COL26011-WPHSBIDB_vol3.pdf

PDF 7 MB Posted

Attached to
William Penn High Bid Pack B State and local contract opportunity
Solicitation number
COL26011-WPHSBIDB
Issued by
New Castle County, Delaware

About this file

This document is a Project Manual Volume 3 for William Penn High School Athletic Fields Athletic Field Improvement and Buildings project, issued by the Christina School District (CSD) in New Castle, Delaware. The project involves fire protection system installation and piping work as Bid Package B for Athletic Field Improvements. The specifications detail comprehensive requirements for fire suppression systems, including wet pipe and dry pipe systems, sprinkler head installation, alarm devices, and all associated piping, fittings, and valves. The work encompasses common fire protection requirements, fire suppression system piping installation, and water-based sprinkler system components throughout the facility. The contractor must obtain all necessary permits and pay associated fees, coordinate work with existing utilities and building systems, and comply with Delaware State Fire Prevention Regulations and NFPA standards. The project manual was issued for bid on October 13, 2026, with the contract number 4-27-03, prepared by Becker Morgan Group as the architect and EDiS Company, Inc. as the project management entity.

The specifications require the contractor to perform hydrant flow testing at the project site, submit detailed shop drawings and hydraulic calculations with a 10 psig safety factor to the State Fire Marshal for approval prior to construction, and provide all labor, materials, equipment, and supervision necessary for complete installation. Water supply parameters for hydraulic calculations assume static pressure of 46 psig, residual pressure of 44 psig, and flow of 1,130 gpm, with an assumed C factor of 100 for exterior piping roughness. The contractor must provide three years of comparable project references, maintain an experienced project manager on-site with minimum 10 years of experience, and deliver comprehensive Operations and Maintenance Manuals including three hardcopies and one electronic copy in searchable PDF format. A two-year warranty period from final acceptance is required, and the contractor must demonstrate all fire protection equipment sequences of operation in the presence of the Owner's representative and Fire Marshal. All work must comply with NFPA-13, NFPA-70, NFPA-72E, and NFPA-101 standards, with equipment and devices requiring UL listing or FM approval.

View the file

Other files for this state and local contract opportunity

Other files attached to William Penn High Bid Pack B, newest first.
File Type Posted
COL26011-WPHSBIDB_vol2.pdf PDF
COL26011-WPHSBIDB_pw.pdf PDF
COL26011-WPHSBIDB_vol1.pdf PDF
COL26011-WPHSBIDB_itb.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

William Penn High School Athletic Fields

Athletic Field Improvement and

Buildings

713 E Basin Rd

New Castle, DE 19720

Bid Package B Project Manual Volume 3 of 3

ARCHITECT

Becker Morgan Group 309 South Governors Avenue

Dover, Delaware 19904

EDiS Company, Inc.

110 S. Poplar Street

Suite 400

Wilmington, DE 19801

Issued for Bid

October 13th, 2026

CSD William Penn High School Contract #4-27-03 Bid Pack B - Athletic Field Improvements August 31, 2026

Becker Morgan Group, Inc. Common Work Results for Fire Protection

2025040.00 210500 - 1

SECTION 210500

COMMON WORK RESULTS FOR FIRE PROTECTION

PART 1 GENERAL

1.01 SUMMARY

A. All work under Division 21 is subject to the Division 01, General Conditions and Special Requirements for the entire contract.

B. Provide all labor, materials, equipment, and services necessary for and incidental to the complete installation and operation of all mechanical work.

C. Unless otherwise specified, all submissions shall be made to, and acceptances and approvals made by the Architect.

D. Contract Drawings are generally diagrammatic and all offsets, fittings, transitions and accessories are not necessarily shown. Furnish and install all such items as may be required to fit the work to the conditions encountered. Arrange piping, equipment, and other work generally as shown on the contract drawings, providing proper clearance and access. Where departures are proposed because of field conditions or other causes, prepare and submit detailed shop drawings for approval in accordance with Submittals specified below. The right is reserved to make reasonable changes in location of equipment, and piping up to the time of rough-in or fabrication.

E. Conform to the requirements of all rules, regulations and codes of local, state and federal authorities having jurisdiction.

F. Coordinate the work under Division 21 with the work of all other construction trades.

G. Be responsible for all construction means, methods, techniques, procedures, and phasing sequences used in the work. Furnish all tools, equipment and materials necessary to properly perform the work in first class, substantial, and workmanlike manner, in accordance with the full intent and meaning of the contract documents.

1.02 PERMITS AND FEES

A. Obtain all permits and pay taxes, fees and other costs in connection with the work. File necessary plans, prepare documents, give proper notices and obtain necessary approvals.

Deliver inspection and approval certificates to Owner prior to final acceptance of the work.

B. Permits and fees shall comply with the Division 01, General Requirements of the specification.

1.03 EXAMINATION OF SITE

A. Examine the site, determine all conditions and circumstances under which the work must be done, and make all necessary allowances for same. No additional cost to the Owner will be permitted for Contractors failure to do so.

B. Examine and verify specific conditions described in individual specifications sections.

C. Verify that utility services are available, of the correct characteristics, and in the correct locations.

Contract #4-27-03 CSD William Penn High School August 31, 2026 Bid Pack B - Athletic Field Improvements

Common Work Results for Fire Protection Becker Morgan Group, Inc.

210500 - 2 2025040.00

1.04 CONTRACTOR QUALIFICATION

A. Any Contractor or Subcontractor performing work under Division 21 shall be fully qualified and acceptable to the Architect and Owner. Submit the following evidence when requested:

1. A list of not less than five comparable projects which the Contractor completed.

2. Letter of reference from not less than three registered professional engineers, general contractors or building owners.

3. Local and/or State License, where required.

4. Membership in trade or professional organizations where required.

B. A Contractor is any individual, partnership, or corporation, performing work by contract or subcontract on this project.

C. Acceptance of a Contractor or Subcontractor will not relieve the Contractor or subcontractor of any contractual requirements or his responsibility to supervise and coordinate the work, of various trades.

1.05 MATERIALS AND EQUIPMENT

A. Materials and equipment installed as a permanent part of the project shall be new, unless otherwise indicated or specified, and of the specified type and quality.

B. Where material or equipment is identified by proprietary name, model number and/or manufacturer, furnish named item, or its equal, subject to approval by Engineer.

Substituted items shall be equal or better in quality and performance and must be suitable for available space, required arrangement, and application. Submit all data necessary to determine suitability of substituted items, for approval.

C. The suitability of named item only has been verified. Where more than one item is named, only the first named item has been verified as suitable. Substituted items, including items other than first named shall be equal or better in quality and performance to that of specified items, and must be suitable for available space, required arrangement and application.

Contractor, by providing other than the first named manufacturer, assumes responsibility for all necessary adjustments and modifications necessary for a satisfactory installation.

Adjustments and modifications shall include but not be limited to electrical, structural, support, and architectural work.

D. Substitution will not be permitted for specified items of material or equipment where noted.

E. All items of equipment furnished shall have a service record of at least five (5) years.

1.06 FIRE SAFE MATERIALS

A. Unless otherwise indicated, materials and equipment shall conform to UL, NFPA and ASTM standards for fire safety with smoke and fire hazard rating not exceeding flame spread of 25 and smoke developed of 50.

1.07 REFERENCED STANDARDS, CODES AND SPECIFICATIONS

A. Specifications, Codes and Standards listed below are included as part of this specification,

2025040.00 210500 - 3 latest edition.

B. ASTM - American Society for Testing and Materials

C. FM - Factory Mutual

D. IBC - International Building Code

E. IEEE - Institute of Electrical and Electronics Engineers

F. MSSP - Manufacturers Standards Society of the Valve and Fittings Industry

G. NEC - National Electrical Code

H. NEMA - National Electrical Manufacturers Association

I. NFPA - National Fire Protection Association

J. UL - Underwriters' Laboratories

K. State of Delaware Fire Protection Requirements.

L. All equipment materials, piping and installation shall comply with the codes and standards listed in the enforceable edition of the Applicable National Fire Protection Association Pamphlets.

M. Fire Protection Systems design, equipment and installation shall comply with the Delaware State Fire Prevention Regulations, latest edition including all Annexes and Addendums.

1.08 SUBMITTALS, REVIEW AND ACCEPTANCE

A. Equipment, materials, installation, workmanship and arrangement of work are subject to review and acceptance. No substitution will be permitted after acceptance of equipment or materials except where such substitution is considered by the Architect to be in best interest of Owner.

B. After acceptance of Material and Equipment List, submit three (3) copies or more as required under General Conditions of complete descriptive data for all items. Data shall consist of specifications, data sheets, samples, capacity ratings, performance curves, operating characteristics, catalog cuts, dimensional drawings, wiring diagrams, installation instructions, and any other information necessary to indicate complete compliance with Contract Documents. Edit submittal data specifically for application to this project.

C. Thoroughly review and stamp all submittals to indicate compliance with contract requirements prior to submission. Coordinate installation requirements and any electrical requirements for equipment submitted. Contractor shall be responsible for correctness of all submittals.

D. Submittals will be reviewed for general compliance with design concept in accordance with contract documents, but dimensions, quantities, or other details will not be verified.

E. Identify submittals, indicating intended application, location and service of submitted items.

Refer to specification sections or paragraphs and drawings where applicable. Clearly indicate exact type, model number, style, size and special features of proposed item.

Common Work Results for Fire Protection Becker Morgan Group, Inc.

210500 - 4 2025040.00

Submittals of a general nature will not be acceptable. For substituted items, clearly list on the first page of the submittal all differences between the specified item and the proposed item. The contractor shall be responsible for corrective action and maintaining the specification requirements if differences have not been clearly indicated in the submittal.

F. Submit actual operating conditions or characteristics for all equipment where required capacities are indicated. Factory order forms showing only required capacities will not be acceptable. Call attention, in writing, to deviation from contract requirements.

G. Acceptance will not constitute waiver of contract requirements unless deviations are specifically indicated and clearly noted. Use only final or corrected submittals and data prior to fabrication and/or installation.

H. For any submittal requiring more than two (2) reviews by the Engineer (including those caused by a change in subcontractor or supplier) the Owner will withhold contractor's funds by a change order to the contract to cover the cost of additional reviews. One review is counted for each action including rejection or return of any reason.

I. For resubmissions, the Contractor must address in writing all of the Engineer’s comments on the original submission to verify compliance.

1.09 SHOP DRAWINGS

A. Prepare and submit shop drawings for all mechanical equipment, specially fabricated items, modifications to standard items, specially designed systems where detailed design is not shown on the contract drawings, or where the proposed installation differs from that shown on contract drawings.

B. Submit data and shop drawings including but not limited to the list below, in addition to provisions of the paragraph above. Identify all shop drawings by the name of the item and system and the applicable specification paragraph number and drawing number.

C. Every submittal including, but not limited to the list below, shall be forwarded with its own transmittal as a separate, distinct shop drawing. Grouping of items/systems that are not related shall be unacceptable.

D. Items and Systems

1. Access Doors/Panels including layout and location

2. Alarm Check Valves

3. Backflow Preventers

4. Blind Flange

5. Coordinated Drawings

6. Drip Pans

7. Exterior Equipment/Piping Supports

8. Fire Protection System including Hydraulic Calculations, Equipment and Devices

9. Fire Stopping - Methods and Materials

2025040.00 210500 - 5

10. Fire Department Connection.

11. Gongs

12. Identification System

13. Material and Equipment List

14. Operations and Maintenance Manuals

15. Pipe Materials Including Itemized Schedule

16. Preliminary and Final Pipe Pressure Tests

17. Pressure Gauges

18. Pressure Relief Valves

19. Sprinkler Heads

20. Strainers

21. Test Certificates

22. Valves

23. Vibration Isolation Materials

24. Weatherproof Assembly Components

25. Wiring Diagrams, Flow Diagrams and Operating Instructions

26. Zone Valve Assemblies and Wire Mesh Enclosures

E. Contractor, additionally, shall submit for review any other shop drawings as required by the Architect. No item shall be delivered to the site, or installed, until the Contractor has received a submittal from the Engineer marked Reviewed or Comments Noted. After the proposed materials have been reviewed, no substitution will be permitted except where approved by the Architect.

F. For any shop drawing requiring more than two (2) reviews by the Engineer (including those caused by a change in subcontractor or supplier) the Owner will withhold contractor's funds by a change order to the contract to cover the cost of additional reviews. One review is counted for each action including rejection or return of any reason.

1.10 SUPERVISION AND COORDINATION

A. Provide complete supervision, direction, scheduling, and coordination of all work under the Contract, including that of subcontractors.

B. Coordinate rough-in of all work and installation of sleeves, anchors, and supports for piping, equipment, and other work performed under Division 21.

C. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction to allow for fire protection installations.

Common Work Results for Fire Protection Becker Morgan Group, Inc.

210500 - 6 2025040.00

D. Coordinate electrical work required under Division 21 with that under Division 26.

Coordinate all work under Division 21 with work under all other Divisions.

E. Supply services of an experienced (10 years minimum) and competent Project Manager to be in constant charge of work at site.

F. Where a discrepancy exists within the specifications or drawings or between the specifications and drawings, the more stringent (or costly) requirement shall apply until clarification can be obtained from the Engineer. Failure to clarify such discrepancies with the Engineer will not relieve the Contractor of the responsibility of conforming to the requirements of the Contract.

G. Failure of contractor to obtain a full and complete set of contract documents (either before or after bidding) will not relieve the contractor of the responsibility of complying with the intent of the contract documents.

1.11 CUTTING AND PATCHING

A. Accomplish all cutting and patching necessary for the installation of work under Division

21. Damage resulting from this work to other work already in place, shall be repaired at Contractor's expense. Where cutting is required, perform work in neat and workmanlike manner. Restore disturbed work to match and blend with existing construction and finish, using materials compatible with the original. Use mechanics skilled in the particular trades required.

B. Do not cut structural members without approval from the Architect or Structural Engineer.

1.12 PENETRATION OF WATERPROOF CONSTRUCTION

A. Coordinate the work to minimize penetration of waterproof construction, including roofs, exterior walls, and interior waterproof construction. Where such penetrations are necessary, furnish and install all necessary curbs, sleeves, flashings, fittings and caulking to make penetrations absolutely watertight.

B. Where pipes penetrate roofs, flash pipe with Stoneman Stormtite, Pate or approved equal, roof flashing assemblies with skirt and caulked counter flashing sleeve.

C. Furnish and install pitch pockets or weather tight curb assemblies where required.

D. Furnish and install curbs, specifically designed for application to the particular roof construction, and install in accordance with the manufacturer's instructions. The Contractor shall be responsible for sleeve sizes and locations. All roof penetrations shall be installed in accordance with manufacturer’s instructions, the National Roofing Contractors Association, SMACNA, and as required by other divisions of these specifications.

1.13 EXCAVATION AND BACKFILLING

A. General

1. Perform all necessary excavation, or installation of work under Division 21, in whatever materials or conditions encountered, using suitable methods and equipment.

2. Accurately establish required lines and grades and properly locate the work.

2025040.00 210500 - 7

3. Determine the locations of all existing utilities before commencing the work.

B. Excavation: (Refer also to other portions of the specifications)

1. Excavate only the required elevations. If excavation is carried below the foundation lines or other required limits, backfill the excess with concrete.

2. Keep banks of trenches as nearly vertical as possible, and provide sheeting and/or shoring as required for protection of work and safety of personnel. Follow local, State, and OSHA Guidelines.

3. Keep excavations dry. Protect excavations from freezing.

C. Backfilling: (Refer also to other portions of the specifications)

1. Backfill excavations to the required elevations and restore surfaces to their original or required conditions.

2. Backfill shall be similar material, free from objectionable matter such as rubbish, roots, stumps, brush, rocks and other sharp objects. Unless otherwise indicated, suitable material from the excavation may be used for backfill.

3. Carefully place and mechanically tamp backfill in layers not exceeding 12 inches loose thickness. Compact to 95 percent minimum.

4. Do not backfill against frozen material. Do not use frozen material for backfill.

1.14 ALTERNATES

A. Refer to Division 01 Section, “Alternates” for description of work under this section affected by alternates

1.15 DEFINITIONS

A. Approve - to permit use of material, equipment or methods conditional upon compliance with contract documents requirements.

B. Furnish and install or provide means to supply, erect, install, and connect to complete for readiness for regular operation, the particular work referred to.

C. Contractor means the mechanical contractor and any of his subcontractors, vendors, suppliers, or fabricators.

D. Piping includes pipe, all fittings, valves, hangers, insulation, identification, and other accessories relative to such piping.

E. Concealed means hidden from sight in chases, formed spaces, shafts, hung ceilings, or embedded in construction.

F. Exposed means not installed underground or concealed as defined above.

G. Invert Elevation means the elevation of the inside bottom of pipe.

H. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above

Common Work Results for Fire Protection Becker Morgan Group, Inc.

210500 - 8 2025040.00 ceiling, unexcavated spaces, crawl spaces, and tunnels.

I. Review - limited observation or checking to ascertain general conformance with design concept of the work and with information given in contract documents. Such action does not constitute a waiver or alteration of the contract requirements.

J. Building Line: Exterior wall of building.

PART 2 ELECTRICAL REQUIREMENTS

2.01 GENERAL MOTOR AND ELECTRICAL REQUIREMENTS

A. Furnish and install control and interlock wiring for the equipment furnished. In general, power wiring and motor starting equipment will be provided under Division 26. Carefully review the contract documents to coordinate the electrical work under Division 21 with the work under Division 26. Where the electrical requirements of the equipment furnished differ from the provisions made under Division 26, make the necessary allowances under Division 21. Where no electrical provisions are made under Division 26, include all necessary electrical work under Division 21.

B. All electrical work performed under Division 21 shall conform to the applicable requirements of Division 26 and conforming to the National Electrical Code. All wiring, conduit, etc., installed in ceiling plenums must be plenum rated per NFPA and the IBC.

C. Provide wiring diagrams with electrical characteristics and connection requirements.

D. Test Reports: Indicate test results verifying nominal efficiency and power factor for three phase motors larger than five (5) horsepower.

E. Protect motors stored on site from weather and moisture by maintaining factory covers and suitable weatherproof covering. For extended outdoor storage, remove motors from equipment and store separately.

F. All motors shall be furnished with visible nameplate indicating motor horsepower, voltage, phase, cycles, RPM, full load amps, locked rotor amps, frame size, manufacturer’s name and model number, service factor, power factor and efficiency.

G. Nominal efficiency and power factor shall be as scheduled at full load and rated voltage when tested in accordance with IEEE 112.

H. Brake horsepower load requirement at specified duty shall not exceed 85 percent of nameplate horsepower times NEMA service factor for motors with 1.0 and 1.15 service factors.

I. All single phase motors shall be provided with thermal protection: Internal protection shall automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature ratings of motor insulation. Thermal protection device shall automatically reset when motor temperature returns to normal range, unless otherwise indicated.

J. Where equipment under this Division is specified with integral disconnecting means, the same shall be a single disconnecting means for disconnecting all ungrounded main power supply conductors that is capable of being locked in the open (“off”) position in accordance with the National Electrical Code and the local electrical inspector.

2025040.00 210500 - 9

2.02 WIRING DIAGRAMS

A. The Contractor is responsible for obtaining and submitting wiring diagrams for all major items of equipment.

B. Wiring diagrams shall be provided with shop drawings for all equipment requiring electric power.

2.03 ENCLOSURES

A. Electrical enclosures including factory provided enclosures, field provided and installed enclosures, and automatic temperature control system enclosures shall be as follows:

1. Dry Interior Locations: NEMA 1.

2. Damp/Wet Locations, Including Exterior Locations: NEMA 3R.

3. Corrosive Locations, Including Chemical Storage Rooms, Janitor’s Closets, and Similar Space = NEMA 4X.

PART 3 EXECUTION

3.01 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS

A. Install equipment to provide maximum possible headroom, if mounting heights are not indicated.

B. Install equipment according to approved submittal data. Portions of the work are shown only in diagrammatic form. Refer conflicts to Architect.

C. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.

D. Install fire protection equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations.

E. Install equipment giving right of way to piping installed at required slope.

F. Do not install equipment or piping over electrical gear, electrical panels, motor controllers, and similar electrical equipment. Install equipment and piping to maintain clear space above and in front of all electrical components per the National Electric Code.

3.02 SUPPORTS, HANGERS AND FOUNDATIONS

A. Provide supports, hangers, braces, attachments and foundations required for the work.

Support and set the work in a thoroughly substantial and workmanlike manner without placing strains on materials, equipment, or building structure, submit shop drawings for approval. Coordinate all work with the requirements of the structural division.

B. Supports, hangers, braces, and attachments shall be standard manufactured items or fabricated structural steel shapes. All interior hangers shall be galvanized or steel with rust inhibiting paint. For un-insulated copper piping provide copper hanger to prevent contact of dissimilar metals. All exterior hangers shall be stainless steel including hangers, rods, nuts, washers, bolts, etc.

Common Work Results for Fire Protection Becker Morgan Group, Inc.

210500 - 10 2025040.00

3.03 DEMONSTRATION AND TRAINING VIDEO RECORDINGS

A. General: Record demonstration and training video recordings. Record each training module separately.

1. At beginning of each training module, record each chart containing learning objective and lesson outline.

B. Video Recording Format: Provide high-quality color video recordings with menu navigation in format acceptable to Engineer

C. Recording: Mount camera on tripod before starting recording, unless otherwise necessary to show area of demonstration and training. Display continuous running time.

D. Narration: Describe scenes on video recording by audio narration by microphone while video recording is recorded. Include description of items being viewed.

E. Transcript: Provide a transcript of the narration. Display images and running time captured from videotape opposite the corresponding narration segment.

3.04 PROVISIONS FOR ACCESS

A. The contractor shall provide access panels and doors for all concealed equipment, valves, strainers, controls, control devices, and other devices requiring maintenance, service, adjustment, balancing or manual operation.

B. Where access doors are necessary, furnish and install manufactured painted steel door assemblies consisting of hinged door, key locks, and frame designed for the particular wall or ceiling construction. Properly locate each door. Door sizes shall be a minimum of 12 inches x 12 inches for hand access, 18 inches x 18 inches for shoulder access and 20 inches x 30 inches for full body access where required. Review locations and sizes with Architect prior to fabrication. Provide U.L. approved and labeled access doors where installed in fire rated walls or ceilings. Doors shall be Milcor Metal Access Doors as manufactured by Inland-Ryerson, Mifab, or approved equal.

1. Acoustical or Cement Plaster: Style B

2. Hard Finish Plaster: Style K or L

3. Masonry or Dry Wall: Style M

C. Where access is by means of liftout ceiling tiles or panels, mark each ceiling grid using small color-coded and numbered tabs. Provide a chart or index for identification. Place markers within ceiling grid not on ceiling tiles.

D. Access panels, doors, etc. described herein shall be furnished under the section of specifications providing the particular service and to be turned over to the pertinent trade for installation. Coordinate installation with installing contractor. All access doors shall be painted in baked enamel finish to match ceiling or wall finish.

E. Submit shop drawings indicating the proposed location of all access panels/doors. Access doors in finished spaces shall be coordinated with air devices, lighting and sprinklers to provide a neat and symmetrical appearance.

F. Where access doors are installed in wet locations (i.e. shower rooms, toilet rooms,

2025040.00 210500 - 11 kitchens, concessions, and similar spaces, etc.) provide aluminum access doors/frames.

3.05 PAINTING AND FINISHES

A. Provide protective finishes on all materials and equipment. Use coated or corrosion-resistant materials, hardware and fittings throughout the work. Paint bare, untreated ferrous surfaces with rust-inhibiting paint. All exterior components including supports, hangers, nuts, bolts, washers, vibration isolators, etc. shall be stainless steel.

B. Clean surfaces prior to application of insulation, adhesives, coatings, paint, or other finishes.

C. Provide factory-applied finishes where specified. Unless otherwise indicated factory-applied paints shall be baked enamel with proper pretreatment.

D. Protect all finishes and restore any finishes damaged as a result of work under Division 21 to their original condition.

E. The preceding requirements apply to all work, whether exposed or concealed.

F. Remove all construction marking and writing from exposed equipment, piping and building surfaces. Do not paint manufacturer's labels or tags.

G. All exposed piping, equipment, etc. shall be painted. Colors shall be as stated in this division or as selected by the Architect in Division 09 and conform to ANSI Standards.

H. All exposed piping, equipment, etc. in finished spaces shall be painted. Colors shall be as selected by the Architect and conform to ANSI Standards.

I. Refer to Division 09 for additional painting requirements.

3.06 CLEANING OF SYSTEMS

A. Thoroughly clean systems after satisfactory completion of pressure tests and before permanently connecting equipment, and other accessory items. Blow out and flush piping until interior surfaces are free of foreign matter.

B. Flush piping to remove cutting oil, excess pipe joint compound, solder slag and other foreign materials. Do not use system pumps until after cleaning and flushing has been accomplished to the satisfaction of the Engineer. Employ chemical cleaners, including a non-foaming detergent, not harmful to system components. After cleaning operation, final flushing and refilling, the residual alkalinity shall not exceed 300 parts per million. Submit a certificate of completion to Engineer stating the name of service company used.

C. Pay for labor and materials required to locate and remove obstructions from systems that are clogged with construction refuse after acceptance. Replace and repair work disturbed during removal of obstructions.

D. Leave systems clean, and in complete running order.

3.07 COLOR SELECTION

A. Color of finishes shall be as selected by the Architect.

B. Submit color of factory-finished equipment for acceptance prior to ordering.

Common Work Results for Fire Protection Becker Morgan Group, Inc.

210500 - 12 2025040.00

3.08 PROTECTION OF WORK

A. Protect work, material and equipment from weather and construction operations before and after installation. Properly store and handle all materials and equipment.

B. Cover temporary openings in piping and equipment to prevent the entrance of water, dirt, debris, or other foreign matter. Deliver pipes and tubes with factory applied end caps.

C. Cover or otherwise protect all finishes.

D. Replace damaged materials, devices, finishes and equipment.

E. Protect stored pipes and tubes from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor, where stored inside.

3.09 OPERATION OF EQUIPMENT

A. Clean all systems and equipment prior to initial operation for testing, or other purposes.

Lubricate, adjust, and test all equipment in accordance with manufacturer's instructions.

Do not operate equipment unless all proper safety devices or controls are operational.

Provide all maintenance and service for equipment that is authorized for operation during construction.

B. Where specified, or otherwise required, provide the services of the manufacturer's factory-trained servicemen or technicians to start up the equipment. Where factory start-up of equipment is not specified, provide field start-up by qualified technician.

C. Submit factory start-up sheets or field start-up sheets for all equipment.

3.10 IDENTIFICATIONS, FLOW DIAGRAMS, ELECTRICAL DIAGRAMS AND OPERATING

INSTRUCTIONS

A. Contractor shall submit for approval working fire protection drawings of each piping system installed in the building. Diagrams shall indicate the location and the identification number of each valve in the particular system. Following approval by all authorities, the diagrams shall be framed, mounted under safety glass and hung in each Mechanical Room where directed. Contractor shall deliver the tracing or sepia from which the diagrams were reproduced to the Owner.

B. All valves shall be plainly tagged. For any bypass valves, install sign indicating valve position as “Normally Open” or “Normally Closed” as required.

C. All items of equipment, including motor starters, and disconnects shall be furnished with white on black plastic permanent identification cards. Lettering shall be a minimum of ¼ inch high. Identification plates shall be secured, affixed to each piece of equipment, starters, disconnects, panels by screw or adhesive (tuff bond #TB2 or as approved equal).

Equipment identification and room name or area served shall be on each label.

D. Provide three (3) hard copies and one (1) electronic copy of operating and maintenance instructions for all principal items of equipment furnished. This material shall be bound as a volume of the Operation and Maintenance Booklet as hereinafter specified.

E. All piping installed under this contract shall be stenciled with direction of flow arrows and with stenciled letters naming each pipe and service. Refer to Division 21 Section, “Fire Suppression System Piping, Fittings, Valves, Etc”. Color code all direction of flow arrows

2025040.00 210500 - 13 and labels. In finished spaces omit labeling and direction of flow arrows. Paint in color as selected by Architect.

F. Submit list of wording, symbols, letter size, and color coding for fire protection identification.

Submit samples of equipment identification cards, piping labels, and valve tags to Engineer for review prior to installation.

G. Provide at least four (4) hours of straight time instruction to the operating personnel. Time of instruction shall be designated by the Owner.

H. Contractor shall demonstrate Sequences of Operation of all fire protection equipment in presence of Owner’s representative, and Fire Marshal.

3.11 WALL AND FLOOR PENETRATION

A. All penetrations of partitions, ceilings, roofs and floors by piping or conduit under Division 21 shall be sleeved, sealed, and caulked airtight for sound and air transfer control.

B. All penetration of fire rated assemblies shall be sleeved, sealed, caulked and protected to maintain the rating of the wall, roof, or floor. Fire Marshal approved U.L. assemblies shall be utilized. See Division 07 Section, “Fire Protection, HVAC and Plumbing Protection Firestopping”.

C. Where piping extends through exterior walls or below grade, provide waterproof pipe penetration seals, as specified in another division of these specifications.

D. Provide pipe escutcheons for sleeved pipes in finished areas.

E. Piping sleeves:

1. Galvanized steel pipe, standard weight where pipes are exposed and roofs and concrete and masonry walls. On exterior walls provide anchor flange welded to perimeter.

2. Twenty-two (22) gauge galvanized steel elsewhere.

F. Extend all floor sleeves through floor at least 2-inches above finished floor, caulk sleeve the entire depth and furnish and install floor plate.

G. Sleeves for penetrations in kitchen, concessions, and food service areas shall finish .375 inches above floor or flush with wall surfaces and be neatly pointed up to fit snuggly against floor or wall material.

3.12 RECORD DRAWINGS

A. Upon completion of the mechanical installations, the Contractor shall deliver to the Architect one complete set of prints of the fire protection drawings which shall be legibly marked in red pencil to show all changes and departures of the installation as compared with the original design. They shall be suitable for use in preparation of Record Drawings.

B. Contractor shall incorporate all sketches, addendums, value engineering, change orders, etc., into record drawings prior to delivering to Architect.

Common Work Results for Fire Protection Becker Morgan Group, Inc.

210500 - 14 2025040.00

3.13 WARRANTY

A. Contractor's attention is directed to warranty obligations contained in the GENERAL

CONDITIONS.

B. The above shall not in any way void or abrogate equipment manufacturer's guarantee or warranty. Certificates of equipment manufacturer’s warranties shall be included in the operations and maintenance manuals.

C. The contractor guarantees for a two (2) year period from the time of final acceptance by the Owner.

1. That the work contains no faulty or imperfect material or equipment or any imperfect, careless, or unskilled workmanship.

2. That all work, equipment, machines, devices, etc. shall be adequate for the use to which they are intended, and shall operate with ordinary care and attention in a satisfactory and efficient manner.

3. That the contractor will re-execute, correct, repair, or remove and replace with proper work, without cost to the Owner, any work found to be deficient. The contractor shall also make good all damages caused to their work or materials in the process of complying with this section.

4. That the entire work shall be water-tight and leak-proof.

3.14 OPERATION AND MAINTENANCE MANUALS

A. The Contractor shall have prepared three (3) hardcopies and one (1) electronic copy of the Operation and Maintenance Manuals and deliver these copies of the manuals to the Owner. The manuals shall be as specified herein. The manuals must be approved and will not be accepted as final until so stamped.

B. The manuals shall be bound in a three ring loose-leaf binder similar to National No. 3881 with the following title lettered on the front: Operations and Maintenance Manuals – William Penn High School – Field House & Athletic Fields – Fire Protection. No sheets larger than 8-1/2 inches x 11 inches shall be used, except sheets that are neatly folded to 8-1/2 inches x 11 inches and used as a pull-out. Provide divider tabs and table of contents for organizing and separating information.

C. Electronic copies of the manual shall be saved on USB flash drives, and shall be in searchable PDF format with interactive index tabs. Approved electronic copies shall be stored in flash drive zipper cases in front of Volume 1 (if applicable) of hard copies of the manual.

D. Provide the following data in the booklet:

1. As first entry, an approved letter indicating the starting/ending time of Contractor’s warranty period.

2. Maintenance, operation, and lubrication instructions on each piece of equipment furnished.

3. Manufacturer's extended limited warranties on equipment.

2025040.00 210500 - 15

4. Chart form indicating frequency and type of routine maintenance for all fire protection equipment. The chart shall also indicate model number of equipment, location and service.

5. Provide sales and authorized service representatives names, address, and phone numbers of all equipment and subcontractors.

6. Provide supplier and subcontractor’s names, address, and phone number.

7. Catalog data of all equipment, valves, etc. shall include wiring diagrams, parts list and assembly drawing.

8. Provide and install in locations as directed by the Owner, valve charts including valve tag number, valve type, valve model number, valve manufacturer, style, service and location. Each valve chart shall be enclosed in a durable polymer based frame with a cover safety glass.

9. Access panel charts with index illustrating the location and purpose of access panels.

10. Approved Fire Suppression System Certificates.

11. Start-up reports for equipment.

12. NFPA Test Reports.

13. Pipe pressure testing logs/reports.

E. Electronic copies of the manual shall be saved on USB flash drives, and shall be in searchable PDF format with interactive index tabs. Approved electronic copies shall be stored in flash drive zipper cases in front of volume 1 (if applicable) of hard copies of the manual.

F. Submit Operations and Maintenance Manuals prior to anticipated date of substantial completion for Engineer review and approval. Substantial completion requires that Operations and Maintenance Manuals be reviewed and approved.

3.15 INSTALLATION AND COORDINATION DRAWINGS

A. Prepare, submit, and use composite installation and coordination drawings to assure proper coordination and installation of work. Drawings shall include, but not be limited, to the following:

1. Complete Plumbing, Sprinkler and HVAC Piping Drawings showing coordination with lights, electrical equipment, HVAC equipment and structural amenities.

B. Draw plans to a scale not less than 3/8-inch equals one foot. Include plans, sections, and elevations of proposed work, showing all equipment, and piping in areas involved. Fully dimension all work including lighting fixtures, conduits, pullboxes, panelboards, and other electrical work, walls, doors, ceilings, columns, beams, joists and other architectural and structural work.

C. Identify all equipment and devices on wiring diagrams and schematics. Where field connections are shown to factory-wired terminals, include manufacturer's literature showing internal wiring.

Common Work Results for Fire Protection Becker Morgan Group, Inc.

210500 - 16 2025040.00

3.16 PIPING SYSTEMS TESTING

A. The entire new fire protection piping systems shall be tested hydrostatically before insulation covering is applied and proven tight under the following gauge pressures for a duration of twenty-four (24) hours. Testing to be witnessed by Owner's representative and documented in writing.

SYSTEM TEST PRESSURE

Fire Suppression Piping (Refer to NFPA) 200 psi

B. Testing and acceptance thereof shall be in accordance with local requirements and shall meet approval of authority having jurisdiction. Submit certificates and approved permits and insert one (1) copy in the Operations and Maintenance Manuals.

3.17 OUTAGES

A. Provide a minimum of fourteen (14) days notice to schedule outages. The Contractor shall include in their bid outages and/or work in occupied areas to occur on weekends, holidays, or at night. Coordinate and get approval of all outages with the Owner.

B. Submit Outage Request form, attached at end of this Section, to Owner for approval.

END OF SECTION 210500

2025040.00 210500 - 17

OUTAGE REQUEST

DATE APPLIED: BY:

DATE FOR OUTAGE: FIRM:

START OUTAGE-TIME: DATE:

END OUTAGE -- TIME: DATE:

AREAS AND ROOMS:

FLOOR(S):

AREA(S):

ROOM(S):

WORK TO BE PERFORMED:

SYSTEM(S):

REQUEST APPROVED BY:

(FOREMAN OR OTHER PERSON IN CHARGE)

(FOR OWNER’S USE ONLY):

APPROVED:

YES NO BY: DATE:

DATE/TIME-AS REQUESTED: OTHER:

OWNER’S PRESENCE REQUIRED:

YES: NO: NAME:

POINT OF CONTACT: PHONE:

Common Work Results for Fire Protection Becker Morgan Group, Inc.

210500 - 18 2025040.00

This page intentionally left blank

Becker Morgan Group, Inc. Fire Suppression System Piping, Fittings and Valves

2025040.00 210505 - 1

SECTION 210505

FIRE SUPPRESSION SYSTEM PIPING, FITTINGS & VALVES

PART 1 GENERAL

1.01 SUMMARY

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02 SYSTEM DESCRIPTION CONDITIONS

A. Provide all labor and materials necessary to furnish and install all piping systems on this project as herein specified and/or shown on the drawings.

B. All piping and insulation installed in ceiling plenums must be plenum rated and comply with NFPA and the authority having jurisdiction.

C. Where more than one piping system material is specified, ensure system components are compatible and joined to ensure the integrity of the system is not jeopardized. Provide necessary joining fittings. Ensure flanges, union, and couplings for servicing are consistently provided.

D. Use unions, flanges, and couplings downstream of valves and at equipment or apparatus connections. Do not use direct welded or threaded connections to valves, equipment or other apparatus.

E. Use non-conducting dielectric connections whenever jointing dissimilar metals in open systems.

F. Provide pipe hangers and supports in accordance with ASTM B31.9, MSS SP69 and NFPA-13 unless indicated otherwise.

G. Use 3/4 inch (20 mm) ball valves with cap and chain for drains at main shut-off valves, low points of piping, bases of vertical risers, and at equipment. Pipe to nearest floor drain.

H. For areas subject to freezing (breezeways), Contractor shall provide and install dry pipe heads, piping, control valves, tamper switches, test stations, and accessories, etc., required by NFPA-13 and the authority having jurisdiction.

1.03 QUALITY ASSURANCE

A. Valves: Manufacturer's name and pressure rating marked on valve body.

B. To assure uniformity and compatibility of piping components in grooved piping systems, all grooved products utilized shall be supplied by a single manufacturer. Grooving tools shall be of the same manufacturer as the grooved components.

C. If the product is available domestically it shall be supplied as such.

1.04 DELIVERY, STORAGE AND HANDLING

A. Deliver, store, protect and handle products to site under as hereinbefore specified.

B. Accept valves on site in shipping containers with labeling in place. Inspect for damage.

Fire Suppression System Piping, Fittings and Valves Becker Morgan Group, Inc.

210505 - 2 2025040.00

C. Provide temporary protective coating on cast iron and steel valves.

D. Provide temporary end caps and closures on piping and fittings. Maintain in place until installation.

E. Protect piping systems from entry of foreign materials by temporary covers, completing sections of the work, and isolating parts of completed systems.

1.05 ENVIRONMENTAL REQUIREMENTS

A. Do not install underground piping when bedding is wet or frozen.

1.06 ALTERNATES

A. Refer to Division 01 Section, “Alternates” for description of work under this section affected by alternates.

PART 2 PRODUCTS

2.01 PIPE MATERIALS

A. All materials, unless otherwise specified, shall be new and of the best quality of their respective kinds, and shall conform to the requirements and ordinances of local, state and insurance authorities having jurisdiction.

1. Fire Suppression System Piping (NFPA-13):

a. Piping Underground: Steel, schedule 40, ASTM A53, black pipe with ASME C105 polyethylene jacket or double layer, half-lapped 10 mil polyethylene tape, or listed ductile iron pipe.

b. Piping Above Grade (Inside): Steel, schedule 40, ASTM A53, black pipe.

Piping 4 inches and smaller shall be ASTM A120, black steel pipe. Sizes 4-inches and above shall be standard weight, black, cast iron with screwed fittings, schedule 10 steel piping shall be acceptable when approved by the authority having jurisdiction.

c. Piping Above Grade (Outside): Galvanized Steel

d. Wet Pipe Fittings: Steel fittings shall be ASME B16.9, wrought steel, butt welded. Cast iron fittings shall be ASME 16.1, flanges and flanged fittings.

Malleable iron fittings shall be ASME B16.3, threaded fittings. Mechanical grooved couplings shall be malleable iron housing clamps to engage and lock C shaped elastomeric sealing gasket, steel bolts, nuts, and washers;

galvanized for galvanized pipe. Mechanical formed fittings shall be carbon steel housing with integral pipe stop and O-ring and O-ring uniformity compressed into permanent mechanical engagement onto pipe.

e. Victaulic, Grinnell, or approved equal, grooved end fittings and mechanical couplings shall be used for wet pipe and dry pipe systems 2” and larger.

Couplings and fitting shall be UL listed and FM approved. Fittings shall be ASTM A536 ductile iron, ASTM A234 forged steel or ASTM A53 fabricated steel with factory grooved ends designed to accept Victaulic couplings.

f. Victaulic, Grinnell, or approved equal, mechanical couplings shall consist of two ASTM A536 ductile iron housings, pressure-responsive, synthetic rubber gasket and plated steel bolts and nuts.

i. Rigid Type: Housings shall be cast with offsetting, angle-pattern bolt pads to provide system rigidity and support and hanging in accordance with NFPA-13. Tongue and recess rigid type

2025040.00 210505 - 3 couplings shall only be used if the contractor uses a torque wrench for installation. Required torque shall be in accordance with the manufacturer’s latest recommendation.

1) 1-1/4” through 8”: “Installation Ready” stab-on rigid coupling, designed for direct ‘stab’ installation onto grooved end pipe without prior field disassembly and no loose part. Victaulic FireLock EZ Style 009H (1-1/4” – 4”) and Victaulic QuickVic Style 107H (2”-8”).

2) 2” and Larger: Standard rigid coupling design. Victaulic Style 07 Zero-Flex.

ii. Flexible Type: use in seismic areas and where required by NFPA- 13.

1) 2” through 8”: “Installation Ready” stab-on flexible coupling, designed for direct ‘stab’ installation onto grooved end pipe without prior field disassembly and no loose parts. Victaulic QuickVic Style 177.

2) 2” and Larger: Standard flexible coupling design. Victaulic Style 75 or 77.

Fire Suppression System Service

Temperature Range Gasket Recommendation

g. Gate Valves: 2-1/2 inches & larger - listed 175 lb. OS&Y, flanged. 2 inches & smaller - UL/FM listed 175 lb., bronze, screwed. Furnish all sprinkler control valves with slow close manual operator and position indicator. Tamper switches furnish under Division 21.

h. Grooved End Gate Valves: 2-1/2inches and Larger – UL listed/FM approved, 250 psi maximum pressure rating, OS&Y, ductile iron body, bronze mounted, grooved ends. Victaulic FireLock Series 771.

i. Grooved End Butterfly Valves: 2 inches & Larger: UL listed/FM approved, up to 365 psi maximum pressure rating, ductile iron body, nickel-plated ductile iron disc, Nitrile seat, weather-proof actuator with two pre-wired supervisory switches. Victaulic FireLock Series 765 or Series 705.

j. Globe Valves: 2 inches & smaller - 175 lb., bronze, screwed, UL/FM listed.

k. Check Valves: 2-1/2 inches & smaller - UL/FM listed 175 lb., flanged swing check. 2 inches & smaller - listed 175 lb., bronze swing check, screwed.

l. Grooved End Check Valves: 2 inches and Larger: UL listed/FM approved, up to 365 psi maximum pressure rating, ductile iron body, spring-loaded stainless steel or EPDM coated ductile iron disc, nickel-plated or welded-in nickel seat. Victaulic FireLock Series 717H or Series 717.

m. Finish: All exposed fire suppression piping shall be primed and painted with epoxy red paint. White letters shall indicate pipe and indicate direction of flow. Painting shall be provided under Division 09.

n. Special Requirements: All fire suppression piping, valves, fittings and joints shall comply with applicable National Fire Protection Pamphlets (NFPA) local codes, building codes, Fire Marshal, Owner's Insurance Underwriter, and the authority having jurisdiction.

B. Steel pipe shall be similar and equal to National Allied Tube or Wheatland black or zinc-coated (galvanized) as hereinafter specified. Pipe shall be free from all defects which may affect the durability for the intended use. Each length of pipe shall be stamped with the manufacturer's name.

C. Copper pipe shall be Revere, Anaconda or Chase with approved solder fittings.

Fire Suppression System Piping, Fittings and Valves Becker Morgan Group, Inc.

210505 - 4 2025040.00

D. Welding fittings for steel pipe shall meet the requirements of ASTM Standard A-23 and shall be standard catalog products. Fittings fabricated by metering and notching pipe will not be accepted.

2.02 PIPE HANGERS

A. All hangers for metallic piping shall be adjustable, wrought clevis type, or adjustable malleable split ring swivel type, having rods with machine threads. Hangers shall be Grinnell Company's Figure 260 for pipe ¾-inch and larger, and Figure 65 for pipe 2-inches and smaller, or approved equal.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .