CN-370000-HW688-DC006A.pdf

PDF 985 KB Posted

Attached to
Master Agreement FL|HW688|1c26fc40a005f0e83ec15988eda37a05
Contract number
HW688
Issued by
Florida

About this file

This is a Task Assignment (TA) executed between the State of Florida Department of Environmental Protection (FDEP) and Wood Environment & Infrastructure Solutions, Inc. The task assignment is issued under Contract Number HW688 and authorizes work on the Oasis Laundromat & Professional site located at 1705 James L Redman Parkway, Plant City, Hillsborough County, Florida. The Department Project Manager is Ginger Shirah, and the Contractor's Project Manager is Geoffrey Schaefer. The task assignment has a completion date of December 30, 2022.

The contractor is authorized to generate a Site Assessment Work Plan (SAWP) for the referenced property under a fixed unit rate payment structure. The total task assignment value is $5,000.00, with payment due upon submittal and FDEP approval of the Site Assessment Work Plan and Project Management deliverables. The deliverable is due on October 3, 2022. The SAWP includes a comprehensive site review of available documents and regulatory records, a site visit with completion of a drycleaning site visit checklist, and preparation of a detailed work plan with site narrative, figures showing proposed sampling locations, sampling plan checklist, proposed schedule for site assessment report submittal, and cost estimate/level of effort worksheets. The scope of work specifically notes that PFAS screening should be included and that no EDR reports, offsite property surveys, or potable well surveys are required.

View the file

Other files

File Type Posted
CN-370000-HW688-DC003A.pdf PDF
CN-370000-HW688-DC007A.pdf PDF
CN-370000-HW688-DC008A.pdf PDF
CN-370000-HW688-DC02ACO1.pdf PDF
CN-370000-GC793-CMC1.pdf PDF
CN-370000-GC910.pdf PDF
CN-370000-HW688-A1.pdf PDF
CN-370000-HW688-BF01A.pdf PDF
CN-370000-HW688-FIL 3.pdf PDF
CN-370000-HW688-FIL1.pdf PDF
CN-370000-HW688-FIL2.pdf PDF
CN-370000-HW688-DC001C.pdf PDF
CN-370000-HW688-DC004A.pdf PDF
CN-370000-HW688-DC005A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW688-DC01A.pdf PDF
CN-370000-HW688-DC01B.pdf PDF
CN-370000-HW688-BF01B.pdf PDF
CN-370000-HW688-DC005A.pdf PDF
CN-370000-HW688-DC02ACO2.pdf PDF
CN-370000-HW688-HW001A.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW688

DC006A Completion December 30, 2022

This Task Assignment authorizes Wood Environment & Infrastructure Solutions, Inc. to generate a Site Assessment Work Plan for the Oasis Laundromat & Professional site located in Plant City, FL in accordance with the attached Site Assessment Work Plan Task List.

Ginger Shirah (850) 245-8899 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Wood Environment & Infrastructure Solutions, Inc.

Wood Environment & Infrastructure Solutions, Inc.

Geoffrey Schaefer (850) 298-7707

ERIC_4720

1705 James L Redman Parkway, Plant City, Hillsborough County, Florida

Oasis Laundromat & Professional

✔ $ 5,000.00

$ 5,000.00

Scope of Work

Geoffrey Schaefer

Contract Manager

Geoff.Schaefer Digitally signed by Geoff.Schaefer Date: 2022.07.11 13:15:37 -04'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.07.07 10:07:20 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Site Assessment Work Plan; Project Management 10/03/2022

Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan; Project Management $ 5,000.00

$ 5,000.00

HW688

DC006A

Site Assessment Work Plan (SAWP) Task List

Site Review:

1. Information Portal/ERIC/OCULUS Review

a. Review applicable documents

b. Application

c. Site Screening Report

d. Other assessment data

e. Permitting/Compliance/Enforcement history

2. Additional information as available and as needed

a. Google maps, aerial photographs, topographical maps, building/planning department records, land use maps, insurance maps

b. Other regulatory agency records

c. Contact DC operator for operations history. May be able to find operator even if DC is no longer operating

Site Visit:

1. Complete Drycleaning Site Visit Checklist

2. Verify Site Screening Report information, especially sample location(s)

3. Identify likely source/release areas (machine location, service door, floor drains, lint trap, sewer line, septic tank, dumpster, ASTs/USTs). Look for evidence on floors/walls for former machine location.

4. Identify above/below ground utilities and potential impediments to assessment activities

5. Verify accuracy of site map, revise as necessary

6. Interview operator/owner for site history

7. Discuss work plan elements with property owner and get direction regarding approach to tenants, and schedule.

SAWP:

1. Completed Drycleaning Site Visit Checklist

2. Site summary/narrative – Initial conceptual site model (brief text)

- Current status and history of DC operations

- Primary solvents used both prior to and after eligibility determination

- Owner/operator/tenant information

- Status of site structures (original, renovated, razed/redeveloped, vacant)

- Historical site assessment/remediation information

- Anticipated lithology, depth to water, and groundwater flow direction

- Known or anticipated source areas -Site Assessment Approach

3. Figures

- Topo

- Site features, aerial view, facility layout, waste storage areas, utilities, etc.

- Proposed sampling locations (soil, MAGS, DPT profiling, MWs, sediment, surface water, sewer/septic/lint trap)

4. Sampling Plan/Checklist (templated, see Word SAWP Summary Checklist) - Including proposed number of samples for soil, MAGs, groundwater, etc.

5. Proposed schedule from approval of SAWP to submittal of SAR

6. Cost Estimate (CE)/Level of Effort (LOE) Worksheets, including subcontractor quotes, as appropriate. The CE/LOE should be submitted upon approval of the SAWP and under separate cover.

Notes: 1) No documents that are available in ERIC or HASPs should be included with the SAWP, 2) No EDR or other ESA-like reports are required, 3) No offsite property owner/use or well survey information is required, 4) No potable well survey, 5) SOW should include PFAS screening (see guidance)

IDW Quote 5.19.22.pdf
PermaFix Qte 9.5.21.pdf
Est. Total
LTL Transportation, per drum (55-gallon)
Transportation Stop Fee
Unit Price
Quantity/Size
CEF - Harveys GW Sampling - 05192022.pdf
Cost Estimate
ST2
ST3
Formula Sheet

File details come from the government source that posted it. Updated .