Combined Drawings 26-504 Building 6 Groung Floor Abatement.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24226B0033
About this file
These architectural demolition and abatement drawings detail a ground floor renovation project for Building 6 at the Veterans Affairs Medical Center (VAMC) located at 400 Fort Hill Avenue in Canandaigua, NY. The project, identified by number 528A5-26-504, involves hazardous materials removal, specifically targeting suspected asbestos-containing materials, with a focus on vermiculite insulation in wall cavities behind existing heaters. The drawings include comprehensive demolition plans for architectural, ceiling, plumbing, and hazardous material abatement, with an issue date of 11/21/2025. Key requirements include strict adherence to asbestos removal regulations, including medical surveillance for workers, proper respiratory protection, and establishing controlled abatement areas in compliance with OSHA standards. The project emphasizes safety protocols, medical certifications, and precise demolition techniques for a thorough and compliant renovation of the ground floor space.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226B0033 0001_1.docx | DOCX document | |
| PRE BID SITE VISIT SIGN IN SHEET.pdf | ||
| BLDG 6 - ArchB.pdf | ||
| Copy of Pre-Bid RFI_528A5-26-504 Building 6 Ground floor abatement.xlsx | XLSX spreadsheet | |
| 36C24226B0033 0002.docx | DOCX document | |
| 36C24226B0033 0001.docx | DOCX document | |
| LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf | ||
| Full Spec 26-504 Building 6 Ground Floor Abatement.pdf | ||
| BUY AMERICAN CERTIFICATE.pdf | ||
| P07 WAGE DETERMINATION.pdf | ||
| 36C24226B0033_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISCIPLINE/
SHEET NO. DESCRIPTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
G001
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CANANDAIGUA, NY
Revisions: Date:
NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
o n e e ig h th in ch o n e f o o t th re e in ch e s o n e f o o t o n e a n d o n e h a lf in ch e s o n e f o o t o n e in ch o n e f o o t th re e q u a rt e rs in ch o n e f o o t o n e h a lf in ch o n e f o o t th re e e ig h th s in ch o n e f o o t o n e q u a rt e r in ch o n e f o o t
Canandaigua VAMC
11/21/2026
PARKING
PARKING
PARKING
WATER TOWER
CAMPUS SITE PLAN
VAMC Canandaigua
RAMP
BUILDING 6 GROUND FLOOR
ABATEMENT
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A5-26-504 CANANDAIGUA, NY
AutoCAD SHX Text G-001
AutoCAD SHX Text Cover Sheet
AutoCAD SHX Text A-001
AutoCAD SHX Text Notes and Legends
AutoCAD SHX Text
GC-101
AutoCAD SHX Text General Phasing Plan
AutoCAD SHX Text
AD-101
AutoCAD SHX Text Reflective Ceiling Plan Demo
AutoCAD SHX Text
AD-102
AutoCAD SHX Text Architectural Demo
AutoCAD SHX Text H-101
AutoCAD SHX Text Hazardous Abatement Plan
AutoCAD SHX Text
PD-101
AutoCAD SHX Text Plumbing Demo
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
SITE LOCATION
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EAST STREET
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
CHAPEL STREET
AutoCAD SHX Text
PARK
AutoCAD SHX Text
EXERCISE
AutoCAD SHX Text
EAST STREET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COURTYARD 2
AutoCAD SHX Text
COURTYARD 2
AutoCAD SHX Text
2 HR VISITOR
AutoCAD SHX Text 4'-0"x10'-0' CONC. PAD FOR PROPANE TANK
AutoCAD SHX Text
BUSHWOOD LN.
AutoCAD SHX Text
LOOP RD.
AutoCAD SHX Text
LOOP RD.
AutoCAD SHX Text
105 SECONDARY TANKS
AutoCAD SHX Text
114 PAVILION COURT 2
AutoCAD SHX Text
124 TRASH HUT - B.6
AutoCAD SHX Text
94 GARAGE (SCHOOL LEASE)
AutoCAD SHX Text
80 S.T.P. CONTROL HOUSE (WASTE WATER TREATMENT)
AutoCAD SHX Text
73 (SCHOOL LEASE)
AutoCAD SHX Text
39 ENGINEERING STORAGE
AutoCAD SHX Text
37 FORMER PATIENT CARE, IS
AutoCAD SHX Text
36 FORMER PATIENT CARE, DAY TREATMENT CENTER
AutoCAD SHX Text
34 SPD, A&MMS, DAYCARES, NETWORK STORAGE
AutoCAD SHX Text
14 VACANT
AutoCAD SHX Text
13 EMERGENCY GENERATOR
AutoCAD SHX Text
5 AUDITORIUM, RECREATION SVC.
AutoCAD SHX Text
NO. BUILDING SCHEDULE 1
AutoCAD SHX Text
4 ADMINISTRATIVE, CANTEEN
AutoCAD SHX Text
18 (SCHOOL LEASE)
AutoCAD SHX Text
OPC OUTPATIENT SERVICES, MAIN ADMIN UNDER CONSTRUCTION
AutoCAD SHX Text
OPC OUTPATIENT CLINIC
AutoCAD SHX Text
3 GEC OFFICES, PATIENT CARE
AutoCAD SHX Text
6 SUBSTANCE ABUSE OFFICES, EMS
AutoCAD SHX Text
7 NHCU, VOLUNTARY SVC., HRMS
AutoCAD SHX Text
9 PATIENT CARE/DOM, LIBRARY, MAIL RM.
AutoCAD SHX Text
11 WAREHOUSE
AutoCAD SHX Text
12 BOILER PLANT/BIOMASS
AutoCAD SHX Text
16 FIRE STATION, GARAGE, GROUNDS MTN.
AutoCAD SHX Text
24 VALOR HEADQUARTERS
AutoCAD SHX Text
33 PATIENT CARE NHCU, INPATIENT PHARMACY
AutoCAD SHX Text
40 GATE HOUSE
AutoCAD SHX Text
41 OUTDOOR FIREPLACE
AutoCAD SHX Text
42 STONE GRANDSTAND
AutoCAD SHX Text
46 WAREHOUSE POLE BARN
AutoCAD SHX Text
70 MISCELLANEOUS STORAGE
AutoCAD SHX Text
81 SLUDGE DIGESTORS
AutoCAD SHX Text
82 SLUDGE BED
AutoCAD SHX Text
76 STORAGE
AutoCAD SHX Text
8 NHCU, ADULT DAYCARE
AutoCAD SHX Text
10 LAUNDRY
AutoCAD SHX Text
20 VA POLICE STATION
AutoCAD SHX Text
75 OIL HOUSE
AutoCAD SHX Text
77 STORAGE
AutoCAD SHX Text
125 TRASH HUT - B.36/37
AutoCAD SHX Text
123 TRASH HUT - B.8
AutoCAD SHX Text
122 OIL STORAGE TANKS
AutoCAD SHX Text
113 PATIENT'S TOILET, COURT 2
AutoCAD SHX Text
121 SWITCHGEAR
AutoCAD SHX Text
118 ENGINEERING SHOPS & OFFICES
AutoCAD SHX Text
112 PATIENT'S TOILET, COURT 1
AutoCAD SHX Text
111 TRANSFORMERS X-RAY B.1
AutoCAD SHX Text
109 AERATION TANKS
AutoCAD SHX Text
108 PRIMARY TANKS
AutoCAD SHX Text
106 TRICKLING FILTER
AutoCAD SHX Text
107 PUMP HOUSE S.T.P.
AutoCAD SHX Text
110 PAVILION COURT 2
AutoCAD SHX Text
120 FIRE PUMP BLDG., BKFLOW PREVENTOR
AutoCAD SHX Text
115 RECREATION STORAGE, COURT 1
AutoCAD SHX Text
17 CADENCE SQUARE
AutoCAD SHX Text
35 RELOCATED DIETETICS, KITCHEN
AutoCAD SHX Text
43 SALT STORAGE BARN (COVER)
AutoCAD SHX Text
44 GROUNDS AND TRANSPORTATION
AutoCAD SHX Text
45 CHILLER PLANT
AutoCAD SHX Text
50 LOADING DOCK
AutoCAD SHX Text
38 FUTURE TEMPORARY OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 35T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OPC-2
AutoCAD SHX Text
OPC-1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
65 TEMPORARY TRAILERS (OFFICES)
AutoCAD SHX Text
AutoCAD SHX Text
ZONED
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
TRAILERS
AutoCAD SHX Text
OFFICES
AutoCAD SHX Text
TRAILERS
AutoCAD SHX Text
OFFICES
AutoCAD SHX Text
ZONED
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
ZONED
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
ZONED
AutoCAD SHX Text
CONSTRUCTION
GENERAL SYMBOLS:
X KEYED NOTE
DOOR OPENING IDENTIFIER
CEILING GRID
ARCHITECTURAL SYMBOLS:
PENDANT SPRINKLER
WIRELESS ACCESS POINT
ASBESTOS AWARENESS NOTES:
1. BUILDING 36 HAS HAD THE MAJORITY OF ITS HAZARDOUS MATERIALS REMOVED DURING PREVIOUS PROJECTS.
HOWEVER, SUSPECT ACM VERMICULITE INSULATION IS ANTICIPATED IN WALL CAVITIES LOCATED BEHIND
EXISTING HEATERS AND WILL BE ABATED ACCORDINGLY.
2. ALL DISTURBANCE OF ASBESTOS SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION 028213 TRADITIONAL
ASBESTOS ABATEMENT.
3. ANY DISTURBANCE OF ASBESTOS-CONTAINING MATERIALS SHALL BE PERFORMED AS AN ASBESTOS ABATEMENT PROJECT UTILIZING A LICENSED ASBESTOS ABATEMENT CONTRACTOR EMPLOYING CERTIFIED
WORKERS.
4. ANY QUESTIONABLE MATERIAL OR MATERIAL SUSPECTED TO CONTAIN ASBESTOS SHALL NOT BE DISTURBED AND SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER OR THE OWNER'S REPRESENTATIVE FOR AN
ACCURATE INTERPRETATION AND/OR SAMPLING AND ANALYSIS
5. AN ASBESTOS CONTROL AREA MAY BE REQUIRED WHICH IS ALSO KNOWN AS A REGULATED AREA - AN OSHA TERM DEFINED IN 29 CFR 1926.1101 MEANING AN AREA ESTABLISHED BY THE CONTRACTOR TO DEMARCATE AREAS WHERE CLASS I, II, III ASBESTOS WORK IS CONDUCTED; ALSO, ANY ADJOINING AREA WHERE DEBRIS AND
WASTE FROM SUCH ASBESTOS WORK ACCUMULATES; AND AN AREA WITHIN WHICH AIRBORNE
CONCENTRATIONS OF ASBESTOS, OR THERE IS A REASONABLE POSSIBLY THEY MAY EXCEED THE PERMISSIBLE
EXPOSURE LIMIT.
6. ACTIVITY HAZARD ANALYSIS (AHA'S) FOR EACH MAJOR PHASE SHALL BE SUBMITTED AND UPDATED DURING THE PROJECT. ANY TIME A WORK TASK CHANGES OR IS UPDATED, A NEW AHA SHALL BE PREPARED FOR THE NEW
TASK.
7. MEDICAL SURVEILLANCE REQUIREMENT SHALL CONFORM TO 29 CFRR 1926.1101. ASBESTOS WORKERS SHALL PARTICIPATE IN A MEDICAL SURVEILLANCE PROGRAM, THAT MEETS 29 CFR 1926.1101 REQUIREMENTS. THIS REQUIREMENT MUST HAVE BEEN SATISFIED WITHIN THE LAST 12 MONTHS. ALL REQUIRED MEDICAL
CERTIFICATIONS AND THE PHYSICIAN'S WRITTEN OPINIONS MUST BE SUBMITTED.
8. RESPIRATORS MUST BE PROVIDED AND USED AS REQUIRED BY 29 CFR 1926.1101. RESPIRATORS SHALL BE APPROVED BY THE NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH (NIOSH) FOR USE IN ENVIRONMENTS CONTAINING AIRBORNE ASBESTOS FIBERS. THE INITIAL RESPIRATOR SELECTION AND THE DECISIONS REGARDING THE UPGRADING OR DOWNGRADING OF THE RESPIRATOR TYPE SHALL BE MADE BASED ON THE MEASURED OR ANTICIPATED AIRBORNE ASBESTOS FIBER CONCENTRATION TO BE ENCOUNTERED.
GENERAL NOTES:
1. THE CONTRACTOR SHALL COORDINATE ALL WORK ASSOCIATED WITH THIS PROJECT WITH THE
SUB-CONTRACTORS, TO PROVIDE A COMPLETE AND FINISHED PROJECT.
2. THIS FACILITY IS OCCUPIED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL METHODS AND MEANS OF
CONSTRUCTION AND SHALL BE RESPONSIBLE TO THE VA COR FOR PROVIDING A SAFE WORK ENVIRONMENT DURING THE CONSTRUCTION PERIOD. EVERY EFFORT SHALL BE MADE BY THE CONTRACTOR TO PROTECT THE
OCCUPANTS, VISITORS AND CUSTOMERS FROM THE HAZARDS OF CONSTRUCTION.
3. ALL WORK SHALL BE PERFORMED IN THE BEST AND MOST PROFESSIONAL MANNER BY CONTRACTORS SKILLED
IN THEIR RESPECTIVE TRADES.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING AND CORRECTING HIS OWN WORKMANSHIP TO
THE EXTENT THAT SATISFIES THE VA COR.
5. THE CONTRACTOR, AND VA COR SHALL BE RESPONSIBLE FOR SPECIFICATIONS OF ALL MATERIALS NOT SPECIFIED ON THE THE DRAWINGS OR IN THE SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE THE SELECTION OF ALL COMPONENT COLORS, MODEL NUMBERS, SIZES, ETC. OF ALL BUILDING ELEMENTS WITH THE
VA COR BEFORE ORDERING MATERIALS.
6. THE CONTRACTOR SHALL VISIT THE SITE TO VERIFY FIELD CONDITIONS, NO ADDITIONAL PAYMENT WILL BE MADE
FOR FAILURE TO ACCOUNT FOR OBSERVABLE CONDITIONS.
7. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO PREVENT THE SPREAD OF DUST, SMOKE, FUMES, ETC., THROUGHOUT THE BUILDING AND NEIGHBORHOOD.
8. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SERVICES INCLUDING, ADEQUATE LIGHTING, WATER, TOILETS, POWER, HEAT, ETC. AS REQUIRED FOR WORKMAN, MATERIAL INSTALLATION, WORK PROTECTION, ETC.
OR AS DISCUSSED AND ALLOWED BY THE VA COR.
9. THE CONTRACTOR SHALL REVIEW ALL CONSTRUCTION DOCUMENTS AND NOTIFY THE VA COR OF ANY INACCURACIES OR DISCREPANCIES IN THE DOCUMENTS AND IN FIELD CONDITIONS SHOWN ON THE DRAWINGS
IN A TIMELY MANNER.
10. THE CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL FEDERAL CODES, RULES, REGULATIONS AND ORDINANCES INCLUDING, BUT NOT LIMITED TO, THE INTERNATIONAL BUILDING CODE, AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) WHETHER OR NOT INFORMATION AND/OR WORK
IS SPECIFICALLY SHOWN ON THE DRAWINGS.
11. THE CONTRACTOR SHALL BE AWARE THAT THE EXISTING FACILITY HAS THE POTENTIAL OF HAVING OTHER
CONSTRUCTION PROJECTS GOING ON AT THE SAME TIME. COORDINATE WITH VA COR.
12. PROTECT ALL AREAS THAT TEMPORARY WASTE RECEPTACLES TRAVERSE. WASTE SHALL NOT PILE UP ON ROOF OR GROUND. IMMEDIATELY RELOCATE WASTE TO DUMPSTER. NO CHUTES ARE ALLOWED FOR ASBESTOS
CONTAINING MATERIAL.
13. ALL WOOD BLOCKING SHALL BE PRESSURE TREATED OR FIRE RETARDANT WITH STAMP SHOWN. REFER TO
PLANS FOR LOCATIONS OF EACH TYPE.
14. CONTRACTOR TO REVIEW AND LOCATE ALL DUMPSTER LOCATIONS WITH VA COR PRIOR TO START OF WORK.
CONTRACTOR TO PLACE ALL DUMPSTERS WITHIN 10 FEET OF A BUILDING. COORDINATE DUMPSTER LOCATION WITH VA COR WHEN THIS IS NOT POSSIBLE. ANY DUMPSTER WITHIN 20 FEET OF A BUILDING WILL REMAIN COVERED WHEN NOT IN USE. CONTRACTOR SHALL USE TEMPORARY MARKINGS AND SIGNAGE TO INDICATE
DUMPSTER PLACEMENT.
15. CONTRACTOR TO PROVIDE FIRE PREVENTION PLAN TO VA COR FOR REVIEW AND APPROVAL.
16. ALL HOT WORK SHALL FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR TIME IN REGARDS TO FIRE
WATCHES.
17. IF CONTRACTOR ENCOUNTERS MECHANICAL EQUIPMENT PREVIOUSLY ABANDONED IN PLACE, COORDINATE
REMOVAL AND REPAIR WITH THE COR ON A CASE BY CASE BASIS.
18. DASHED LINES INDICATE GENERAL EXISTING CONSTRUCTION TO BE REMOVED. GENERAL CONTRACTOR IS
RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS RELATING TO THE DEMOLITION REQUIRED.
19. SEE CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING DRAWINGS FOR OTHER DEMOLITION WORK
REQUIRED. ANY DEMOLITION OF MECHANICAL, ELECTRICAL, OR PLUMBING EQUIPMENT SHOWN ON THESE DRAWINGS, IS FOR COORDINATION ONLY. COORDINATE ALL WORK BY OTHER CONTRACTORS INCLUDING CAPPING AND DISCONNECTING OF BUILDING SERVICES SUCH AS WATER, SEWER, ELECTRIC, GAS, COMMUNICATIONS, ETC.
20. EXISTING CONDITIONS AS THEY APPEAR IN THESE CONTRACT DOCUMENTS MAY VARY WITH ACTUAL CONDITIONS BECAUSE OF ITEMS REMOVED BY THE OWNER'S STAFF. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PATCHING AND REPAIR WORK AS A RESULT OF THE OWNER'S REMOVAL OF SUCH ITEMS.
21. DEMOLITION WORK SHOWN ON THE DEMOLITION CONTRACT DRAWINGS SHALL BE FOR THE BUILDING RECEIVING MAJOR DEMOLITION WORK, AND DOES NOT REPRESENT THE DEMOLITION FOR THE PROJECT IN ITS ENTIRETY.
REFER TO CONTRACT DRAWINGS FOR ADDITIONAL DEMOLITION WORK REQUIRED BY OTHER SUB
CONTRACTORS. OTHER SUB CONTRACTORS DEMOLITION WORK SHALL BE COORDINATED BY THE GENERAL
CONTRACTOR WITH REGARDS TO BUT NOT LIMITED TO SCHEDULE AND SEQUENCE.
22. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL DEMOLITION CONDITIONS RELATED
TO ANY ACCEPTED ALTERNATE BIDS.
23. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE BUILDING AFTER ANY DEMOLITION WHICH RENDERS ANY PART OF THE
BUILDING STRUCTURALLY UNSTABLE.
24. NO DEMOLITION SHALL OCCUR WHICH LEAVES THE BUILDING INTERIOR WITHOUT WEATHER PROTECTION. ALL DEMOLITION OF EXTERIOR SURFACES SHALL BE FOLLOWED IMMEDIATELY BY PROTECTIVE CONSTRUCTION.
GENERAL CONTRACTOR SHALL INSURE THAT TEMPORARY PROTECTION FROM WEATHER IS PROVIDED AND
INSTALLED AT ALL EXPOSED OPENINGS.
25. GENERAL CONTRACTOR SHALL TAKE ALL POSSIBLE PRECAUTIONS AGAINST DAMAGING ANY EXISTING CONSTRUCTION THAT IS TO REMAIN. ALL DAMAGES CAUSED BY THE OPERATIONS OF THIS CONTRACT SHALL BE
REPAIRED AT THAT CONTRACTORS EXPENSE TO THE COMPLETE SATISFACTION OF THE OWNER.
26. GENERAL CONTRACTOR SHALL BE AWARE THAT THE EXISTING BUILDING WILL BE OCCUPIED AND IN USE DURING THE CONTRACT SCHEDULE. ALL CONTRACTORS SHALL CONDUCT THEIR OPERATIONS SO THAT THERE WILL BE MINIMAL INTERFERENCE WITH THE CONTINUED OPERATIONS OF THE ADJACENT SPACES AND SITE AREAS. ANY INTERFERENCE OR INCONVENIENCE WITH THE CONTINUED OPERATION OF THE FACILITY SHALL BE REVIEWED
WITH THE ARCHITECT AND THE OWNER PRIOR TO APPROVAL.
27. REFER TO SPECIFICATIONS AND PHASING DRAWINGS FOR CONSTRUCTION PHASING OR SEQUENCING WHICH
MAY AFFECT THE SCHEDULE OF REMOVALS.
28. DEMOLITION PLANS REFLECT LOCATIONS OF DEMOLITION . EXTENT OF WORK SHALL BE ALL CONSTRUCTION
WORK NECESSARY TO PROPERLY COMPLETE THE PROJECT.
29. FLOOR MATERIALS SCHEDULED TO BE REMOVED DOWN TO THE FLOOR SUBSTRATE UNLESS OTHERWISE
NOTED.
GENERAL PLUMBING DEMOLITION NOTES:
1. DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING NFPA
101 LIFE SAFETY CODE, VA PLUMBING DESIGN MANUAL, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN WHICH
THIS PROJECT IS BEING CONSTRUCTED.
2. BIDDERS ARE TO VISIT THE SITE AND FAMILIARIZE THEMSELVES AS TO THE NATURE AND SCOPE OF THE WORK PRIOR TO SUBMISSION OF A BID. SUBMISSION OF A BID WILL SERVE AS EVIDENCE THAT SUCH AN INVESTIGATION HAS BEEN PERFORMED AND THAT THE CONTRACTOR IS SATISFIED IN REGARDS TO THE CONTRACT DOCUMENTS AND HOW THEY RELATE TO THE
PROPOSED SCOPE OF WORK.
3. THIS CONSTRUCTION PACKAGE WAS PREPARED FORM AVAILABLE REFERENCE INFORMATION PROVIDED BY THE OWNER, AS WELL AS FIELD SURVEY INFORMATION COMPILED BY THE ARCHITECT/ENGINEER DESIGN TEAM. EXISTING CONDITIONS ARE REPRESENTED AS ACCURATELY AS POSSIBLE. FIELD CONDITIONS MAY VARY FROM THOSE INDICATED WITHIN THIS CONSTRUCTION PACKAGE. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, LOCATIONS, SIZES, AND CONDITIONS ON SITE AND REPORT DISCREPANCIES TO THE OWNER AS SOON AS PRACTICAL, AND PRIOR TO BEGINNING
FABRICATION OR INSTALLATION OF NEW WORK.
4. DRAWINGS MAY NOT INDICATE ALL DEMOLITION/REMOVALS. CONTRACTOR SHALL REFER TO DRAWINGS, SPECIFICATIONS AND VERIFY FIELD CONDITIONS TO DETERMINE FULL SCOPE AND PARTICULARS OF REMOVALS AS REQUIRED FOR AND COORDINATED WITH THE NEW WORK PRIOR TO BIDDING WORK. VERIFY AND CONFIRM WITH OWNER WHICH ITEMS ARE TO BE
SAVED FOR OWNER'S USE OR REINSTALLATION BY CONTRACTOR.
5. CONTRACTOR SHALL COORDINATE THE WORK WITH EACH TRADE SO THAT THE WORK AND SCHEDULE ARE NOT IMPEDED.
SCHEDULE WORK PROGRESS THROUGHOUT THE ENTIRE PROJECT TO PREVENT CONFLICTS AND INTERFERENCES. OBTAIN ALL NECESSARY INFORMATION SUCH AS SIZES, LOCATIONS, TEMPLATES, LAYOUT, DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER AND WELL COORDINATED INSTALLATION. PRIOR TO INSTALLATION OF ITEMS, VERIFY AND CONFIRM
WITH EACH TRADE EXACT LOCATION OF ALL ITEMS.
6. THE CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT ALL RULES AND REGULATIONS, INCLUDING THOSE WHICH MAY BE ISSUED BY THE OWNER, ARE BEING OBSERVED; PARTICULARLY WORKPLACE SAFETY REQUIREMENTS FOR PERSONNEL ON THE PREMISES. THE CONTRACTOR WILL INSTALL SIGNAGE, BARRIERS, AND OTHER MEANS BY WHICH TO PROVIDE WARNING AND PERSONNEL SAFETY. PLACEMENT OF SIGNAGE AND BARRIERS WILL BE IN ACCORDANCE WITHIN THIS DESIGN PACKAGE
AND IN COORDINATION WITH THE OWNER.
7. THE CONTRACTOR MUST MAINTAIN ORDERLY HOUSEKEEPING DURING CONSTRUCTION AND MUST PERFORM FINAL CLEANUP OF WORK AREAS UPON SUBSTANTIAL COMPLETION OF SCOPE. REMOVE CONSTRUCTION RUBBISH, SCAFFOLDING, EQUIPMENT, TEMPORARY PROTECTION, TEMPORARY STRUCTURES, AND ANY OTHER MATERIALS/EQUIPMENT THAT WERE REQUIRED DURING CONSTRUCTION BUT ARE NOT A PERMANENT PART THEREOF PRIOR TO RELEASE OF WORK ARE BACK TO THE OWNER.
8. ALL PENETRATIONS THROUGH FLOORS AND FULL HEIGHT WALLS TO BE FIRE STOPPED. ALL GAPS AND JOINTS AT FIRE RESISTIVE FLOORS, ROOFS AND WALL TO BE FIRE AND SMOKE STOPPED. GAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK WALL TO BEAMS, AND CONTROL OR EXPANSION FIRE STOPPING INCLUDES BOTH FORM
OR PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL.
APPLICABLE CODES:
THE APPLICABLE MODEL CODES, STANDARDS AND REFERENCES DOCUMENTS PERTINENT TO THE PROJECT ARE AS FOLLOWS:
·NFPA 101 LIFE SAFETY CODE (LATEST EDITION)
·INTERNATIONAL PLUMBING CODE (LATEST EDITION
·NFPA 70 NATIONAL ELECTRIC CODE (LATEST EDITION)
·OCCUPATIONAL, SAFETY, AND HEALTH ADMINISTRATIONS VA STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE
TECHNICAL INFORMATION LIBRARY
·VA PLUMBING DESIGN MANUAL
100%
A-001
BUILDING 6 GROUND FLOOR
ABATEMENT
400 FORT HILL AVE. CANANDAIGUA, NY 14424
Project Number
Project Director
Project Issue Date
SEK
Project Status
# Revisions Date
528A5-26-504 Office of Construction and
Facilities Management
U.S. Department of Veterans Affairs 11/21/2025
Project TitleDrawing Title
100%
SCALE: N.T.S.
ARCHITECTURAL NOTES
AND LEGENDS
NORTH
SCALE: 1/8"=1'0"
BUILDING 6 - GROUND FLOOR - ARCHETCTURAL DEMOLITION PLAN1
100%
AD-101
BUILDING 6 GROUND FLOOR
ABATEMENT
400 FORT HILL AVE. CANANDAIGUA, NY 14424
Project Number
Project Director
Project Issue Date
Project Status
# Revisions Date
528A5-26-504 Office of Construction and
Facilities Management
U.S. Department of Veterans Affairs 11/21/25
Project TitleDrawing Title
100%
SCALE: 14" = 1'-0"
REFLECTED CEILING
DEMOLITION PLAN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text KEYED NOTES: KEYED NOTES: 1. REMOVE APPROXIMATELY 3200 SQUARE FEET OF ACCOUSTICAL CEILING TILE GRID SYSTEM AND CEILING MOUNTED DEVICES FOR ENTIRE ROOM OR EXTENT SHOWN. SALVAGE AND STORE EXISTING CEILING MOUNTED DEVICES AND ALL ASSOCIATED SUPPORT STRUCTURES.
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
%%UBUILDING 6 KEYPLAN
SEK
1 1
NORTH
SCALE: 1/8"=1'0"
BUILDING 6 - GROUND FLOOR - ARCHETCTURAL DEMOLITION PLAN1
100%
AD-102
BUILDING 6 GROUND FLOOR
ABATEMENT
400 FORT HILL AVE. CANANDAIGUA, NY 14424
Project Number
Project Director
Project Issue Date
Project Status
# Revisions Date
528A5-26-504 Office of Construction and
Facilities Management
U.S. Department of Veterans Affairs 11/21/25
Project TitleDrawing Title
100%
SCALE: 14" = 1'-0"
ARCHITECTURAL DEMOLITION
PLAN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text KEYED NOTES: KEYED NOTES: 1. REMOVE EXISTING DOORS, FRAMES, ASSOCIATED HARDWARE AND TEMPORARY WALL PARTITIONS. 2. REMOVE EXISTING BATHROOM MARBLE WALL PARTITIONS AND ALL ASSOCIATED HARDWARE. 3. REMOVE EXISTING CMU WALLS CLEAN DOWN TO CONCRETE FLOOR. 4. REMOVE DRYWALL WALLS AND METAL STUD FRAMING.
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
%%UBUILDING 6 KEYPLAN
NORTH
SCALE: 1/8"=1'-0"
BUILDING 6-GROUND FLOOR - HAZARDOUS ABATEMENT DEMOLITION PLAN1
100%
H-101
BUILDING 6 GROUND FLOOR
ABATEMENT
400 FORT HILL AVE. CANANDAIGUA, NY 14424
Project Number
Project Director
Project Issue Date
Project Status
# Revisions Date
528A5-26-504 Office of Construction and
Facilities Management
U.S. Department of Veterans Affairs 11/21/25
Project TitleDrawing Title
100%
SCALE: 1/8" = 1'-0"
HAZARDOUS ABATEMENT
PLAN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
TUNNEL TO BLDG 5
AutoCAD SHX Text
NAU
AutoCAD SHX Text
NAU
AutoCAD SHX Text
NAU
AutoCAD SHX Text
NAU
AutoCAD SHX Text
ASBESTOS WASTE DUMPSTER
AutoCAD SHX Text
HARD BARRIER FIRE RESISTANT DRYWALL PHASE 1
AutoCAD SHX Text
HARD BARRIER FIRE RESISTANT DRYWALL PHASE 2
AutoCAD SHX Text
MOBILE DECONTAMINATION UNIT
AutoCAD SHX Text GENERAL REMOVAL NOTES: GENERAL REMOVAL NOTES: 1. VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL REMOVAL ACTIVITIES WITH CONSTRUCTION DOCUMENTS. 2. CONTRACTOR SHALL COORDINATE WITH VETERANS CONTRACTOR SHALL COORDINATE WITH VETERANS ADMINISTRATION (VA) FOR SEQUENCE OF REMOVAL AND SHUT DOWNS SO AS NOT TO DISRUPT THE ONGOING OPERATION OF THE HOSPITAL. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER STAGING OF WORK AS TO PROTECT AND ENSURE THAT IT WILL NOT HAVE ANY INTERFERENCE OF ACCESS TO OR FROM FIRE EGRESS, ELEVATORS, ETC. COORDINATE PHASING AND TEMPORARY PARTITIONS AND DOORS WITH VETERAN ADMINISTRATION. 4. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF THE INFECTION CONTROL RISK ASSESSMENT AND INTERIM LIFE SAFETY MEASURES PLANS PERTAINING TO REMOVAL ACTIVITIES. 5. CONTRACTOR WILL PLACE WASTE RECEPTACLE AT LEAST 30' CONTRACTOR WILL PLACE WASTE RECEPTACLE AT LEAST 30' AWAY FROM THE BUILDING. 6. PERFORM ALL WORK REQUIRED TO PROTECT THE BUILDING, PERFORM ALL WORK REQUIRED TO PROTECT THE BUILDING, BUILDING OCCUPANTS, AND BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGH OUT THE COURSE OF REMOVAL ACTIVITIES. 7. REMOVAL MAYBE REQUIRED TO BE COMPLETED OFF HOURS AS REMOVAL MAYBE REQUIRED TO BE COMPLETED OFF HOURS AS TO HELP MITIGATE BUILDING DISRUPTION. 8. NEGATIVE AIR MACHINES MUST BE EXHAUSTED TO THE NEGATIVE AIR MACHINES MUST BE EXHAUSTED TO THE EXTERIOR OF THE BUILDING AND CONTINUOUSLY RUN UNTIL CLEARANCE SAMPLES COME BACK. KEYED NOTES: KEYED NOTES: 1. MATERIALS AND APPROXIMATE QUANTITIES SCHEDULED FOR MATERIALS AND APPROXIMATE QUANTITIES SCHEDULED FOR REMOVAL CONSIST OF APPROXIMATELY 4200 SQ FT OF VARIOUS CARPET, FLOOR TILE AND MASTIC. AREAS INDICATED BY HATCHING WILL BE ABATED DOWN COMPLETELY TO CONCRETE AND DISPOSED OF AS ASBESTOS CONTAINING MATERIAL. 2. ENCAPSULATE EXPOSED EDGE OF FLOOR TILE AND MASTIC ENCAPSULATE EXPOSED EDGE OF FLOOR TILE AND MASTIC OUTSIDE OF REMOVAL AREA.
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
%%UBUILDING 6 KEYPLAN
1 2
NORTH
SCALE: 1/8"=1'0"
BUILDING 6 - GROUND FLOOR - PLUMBING DEMOLITION PLAN1
100%
PD-101
BUILDING 6 GROUND FLOOR
ABATEMENT
400 FORT HILL AVE. CANANDAIGUA, NY 14424
Project Number
Project Director
Project Issue Date
Project Status
# Revisions Date
528A5-26-504 Office of Construction and
Facilities Management
U.S. Department of Veterans Affairs 11/21/25
Project TitleDrawing Title
100%
SCALE: 1/8" = 1'-0"
PLUMBING DEMOLITION
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text KEYED NOTES: KEYED NOTES: 1. DISCONNECT HOT AND COLD WATER SUPPLIES FROM SINKS AND DISCONNECT HOT AND COLD WATER SUPPLIES FROM SINKS AND CAP AT WALL PENETRATION. REMOVE WALL HUNG SINKS, TRAPS AND ALL ASSOCIATED HARDWARE. CAP SANITARY LINE AT WALL PENETRATION. 2. DISCONNECT COLD WATER SUPPLY TO WATER CLOSETS AND CAP DISCONNECT COLD WATER SUPPLY TO WATER CLOSETS AND CAP AT WALL PENETRATION. REMOVE WATER CLOSETS AND ALL ASSOCIATED HARDWARE. CAP SANITARY LINE AT WALL PENETRATION.
AutoCAD SHX Text
SCALE: NONE
%%UBUILDING 6 KEYPLAN
| Building 6 Abatement Title Sheet-G-001 COVER PAGE |
| G-001 COVER PAGE |
| A-001 Notes and legends-A-001 |
| A-001 |
| AD-101 Reflected ceiling plan |
| AD-102 |
| AD-102 Architectural Demo |
| AD-102 |
| H-101 Abatement Demo |
| H-101 |
| PD-101 Plumbing Demo |
| PD-101 |
File details come from the government source that posted it. Updated .