Coldwater WC HMA Sch A.docx

DOCX document 66 KB Posted

Attached to
PRE QUALIFIED MAINTENANCE-Coldwater Welcome Center-HMA-I-69
Solicitation number
RFP 591 210000002385 1
Issued by
Bay County, Clifford Village, Michigan

About this file

This is a Schedule A Statement of Work document from the Michigan Department of Transportation (MDOT) for Request for Proposal No. 210000002385, concerning Hot Mix Asphalt (HMA) single course mill and fill services at the Coldwater Welcome Center. The project scope includes a 1.5-inch mill and overlay on the I-69 exit ramp to the Coldwater Welcome Center, the entrance ramp from the parking lots to the pavement change, and the Welcome Center car and truck parking lots. Additional work includes inlet protection, maintenance of traffic, and pavement markings. All contract activities must be completed between September 27, 2021 and October 29, 2021, with work to be completed within three consecutive days of the start date following engineer approval. The contractor must submit a progress schedule to Greg Finnila, P.E. prior to beginning work. Work shall be conducted in accordance with the Michigan Department of Transportation 2020 Standard Specifications for Construction and the Michigan Manual of Uniform Traffic Control Devices.

Pricing for the contract is firm for the entire contract period and includes mobilization, equipment, labor, cold milling, HMA, and all incidentals associated with the work. The contractor must appoint a dedicated Contractor Representative for State of Michigan accounts and disclose any subcontractors, including their legal business names, addresses, telephone numbers, service descriptions, and pricing. The contractor must provide lien and performance bonds subject to MDOT Construction Section review and approval. Liquidated damages of $800 per day apply for late or improper completion. All invoices must be submitted to Robin Lester at lesterr@michigan.gov with a copy to Greg Finnila at finnilag@michigan.gov and must include date, purchase order number, quantity, description, unit price, shipping costs, vendor invoice number, and total price. The contractor must also comply with hazardous chemical identification requirements under federal law and disclose any products containing mercury or brominated flame retardants.

View the file

Other files

File Type Posted
standard_contract_terms.docx DOCX document
Coldwater WC HMA PI.CT.VQ.docx DOCX document
Coldwater WC HMA Sch B.docx DOCX document
07072021-RQN 21-3253-213036_Proposal.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement

Contractor must enter company name here.

Michigan.gov/MiProcurement

SCHEDULE A – STATEMENT OF WORK CONTRACT ACTIVITIES

HMA Single Course Mill and Fill of Coldwater Welcome Center Parking Lots and Ramps

Request for Proposal No. 210000002385

HMA Single Course Mill and Fill of Coldwater Welcome Center Parking Lots and Ramps This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

SCOPE

Hot Mix Asphalt (HMA) 1.5-inch mill and overlay on the I-69 exit ramp to the Coldwater Welcome Center from the pavement change near the 22’ point to the parking lots (also included), the Coldwater Welcome Center entrance ramp from the parking lots (also included) to the pavement change near the 22’ point of the I-69 and the Coldwater Welcome Center Car and Truck Parking Lots (See 213036_Proposal.pdf LOG OF PROJECT). Inlet protection, maintenance of traffic, and pavement markings will also be provided by the Contractor.

REQUIREMENTS

1. General Requirements All the work shall be done in accordance with regulations governing the state agency wherein the work is to be performed and with minimum possible interference with the daily, proper and continued functioning of the activities of the state agency. In the case of inclement weather and/or hazardous road conditions, the Contractor may not be allowed to work along the roadway. It shall be up to the discretion of the MDOT Program Manager whether to allow the Contractor to work in that area under such conditions.

All work shall be conducted in accordance with the Michigan Department of Transportation 2020 Standard Specifications for Construction and other special provisions and attachments contained within this RFP.

1.1. Work Specifications – Please refer to the Log of Project The Contractor shall provide all personnel, equipment, tools, supplies/materials, supervision, training and other items and services necessary to provide the deliverables/service as described within Schedule A.

1.2. Contract Schedule

All Contract Activities must be completed by October 29, 2021. Reference 213036_Proposal.pdf, page 1 Progress Clause.

1.3. Maintaining Traffic

The Contractor will be responsible for maintaining traffic.

Traffic shall be maintained in accordance with the current Standard Specifications for Construction and the current edition of the Michigan Manual of Uniform Traffic Control Devices (MMUTCD) and the current Maintenance Work Zone Traffic Control Guidelines.

The Contractors shall furnish and place, all necessary warning, and directional devices to maintain traffic. This includes signs, sign sheeting, sign covers and channelizing devices. All work shall be performed with the flow of traffic.

Reference 213036_Proposal.pdf, pages 2 to 33 SPECIAL PROVISION FOR MAINTAINING TRAFFIC.

MDOT will not be responsible for any citations, fines or tickets received, while performing Contract activities.

1.4. Quality Assurance Program

Upon delivery of Hot Mix Asphalt (HMA) if material does not meet stated specification, MDOT has the right to refuse the product and expect a new batch of HMA at that time.

Reference 213036_Proposal.pdf for mix specifications.

1.5. Meetings

The State may request other meetings as it deems appropriate.

1.6. Service Levels/Time Frames

All Contract Activities must be completed no earlier than September 27, 2021 through October 29, 2021 from receipt of order. All work must be completed within three consecutive days of start date after approval from engineer. Progress schedule must be submitted to Greg Finnila, P.E. (269-789-0560) prior to beginning work. The receipt of order date is pursuant to the Notices section of the Standard Contract Terms.

☐
I have reviewed the above requirements and agree with no exception.
☐
I have reviewed the above requirements and have noted all exception(s) below.

List all exception(s):

2. Staffing

2.1. Contractor Representative

The Contractor must appoint one individual, specifically assigned to State of Michigan accounts, that will respond to State inquiries regarding the Contract Activities, answering questions related to the work, etc. (the “Contractor Representative”).

The Contractor must notify the Contract Administrator at least 7 calendar days before removing or assigning a new Contractor Representative.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List Contract Representative Contact Information:

2.2. Disclosure of Subcontractors

If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:

· The legal business name; address; telephone number; a description of subcontractor’s organization and the services it will provide; and information concerning subcontractor’s ability to provide the Contract Activities.

· The relationship of the subcontractor to the Contractor. Of the total bid, the price of the subcontractor’s work. Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.

· A complete description of the Contract Activities that will be performed or provided by the subcontractor.

Bidder must provide detailed information as requested in the requirement(s):

The legal business name, address, telephone number of the subcontractor(s):

A description of subcontractor’s organization and the services it will provide and information concerning subcontractor’s ability to provide the Contract Activities:

The relationship of the subcontractor to the Bidder:

Whether the Bidder has a previous working experience with the subcontractor.

If yes, provide the details of that previous relationship:

A complete description of the Contract Activities that will be performed or provided by the subcontractor:

Of the total bid, the price of the subcontractor’s work:

3. Pricing

3.1. Price Term

Pricing is firm for the entire length of the Contract.

Bid price includes: mobilization, equipment, labor, cold milling, HMA and all other incidentals associated with the work. See the Log in 213036_Proposal.pdf, pages 84 to 90 for items of work.

☐
I have reviewed the above requirements and agree with no exception.
☐
I have reviewed the above requirements and have noted all exception(s) below.

List all exception(s):

4. Acceptance

4.1. Final Acceptance

All work will be visually inspected and approved by MDOT staff if acceptable prior to demobilizing from the site.

☐
I have reviewed the above requirements and agree with no exception.
☐
I have reviewed the above requirements and have noted all exception(s) below.

List all exception(s):

5. Ordering

5.1. Authorizing Document

The appropriate authorizing document for the Contract will be a purchase order.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

6. Invoice and Payment

6.1. Invoice Requirements

All invoices submitted to the State must include: (a) date; (b) purchase order; (c) quantity; (d) description of the Contract Activities; (e) unit price; (f) shipping cost (if any); (g) vendor-generated invoice number and (h) total price. Invoices are to be Emailed as an attachment directly to: Robin Lester at lesterr@michigan.gov and copy Greg Finnila finnilag@michigan.gov.

☐
I have reviewed the above requirements and agree with no exception.
☐
I have reviewed the above requirements and have noted all exception(s) below.

List all exception(s):

7. Liquidated Damages Late or improper completion of the Contract Activities will cause loss and damage to the State and it would be impracticable and extremely difficult to fix the actual damage sustained by the State. Therefore, if there is late or improper completion of the Contract Activities the State is entitled to collect liquidated damages in the amount of $800 per day for each day Contractor fails to remedy the late or improper completion of the Work.

☐
I have reviewed the above requirements and agree with no exception.
☐
I have reviewed the above requirements and have noted all exception(s) below.

List all exception(s):

8. Bonds. Contractor must provide lien and performance bonds for each project. Creation and acceptance of bonds will be subject to review and approval by the MDOT, Construction Section.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

9. Additional Requirements

9.1. Hazardous Chemical Identification

In accordance with the federal Emergency Planning and Community Right-to-Know Act, 42 USC 11001, et seq., as amended, the Contractor must provide a Material Safety Data Sheet listing any hazardous chemicals as defined in 40 CFR §370.2, to be delivered. Each hazardous chemical must be properly identified, including any applicable identification number, such as a National Stock Number or Special Item Number.

The Contractor must identify any hazardous chemicals that will be provided under any resulting contract.

9.2. Mercury Content

Pursuant to MCL 18.1261d, mercury-free products must be procured when possible. The Contractor must explain if it intends to provide products containing mercury, the amount or concentration of mercury, and whether cost competitive alternatives exist. If a cost competitive alternative does exist, the Contractor must provide justification as to why the particular product is essential. All products containing mercury must be labeled as containing mercury.

9.3. Brominated Flame Retardants

The State prefers to purchase products that do not contain brominated flame retardants (BFRs) whenever possible. The Contractor must disclose whether the products contain BFRs and describe how the products are identified or otherwise labelled.

☐
I have reviewed the above requirements and agree with no exception.
☐
I have reviewed the above requirements and have noted all exception(s) below.

List all exception(s):

Version 4 (10/2020) 2

Version 2021-1 Page 2 of 2 image1.png