COEWO-00270 - EW_BMcD_SMS_4518-EWO138-ATP196 Ramp E Rip Rap_07262023 - Package.pdf

PDF 15 MB Posted

Attached to
I-20-4518 - EWO #138 - ATP #196 - I-294 Roadway Reconstruction and Widening
Solicitation number
24-557THA-ENGCO-B-38519
Issued by
Cook County, Chicago City, Illinois

About this file

This document is a package containing an attachment for a state and local government contract opportunity in Illinois. The contract opportunity, identified as I-20-4518 - EWO #138 - ATP #196 - I-294 Roadway Reconstruction and Widening, is being issued by the state of Illinois, Cook County, and the city of Chicago. The package includes details on the scope of work for the project, which involves rip rap work on Ramp E. The contract opportunity does not provide specific quantities or response due dates, but it indicates that additional information can be found in the item and attachment tabs.

The document does not provide details on pricing terms, set asides, incumbents, funding requirements or sources, or any other salient financial information. It appears to be a supplemental package to the main contract opportunity, focusing on the technical specifications and requirements for the rip rap work on Ramp E.

View the file

Other files

File Type Posted
Executed COEWO by Contract_4518_08102023~1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Change Order/Extra Work Order 4518C I-294 Rdwy Recon & Widening, Plaza 39 to 75th St

10:40:43 AM, 8/7/2023

Project: 4518C I-294 Rdwy Recon & Widening, Plaza 39 to 75th St

Project Number:

4518C

Process Document:

COEWO - 270 Overall Due Date:

Current Workflow

Step:

EWO package Step Due Date:

Subject: EW_BMcD_SMS_4518-EWO138- ATP196 Ramp E Rip Rap_07262023

Status: Pending

Change Order/Extra Work Order Details

Contract Number:

I-20-4518

Change Type (may choose more than one):

Extra Work Order

Change Order or Extra Work Order No.:

Amount of Change

Order/Extra Work Order ($):

$189000.00

Offsetting CO/EWO?: No

Associated Offsetting

CO/EWO No.:

Related ATP #: 196.0

Related ATP Title: Ramp E Rip Rap

Reason for Change/Extra

Work:

The backslope on the south side of I-294 between stations 1060+75 and 5069+25 is experiencing groundwater seepage. Maintaining and mowing this area will be extremely difficult due to the highly saturated soil. The CM recommends installing permanent riprap at this location to stabilize and prevent future maintenance issues. This work will be performed on a time and material basis.

Impact on Schedule: This work is not anticipated to have an impact on the critical path of the project.

The interim, substantial, and final completion dates are not anticipated to be impacted by this change. A time extension is not anticipated to be required.

CO/EWO

Determination:

Comments

ILLINOIS STATE TOLL HIGHWAY AUTHORITY

ROADWAY AND BRIDGE RECONSTRUCTION

TRI-STATE TOLLWAY (I-294)

CONTRACT NO. I-20-4518

EXTRA WORK ORDER NO: 138

Revision 1 1 of 1 F3080.03

EXPLANATION

The backslope on the south side of I-294 between stations 1060+75 and 5069+25 is experiencing groundwater seepage. Maintaining and mowing this area will be extremely difficult due to the highly saturated soil. The CM recommends installing permanent riprap at this location to stabilize and prevent future maintenance issues. This work will be performed on a time and material basis.

ITEM NO. FRC13800 PERMANENT RIP RAP

SPECIFICATION

S.P. FRC13800.1 DESCRIPTION

Re-grade and install permanent rip rap on the south backslope of I-294 between stations 1060+75 and 5069+25.

S.P. FRC13800.2 GENERAL REQUIREMENTS

This work shall be per the Contract Documents and per the direction of the Engineer.

S.P. FRC13800.3 MATERIAL

This material shall be per the Contract Documents and per the direction of the Engineer.

S.P. FRC13800.4 MEASUREMENT

This work will not be measured for payment.

S.P. FRC13800.5 PAYMENT

Payment for PERMANENT RIP RAP will be made as specified in Subsection 109.04 of the Tollway Supplemental Specifications using a force account basis and will not exceed the costs incurred by the Contractor and approved by the Engineer.

PAY ITEM

NUMBER DESIGNATION

UNIT OF

MEASURE

FRC13800 PERMANENT RIP RAP UNIT

IMPACT ON SCHEDULE

This work is not anticipated to have an impact on the critical path of the project. The interim, substantial, and final completion dates are not anticipated to be impacted by this change. A time extension is not anticipated to be required.

1431 Opus Place \ Suite 400 \ Downers Grove, IL 60515

O 630‐724‐3200 \ F 630‐724‐3201 \ burnsmcd.com

To: Joseph Hunn P.E., Project Manager Date: August 1, 2023 Illinois State Toll Highway Authority

From: Shelli Schweickert, P.E., Burns & McDonnell

Contract: I-20-4518 – TRI-STATE TOLLWAY (I-294) Roadway and Bridge Reconstruction

MP 19.30 TO 22.30

Subject: EWO Accuracy and Merit Independent Determination EWO 138 – Permanent Rip Rap

We the Construction Manager, independently checked the cost accounting math and determined it to be accurate and correct. We further confirm the work as germane to the contract and necessary to complete the project. We also verify the cost of such work to be within the normal range and it is neither redundant nor incidental to the original contract. As such, we hereby recommend the EWO for payment, as follows:

Scope of Work Proposed Estimated Cost Amount Work Verified by Date

EWO 138 – Permanent Rip Rap $189,000.00 Burns & McDonnell 07-26-2023

Please feel free to contact me at 630-514-2320 if you should have any questions.

Sincerely, Shelli Schweickert, P.E.

Resident Engineer Burns & McDonnell Engineering

Contract No.: I-20-4518 EXHIBIT C Roadway and Bridge Reconstruction and Widening Tri-State Tollway (I-294) M.P. 19.3 to M.P. 22.3 ATP: 196

Calc By: CKS

Checked By: SMS

Labor Hours: Overtime Rate: Total:

2 Laborer 50 47.40$ 4,740.00$

1 Laborer ‐ Foreman 50 48.15$ 2,407.50$

2 Operator 50 56.30$ 5,630.00$

1 Truck Driver 16 40.60$ 649.60$

Labor Subtotal 13,427.10$

Benefits (60%) 8,056.26$

Benefits & Labor Markup (35%) 7,519.18$

Insurance w/markup (35%) 4,699.49$

Labor Total = 33,702.02$ A

Equipment Hours: Rate: Total:

1 Backhoe 50 90.00$ 4,500.00$

1 Dump truck 16 70.00$ 1,120.00$

1 Front End Loader 50 65.00$ 3,250.00$

3 GMC Truck 50 31.00$ 4,650.00$

1 Lowboy 8 110.00$ 880.00$

1 Lane Closure (each) 3 Each 2,500.00$ 7,500.00$

1 Disposal Fee ‐ Removed Concrete 6 Load 100.00$ 600.00$

Equipment Total = 22,500.00$ B

Material Quantity: Rate: Total:

Rip Rap (ton) 2300 50.00$ 115,000.00$

Material Subtotal 115,000.00$

Markup (15%) 17,250.00$

Material Total = 132,250.00$ C

CM's Estimate of the Contractor's Additional Cost 188,452.02$ A+B+C

Contractor mark‐up (5% on subcontracted work) ‐$

Total 188,452.02$

CM Estimated cost of Work 189,000.00$

Engineers Estimate: Scope consists of re‐grading and installing permanent rip rap on the south backslope of I‐294 between stations 1060+75 and

5069+25.

cschultz Text Box

EXHIBIT D

NWECHP 7/22/2020

681 1085

1 15

TS20.00N,SB

GENERAL PLAN AND ELEVATION (1 OF 5)

JLP 7/22/2020

I-20-4518

P L

O T

D A

T E

P L

I

M E

:2

:3

P M

P L

S C

A L

E

:0 i n

F I L

E

N

M E p w a e c o m n a p w .b e n t l e y .c o m :A

E C

O M

D

S

N A

D o c u m e n t s

C e n t r a l

T r i S t a t e

M

W o r k a c k a g e s I S

G

G

N

S

H T

S t r u c t u r a l

H D

R

T S .0

N

S B

C S

H T S

T R

T S .0

N

S B

G P

E

H D

R

DRAWN BY

CHECKED BY

DATE

DATE

NO. DATE DESCRIPTION

REVISIONS

I L L I N O I S 6 0 5 1 5

D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY CONTRACT NO.

SHEET NO.

DRAWING NO.

OF

OF

ROSEMONT, IL 60018

9450 W. BRYN MAWR AVE.

HDR ENGINEERING, INC.

24" RCP

24" RCP 27" RCP

C

M P

LEGEND:

SOIL BORING LOCATION

EXISTING LIGHT POLE

EXISTING ELECTRIC LINE

PROPOSED STORM SEWER

FIBER OPTIC LINE

FIBER OPTIC AERIAL LINE

PROPOSED LUMINAIRE

LOCATION SKETCH

A R C

H E R A

V E

4296-NWB-047

OFFSET 144.64' LT

STA. 1060+77.23 ¡ I-294

BEGIN NAW

TYP.

20'-0''

POST EL.

T/WALL &

13 14 15 16 17

NAW LENGTH

ELEVATION

(VERTICAL SCALE EXAGGERATED)

GT05-1

PLAN

(TYP.)

POST MARK

(TYP.)

PANEL MARK

NOISE ABATEMENT WALL

GROUND MOUNTED

NON-CRASHWORTHY

GT06-1 GT05-1 GT05-1 GT05-1 GT05-1

¡ RAMP E

01 02 03

04 05 06

07 08 09 10 11 12

FENCE

WOODS AND BRUSH

GT07-1

GC04-1

GC04-1

GC04-1

GT07-1

GC04-1

GC04-1

GC04-1

GT06-1

GC04-1

GC04-1

GC04-1

GT06-1

GC04-1

GC04-1

GC04-1

GT06-1

GC04-1

GC04-1

GC04-1

GT05-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-1

HIGHWAY CLASSIFICATION SEISMIC DATA

SEISMIC PERFORMANCE ZONE (SPZ) = 1

DESIGN SPECTRAL ACCELERATION AT 1.0 SEC (SDI) = 0.063

DESIGN SPECTRAL ACCELERATION AT 0.2 SEC (SDS) = 0.114

SOIL SITE CLASS = C

INDEX OF SHEETS

NOTES

SB TRI-STATE TOLLWAY (I-294)

FUNCTIONAL CLASS: INTERSTATE

ADT: 71,750 (2015); 82,000 (2040)

ADTT: 12,200 (2015); 13,950 (2040)

DHV: AM-4,660; PM-7,070 (2015); AM-5,900; PM-7,500 (2040)

DESIGN SPEED: 70 M.P.H.

POSTED SPEED: 60 M.P.H.

ONE WAY TRAFFIC

DIRECTION DISTRIBUTION 100%-0%

EX. ROW

PROP. COMM. CONDUITS

PIPE REMOVAL

PROP. DRILLED SHAFT

¡ POST AND SHAFT (TYP.)

PIPE UNDERDRAIN

2143'-101 2"

LOCATION

PROJECT

T W

P

N

RANGE 12E, 3RD P.M.

79TH ST

I-294

T H

A

V E

R O

B E

R T S

R

D

U S

N

SEE DRAINAGE PLANS

FOR PIPE UNDERDRAIN,

NWE-1

NWE-2

NWE-3

NWE-4

NWE-5

NWE-6

NWE-7

NWE-8

NWE-9

NWE-10

NWE-11

NWE-12

NWE-13

NWE-14

NWE-15

GENERAL PLAN AND ELEVATION (1 OF 5)

GENERAL PLAN AND ELEVATION (2 OF 5)

GENERAL PLAN AND ELEVATION (3 OF 5)

GENERAL PLAN AND ELEVATION (4 OF 5)

GENERAL PLAN AND ELEVATION (5 OF 5)

NAW PANEL SCHEDULE AND NOTES

NAW FOUNDATION AND POST SCHEDULE

NAW FOUNDATION AND POST SCHEDULE

SOIL BORING LOGS

SOIL BORING LOGS

SOIL BORING LOGS

SOIL BORING LOGS

SOIL BORING LOGS

SOIL BORING LOGS

SOIL BORING LOGS

GENERAL PLAN & ELEVATION

TRI-STATE TOLLWAY (I-294)

COOK COUNTY

STATION 1060+77.23 TO 5083+18.96

NOISE ABATEMENT WALL TS20.00N,SB

BENCHMARK: BM18: CH X IN SE BOLT ON BASE OF 2ND LP S OF GANTRY SIGN IN SBL WHERE NB 171 ON RAMP MERGES IN SBL, APPROX 90' SE OF END OF

GORE. ELEV. 605.544.

EXISTING STRUCTURE: NONE

PROPOSED STRUCTURE: NON-CRASHWORTHY GROUND MOUNTED NOISE ABATEMENT WALL CONSISTING OF STEEL POSTS AND PRECAST CONCRETE PANELS SUPPORTED BY

CONCRETE DRILLED SHAFTS ALONG WESTERN SHOULDER OF SB I-294 IS 2163'-101

2" IN TOTAL LENGTH AND VARYING IN HEIGHT WITH MAX. POST HEIGHT OF 24FT.

GT06-1 GT06-1 GT06-1 GT06-1

ACOUSTICAL PROFILE

FACILITY (SEE NOTE 5)

ABANDONED UTILITY

1. FOR NOISE WALL BILL OF MATERIAL, SEE SHEET NWE-8.

2. ALL MEASUREMENTS AND STATIONS ARE TAKEN ALONG

THE FRONT FACE (ROADWAY SIDE) OF NAW UNLESS

NOTED OTHERWISE.

3. TOP OF WALL AND TOP OF POST ELEVATIONS ARE TO

MATCH AS SHOWN IN THE ELEVATION VIEW.

4. ACOUSTICAL PROFILE SHOWN FOR INFORMATION ONLY.

5. ABANDONED UTILITY FACILITY SHALL BE REMOVED AND

BACKFILLED IN ACCORDANCE WITH THE SPECIAL

PROVISION 'ALLOWANCE FOR DEBRIS REMOVAL AND

DISPOSAL'.

GBU04-1 GBU04-1 GBU04-1 GBU04-1 GBU04-1

GBU04-1 GBU04-1 GBU04-1 GBU04-1 GBU04-1

GBU04-1 GBU04-1 GBU04-1 GBU04-1

GBU04-1

EL. 645.23

EL. 646.23

EL. 647.23

EL. 648.23

(TYP.)

DRILLED SHAFT,

G -1

4296-NWB-045

4296-NWB-046

M A

T C

H L

IN

E

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

LOCATION MARK (TYP.)

(T Y P

IN

169+00 168+00

170+00 171+00

4296-NWB-048

(ROADWAY SIDE)

F.F. OF WALL

(RESIDENTIAL SIDE)

B.F. OF WALL

WITH 6" SHIMS

BOTTOM STEP

1'-0" MIN.

AT F.F. OF WALL

EX. GROUND

GBU04-1

(RESIDENTIAL SIDE)

AT B.F. OF WALL

PROP. GROUND

(ROADWAY SIDE)

AT F.F. OF WALL

PROP. GROUND

OF WALL

PROFILE AT B.K.

PROP. DITCH

cschultz Callout Permanent riprap cschultz Text Box

EXHIBIT E 1/4

Polygon

682 1085

2 15

TS20.00N,SB

GENERAL PLAN AND ELEVATION (2 OF 5)

JLP 7/22/2020

I-20-4518

P L

T E

P L

M E

:2

:0

P L

A L

E

:0 i n

F I

M E p w a e c o m n a p w .b e n t l e y .c o m :A

E C

O M

D

S

N A

D o c u m e n t s

C e n t r a l

T r i S t a

M c k a g e s I S

G

N

S

H T

S t r u c t u r a l

H D

R

T S .0

N

S B

C S

H T S

T R

T S .0

N

S B

G P

E

H D

R

DRAWN BY

CHECKED BY

DATE

DATE

NO. DATE DESCRIPTION

REVISIONS

I L L I N O I S 6 0 5 1 5

D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY CONTRACT NO.

SHEET NO.

DRAWING NO.

OF

OF

ROSEMONT, IL 60018

9450 W. BRYN MAWR AVE.

HDR ENGINEERING, INC.

T L A E

27" RCP

36" RCP

36" RCP

36" RCP

R C

P

48" RCP

C

M P

C

M P

ELEVATION

(VERTICAL SCALE EXAGGERATED)

4296-NWB-049

05 06 07 08

09 10 11 12

GT05-1

GT05-2GT05-1 GT05-1 GT05-1 GT05-1 GT05-1 GT05-1 GT05-1 GT05-1 GT05-1GT05-1

PLAN

¡ RAMP E

GT05-2 GT05-2

GT06-2 GT06-2

GT05-2 GT05-2

GT05-2

21 22 23 24 25 2619 20

SP1

GC04-1

KINK

15'-0''

(TYP.)

PANEL MARK

NOISE ABATEMENT WALL

GROUND MOUNTED

NON-CRASHWORTHY

POST EL.

T/WALL &

(TYP.)

POST MARK

TYP.

20'-0''

LOCATION MARK (TYP.)

GC04-1 GC04-1 GC04-1 GC04-1

GC04-1 GC04-1 GC04-1 GC04-1

GC04-1 GC04-1 GC04-1 GC04-1

GBU04-1 GBU04-1 GBU04-1 GBU04-1

GC04-1 GC04-1 GC04-1 GC04-1

GC04-1 GC04-1 GC04-1 GC04-1

GC04-1 GC04-1 GC04-1 GC04-1

GBU04-1 GBU04-1 GBU04-1 GBU05-1

GC04-1 GC04-1

GC04-1 GC04-1

GC04-1 GC04-1

GBU05-1 GBU05-1

SP1

GC04-1

SP1

GC04-1

GC04-1

GC04-1

GC04-1

GC04-2

GC04-2

GBU05-2

SP1

GC04-2

SP1

GC04-2

SP1

GC04-2

GT05-1

SP1

GC04-1

SP1

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GBU05-2

GC04-2

GC04-2

GC04-2

GBU05-2

GC04-2

GC04-2

GC04-2

GBU05-2

GC04-2

GC04-2

GC04-2

GBU05-2

GC04-2

GC04-2

GC04-2

GBU05-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GBU05-2 GBU05-2

GBU04-2

GBU05-2

GC04-2

GC04-2

EX. ROW

TYP.

20'-0''

¡ POST AND SHAFT (TYP.)

WALL SEGMENT-2 BEGIN WALL SEGMENT-1 END

EXISTING FENCE

SEE DRAINAGE PLANS

FOR PIPE UNDERDRAIN,

� POINT OF MAX. UNBALANCED SOIL CONDITION

SP1

GBU05-1 3

ACOUSTICAL PROFILE

GT05-2GT05-2

GT05-2

27 28

SP1

GT05-1

SP1

GT06-2

EL. 645.23

15'-0''

15'-0''

''4

14'-11

15'-0''

''4 314'-11

01 02

EL. 645.75

EL. 646.75

EL. 648.75

EL. 649.75

M A

T C

H L

IN

E

M A

T C

H L

IN

E

.0

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -1

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

(TYP.)

DRILLED SHAFT,

4296-NWB-051

G -1

(T Y P

4296-NWB-050

4296-NWB-052

167+00

166+00

165+00

163+00

G -1

(ROADWAY SIDE)

F.F. OF WALL

B.F. OF WALL (RESIDENTIAL SIDE)

SP1

GBU04-2

GBU05-2

AT F.F. OF WALL

EX. GROUND WITH 6" SHIMS, TYP.

BOTTOM STEP

1'-0" MIN.

GBU04-1

GBU04-1

SP1

174°36'58"

164+00

(RESIDENTIAL SIDE)

AT B.F. OF WALL

PROP. GROUND

(ROADWAY SIDE)

AT F.F. OF WALL

PROP. GROUND

OF WALL

PROFILE AT B.K.

PROP. DITCH

cschultz Text Box

EXHIBIT E 2/4

cschultz Polygon cschultz Callout Permanent riprap

683 1085

3 15

TS20.00N,SB

GENERAL PLAN AND ELEVATION (3 OF 5)

JLP 7/22/2020

I-20-4518

P L

T E

P L

M E

:2

:3

P L

A L

E

:0 i n

F I

M E p w a e c o m n a p w .b e n t l e y .c o m :A

E C

O M

D

S

N A

D o c u m e n t s

C e n t r a l

T r i S t a

M c k a g e s I S

G

N

S

H T

S t r u c t u r a l

H D

R

T S .0

N

S B

C S

H T S

T R

T S .0

N

S B

G P

E

H D

R

DRAWN BY

CHECKED BY

DATE

DATE

NO. DATE DESCRIPTION

REVISIONS

I L L I N O I S 6 0 5 1 5

D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E

THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY CONTRACT NO.

SHEET NO.

DRAWING NO.

OF

OF

ROSEMONT, IL 60018

9450 W. BRYN MAWR AVE.

HDR ENGINEERING, INC.

E

T

A T

M

T L A E

160+00

54" RCP

48" RCP 1

R

C P

12" RCP

C

M P

C

M P

C

M P

4296-NWB-057

GT07-2

GT07-2

GT06-2

GT05-2

GT06-2 GT06-2

GT04-2

GT05-2

GT04-2

GT04-2

GT06-2

GT04-2

GT05-2 GT04-2

GT06-2

GT05-3

GT05-3

PLAN

(VERTICAL SCALE EXAGGERATED)

ELEVATION

SP1

GC04-2

KINK

19 20 21

24 25

28 29 30

31 32

¡ RAMP E

15'-0''

KINK

LOCATION MARK (TYP.)

(TYP.)

PANEL MARK

NOISE ABATEMENT WALL

GROUND MOUNTED

NON-CRASHWORTHY

POST EL.

T/WALL &

(TYP.)

POST MARK

EL. 649.75

SP1

GC04-2

SP1

GT07-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GC04-2

GT05-3

SP3

GC04-3

SP3

GC04-3

SP3

GC04-3

GC04-3

GC04-3

GT06-2

GC04-2

GC04-2

GC04-2

GC04-3

GC04-3

GC04-3

SP2

SP2

GC04-2

SP2

GC04-2

SP2

GC04-2

SP2

GC04-2

SP2

GC04-2

SP2

GC04-2

SP2

GC04-2

SP2

GC04-2

''4 319'-11

WALL SEGMENT-3 BEGIN WALL SEGMENT-2 END

EXISTING FENCE

4296-NWB-054

SEE DRAINAGE PLANS

FOR PIPE UNDERDRAIN,

PROFILE

ACOUSTICAL

4296-NWB-056

4296-NWB-057A

4296-NWB-058A

15'-0''

''4 318'-8

GBU05-2

GBU05-2 GBU05-2

GBU06-2

GBU06-2

GBU06-2

GBU06-2

GBU05-2 GBU06-2

GBU06-2

GBU05-2

EL. 653.75

EL. 655.75

EL. 656.75

EL. 657.75

EL. 658.75

EL. 662.75

EL. 664.75

EL. 665.75

EL. 667.75

EL. 669.75

EL. 671.75

EL. 673.75

EL. 660.75

EL. 674.13

EL. 675.13

SP2

GT07-2

SP2

GT05-2

SP2

GT05-2

EL. 651.75

M A

T C

H L

IN

E

.0

M A

T C

H L

IN

E

.0

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -2

G -3

G -3

TYP.

20'-0''

(TYP.)

DRILLED SHAFT,

(T Y P

''2

18'-8

''4

19'-11''4 319'-11

''4 319'-11

G -2

G -2

G -2

G -2

G -2

G -3

G -3

¡ POST AND SHAFT (TYP.)

G -2

162+00

4296-NWB-055

4296-NWB-053

PANEL

OPENING IN

7"x7" DRAINAGE

(ROADWAY SIDE)

F.F. OF WALL

(RESIDENTIAL SIDE)

B.F. OF WALL

161+00

PANEL

OPENING IN

7"x7" DRAINAGE

4296-NWB-058

AT F.F. OF WALL

EX GROUND

GBU04-2

GBU06-2

GBU06-2

GBU04-2

GBU04-3

GBU04-3

SP1

GBU07-2

SP2

GBU04-2

SP2

GBU06-2

SP2

GBU06-2

GBU04-3

SP3

170°8'39"

171°40'33"

TYP., U.N.O.

WITH 6" SHIMS,

BOTTOM STEP

1'-0" MIN.

(RESIDENTIAL SIDE)

AT B.F. OF WALL

PROP. GROUND

(ROADWAY SIDE)

AT F.F. OF WALL

PROP. GROUND

GBU04-2

OF WALL

PROFILE AT B.K.

PROP. DITCH

cschultz Text Box

EXHIBIT E 3/4

cschultz Polygon cschultz Callout Permanent riprap

Polygon cschultz Callout Proposed Rip Rap cschultz Text Box

EXHIBIT E 4/4

Revision Level: 2 Page 1 of 1 F3080.07

CO/EWO DETERMINATION PROCUREMENT FORM

Contract No.: I-20-4518

Project Description: 4518C I-294 Rdwy Recon & Widening, Plaza 39 to 75th St

Contractor: Walsh Construction Company II LLC

Awarded Contract Value: $70,518,407.28

Change Order No: / Extra Work Order No.: 138

Authorization Amount: $189,000.00

Description and Reason for Change: The backslope on the south side of I-294 between stations 1060+75 and 5069+25 is experiencing groundwater seepage. Maintaining and mowing this area will be extremely difficult due to the highly saturated soil. The CM recommends installing permanent riprap at this location to stabilize and prevent future maintenance issues. This work will be performed on a time and material basis.

Department:

The undersigned, pursuant to the requirements of Section 6.385 of the Joint Committee on Administrative Rules and Section 33E-9 of the Illinois Criminal Code, makes the following determination:

[ X ] The circumstances necessitating this change were not reasonably foreseeable at the time the contract was originally signed.

[ X ] The change is germane to the original contract as signed.

[ ] Provision for this work is included in the original contract.

[ X ] Work of this type was included in the original contract, and the additional efforts of this work are within the intent of the contract and Department policy.

[ ] The change represents an adjustment required by the contract, based on unpredictable developments in the work.

[ ] The change in design is necessary to fulfill the original intent of the contract.

[ ] See below or attached sheet for additional explanation of germaneness.

[ ] The change is otherwise in the best interest of the Authority and authorized by law.

Joe Hunn Project Manager 8/7/23 Name: Joe Hunn Title Date