CNN and NHIC Deepening_DRAFT BID SCHEDULE.pdf

PDF 668 KB Posted

Attached to
Norfolk Harbor and Channels Navigation Improvements, Inner Channels Deepening Federal contract opportunity
Solicitation number
W9123622B5000
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This document includes a bid schedule and related federal contract opportunity notice for dredging projects in the Norfolk Harbor and Channel to Newport News areas in Virginia. The U.S. Army Corps of Engineers Norfolk District is seeking bids to dredge the Channel to Newport News to a required depth of -55 feet, and the Norfolk Harbor Inner Channels to a required depth of -54 feet. Dredged materials will be hydraulically placed in the Craney Island Dredged Material Management Area. The bid schedule outlines pay items for dredging, containment dike construction, and mobilization/demobilization. The federal contract opportunity notice provides additional details such as an estimated price range of $25-100 million, NAICS code 237990, and definitive responsibility criteria related to hydraulic dredging experience. Interested firms must register by November 9th for a webinar on November 10th to obtain more information and ask questions regarding technical requirements and restrictions. The solicitation is expected to be issued on SAM.gov thereafter.

View the file

Other files for this federal contract opportunity

Other files attached to Norfolk Harbor and Channels Navigation Improvements, Inner Channels Deepening, newest first.
File Type Posted
Industry Day KTR Inquiries_Govt Responses_20211202.pdf PDF
NH Deepening Project Slides Industry Day_17 November 2021.pdf PDF
DRAFT NHICPS 2021-06-08.pdf PDF
CNN Deepening Specs_95.pdf PDF
DRAFT CNNPS2101C-HP2207.pdf PDF
Norfolk Harbor - Excel worksheet for pre-submitted questions.xlsx XLSX spreadsheet
NHIC Deepening Specs_95.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Channel to Newport News and Norfolk Harbor Inner Channels Deepening

Hampton Roads, VA

RFP NUMBER:

OFFEROR’S NAME: ____________________________

CONTRACT LINE ITEM SCHEDULE I – CHANNEL TO NEWPORT NEWS

Item

No. Description Quantity Unit Line Item Price Amount

SCHEDULE I – BASE BID

1001 Mobilization and demobilization of all plant and equipment for dredging Channel to

Newport News and hydraulic placement of material into Craney Island Dredged Material

Management Area (CIDMMA), complete as indicated and specified. 1 JOB $ $

1002 Dredging of Channel to Newport News to a depth of -55 feet with 1 foot of allowable overdepth. This line item also includes hydraulic placement of dredged material into upland placement site CIDMMA (including all plant, methods, and labor). Post dredging clean-up of shoals regardless of means and methods (hydraulic or mechanical) shall be paid for under this line item. Removal of material accumulated due to accretion shall also be paid under this line item. Complete as indicated and specified. 1,645,600 CY $ $

1003 A “Containment Area” shall be constructed at the placement site to function as a protective barrier between the placed material and the rest of the Center Cell of the CIDMMA. Work at the borrow site is included in this bid item including excavation, mixing of materials, transport to the containment construction area, and maintenance of the dikes. All methods, material and labor required to construct this item in accordance with plans and specifications shall be all inclusive and complete. 1 Job $ $

TOTAL SCHEDULE I BASE BID $

NOT FOR SOLICITATION

No. Description Quantity Unit Line Item Price Amount

SCHEDULE I – OPTION BID

1004 Dredging of Channel to Newport News to a depth of -56 feet with 1 foot of allowable overdepth. This line item also includes hydraulic placement of dredged material into upland placement site CIDMMA (including all plant, methods, and labor). Post dredging clean-up of shoals regardless of means and methods (hydraulic or mechanical) shall be paid for under this line item. Removal of material accumulated due to accretion shall indicated and specified. 751,300 CY $ $

TOTAL SCHEDULE I OPTION BID $

TOTAL SCHEDULE I BASE + OPTION BID $

CONTRACT LINE ITEM SCHEDULE II – NORFOLK HARBOR INNER CHANNEL

No. Description Quantity Unit Line Item Price Amount

SCHEDULE II – BASE BID

2001 Mobilization and demobilization of all plant and equipment for dredging Norfolk Harbor

Inner Channel and hydraulic placement of material into Craney Island Dredged Material

Management Area (CIDMMA), complete as indicated and specified. 1 JOB $ $

2002 Dredging of Norfolk Harbor Inner Channel to a depth of -54 feet with 1 foot of allowable overdepth. This line item also includes hydraulic placement of dredged material into upland placement site CIDMMA (including all plant, methods, and labor). Post dredging clean-up of shoals regardless of means and methods (hydraulic or mechanical) shall be paid for under this line item. Removal of material accumulated due to accretion shall indicated and specified. 3,747,700 CY $ $

TOTAL SCHEDULE II BASE BID $

No. Description Quantity Unit Line Item Price Amount

SCHEDULE II – OPTION BID

2003 Dredging of Norfolk Harbor Inner Channel to a depth of -55 feet with 1 foot of allowable overdepth. This line item also includes hydraulic placement of dredged material into upland placement site CIDMMA (including all plant, methods, and labor). Post dredging clean-up of shoals regardless of means and methods (hydraulic or mechanical) shall be paid for under this line item. Removal of material accumulated due to accretion shall indicated and specified. 1,427,800 CY $ $

2004 Dredging of Norfolk Harbor Inner Channel to a depth of -56 feet with 1 foot of allowable overdepth. This line item also includes hydraulic placement of dredged material into upland placement site CIDMMA (including all plant, methods, and labor). Post dredging clean-up of shoals regardless of means and methods (hydraulic or mechanical) shall be paid for under this line item. Removal of material accumulated due to accretion shall indicated and specified. 1,633,100 CY $ $

TOTAL SCHEDULE II OPTION BID $

TOTAL SCHEDULE II BASE + OPTION BID $