MEMBRANE TO BE OF SBS CONSTRUCTION.

3. CONTRACTOR SHALL COORDINATE ROOFING INSTALLATION WITH

MECHANICAL DRAWINGS. PROVIDE CURBING AND FLASHING AS

REQUIRED AT ROOF PENETRATIONS TO MAINTAIN INTEGRITY OF

ROOF MEMBRANE.

4. REFILL PITCH POCKETS & INSTALL NEW STORM COLLARS.

5. ALL WORK TO OCCUR AFTER HOURS AND BE READY FOR USE THE

NEXT BUSINESS DAY.

6. ROOF DRAINS NEED TO COMPLY WITH 20-YEAR WARRANTY.

7. THESE DETAILS ARE NOT INTENDED TO ITEMIZE ALL WORK TASKS

REQUIRED TO COMPLETE THE REQUIREMENTS OF THIS PROJECT.

THESE DETAILS ARE OFFERED AS AN OVERVIEW OF TASK

MILESTONES.

8. PROVIDE FULL-TIME JOB-SITE INSPECTION THROUGHOUT THE

PROJECT.

GENERAL NOTES - ROOF PLAN

A

A A

B B

C C

D D

E E

F F

G G

RA RA

RB RB

H H

R1

R8

R7

R6

R5

R4

R3

R2

AA

BB

CC

DD

AHU #2

AHU #1

AHU #3

B1

A501

B1

A501

B1

A501

B1

A501

B1

A501

F7

A501

D3

A501

E5

A502

D5

A501

D5

A501

D5

A501

EXISTING

AHU SCREEN

1. INSTALL ACCORDING TO MANUFACTURER'S SPECIFICATIONS TO ACHIEVE

WARRANTY.

2. NEW ROOF MEMBRANE TO BE OF SBS CONSTRUCTION.

3. CONTRACTOR SHALL COORDINATE ROOFING INSTALLATION WITH

MECHANICAL DRAWINGS. PROVIDE CURBING AND FLASHING AS REQUIRED

AT ROOF PENETRATIONS TO MAINTAIN INTEGRITY OF ROOF MEMBRANE.

4. REFILL PITCH POCKETS & INSTALL NEW STORM COLLARS.

5. ALL WORK TO OCCUR AFTER HOURS AND BE READY FOR USE THE NEXT

BUSINESS DAY.

6. ROOF DRAINS NEED TO COMPLY WITH 20-YEAR WARRANTY.

7. THESE DETAILS ARE NOT INTENDED TO ITEMIZE ALL WORK TASKS

REQUIRED TO COMPLETE THE REQUIREMENTS OF THIS PROJECT. THESE

DETAILS ARE OFFERED AS AN OVERVIEW OF TASK MILESTONES.

8. PROVIDE FULL-TIME JOB-SITE INSPECTION THROUGHOUT THE PROJECT.

GENERAL NOTES - ROOF PLAN

VENT FAN

ROOF SLOPE, 1/4" / 12" MIN.

ROOF DRAIN

LEGEND - ROOF PLAN

PLUMBING EXHAUST PIPE

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

n a g e l-d c \c o m p a n y \P ro je c ts

\2 K

C H o n o r

A n n e x R o o f R e p la c e m e n t\

D e s ig n D o c u m e n ts

\4

D M o d e lin g \2

-K

C H o n o r

A n n e x R o o f R e p la c e m e n t.

rv t

/1

/2

:1 :0

P

M

A103

ROOF PLAN - ARCHITECTURAL REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023 ES RB

BID DOCUMENTS

FULLY SPRINKLERED

22009

0' 4' 8' 16'

NO

RTH1/8" = 1'-0"

F2

ROOF PLAN - ARCHITECTURAL

KEYNOTES - ROOF PLAN

1 SPLASH BLOCK TO BE PROVIDED FOR DOWNSPOUT ON NEW GUTTER SYSTEM

2 SLOPE ROOF AWAY FROM EXISTING MECHANICAL UNIT

3 REINSTALL METAL STAIRS REMOVED DURING THE DEMOLITION PHASE

4 NEW ROOF-MOUNTED HOSE BIBB, SEE MECHANICAL DRAWINGS

5 NEW STEEL ROOF HATCH WITH STEEL SHIPS LADDER

6 NEW LOW RISE FOAM INSULATION ROOF ON CONCRETE DECK. SEE E8/A502

7 NEW LOW RISE FOAM INSULATION ROOF ON STEEL DECK. SEE C8/A502

Revisions: Date:

35% SCHEMATIC DESIGN 7/22/2022

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

RIGID INSULATION TO FILL CAVITY

AS NEEDED

3/4" EXTERIOR

PLYWOOD SHEATHING

SLOPE

EXISTING FOIL FACED FIBERGLASS BATT

INSULATION CLIPPED TO FRAME

2X TREATED WD.

BLOCKING

NOTE: PROVIDE ELECTROSTATIC ISOLATION

BETWEEN ALUMINUM AND STEEL

2 LAYERS OF BOARD INSULATION W/

JOINTS STAGGERED VERTICALLY &

HORIZONTALLY

FULLY ADHEARED AIR CONTROL

BARRIER

ROOF SHEATHING

COVERBOARD

CANT. STRIP

SBS ROOFING SYSTEM

PREFINISHED ALUMINUM COPING

AND FLASHING

EXISTING ALUMINUM AND GLASS

CURTAIN WALL SYSTEM

SPECIFIED DRAWBAND AND SEALANT

METAL PITCH POCKET MINIMUM 4"

HEIGHT W/ METAL HOOD

TOP OFF W/ SEALANT

TWO-PLY

STRIPPING

PRIME INTERIOR OF PITCH

POCKET AND FILL 1" FROM

TOP W/ NON-SHRINK GROUT

SEAL PIPE BASE TO

PREVENT GROUT

LEAKAGE INTO BUILDING

FLANGE SET IN SPECIFIED

ASPHALT CEMENT,

MECHANICALLY FASTENED 3"

O.C., STAGGERED PRIME METAL

FLANGE BEFORE STRIPPING

WOOD NAILER SECURED TO

DECK W/ APPROPRIATE

FASTENERS, 2 ROWS

STAGGERED EACH ROW 24" O.C.

EXISTING ROOF DECK

SPECIFIED INSULATION

SPECIFIED BUR MEMBRANE

UNDER PRIME METAL FLANGE

SOFT METAL CAP 1"

DOWN INTO PIPE

FOR PLUMBING VENTS WITH

DIAMETERS LESS THAN 2"

USE SOFT METAL CAPS

ROLLED SOFT METAL

FLASHING 1" DOWN INTO PIPE

OPTIONAL SOLDER STAINLESS STEEL SCREEN

PLUMBING VENT STACK

TWO TARGET PLIES ADHERED

IN SPECIFIED ADHESIVE

PLUMBING VENT STACK

MASTIC SEAL

" M

IN

. F

L A

N G

E

SET FLANGE IN

SPECIFIED MASTIC

SPECIFIED BUR MEMBRANE

SPECIFIED INSULATION

EXISTING ROOF DECK

NOTES

SOFT METAL FLASHINGS

1. SHEET LEAD: MINIMUM 4LB. (20kg /m) PER SQ. FT.

2. SHEET COPPER: MINIMUM 16 OZ. IF COPPER FLASHING IS INSTALLED OVER AN

IRON OR STEEL PIPE, WRAP AS ASHPALT COATED ROOFING FELT TO PREVENT TO

DIRECT CONTACT BETWEEN TWO DISSIMILAR METALS.

2"

EXISTING ROOF

DECK

INSULATION

SPECIFIED CANT

SPECIFIED BUR MEMBRANE

TWO-PLY STRIPPING

" M

IN

BASE FLASHING AS SPECIFIED

FLASHING MEMBRANE INSTALLED

OVER NAILER

ATTACH NAILER TO WALL

REFER TO FACTORY MUTUAL

DATA SHEET I-49

CONTINUOUS CLEAT

FASTENED 16" O.C.

NEOPRENE GASKETED

FASTENER 24" O.C.

SEALANT BETWEEN METAL SECTIONS

TURN ENDS DOWN 45°

ANGLE

A

A

SECTION A-A

10'-0

MAX.

EXISTING ROOFING

EXTEND NEW

ROOFING 12" ONTO

PREPARED AREA

SEAL EDGE WITH

REINFORCING MESH

AND ASPHALT

MASTIC

SPECIFIED BUR

MEMBRANE

12" AND 18" PLY

SHEETS ADHERED

IN SPECIFIED

ADHESIVE

REMOVE

EMBEDDED

GRAVEL / DEBRIS

MINIMUM 18"

EXISTING ROOF

DECK

NOTES

1. BEFORE NEXT DAY'S WORK, REMOVE TEMPORARY

TIE-IN AND INSULATION FILLERS

RE-USE EXISTING AIR TERMINAL

FLAT SURFACE BASE ADHERE

TO ROOF MEMBRANE WITH

POLY ROOF SF

CABLE PLATE ADHESIVE

ADHERE TO ROOF MEMBRANE

WITH POLY ROOF SF

RE-USE EXISTING LIGHTNING CONDUCTOR

NOTES

1. PRIME ALL METAL SURFACES PRIOR TO CONTACT WITH SPECIFIED PRIMER

TWO-PLY STRIPPING

GRAVEL RETAINER

24 INCHES SQUARE

SPECIFIED BUR

MEMBRANE

SPECIFIED INSULATION

DECK CLAMP

STRAINER/DOME

CLAMPING RING

TWO-PLY STRIPPING

LEAD / METAL FLASHING

EXISTING ROOF DECK

NOTES

1. PRIME ALL METAL SURFACES THAT WILL COME INTO

CONTACT WITH ADHESIVES.

TWO-PLY STRIPPING

METAL FLANGE SET IN

SPECIFIED ASPHALT

CEMENT PRIME FLANGE

BEFORE STRIPPING

FASTEN 3IN. O.C.

STAGGERED 2 ROWS

SPECFIED BUR

MEMBRANE

SPECIFIED INSULATION

EXISTING ROOF DECK

ATTACH NAILER TO

WALL

DRY SHEET

FELT ENVELOPE

IF SPECIFIED

GUTTER STRAP

36 IN. O.C.

GUTTER BRACKET

36 IN. O.C.

NOTES

1. SLOPE GUTTER TO DOWNSPOUTS 1/4 IN./FT.

MINIMUM

6"

/2

4" - 6"

NOTES

1. RUBBER TRIANGLE BLOCKS ARE USED FOR ROOFTOP

SUPPORT FOR STEEL PIPE, ELECTRICAL CONDUIT, AND

COPPER TUBING TO PROVIDE SUPPORT FOR THESE LINES

ON NEW AND EXISTING ROOF SURFACES.

SUBCONTRACTOR SHALL CHECK LOCAL BUILDING CODES

FOR SPACING REQUIREMENTS.

EXISTING METAL

COUNTERFLASHING

NEW GROMMETED FASTENERS 8 IN. O.C.

INSTALL NEW METAL COUNTERFLASHING

ELASTOMERIC BASE FLASHING

ADHERED WITH SPECIFIED

SHEET ADHESIVE

TWO-PLY STRIPPING

SPECIFIED BUR MEMBRANE

SPECIFIED INSULATION

EXISTING ROOF DECK

SPECIFIED CANT

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

n a g e l-d c \c o m p a n y \P ro je c ts

\2 K

C H o n o r

A n n e x R o o f R e p la c e m e n t\

D e s ig n D o c u m e n ts

\4

D M o d e lin g \2

-K

C H o n o r

A n n e x R o o f R e p la c e m e n t.

rv t

/1

/2

:1 :0

P

M

A501

EXTERIOR DETAILS -

ARCHITECTURAL

REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023 ES RB

BID DOCUMENTS

FULLY SPRINKLERED

22009

1 1/2" = 1'-0" F7

PARAPET AT CURTAINWALL

NTS

B7

HOT/COLD PITCH POCKET WITH GROUT

NTS

B5

PLUMBING VENT

NTS

B1

LIGHT METAL PARAPET CAP

NTS

D1

DAILY TIE IN

NTS

B9

ADHESIVE AIR TERMINAL

NTS

B3

ROOF DRAIN WITH GRAVEL GUARD

NTS

D3

ROOF EDGE WITH GUTTER

3" = 1'-0" F1

RUBBER TRIANGLE PIPE BLOCKING

NTS

D5

SLIP METAL SKIRT FLASHING

Revisions: Date:

35% SCHEMATIC DESIGN 7/22/2022

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

METAL FLASHING

SBS ROOFING SYSTEM

STEEL ACCESS HATCH PER

SPECIFICATION 077200

STEEL SHIPS LADDER PER

SPECIFICATION 055100

ROOF

129'-8"

SECOND FLOOR

114'-8"

EXISTING SYSTEMS PANEL

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

n a g e l-d c \c o m p a n y \P ro je c ts

\2 K

C H o n o r

A n n e x R o o f R e p la c e m e n t\

D e s ig n D o c u m e n ts

\4

D M o d e lin g \2

-K

C H o n o r

A n n e x R o o f R e p la c e m e n t.

rv t

/1

/2

:1 :0

P

M

A502

EXTERIOR DETAILS -

ARCHITECTURAL

REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023 ES RB

BID DOCUMENTS

FULLY SPRINKLERED

22009

NTS

E8

LOW RISE FOAM INSULATION ON CONCRETE DECK

NTS

C8

LOW RISE FOAM INSULATION ON STEEL DECK

NTS

E5

ROOF HATCH LADDER

Revisions: Date:

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

C :\U se rs

\r ya nb \D oc um en ts

\2

-K

C H on or

A nn ex R oo f R ep la ce m en t_

R ya n.

bo ur la nd .r vt 2/

8/

:0 4:

A

M

A900

EXISTING PHOTOS REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023 ES MC

BID DOCUMENTS

FULLY SPRINKLERED

22009

1" = 30'-0"

EXISTING PHOTO KEY PLAN 1

1 2 3 4 5 6

7 8 9 10 11 12

13 14 15 16 17

18 19 20 21 22

Revisions: Date:

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

95%R CONSTRUCTION DOCUMENTS 1/12/2023

100% CONSTRUCTION DOCUMENTS 2/2/2023

1 2 3 4 5 6 7 8

A

B

C

D

E

F

G

RA

RB

H

R1

R8

R7

R6

R5

R4

R3

R2

AA

BB

CC

DD

15 16

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

C :\U se rs

\r ya nb \D oc um en ts

\2

-K

C H on or

A nn ex R oo f R ep la ce m en t_

R ya n.

bo ur la nd .r vt 2/

8/

:0 5:

A

M

A901

EXISTING PHOTOS REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023 ES MC

BID DOCUMENTS

FULLY SPRINKLERED

22009

1" = 30'-0"

EXISTING PHOTO KEY PLAN 2

23 24 25 26 27 28

29 30 31 32 33 34

35 36 37 38 39

40 41 42 43 44

INTERIOR PHOTO

Revisions: Date:

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

95%R CONSTRUCTION DOCUMENTS 1/12/2023

100% CONSTRUCTION DOCUMENTS 2/2/2023

1 2 3 4 5 6 7 8

A

B

C

D

E

F

G

RA

RB

H

R1

R8

R7

R6

R5

R4

R3

R2

AA

BB

CC

DD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

C :\U se rs

\r ya nb \D oc um en ts

\2

-K

C H on or

A nn ex R oo f R ep la ce m en t_

R ya n.

bo ur la nd .r vt 2/

8/

:0 5:

A

M

A902

EXISTING PHOTOS REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

02 FEBRUARY 2023 ES MC

BID DOCUMENTS

FULLY SPRINKLERED

22009

1" = 30'-0"

EXISTING PHOTO KEY PLAN 3

45 46 47 48 49 50

51 52

INTERIOR PHOTO INTERIOR PHOTO

Revisions: Date:

75% DESIGN DEVELOPMENT 11/3/2022

95% CONSTRUCTION DOCUMENTS 12/08/2022

95%R CONSTRUCTION DOCUMENTS 1/12/2023

100% CONSTRUCTION DOCUMENTS 2/2/2023

1 2 3 4 5 6 7 8

A

B

C

D

E

F

G

RA

RB

H

R1

R8

R7

R6

R5

R4

R3

R2

AA

BB

CC

DD

PLUMBING SYMBOL LIST

SYMBOL: DESCRIPTION:

PIPE SERVING FIXTURE ON FLOOR ABOVE

(EXAMPLE: FD = FLOOR DRAIN)FD

PITCH PIPE IN DIRECTION

RD-1

6"(1000)

ROOF DRAIN PROPERTIES SYMBOL

SIZE (ROOF SQ. FT.)

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

GPM

CHECK VALVE

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

METERM

ALIGNMENT GUIDE

PIPE ANCHOR

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

COLD WATER - POTABLECW

HOT WATER - POTABLEHW

HOT WATER CIRCULATING - POTABLEHWC

HOT WATER - POTABLE NUMBER INDICATES TEMPHW140

HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140

SANITARY DRAINAGESAN

SOFT COLD WATERSCW

SOFT HOT WATERSHW

STORM DRAINAGEST

STS STORM DRAINAGE (SECONDARY)

VENTV

WASTE ANETHESIA GAS DISPOSALWAGD

COMPRESSED AIRCA

DRAIND

NOT ALL SYMBOLS MAY APPLY.

PRESSURE REDUCING VALVE (LIQUID/GAS)

LAB VACUUMVAC

SOLENOID VALVE

SAFETY/RELIEF VALVE

VACUUM BREAKER

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

PUMP

INSTRUMENT AIRIA

MEDICAL AIRMA

MEDICAL VACUUMMV

NITROGENN

NITROUS OXIDENO

OXYGENO

PIPE CONTINUATION

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

ROUTE TO DRAIN

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE

AND HOSE CONNECTION WITH CAP

FLEXIBLE CONNECTION

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

EA MEDICAL EQUIPMENT AIR

VALVE BOX

MEDICAL GAS OUTLET (MGO)

ALARM PANEL

HEADWALL

SINGLE GAS OUTLET (AIR)A

SINGLE GAS OUTLET (OXYGEN)O

SINGLE GAS OUTLET (VACUUM)V

NITROGEN PRESSURE CONTROL CABINET

PRESSURE TRANSDUCER WITH ALARM WIRING

CO2 CARBON DIOXIDE

DRAIN - MEDICAL GASDMG

BACKFLOW PREVENTER

MEDIUM PRESSURE GASMPG

EXPANSION JOINT

#.#" IS THE EXPANSION TRAVEL INCHESEJ-#

AIR ADMITTANCE VALVE

PLUMBING ABBREVIATION KEY

BATHTUBBT

CO CLEANOUT

CLINICAL SINKCS

DRINKING FOUNTAINDF

EMERGENCY EYEWASHEE

FLOOR CLEANOUTFCO

FLOOR DRAINFD

FLOOR SINKFS

GARBAGE DISPOSERGD

GREASE INTERCEPTORGI

HOSE BIBBHB

I.E. INVERT ELEVATION (FOR REFERENCE ONLY)

LAVATORYLAV

MOP BASINMB

MH MANHOLE

MIXING VALVEMV

NEUTRALIZATION TANKNT

OIL SEPARATOROS

ROOF DRAINRD

SHOWERSH

SINKSK

SERVICE SINKSS

TRENCH DRAINTD

TRAP PRIMERTP

URINALUR

WATER CLOSETWC

WALL CLEANOUTWCO

WASH FOUNTAINWF

WATER HEATERWH

WASHING MACHINE FIXTUREWMF

YARD CLEANOUTYCO

EMERGENCY SHOWERES

EMERGENCY SHOWER/EYEWASHESE

ELECTRIC WATER COOLEREWC

VENT THROUGH ROOFVTR

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

BFP BACKFLOW PREVENTER

NOT IN CONTRACTNIC

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS OTHERWISE NOTESUON

EXISTINGE

FLOW METERFM

WATER SOFTENERWS

WATER METERWM

DIALYSIS BOXDB

CATCH BASINCB

CAST IRONCI

DUCTILE IRONDI

UTILITY BOXUB

SHORT CIRCUIT CURRENT RATINGSCCR

OVERFLOW ROOF DRAINORD

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO

THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE

BASIS OF DESIGN.

3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL

APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.

4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874

5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY

ALL ELEVATIONS BEFORE BEGINNING WORK.

6. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO

PLUMBING FIXTURES.

7. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN

DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT

BE CONSIDERED SHUTOFF VALVES.

8. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL

SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR

ADDITIONAL DEMOLITION INFORMATION.

9. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK

UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL

INFORMATION.

10. ALL STORM AND OVERFLOW STORM DRAINAGE PIPING SHALL BE CAST IRON AND SHALL BE

SUPPORTED AS SPECIFIED IN SECTION 22 14 00.

PLUMBING GENERAL NOTES:

PLUMBING SLOPE REQUIREMENTS:

INTERIOR:

STORM (GRAVITY): 1/8” PER FOOT

DOMESTIC WATER: NO SPECIFIC PITCH, PITCH TO FIXTURES

BASED ON PLUMBING CODE: [IPC-2018]

PLUMBING SHEET INDEX

P000 PLUMBING COVERSHEET

P100 FIRST FLOOR - PLUMBING

P101 SECOND FLOOR - PLUMBING

PD100 FIRST FLOOR DEMOLITION - PLUMBING

PD101 SECOND FLOOR DEMOLITION - PLUMBING

GRAND TOTAL: 5

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

BID DOCUMENTS

2-2-2023

B

IM

/1

.0

V

A

K C

H o n o r A n n e x R o o f R e p la c e

/M E

P

.0

V

A -K

C -H o n o r

A n n e x R o o f R e p la c e

C .r v t

/7

/2

:1

:5

A

M

P000

PLUMBING COVERSHEET REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

2 FEBRUARY 2023 BEH

BID DOCUMENTS

FULLY SPRINKLERED

22009

1600 BALTIMORE

SUITE 300

KANSAS CITY, MO 64108

P: 816.842.8437 www.imegcorp.com

Missouri Certificate of Authority #F001325536

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #18001588.05Revisions: Date:

FAP

FE

FAP

FAP FE

FAP

FE

FAP

FE

FAP

FAP

FE

FAP

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

GROUP

TOILET

OFFICE

WORK FILE

GROUP

OFFICE

COFFEE

OFFICE

OFFICE, CHIEF

OFFICE

OFFICE

MAINTENANCE

ELEC. ROOM

MECH. ROOM

EXAM

JAN. CLOSET /

STORAGE

SPECIMEN

PROCESS

BIO

STORAGE

EXAM

1039A

LIEDOWN

SPECIMEN

COLLECTION

BLOOD DRAW

TOILET

TOILET

RADIOLOGY

RECEIVING

DARK ROOM

CHEMICAL

STORAGE

DRESSING

ROOM

DRESSING

ROOM

TOMOGRAPHY

MAMMOGRAPHY

OFFICE

CONFERENCE

TOILET, FEMALE

COURIER MAIL /

COPY

EQUIPMENT

GREETER

ELEVATOR

ELEVATOR

ELEC. ROOM

TOILET, MALE

PUMP ROOM

TELECOM.

CASH

GREETER

VESTIBULE

WAITING

WILL CALL

RECEIVE

STORAGE

CONSULT

WORK

REFILL

INPUT

BIOMED

NETWORK

CLOSET

OFFICE

FILL

INVENTORY

COMPENSATION

TOILET

LOUNGE

CHILD WAITING

LOBBY

VESTIBULE

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

WAITING

STAIRWELL

CORRIDOR

RECEPTION

WAITING

CORRIDOR

STAIRWELL

OFFICE

CLOSET

1044A

UP

UP

UP

H

RB

RA

G

F

E

D

C

B

A

1 2 3 4 R8 5 6 7 8

DD

CC

BB

AA

R2

R3

R4

R5

R7

R6

"S

T S

8"STS

"S

T S

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

BID DOCUMENTS

2-2-2023

B

IM

/1

.0

V

A

K C

H o n o r A n n e x R o o f R e p la c e

/M E

P

.0

V

A -K

C -H o n o r

A n n e x R o o f R e p la c e

C .r v t

/7

/2

:1

:1

A

M

PD100

FIRST FLOOR DEMOLITION -

PLUMBING

REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

2 FEBRUARY 2023 BEH

BID DOCUMENTS

FULLY SPRINKLERED

22009

1600 BALTIMORE

SUITE 300

KANSAS CITY, MO 64108

P: 816.842.8437 www.imegcorp.com

Missouri Certificate of Authority #F001325536

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #18001588.05

N O R

HT

1/8" = 1'-0"

LEVEL 01 DEMOLITION - PLUMBING

SHEET NOTES:

1. SEE SHEET P000 FOR GENERAL NOTES AND

SYMBOLS.

2. WORK SHOWN DARK AND DASHED IS WORK

TO BE REMOVED.

3. NOT ALL DEMOLITION WORK MAY BE SHOWN.

CONTRACTOR SHALL DISCONNECT AND

REMOVE ALL ITEMS NOT REQUIRED TO

REMAIN.

Revisions: Date:

FE

FE

FAP

FAP

FE

FE

FE

STAIRWELL

CORRIDOR

CARE UNIT C

CHILD WAITING

CORRIDOR

STORAGE

TELECOM.

LONG EYE LANE

LONG EYE LANE

CORRIDOR

EXAM

EXAM

NURSE /

TONOMETRY

MEDICINE

PREPARATION

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

EQUIPMENT

CLEAN UTILITY

SOILED UTILITY

TOILET

NURSE STATION

NURSE STATION

CORRIDOR

CORRIDOR

OBSERVATION

EXAM

EXAM

EXAM

EXAM

EXAM

CORRIDOR

EXAM

TOILET

OFFICE

EXAM

OFFICE,

SUPERVISOR

AUDIO

EXAM

EXAM

CORRIDOR

OFFICE

OFFICE

OFFICE

OBSERVATION

EXAM

NURSE STATION

CLEAN UTILITY

NURSE STATION

CORRIDOR

OFFICE

OFFICE

EXAM

EXAM

MEDICINE

PREPARTAION

2066EQUIPMENT

EXAM

EXAM

SPECIAL

PROCEDURE

2016EXAM

EXAM

SPECIAL

RESPIRATORY

ISOLATION

ROOM

SOILED UTILITY

CORRIDOR

CORRIDOR

OFFICE

TOILET

COFFEE

OBSERVATION

ROOM

COATS /

LOCKERS

EXAM

OFFICE

EXAM

EXAM

CORRIDOR

EXAM

WORK

2080A

TOILET

OBSERVATION

OFFICE

CORRIDOR

CORRIDOR

NURSE STATION

PREPARATION

EQUIPMENT

JAN. CLOSET

OFFICE

CORRIDOR

NURSE STATION

OFFICE

OFFICE

EXAM

TOILET

WORK

CLEAN UTILITY

SOILED UTILITY

TOILET

CORRIDOR

EXAM

EXAM

EXAM

EXAM

EXAM

STORAGE

STAIRWELL

CORRIDOR

GREETER

WAITING

CHILD WAITING

TOILET, FEMALE

ELEC. ROOM

PROCEDURE

TOILET

OFFICE

CORRIDOR

CORRIDOR

VESTIBULE

BIO

STORAGE

GREETER

OFFICE

TOILET, MALE

WAITING

WAITING

WAITING

VIDEO

ELEVATOR

PROCEDURE

ROOM

ELEC. ROOM

2112 ELEVATOR

TELECOM.

COFFEE

CORRIDOR

C

C

C C

SM

SM

EM

DN

DN

DN

H

RB

RA

G

F

E

D

C

B

A

1 2 3 4 R8 5 6 7 8

DD

CC

BB

AA

R1

R2

R3

R4

R5

R7

R6

REMOVE COLD

WATER PIPING UP

TO HOSE BIBB.

C W

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

BID DOCUMENTS

2-2-2023

B

IM

/1

.0

V

A

K C

H o n o r A n n e x R o o f R e p la c e

/M E

P

.0

V

A -K

C -H o n o r

A n n e x R o o f R e p la c e

C .r v t

/7

/2

:1

:1

A

M

PD101

SECOND FLOOR DEMOLITION -

PLUMBING

REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

2 FEBRUARY 2023 BEH

BID DOCUMENTS

FULLY SPRINKLERED

22009

1600 BALTIMORE

SUITE 300

KANSAS CITY, MO 64108

P: 816.842.8437 www.imegcorp.com

Missouri Certificate of Authority #F001325536

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #18001588.05

N O R

HT

1/8" = 1'-0"

LEVEL 02 DEMOLITION - PLUMBING

KEYNOTES:

1. REMOVE EXISTING HORIZONTAL DOWNSPOUT

PIPING.

SHEET NOTES:

1. SEE SHEET P000 FOR GENERAL NOTES AND

SYMBOLS.

2. WORK SHOWN DARK AND DASHED IS WORK

TO BE REMOVED.

3. NOT ALL DEMOLITION WORK MAY BE SHOWN.

CONTRACTOR SHALL DISCONNECT AND

REMOVE ALL ITEMS NOT REQUIRED TO

FE

FAP

FAP FE

FAP

FE

FAP

FE

FAP

FAP

FE

FAP

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

GROUP

TOILET

OFFICE

WORK FILE

GROUP

OFFICE

COFFEE

OFFICE

OFFICE, CHIEF

OFFICE

OFFICE

MAINTENANCE

ELEC. ROOM

MECH. ROOM

EXAM

JAN. CLOSET /

STORAGE

SPECIMEN

PROCESS

BIO

STORAGE

EXAM

1039A

LIEDOWN

SPECIMEN

COLLECTION

BLOOD DRAW

TOILET

TOILET

RADIOLOGY

RECEIVING

DARK ROOM

CHEMICAL

STORAGE

DRESSING

ROOM

DRESSING

ROOM

TOMOGRAPHY

MAMMOGRAPHY

OFFICE

CONFERENCE

TOILET, FEMALE

COURIER MAIL /

COPY

EQUIPMENT

GREETER

ELEVATOR

ELEVATOR

ELEC. ROOM

TOILET, MALE

PUMP ROOM

TELECOM.

CASH

GREETER

VESTIBULE

WAITING

WILL CALL

RECEIVE

STORAGE

CONSULT

WORK

REFILL

INPUT

BIOMED

NETWORK

CLOSET

OFFICE

FILL

INVENTORY

COMPENSATION

TOILET

LOUNGE

CHILD WAITING

LOBBY

VESTIBULE

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

WAITING

STAIRWELL

CORRIDOR

RECEPTION

WAITING

CORRIDOR

STAIRWELL

OFFICE

CLOSET

1044A

UP

UP

UP

H

RB

RA

G

F

E

D

C

B

A

1 2 3 4 R8 5 6 7 8

DD

CC

BB

AA

R1

R2

R3

R4

R5

R7

R6 CONNECT TO EXISTING 8"

OVERFLOW DRAIN DN.

CONNECT TO EXISTING 8"

OVERFLOW DRAIN UP.

"S

T S

EXISTING 4"

DOWNSPOUT

UP AND DOWN

TO REMAIN.

EXISTING 6"

DOWNSPOUT

UP AND DOWN

TO REMAIN.

EXISTING 6"

DOWNSPOUT

UP AND DOWN

TO REMAIN.

EXISTING 10"

DOWNSPOUT

UP AND DOWN

TO REMAIN.

EXISTING 8"

DOWNSPOUT

UP AND DOWN

TO REMAIN.

"S

T S

CONNECT TO EXISTING 6"

OVERFLOW DRAIN DN.

CONNECT TO EXISTING 6"

OVERFLOW DRAIN UP.

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

BID DOCUMENTS

2-2-2023

B

IM

/1

.0

V

A

K C

H o n o r A n n e x R o o f R e p la c e

/M E

P

.0

V

A -K

C -H o n o r

A n n e x R o o f R e p la c e

C .r v t

/7

/2

:1

:1

A

M

P100

FIRST FLOOR - PLUMBING REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

2 FEBRUARY 2023 BEH

BID DOCUMENTS

FULLY SPRINKLERED

22009

1600 BALTIMORE

SUITE 300

KANSAS CITY, MO 64108

P: 816.842.8437 www.imegcorp.com

Missouri Certificate of Authority #F001325536

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #18001588.05

N O R

HT

1/8" = 1'-0"

LEVEL 01 - PLUMBING

SHEET NOTES:

1. SEE SHEET P000 FOR GENERAL NOTES AND

SYMBOLS.

2. WORK SHOWN DARK AND DASHED IS WORK

TO BE REMOVED.

3. NOT ALL DEMOLITION WORK MAY BE SHOWN.

CONTRACTOR SHALL DISCONNECT AND

REMOVE ALL ITEMS NOT REQUIRED TO

FE

FE

FAP

FAP

FE

FE

FE

STAIRWELL

CORRIDOR

CARE UNIT C

CHILD WAITING

CORRIDOR

STORAGE

TELECOM.

LONG EYE LANE

LONG EYE LANE

CORRIDOR

EXAM

EXAM

NURSE /

TONOMETRY

MEDICINE

PREPARATION

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

EQUIPMENT

CLEAN UTILITY

SOILED UTILITY

TOILET

NURSE STATION

NURSE STATION

CORRIDOR

CORRIDOR

OBSERVATION

EXAM

EXAM

EXAM

EXAM

EXAM

CORRIDOR

EXAM

TOILET

OFFICE

EXAM

OFFICE,

SUPERVISOR

AUDIO

EXAM

EXAM

CORRIDOR

OFFICE

OFFICE

OFFICE

OBSERVATION

EXAM

NURSE STATION

CLEAN UTILITY

NURSE STATION

CORRIDOR

OFFICE

OFFICE

EXAM

EXAM

MEDICINE

PREPARTAION

2066EQUIPMENT

EXAM

EXAM

SPECIAL

PROCEDURE

2016EXAM

EXAM

SPECIAL

RESPIRATORY

ISOLATION

ROOM

SOILED UTILITY

CORRIDOR

CORRIDOR

OFFICE

TOILET

COFFEE

OBSERVATION

ROOM

COATS /

LOCKERS

EXAM

OFFICE

EXAM

EXAM

CORRIDOR

EXAM

WORK

2080A

TOILET

OBSERVATION

OFFICE

CORRIDOR

CORRIDOR

NURSE STATION

PREPARATION

EQUIPMENT

JAN. CLOSET

OFFICE

CORRIDOR

NURSE STATION

OFFICE

OFFICE

EXAM

TOILET

WORK

CLEAN UTILITY

SOILED UTILITY

TOILET

CORRIDOR

EXAM

EXAM

EXAM

EXAM

EXAM

STORAGE

STAIRWELL

CORRIDOR

GREETER

WAITING

CHILD WAITING

TOILET, FEMALE

ELEC. ROOM

PROCEDURE

TOILET

OFFICE

CORRIDOR

CORRIDOR

VESTIBULE

BIO

STORAGE

GREETER

OFFICE

TOILET, MALE

WAITING

WAITING

WAITING

VIDEO

ELEVATOR

PROCEDURE

ROOM

ELEC. ROOM

2112 ELEVATOR

TELECOM.

COFFEE

CORRIDOR

C

C

C C

SM

SM

EM

DN

DN

DN

H

RB

RA

G

F

E

D

C

B

A

1 2 3 4 R8 5 6 7 8

DD

CC

BB

AA

R1

R2

R3

R4

R5

R7

R6

"S

T S

4"STS

4"ST

CONNECT TO EXISTING

6" DOWNSPOUT DOWN

UP TO NEW 6"

ROOF DRAIN

UP TO NEW 6"

OVERFLOW

ROOF DRAIN

CONNECT TO

EXISTING 8"

OVERFLOW

DOWNSPOUT

DOWN

"S

T S

CONNECT TO EXISTING 4"

DOWNSPOUT DOWN

UP TO NEW 4"

ROOF DRAIN

UP TO NEW 4"

OVERFLOW

ROOF DRAIN

UP TO NEW 6"

ROOF DRAIN

UP TO NEW 6"

OVERFLOW

ROOF DRAIN

"S

T S

"S

T

6"STS

4"ST

6"STS

"S

T S

"S

T

UP TO NEW 6"

ROOF DRAIN

UP TO NEW 6"

OVERFLOW

ROOF DRAIN

CONNECT TO EXISTING 6"

OVERFLOW DRAIN DOWN

CONNECT TO EXISTING 6"

DOWNSPOUT DRAIN DOWN

CONNECT TO EXISTING 8"

DOWNSPOUT DRAIN DOWN

8"S T

UP TO NEW 8"

ROOF DRAIN

UP TO NEW 8"

OVERFLOW

ROOF DRAIN

8"S

TS

"S

TS

CONNECT TO EXISTING 10"

OVERFLOW DRAIN DOWN

UP TO NEW 6"

OVERFLOW

ROOF DRAIN

UP TO NEW 6"

ROOF DRAIN

6"S T

CONNECT TO EXISTING 6"

DOWNSPOUT DRAIN DOWN

3/4"CW

1/2"D1

NEW 3/4" COLD WATER

UP TO ROOF HYDRANT.

13890 bishops drive, suite 250 brookfield, wi 53005

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NAGEL

project number:

BID DOCUMENTS

2-2-2023

B

IM

/1

.0

V

A

K C

H o n o r A n n e x R o o f R e p la c e

/M E

P

.0

V

A -K

C -H o n o r

A n n e x R o o f R e p la c e

C .r v t

/7

/2

:1

:1

A

M

P101

SECOND FLOOR - PLUMBING REPLACE HONOR ANNEX ROOF

4251 NORTHERN AVE, KANSAS CITY, MO, 64133

589-22-105

2 FEBRUARY 2023 BEH

BID DOCUMENTS

FULLY SPRINKLERED

22009

1600 BALTIMORE

SUITE 300

KANSAS CITY, MO 64108

P: 816.842.8437 www.imegcorp.com

Missouri Certificate of Authority #F001325536

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #18001588.05

N O R

HT

1/8" = 1'-0"

LEVEL 02 - PLUMBING

SHEET NOTES:

1. SEE SHEET P000 FOR GENERAL NOTES AND

SYMBOLS.

2. WORK SHOWN DARK AND DASHED IS WORK

TO BE REMOVED.

3. NOT ALL DEMOLITION WORK MAY BE SHOWN.

CONTRACTOR SHALL DISCONNECT AND

REMOVE ALL ITEMS NOT REQUIRED TO

REMAIN.

KEYNOTES:

1. PROVIDE 1-1/2" AIR GAP FITTING FOR ROOF

HYDRANT DRAIN. CONNECT TO EXISTING

WASTE PIPING IN CHASE.

MTR

PRESSURE SWITCHPS

ELECTRICAL TO PNEUMATIC VALVEEP

C COMMON

MECHANICAL ABBREVIATION KEY

ABBR: DESCRIPTION:

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

CFSD CONTROL/FIRE/SMOKE DAMPER

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)

ECFSD EXISTING CONTROL FIRE SMOKE DAMPER

EFD EXISTING FIRE DAMPER

EFSD EXISTING FIRE SMOKE DAMPER

ESD EXISTING SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

UON UNLESS OTHERWISE NOTES

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

BFP BACKFLOW PREVENTER

CO CLEANOUT

CLINICAL SINKCS

DRINKING FOUNTAINDF

EMERGENCY EYEWASHEE

FLOOR CLEANOUTFCO

FLOOR SINKFS

GARBAGE DISPOSERGD

GREASE INTERCEPTORGI

HOSE BIBBHB

I.E. INVERT ELEVATION (FOR REFERENCE ONLY)

LAVATORYLAV

MOP BASINMB

MH MANHOLE

MIXING VALVEMV

NEUTRALIZATION TANKNT

OIL SEPARATOROS

ROOF DRAINRD

SHOWERSH

SINKSK

SERVICE SINKSS

TRAP PRIMERTP

URINALUR

WATER CLOSETWC

WALL CLEANOUTWCO

WASH FOUNTAINWF

WATER HEATERWH

WASHING MACHINE FIXTUREWMF

YARD CLEANOUTYCO

EMERGENCY SHOWERES

EMERGENCY SHOWER/EYEWASHESE

ELECTRIC WATER COOLEREWC

VENT THROUGH ROOFVTR

EXISTINGE

FLOW METERFM

WATER SOFTENERWS

WATER METERWM

DIALYSIS BOXDB

CATCH BASINCB

CAST IRONCI

DUCTILE IRONDI

UTILITY BOXUB

BATHTUBBT

SCCR SHORT CIRCUIT CURRENT RATING

FAN

MOTOR

MECHANICAL SYMBOL LIST

SYMBOL: DESCRIPTION:

NOT ALL SYMBOLS MAY APPLY.

ACTUATOR

DOOR SWITCH

DIFFERENTIAL PRESSURE SWITCH

CURRENT SWITCH

VIBR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .