CN23.docx

DOCX document 24 KB Posted

Attached to
RAILS FOR WATERVLIET ARSENAL
Solicitation number
W911PT26QA111
Issued by

About this file

This is a Contract Data Requirement List (DD Form 1423) specifying deliverable documentation requirements for a federal contract at Watervliet Arsenal. The contractor must submit a Test Procedure document for Magnetic Particle Inspection Procedures (Data Item CN 23) that conforms to authority DI-NDTI-80603 and references QAP-APPX-WVA and ASTM-E1444 standards. The procedure must be submitted 60 days prior to First Article approval and must receive approval from Watervliet Arsenal Level 3 authority before implementation. The government requires 15 days for review and approval of the submitted procedure. One final copy of the procedure must be delivered to the Department of the Army at Watervliet Arsenal, Attn: TAWV-CQD-E, located at Bldg. 35-E, 1 Buffington Street, Watervliet, NY 12189-4000, with submission required either with the First Article or no later than 30 days prior to first production shipment when First Article is not required.

The related solicitation (W911PT26QA111) is for Rails for Watervliet Arsenal with increased quantities: 60 left rails and 53 right rails per drawing specifications. The procurement specifies First Article (FA) sample pricing is required, and delivery is FOB destination. The contracting agency is the Department of the Army Materiel Command Contracting Command Detroit Arsenal.

View the file

Other files

File Type Posted
CN2.pdf PDF
CN 3.pdf PDF
CN9.docx DOCX document
CN12.docx DOCX document
Solicitation - W911PT26QA111.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENT LIST – DD Form 1423 Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:

B. EXHIBIT

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.:

F. CONTRACTOR

1. DATA ITEM NO:

2. TITLE OF DATA ITEM: Test Procedure

3. SUBTITLE: Magnetic Particle Inspection Procedures (CN 23)

4. AUTHORITY: DI-NDTI-80603

5. CONTRACT REFERENCE: QAP-APPX-WVA and ASTM-E1444

6. REQUIRING OFFICE: TAWV-CQD-E

7. DD250 REQUIRED: No

8. APP CODE: A

9. DISTRIBUTION STATEMENT REQUIRED: B Test and Evaluation

10. FREQUENCY: ONE/R

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: *See Block 16

13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Revision

14. DISTRIBUTION:

A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-CQD-E Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000

B. COPIES:

DRAFT: 0

FINAL: 1

15. TOTAL: 1

16. REMARKS: Delete paragraph 10.2 through 10.2.2.8 of referenced DID (Block 4). Written “Procedure must be submitted 60 days prior to FA” “Procedure must be approved by WVA Level 3”. The minimum elements of the procedure are detailed in paragraphs 5.3 thru 5.3.1.15 of ASTM-E1444. Specific heat treatment requirements will be per QAP-APPX-WVA paragraph 9.1. *With First Article or no later than 30 days prior to first production shipment when First Article is not required. Government requires 15 days to review/approve. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY: J Cannon H. DATE: 3 Mar 2025 I. APPROVED BY: William Potter, TAWV-CQD-E J. DATE: 3 March 2025

File details come from the government source that posted it. Updated .