This document is a comprehensive project manual for a metal building renovation project at Collin College's McKinney campus, prepared by Corgan Associates, Inc. with an issue date of February 25, 2025. The project involves recladding an existing metal building with two potential envelope options: an Insulated Metal Panel (IMP) system or an Exterior Insulation Finishing System (EIFS). The project manual includes detailed specifications across multiple divisions, covering structural requirements, materials, fabrication, installation procedures, and quality control standards for the renovation. The document provides extensive technical guidance for contractors, including framing, concrete work, metal components, roofing, and finishing specifications.
The project manual includes comprehensive technical requirements that address performance standards, material specifications, installation methods, and quality assurance protocols. The specifications indicate a thorough approach to the renovation, with specific attention to thermal performance, wind load resistance, air infiltration limits, and moisture protection. The document suggests a competitive bidding process with detailed technical requirements that will help ensure a high-quality renovation outcome. The project appears to be funded through standard institutional capital improvement processes, with a focus on upgrading the building's exterior envelope to improve energy efficiency and aesthetic appearance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
Collin College
McKinney - Metal
Building Renovation
Issue for Bid
25 February 2025
24719.0000
Corgan Associates, Inc.
401 North Houston Street
Dallas, Texas 75202
214 748 2000
This page intentionally left blank.
Collin College McKinney - Metal Building Renovation 24719.0000
Issue for Bid 25 February 2025
Seals Page 00 01 07 - 1
DOCUMENT 00 01 07
SEALS PAGE
Project Manual Issue for Bid
25 February 2025 24719.0000
Collin College McKinney - Metal Building Renovation
ARCHITECT OF RECORD
Corgan Associates, Inc.
401 North Houston Street Dallas, Texas 75202 214 748 2000 Responsible for Sections marked with (CAI) in Document 00 01 10 "Table of Contents."
02/25/25
Architect of Record Date
Seals Page 00 01 07 - 2
STRUCTURAL ENGINEER OF RECORD
Ponce‑Fuess Engineering, LLC 3333 Lee Parkway, Suite 350 Dallas, Texas 75219 469 310 2850 Firm License #: F‑12125 Responsible for Sections marked with (PFE) in Document 00 01 10 "Table of
Structural Engineer of Record
Date
ENVELOPE ARCHITECT OF RECORD
DRYTEC Moisture Protection Technology Consultants 8750 N Central Expressway, Suite 725 Dallas, Texas 75231 214 363 2192 Responsible for Sections marked with (DRY) in Document 00 01 10 "Table of
Envelope Architect of Record
Seals Page 00 01 07 - 3
MECHANICAL ENGINEER OF RECORD
Reed, Wells, Benson, and Company 12001 North Central Expressway Suite 1100 Dallas, Texas 75243 214 788 4222 Firm License #: F‑2176 Responsible for Sections marked with (RWB‑M) in Document 00 01 10 "Table of
Mechanical Engineer of Record
ELECTRICAL ENGINEER OF RECORD
Reed, Wells, Benson, and Company 12001 North Central Expressway Suite 1100 Dallas, Texas 75243 214 788 4222 Firm License #: F‑2176 Responsible for Sections marked with (RWB‑E) in Document 00 01 10 "Table of
Electrical Engineer of Record
END OF DOCUMENT
Table of Contents 00 01 10 - 1
DOCUMENT 00 01 10
TABLE OF CONTENTS
Designer Responsibility (DR): For DR codes, seals, and designer contact information; refer to Document 00 01 07 "Seals Page."
Division Section Title DR Code Date
DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 Project Title Page ..................................................................... ............. ... 02/25/25 00 01 07 Seals Page ............................................................................... ............. ... 02/25/25 00 01 10 Table of Contents ..................................................................... ............. ... 02/25/25 00 73 43 Wage Rate Requirements ......................................................... ............. ... 02/25/25
Attachment: General Decision Number ..................................... ............. ... 02/25/25
DIVISION 01 — GENERAL REQUIREMENTS
01 10 00 Summary .................................................................................. ....... CAI ... 02/25/25 01 23 00 Alternates ................................................................................. ....... CAI ... 02/25/25 01 25 00 Substitution Procedures ............................................................ ....... CAI ... 02/25/25
Attachment: Substitution Request Form .................................... ....... CAI ... 02/25/25 01 26 00 Contract Modification Procedures ............................................. ....... CAI ... 02/25/25 01 29 00 Payment Procedures ................................................................ ....... CAI ... 02/25/25 01 31 00 Project Management and Coordination ..................................... ....... CAI ... 02/25/25 01 32 00 Construction Progress Documentation ...................................... ....... CAI ... 02/25/25 01 32 33 Photographic Documentation .................................................... ....... CAI ... 02/25/25 01 33 00 Submittal Procedures ............................................................... ....... CAI ... 02/25/25 01 35 16 Alteration Project Procedures ................................................... ....... CAI ... 02/25/25 01 40 00 Quality Requirements ............................................................... ....... CAI ... 02/25/25 01 41 00 Regulatory Requirements ......................................................... ....... CAI ... 02/25/25 01 42 00 References ............................................................................... ....... CAI ... 02/25/25 01 50 00 Temporary Facilities and Controls ............................................ ....... CAI ... 02/25/25 01 60 00 Product Requirements .............................................................. ....... CAI ... 02/25/25 01 73 00 Execution .................................................................................. ....... CAI ... 02/25/25 01 77 00 Closeout Procedures ................................................................ ....... CAI ... 02/25/25 01 78 23 Operation and Maintenance Data ............................................. ....... CAI ... 02/25/25 01 78 39 Project Record Documents ....................................................... ....... CAI ... 02/25/25
DIVISION 02 — EXISTING CONDITIONS
02 41 19 Selective Demolition ................................................................. ....... CAI ... 02/25/25
DIVISION 03 — CONCRETE
03 11 13 Structural Concrete Forming ..................................................... ...... PFE ... 02/25/25 03 20 00 Concrete Reinforcing ................................................................ ...... PFE ... 02/25/25 03 31 00 Structural Concrete ................................................................... ...... PFE ... 02/25/25
DIVISION 04 — MASONRY
Not used
DIVISION 05 — METALS
05 12 00 Structural Steel Framing ........................................................... ...... PFE ... 02/25/25 05 41 00 Structural Metal Stud Framing .................................................. ...... PFE ... 02/25/25
Division Section Title DR Code Date
Table of Contents 00 01 10 - 2
05 50 00 Metal Fabrications .................................................................... ....... CAI ... 02/25/25
DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES
Not used
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
07 24 19 Water-Drainage Exterior Insulation and Finish System (EIFS) .. ....... CAI ... 02/25/25 07 42 13.13 Formed Metal Wall Panels ........................................................ ....... CAI ... 02/25/25 07 42 13.19 Insulated Metal Wall Panels ...................................................... ....... CAI ... 02/25/25 07 60 00 Sheet Metal Work ..................................................................... ...... DRY ... 02/25/25 07 61 40 Standing Seam Metal Roofing .................................................. ...... DRY ... 02/25/25 07 72 00 Roof Accessories ...................................................................... ...... DRY ... 02/25/25 07 92 00 Joint Sealants ........................................................................... ....... CAI ... 02/25/25
DIVISION 08 — OPENINGS
08 11 13 Hollow Metal Doors and Frames ............................................... ....... CAI ... 02/25/25 08 33 23 Overhead Coiling Doors............................................................ ....... CAI ... 02/25/25 08 43 13 Aluminum-Framed Storefronts .................................................. ....... CAI ... 02/25/25 08 80 00 Glazing ..................................................................................... ....... CAI ... 02/25/25
DIVISION 09 — FINISHES
09 21 16 Gypsum Board Assemblies ....................................................... ....... CAI ... 02/25/25 09 91 13 Exterior Painting ....................................................................... ....... CAI ... 02/25/25 09 91 23 Interior Painting ........................................................................ ....... CAI ... 02/25/25
DIVISION 10 — SPECIALTIES
10 14 16.16 Room-Identification Plaques ..................................................... ....... CAI ... 02/25/25
DIVISIONS 11 — 21
Not used
DIVISION 22 — PLUMBING
22 05 00 Common Work Results for Plumbing ........................................ . RWB-M ... 02/25/25 22 05 01 Plumbing Demolition ................................................................. . RWB-M ... 02/25/25
DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING
23 00 00 Heating, Ventilating, and Air Conditioning (HVAC) Work........... . RWB-M ... 02/25/25 23 05 00 Common Work Results for HVAC ............................................. . RWB-M ... 02/25/25 23 07 00 Insulation .................................................................................. . RWB-M ... 02/25/25 23 23 00 Refrigerant Piping ..................................................................... . RWB-M ... 02/25/25
DIVISION 25 — INTEGRATED AUTOMATION
Not used
DIVISION 26 — ELECTRICAL
26 05 00 Electrical ................................................................................... ..RWB-E ... 02/25/25 26 05 01 Electrical Demolition ................................................................. ..RWB-E ... 02/25/25
Wage Rate Requirements 00 73 43 - 1
DOCUMENT 00 73 43
WAGE RATE REQUIREMENTS
1.1 FEDERAL PARTICIPATION DISCLOSURE
A. This project will be partially funded with Federal funds from the United States Department of Commerce, Economic Development Administration and therefore is subject to the Federal laws and regulations associated with that program.
1.2 DUTY TO PAY PREVAILING WAGE RATES
A. Contractor shall pay not less than wage scale of various classes of labor as shown in the Attachment to this Document. The wage rates set forth are minimum rates only.
Owner will not consider any claims for additional compensation made by any Contractor because the Contractor pays wages in excess of the applicable minimum rate stipulated in the Contract. The Attachment is not a representation that quantities of qualified labor adequate to perform the Work may be found locally at specified wage rates.
1.3 ATTACHMENT
A. The attached Document is part of the Procurement and Contracting Requirements for Project. They provide Owner's information and are made available for Bidders' convenience and information.
B. Attachment: Document 00 73 43.10 "General Decision Number TX20250239" dated 01/03/2025.
General Decision Number 00 73 43.10 - 1
GENERAL DECISION NUMBER
General Decision Number: TX20250239 01/03/2025
Superseded General Decision Number: TX20240239
State: Texas
Construction Type: Building
County: Collin County in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.75 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2025. |
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $13.30 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2025. |
General Decision Number 00 73 43.10 - 2
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2025
ASBE0021-011 06/01/2023
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Duct, Pipe and
Mechanical System Insulation)....$ 31.32 7.52
BOIL0074-003 07/01/2023
BOILERMAKER......................$ 37.00 24.64
CARP1421-002 10/01/2023
MILLWRIGHT.......................$ 32.02 11.27
ELEV0021-006 01/01/2024
ELEVATOR MECHANIC................$ 49.71 37.885+a+b
FOOTNOTES:
A. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked.
B. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Veterans Day.
ENGI0178-005 06/01/2020
General Decision Number 00 73 43.10 - 3
POWER EQUIPMENT OPERATOR
(1) Tower Crane.............$ 32.85 13.10
(2) Cranes with Pile
Driving or Caisson
Attachment and Hydraulic
Crane 60 tons and above.....$ 28.75 10.60
(3) Hydraulic cranes 59
Tons and under..............$ 32.35 13.10
IRON0263-005 06/01/2024
IRONWORKER (ORNAMENTAL AND
STRUCTURAL)......................$ 28.64 7.93
PLUM0100-005 11/01/2024
HVAC MECHANIC (HVAC Unit
Installation Only)...............$ 39.76 14.04
PIPEFITTER (Excludes HVAC
Pipe Installation)...............$ 39.76 14.04
SUTX2014-015 07/21/2014
BRICKLAYER.......................$ 21.06 0.00
CARPENTER, Excludes Drywall
Hanging, Form Work, and Metal
Stud Installation................$ 15.78 ** 0.00
CAULKER..........................$ 15.16 ** 0.00
CEMENT MASON/CONCRETE FINISHER...$ 13.04 ** 0.00
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 13.00 ** 0.00
ELECTRICIAN (Alarm
Installation Only)...............$ 20.93 3.86
ELECTRICIAN (Communication
Technician Only).................$ 15.35 ** 1.39
ELECTRICIAN (Low Voltage
General Decision Number 00 73 43.10 - 4
Wiring Only).....................$ 17.04 ** 1.39
ELECTRICIAN, Excludes Low
Voltage Wiring and
Installation of Alarms/Sound and Communication Systems........$ 20.01 2.69
FORM WORKER......................$ 11.89 ** 0.00
GLAZIER..........................$ 16.46 ** 3.94
HIGHWAY/PARKING LOT STRIPING:
Operator (Striping Machine).....$ 10.04 ** 2.31
INSTALLER - SIDING
(METAL/ALUMINUM/VINYL)...........$ 14.74 ** 0.00
INSTALLER - SIGN.................$ 15.50 ** 0.00
INSULATOR - BATT.................$ 13.00 ** 0.00
IRONWORKER, REINFORCING..........$ 12.29 ** 0.00
LABORER: Common or General......$ 10.52 ** 0.00
LABORER: Mason Tender - Brick...$ 10.54 ** 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 10.93 ** 0.00
LABORER: Pipelayer..............$ 13.00 ** 0.35
LABORER: Plaster Tender.........$ 12.22 ** 0.00
LABORER: Roof Tearoff...........$ 11.28 ** 0.00
LABORER: Landscape and
Irrigation.......................$ 10.55 ** 0.00
LATHER...........................$ 16.00 ** 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 12.83 ** 0.00
OPERATOR: Bobcat/Skid
Steer/Skid Loader................$ 13.93 ** 0.00
OPERATOR: Bulldozer.............$ 18.29 1.31
OPERATOR: Drill.................$ 15.69 ** 0.50
OPERATOR: Forklift..............$ 13.21 ** 0.81
General Decision Number 00 73 43.10 - 5
OPERATOR: Grader/Blade..........$ 13.03 ** 0.00
OPERATOR: Loader................$ 13.46 ** 0.85
OPERATOR: Mechanic..............$ 17.52 ** 3.33
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 18.44 0.00
OPERATOR: Roller................$ 15.04 ** 0.00
PAINTER (Brush, Roller and
Spray), Excludes Drywall
Finishing/Taping.................$ 13.35 ** 5.10
PAINTER: Drywall
Finishing/Taping Only............$ 14.24 ** 3.83
PIPEFITTER (HVAC Pipe
Installation Only)...............$ 20.45 4.00
PLASTERER........................$ 16.58 ** 0.00
PLUMBER, Excludes HVAC Pipe
Installation.....................$ 22.46 4.06
ROOFER...........................$ 17.19 ** 0.00
SHEET METAL WORKER (HVAC Duct
Installation Only)...............$ 21.13 4.79
SHEET METAL WORKER, Excludes
HVAC Duct Installation...........$ 24.88 5.97
SPRINKLER FITTER (Fire
Sprinklers)......................$ 37.50 0.00
TILE FINISHER....................$ 11.22 ** 0.00
TILE SETTER......................$ 14.25 ** 0.00
TRUCK DRIVER: 1/Single Axle
Truck............................$ 16.00 ** 0.81
TRUCK DRIVER: Dump Truck........$ 12.39 ** 1.18
TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57
TRUCK DRIVER: Semi-Trailer
Truck............................$ 12.50 ** 0.00
General Decision Number 00 73 43.10 - 6
TRUCK DRIVER: Water Truck.......$ 12.00 ** 4.11
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658
($13.30). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
General Decision Number 00 73 43.10 - 7
Union Rate Identifiers
A four-letter identifier beginning with characters other than
""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, General Decision Number 00 73 43.10 - 8
6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
General Decision Number 00 73 43.10 - 9
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
Washington, DC 20210.
END OF GENERAL DECISION
END OF ATTACHMENT
Summary 01 10 00 - 1
SECTION 01 10 00
SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project Information
2. Work covered by Contract Documents
3. Work Contract Method.
4. Work by Owner.
5. Work under separate contracts.
6. Owner furnished products.
7. Access to site; Contractor use of site.
8. Work restrictions.
9. Specification and Drawing conventions.
10. Miscellaneous provisions.
11. Owner occupancy.
1.2 PROJECT INFORMATION
A. Project Information:
1. Project Identification: Collin College McKinney - Metal Building Renovation for Collin County Community College District; 2200 West University Drive, McKinney, Texas 75071.
2. Code Requirements: This project is governed by the Codes as indicated on the Drawings, with local amendments applicable to McKinney, Texas. The Contractor shall comply with all requirements of the Codes and the Local Authority Having Jurisdiction.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. Type of Contract:
1. Single Prime: Project will be constructed under a single prime (lump sum) contract.
2. Project is tax exempt. The Contract will be executed with separate contract sums for materials and services to comply with requirements of 1991 Texas House Bill 11.
3. Contract: Contract form provided by Owner.
Summary 01 10 00 - 2
1.4 WORK CONTRACT METHOD
A. Type of Contract: Single prime contract.
B. Items noted "NIC" (Not in Contract) are provided by Owner.
1.5 WORK BY OWNER OR ALTERNATE CONTRACTS
A. Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the work of this Contract with work performed by Owner.
B. Preceding Work: Owner reserves the right to perform certain construction operations at Project site. Those operations are scheduled to be substantially complete before work under this Contract begins. Cooperate and coordinate fully with the Owner to permit preceding Work to be completed without disruption.
C. Concurrent Work: Owner reserves the right to perform concurrent construction operations and Work at the Project site. Those operations may be conducted simultaneously with Work under this Contract. Cooperate and coordinate fully with the Owner to permit concurrent Work to be completed without disruption.
D. Work under Separate Contracts: Owner reserves the right to award separate contracts for portions of the Work. Cooperate fully with separate contractors so Work under those contracts may be carried out smoothly, without interfering with or delaying Work under this Contract or other contracts. Coordinate the Work of this Contract with Work performed under separate contracts.
E. Purchase (Assign) Contracts: Owner reserves the right to negotiate Purchase contracts with suppliers of material and equipment to be incorporated into the Work. Owner will assign the Purchase contracts to Contractor. Include costs for purchasing, receiving, handling, storage if required, and installation of material and equipment in the Contract Sum unless otherwise indicated.
1. Contractor's responsibilities are same as if Contractor had negotiated Purchase contracts, including responsibility to renegotiate purchase and to execute final purchasing agreements.
1.6 OWNER FURNISHED PRODUCTS
A. Owner furnished items shall be as indicated on the Drawings as Owner Furnished Contractor Installed (OFCI) items.
B. Owner Responsibilities: Owner reserves the right to furnish certain products. The Work includes receiving, unloading, handling, storing, protecting, and installing Owner furnished products and making building services connections.
1. Owner will arrange for and deliver Shop Drawings, Product Data, and Samples to Contractor.
Summary 01 10 00 - 3
2. Owner will arrange and pay for delivery of Owner furnished items according to Contractor's Construction Schedule.
3. Upon delivery, Owner and Contractor will inspect delivered items for damage.
Assist Owner with inspection.
a. If Owner furnished items are damaged, defective, or missing, Owner will arrange for replacement.
4. Owner will arrange for manufacturer's field services and for delivery of manufacturer's warranties to Contractor.
5. Owner will furnish Contractor a potential delivery date for Owner furnished products.
C. Contractor Responsibilities: Using Owner furnished delivery dates, incorporate delivery dates of Owner furnished items in Contractor's Construction Schedule.
1. Review Shop Drawings, Product Data, and Samples and return to Architect noting discrepancies or anticipated problems in use of product.
2. Receive, unload, and store Owner furnished items at site.
3. Upon delivery, inspect delivered items with owner for damage.
4. Protect Owner furnished items from damage during storage and handling, including damage from exposure to the elements.
5. If Owner furnished items are damaged as a result of Contractor's operations, repair or replace items.
6. Install and incorporate Owner furnished items into the Work.
1.7 CONTRACTOR'S USE OF PREMISES AND SITE
A. Unrestricted Use: Contractor shall have complete and exclusive use of immediate premises and site, with all exceptions as agreed to with the Owner. To the extent possible, limit use of site to areas within the Contract limits if so indicated. Do not disturb portions of site beyond areas in which the Work is indicated and protect all items to remain from damage.
1. Driveways, Walkways and Entrances: Keep driveways, loading areas, entrances, fire exits or lanes, or delivery routes serving premises clear and available to Owner, Owner's employees, the public, and emergency vehicles. Do not use these areas for parking or for storage of materials.
a. The Contractor shall protect all driveways, walkways and paving from damage during construction. Any damaged driveways, walkways and entrances shall be repaired by the Contractor at no additional cost to the Owner.
2. Coordinate use of premises under direction of Architect and Owner. Contractor shall be responsible for monitoring use of premises by employees and subcontractors.
Summary 01 10 00 - 4
B. Existing Utility Interruptions: Do not interrupt utilities serving facilities unless permitted under the following conditions and after providing temporary utility services according to requirements indicated:
1. Notify Architect and Owner not less than two days in advance of proposed utility interruptions. Include length of service outages and intended scope of Work in all such notifications.
2. Obtain Owner's written permission before proceeding with utility interruptions.
C. Access routes for delivery of materials and equipment shall be as indicated on drawings by Contractor. Do not use access routes other than those indicated without permission of Owner and Architect.
D. Assume full responsibility for protection and safekeeping of products stored on project site, including but not limited to all salvaged items. Store materials and products in areas indicated for staging and protect from damage.
E. Move stored products, under Contractor's control, which interfere with operations of Owner or as required by Architect. Do not unnecessarily encumber project site with materials and equipment.
F. Store all salvaged items and protect from damage and weather conditions.
G. Staging and material storage shall be limited to areas indicated. Obtain specific permission from Owner for use of other areas for storage and staging.
H. Do not overload existing or new structures with weight that would compromise safety.
Verify design loads for structure if necessary prior to loading structure.
I. Obtain and pay for use of additional secured storage or Work areas needed for operations, material storage for new and salvaged items.
J. Protect existing lawns, landscaping, sidewalks, pavements, curbs, and utilities subject to damage by Work under this Contract. Repair or replace existing Work damaged by Contractor. Replace existing lawns damaged by Contractor's activities with hydromulched lawn seed to provide full stand of replacement grass.
K. Parking areas for Contractor's personnel shall be as indicated by Owner.
1.8 PARTIAL OWNER OCCUPANCY
A. Schedule construction operations for completion of portions of Work for any Owner's occupancy prior to Substantial Completion of entire Work.
B. Contractor agrees to the use and occupancy of portion of Project by Owner prior to Substantial Completion of entire Project, provided Owner:
1. Secures written consent of Contractor except when, in opinion of Architect, Contractor is chargeable with unwarranted delay in final completion of uncompleted items or other Contract requirements.
Summary 01 10 00 - 5
2. Secures endorsement from insurance carrier and consent of surety permitting partial occupancy of Project or use of Project during remaining period of construction.
C. Use and occupancy prior to Substantial Completion of entire Project does not relieve Contractor of responsibility to maintain specified insurance coverage on 100 percent basis for benefit of Owner, Contractor and subcontractors until Project is complete and accepted by Owner.
D. After Owner occupancy, allow following:
1. Access for Owner's personnel.
2. Operation of heating, ventilating, air-conditioning, and electrical systems.
E. During partial occupancy, mutually acceptable arrangements shall be negotiated between Owner and Contractor regarding warranties and insurance requirements respecting portion of Work affected by partial occupancy and regarding operation and cost of building services so that costs attributable to partial occupancy shall be borne by Owner and costs attributable to performance of Work shall be borne by Contractor.
F. Prior to occupancy, execute Certificate of Substantial Completion, designating areas to be occupied by Owner.
1.9 WORK SEQUENCE
A. Construct Work in phases to accommodate Work to be completed on schedule and as agree with Owner; coordinate construction schedule and operations with Owner's representative.
B. Construct Work to minimize public inconvenience. Do not close off public use travel paths until completion of one stage of construction will provide alternative usage.
C. Owner may require certain Work to be performed after normal Working hours or on holidays or weekends. Negotiate all such Work with Owner prior to final Agreement.
1.10 WORK RESTRICTIONS
A. Work Restrictions: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 6:00 p.m., Monday through Friday, unless otherwise indicated or required by the Authority Having Jurisdiction.
1. Weekend Hours: As permitted by Owner written authorization and in compliance with Local Ordinances.
2. Early Morning Hours: Comply with time restrictions set forth by the Local Authority Having Jurisdiction for restrictions.
Summary 01 10 00 - 6
3. Hours for Utility Shutdowns: Only during hours agreed to in writing by the Owner 2 weeks in advance.
4. Hours for Core Drilling or other noisy activity: During times unrestricted by the Owner and in accordance with Local Ordinances.
C. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes.
D. Restricted Substances and Firearms: Use of tobacco products and other controlled substances and firearms on Project site is not permitted.
E. Employee Identification: Owner may require identification tags for Contractor personnel Working on site. If so required, insure all personnel onsite use identification tags at all times.
F. Comply with all Work Restrictions imposed by the Local Authority.
G. Abide by all road cleaning and other requirements imposed by the Local Authority.
1.11 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of the specification sections.
C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations and scheduled on Drawings.
Summary 01 10 00 - 7
PART 2 - PRODUCTS
2.1 HAZARDOUS MATERIALS - ASBESTOS
A. Owner requires that products and materials used meet the following requirements:
1. Contain not more than 1.0% of any kind or combination of asbestos, as determined by the Environmental Protection Agency (EPA) recommended test methods as listed in EPA/600R-93/116 July 1993 “Method for the Determination of Asbestos in Bulk Building Materials." This means one material component or a structure or layer of a material sample. Composite sample analysis is not allowed.
B. Contractor, by executing this Contract, accepts responsibility for prohibiting materials or products containing asbestos from being used on this Project.
C. Should Contractor furnish, use, or install products or materials containing asbestos, knowingly or otherwise, he has not met the requirements of this Contract.
D. Asbestos Survey: Provide an asbestos survey, meeting the same criteria as required for new building permits, by an inspector licensed by the State of Texas.
1. Preliminary Survey: Contractor shall submit preliminary survey of materials installed at time of Substantial Completion with request for Substantial Completion to the Architect.
2. Final Survey: Contractor shall submit revised survey reflecting materials install after Substantial Completion to the Architect for transmittal to the Owner prior to release of Retainage.
2.2 HAZARDOUS MATERIALS – MOLD
A. If mold is present on the inside of the building; determine source of moisture and correct prior to performing the following:
1. Nonporous Surfaces: Mold growing on steel, aluminum or other nonporous materials may be cleaned using methods recommended by an Environmental Inspector licensed by the State of Texas.
2. Porous Surfaces: Entire mold contaminated surface must be removed and disposed of using methods recommended by an Environmental Inspector licensed by the State of Texas.
3. Following elimination of mold provide a report prepared by an Environmental Inspector licensed by the State of Texas that the building is free from mold contamination.
PART 3 - EXECUTION
Not used.
END OF SECTION
Alternates 01 23 00 - 1
SECTION 01 23 00
ALTERNATES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.2 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if the Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described are part of the work only if enumerated in the Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the
Contract Sum to incorporate alternates into the work. No other adjustments are made to the Contract Sum.
1.3 PROCEDURES
A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
B. Execute accepted alternates under the same conditions as other work of the Contract.
C. Schedule: A schedule of alternates is included. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
PART 2 - PRODUCTS
Alternates 01 23 00 - 2
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. Alternate No. 01: Exterior Insulation and Finish System:
1. Base Bid: Exterior walls constructed of insulated metal panels as specified in Section 07 42 13.19 “Insulated Metal Wall Panels.”
2. Alternate: Exterior walls constructed with exterior insulation finish system as specified in Section 07 24 19 “Water-Drainage Exterior Insulation and Finish System (EIFS)” and as noted on Drawings.
Substitution Procedures 01 25 00 - 1
SECTION 01 25 00
SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Administrative and procedural requirements for substitutions.
1.2 DEFINITIONS
A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.
2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required in order to meet Project requirements but may offer advantage to Contractor or Owner.
B. Comparable Products: Products demonstrated and approved through the product substitution process to have similar qualities related to type, function, dimension, in service performance, physical properties, appearance, and characteristics equivalent to or exceeding those of the specified product and incorporated into the Contract Documents.
C. Substitutions submitted and accepted prior to the award of the Contract for Construction are deemed part of the Contract Documents and are not subject to substitution requirements.
1.3 ACTION SUBMITTALS
A. Substitution Requests: Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Identify the Specification Section number and title and Drawing numbers and titles.
1. Substitution Request Form: Use facsimile of form provided in Form 01 25 00.10 "Substitution Request Form."
2. Documentation: Demonstrate compliance with requirements for substitutions and the following, as applicable:
a. Statement indicating the reason the specified product, fabrication, or installation method cannot be provided, if applicable.
b. Coordination of information, including a list of changes or revisions needed to other parts of the work and to construction performed by Owner and
Substitution Procedures 01 25 00 - 2 separate contractors that will be necessary to accommodate proposed substitution.
c. Detailed comparison of significant qualities of proposed substitutions with those of the work specified. Include annotated copy of applicable Specification Section. Significant qualities may include attributes, such as performance, physical characteristics, weight, size, durability, visual effect, noise levels, color and texture, vibration generation, interchangeability of parts or components, maintenance, compatibility with other materials, products, assemblies and components, equipment capacities and performance characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the work specified.
d. Product Data, including drawings and descriptions of products and fabrication and installation procedures. Mark cut sheet to indicate specific model or product.
e. Samples, where applicable or requested.
f. Certificates and manufacturer/installer/fabricator qualification data, where applicable.
g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.
h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.
i. Research reports evidencing compliance with building code in effect for
Project, from ICC-ES and local regulations.
j. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.
k. Cost information, including a proposal of change, if any, in the Contract Sum.
l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.
m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
3. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. Architect will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.
a. Form of Acceptance During Bidding: Addenda.
b. Form of Rejection During Bid Period: No response.
c. Forms of Acceptance During Construction: Change Order, Construction
Change Directive, or Architect's Supplemental Instructions for minor changes in the work.
Substitution Procedures 01 25 00 - 3
d. Form of Rejection During Construction: Written rejection on Substitution Request Form.
4. No response will be given for substitutions submitted by individual subcontractors or material suppliers.
5. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.
B. Substitution requests are not allowed when disguised as a submittal. Request substitutions in accordance with substitution procedures. Substitutions submitted as a Submittal will be returned without review or comment.
1. Contractor assumes full and complete responsibility for installing substitutions that have not been formally submitted and approved by the Architect.
1.4 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.
1.5 COORDINATION
A. Revise or adjust affected work necessary to integrate work of the approved substitutions.
1.6 PRODUCT SUBSTITUTIONS
A. Conditions for Consideration: Substitution requests will be considered when the request is submitted in writing on the Request for Substitution form by the Contractor.
B. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.
1. Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution is consistent with the Contract Documents and will produce indicated results.
b. Substitution request is fully documented and properly submitted.
c. Requested substitution will not adversely affect Contractor's construction schedule.
d. Requested substitution has the necessary approvals of authorities having jurisdiction.
e. Requested substitution is compatible with other portions of the work.
Substitution Procedures 01 25 00 - 4
f. Requested substitution has been coordinated with other portions of the work.
g. Requested substitution provides specified warranty.
1) A warranty based on the same warranty period only is not considered equivalent to the specified warranty.
h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the work, is uniform and consistent, is compatible with other products, and is acceptable to each contractor involved.
C. Substitutions for Convenience: Architect will consider requests for substitution if received within 60 days after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of Architect.
1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution offers Owner a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Owner must assume.
1) Additional…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .