About this file

Document Summary

This Task Assignment (TA BF01A) is a state and local contract indefinite delivery vehicle entered into between the State of Florida Department of Environmental Protection (FDEP) and Wood Environment & Infrastructure Solutions, Inc. The task assignment is executed under Contract Number HW688 and involves environmental assessment activities at the Former Colt's Station site in Gilchrist County, Florida. Key personnel include Justin Cross as the Department Project Manager and Geoff Schaefer, P.E., as the Contractor's Project Manager. The work is funded through federal dollars from the State & Tribal Response Program (SRP) cooperative agreement administered by FDEP on behalf of the EPA.

The contract covers supplemental site assessment (SSA) activities with a total task assignment value of $9,323.00 on a fixed unit rate basis. Services are divided into four subtasks: (1) Project Management at $681.41, (2) SSA Work Plan/QAPP and Health and Safety Plan preparation at $900.95, (3) Groundwater sampling from seven existing monitoring wells with chemical analysis for VOCs, PAHs, TRPHs, and lead at $4,884.14, and (4) Supplemental Site Assessment Report preparation at $2,856.50. Deliverables include the QAPP Workplan/HASP due March 15, 2022; field notes, photos, and sampling logs due March 31, 2022; and the final Supplemental Site Assessment Report due May 16, 2022. Invoicing is contingent upon FDEP approval of each deliverable phase, with the overall task assignment completion date of June 15, 2022.

View the file

Other files

File Type Posted
CN-370000-HW688-DC001C.pdf PDF
CN-370000-HW688-DC004A.pdf PDF
CN-370000-HW688-DC005A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW688-DC006A.pdf PDF
CN-370000-HW688-DC01A.pdf PDF
CN-370000-HW688-DC01B.pdf PDF
CN-370000-HW688-BF01B.pdf PDF
CN-370000-HW688-DC005A.pdf PDF
CN-370000-HW688-DC02ACO2.pdf PDF
CN-370000-HW688-HW001A.pdf PDF
CN-370000-HW688-DC003A.pdf PDF
CN-370000-HW688-DC007A.pdf PDF
CN-370000-HW688-DC008A.pdf PDF
CN-370000-HW688-DC02ACO1.pdf PDF
CN-370000-GC793-CMC1.pdf PDF
CN-370000-GC910.pdf PDF
CN-370000-HW688-A1.pdf PDF
CN-370000-HW688-FIL 3.pdf PDF
CN-370000-HW688-FIL1.pdf PDF
CN-370000-HW688-FIL2.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW688

BF01A Completion June 15, 2022

Per Wood's 02/18/2022 (revised 02/25/2022) Cost Proposal and Level of Effort, this task assignment covers the collecting of groundwater samples from seven (7) existing monitoring wells as well as depth to water measurements at the Former Colt's Station site in Gilchrist County.

Justin Cross 850.245.8968 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Wood Environment & Infrastructure, Inc.

Wood Environment & Infrastructure, Inc.

Geoff Schaefer, P.E. 850.298.7707

ERIC_5564

1022 SE State Road 26, Trenton, Gilchrist County

Former Colt's Station

✔ $ 9,323.00

$ 9,323.00

Scope of Work

Geoff Schaefer, PE

Project Manager

Geoff.Schaefer Digitally signed by Geoff.Schaefer Date: 2022.03.03 14:11:27 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2022.03.01 08:42:35 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

QAPP Workplan/HASP 03/15/2022

Field notes, photos, COCs, sampling logs 03/31/2022

Supplemental Site Assessment Report/Project Management 05/16/2022

FDEP approval of QAPP Workplan/HASP (Subtask 2) $ 900.95

FDEP approval of field notes, photos, COCs, and sampling logs (Subtask 3) $ 4,884.14

FDEP approval of Supplemental Site Assessment Report/Project Managment (Subtasks 1 & 4) $ 3,537.91

$ 9,323.00

HW688

BF01A

www.FloridaDEP.gov

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum TO: Wood Environment & Infrastructure, Inc., HW688 Contract File

FROM: Justin Cross, Contract Manager

DATE: February 28, 2022

SUBJECT: Negotiation Summary - SRP18, TA BF01A Supplemental Site Assessment (SSA) Activities Former Colt’s Station, Gilchrist County

ERIC_5564

This Task Assignment (TA) is intended for conducting additional SSA activities at the Former Colt’s Station site in Trenton, Gilchrist County. The scope of work builds upon the previous contamination assessment activities and was reviewed and approved by the Department’s District and Business Support Program (DBSP) for the eventual issuance of a Site Rehabilitation Completion Order (SRCO) as described in Rule 62-780.680, Florida Administrative Code (F.A.C). The services are being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement that is administered by DEP on behalf of EPA.

Subtask 1 Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, and fringe. The cost of this subtask is $681.41

Subtask 2: SSA Work Plan/QAPP, and Health and Safety Plan In accordance with an EPA directive, this subtask includes the completion of a Work Plan/Quality Assurance Project Plan (QAPP), a Health and Safety Plan (HASP). The SSA QAPP Workplan will provide a brief summary of the scope of work and tables and figures showing the proposed sample locations. The agreed upon cost of this subtask is $900.95.

Subtask 3 SSA Activities Under this subtask, Wood will collect groundwater samples from the seven (7) existing monitoring wells (MW-1 through MW-7) at the site. Depth to water measurements will also be collected. The monitoring wells will be sampled and analyzed for volatile organic compounds (VOCs) (including MTBE) using the United States Environmental Protection Agency (USEPA) Method 8260, polynuclear aromatic hydrocarbons (PAHs) using USEPA Method 8270, total recoverable petroleum hydrocarbons (TRPHs) using the FL-PRO method and lead using USEPA Method 6010 by Advanced Environmental Laboratories (AEL) of Tallahassee, Florida.

All sampling efforts will be conducted in accordance with FDEP Standard Operating Procedures. The cost of this subtask is $4,884.14.

http://www.floridadep.gov/

Negotiation Summary – Task Assignment (TA) BF01A Former Colt’s Station

ERIC_5564

Gilchrist County SSA Activities February 28, 2022 www.FloridaDEP.gov

Subtask 4 SSA Report Upon completion of the field activities and receipt of the analytical data, Wood will prepare a Supplemental Site Assessment Report Addendum for the site detailing the findings of the most recent SSA activities as described above including updated site figures and tables with historical and new data included for comparison purposes and will also include conclusions and recommendations for any future work needed to meet Chapter 62-780, F.A.C. closure requirements. The cost of this subtask is $2,856.50.

Summary DEP’s SRP Contract Manager and Wood’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $9,323.00. Documentation of these costs is included in the Level of Effort/Cost Proposal (LOE-CP) Form and LOE-CP letter provided by Wood on February 18, 2022 (revised February 25, 2022), as well as the Task Assignment Form for BF01A prepared by DEP. The final deliverable must be received by FDEP no later than May 16, 2022.

Wood’ is a trading name for John Wood Group PLC and its subsidiaries

Wood Environment & Infrastructure Solutions, Inc.

1441 McClay Commerce Drive, Suite 102

Tallahassee, Florida 32312

USA

T: 850-656-1293 www.woodplc.com

February 18, 2022

Mr. Justin Cross Florida Department of Environmental Protection State Brownfields Program 2600 Blair Stone Road Tallahassee, FL 32399-2400

RE: Cost Proposal to Conduct Supplemental Site Assessment Activities (SSA-9)

Former Colt’s Station Site Trenton, Gilchrist County, Florida FDEP FAC ID No: 21/8508484, ERIC_5564 HW688 Task Assignment No: To Be Determined

Dear Justin, Wood Environment & Infrastructure Solutions, Inc., (Wood) is pleased to provide this cost proposal as requested to conduct additional assessment activities at the former Colt’s Station site. Please find attached the cost summary spreadsheets for the workplan and QAPP package for the above-referenced site. The Workplan/QAPP will include a history of the site, site background including previous assessments, a site location map and site map with proposed monitoring well locations.

Subtask 1: Project Management This subtask is for project management and includes a percentage of the overall project fees and has been negotiated as a contract rate.

Subtask 2: Supplemental Site Assessment (SSA) Cost Proposal This task covers the level of effort to prepare the QAPP Workplan and this cost proposal. The SSA QAPP Workplan will provide a summary of the scope of work and include tables and figures showing the proposed sample locations.

Subtask 3: SSA Activities Under this subtask, Wood will collect groundwater samples from the seven existing monitoring wells (MW-1 through MW-7) at the site. Depth to water measurements will also be collected.

The monitoring wells will be sampled and analyzed for volatile organic compounds (VOCs) (including MTBE) using the United States Environmental Protection Agency (USEPA) Method 8260, polynuclear aromatic hydrocarbons (PAHs) using USEPA Method 8270, total recoverable petroleum hydrocarbons (TRPHs) using the FL-PRO method and lead using USEPA Method 6010 by Advanced Environmental Laboratories (AEL) of Tallahassee, Florida. All sampling efforts will be conducted in accordance with FDEP Standard Operating Procedures.

Subtask 4: SSA Report Upon completion of the field activities and receipt of the analytical data, Wood will prepare a Supplemental Site Assessment Report Addendum for the site detailing the findings of the most recent SSA activities as described above including updated site figures and tables with historical and new data included for comparison purposes, as well as conclusions and recommendations for the site.

Deliverables

The total estimated cost for the proposed activities is $9,323.00. The supplemental site assessment activities can be conducted once a signed Task Assignment has been received. It is estimated to take one day for the groundwater sampling including round trip travel.

Please call to discuss if you have any questions.

Sincerely, Wood Environment & Infrastructure Solutions, Inc.

Geoff Schaefer, P.E. Ron White, P.G.

Project Manager Principal Geologist

Deliverable Schedule

SubTask Proposed

Field/Office Date

Samples Deliverable Proposed

Deliverable Due Date

2 Mar 2022 NA Site Assessment / QAPP Work Plan Mar 15, 2022 3 Mar/Apr 2022 MW-1 through MW-7 GW Sampling Mar 31, 2022 4 Apr 2022 NA SSAR-9 May 16, 2022

2-4 May 2022 NA Invoice Jun 15, 2022

ID Task Mode

Task Name Start Finish

1 Project Setup Mon 2/28/22 Tue 3/1/22

2 Subtask 2 Mon 2/28/22 Tue 3/15/22

3 QAPP/HASP/WP Mon 2/28/22 Tue 3/15/22

4 Subtask 3 Tue 3/15/22 Thu 3/31/22

5 Groundwater Sampling Thu 3/31/22 Thu 3/31/22

6 Subtask 4 Wed 3/16/22 Thu 6/16/22

7 Supplemental Site Assessment 9 Fri 4/1/22 Mon 5/16/22

8 Invoice Thu 6/16/22 Thu 6/16/22

GS,RP,RW

GS,RW,GB,RP

CP,ZL

GS,RW,AH,GB,RP

6/16

232629 1 4 7 10131619222528 3 6 9 12151821242730 2 5 8 11141720232629 2 5 8 11141720232629 1 4 7 10131619222528 February 2022 March 2022 April 2022 May 2022 June 2022

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Project: Colts SSA-9 Date: Fri 2/18/22

FDEP COST ESTIMATEContractor: Wood Environment & Infrastructure Solutions, Inc.

Date: February 18, 2022

Task #: SubTask 1 Project Management

Site: Colt's Station SubTask 2 SA QAPP Workplan

Activity/Phase: Supplemental Site Assessment SubTask 3 Groundwater Sampling

Project Manager: Justin Cross (FDEP/Geoff Schaefer (Wood) SubTask 4 Supplemental Site Assessment Report

Wood Project # 6783227021 SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$57.15 Project Manager GS 4 4.0 $57.15 Program Manager 0 0 0 0 0 $57.15 Project Manager GS 0 0 0 0 0 $49.56 Consulting Eng/Sci RW 19 5 0 14 0 $45.00 Principal Eng/Sci 0 0 0 0 0 $45.00 Senior Scientist 0 0 0 0 0 $45.00 Senior Engineer 0 0 0 0 0 $19.23 Staff Scientist ZL 12 0 12 0 0 $28.85 Project Scientist AH 4 0 0 4 0 $19.25 Staff Scientist CP 14 0 14 0 0 $19.25 Staff Engineer 0 0 0 0 0 $49.56 Technical Editor 0 0 0 0 0 $33.00 Construction Supervisor 0 0 0 0 0 $19.23 O&M Specialist 0 0 0 0 0 $30.64 Drafter/GIS GB 5 1 0 4 0 $23.00 Senior Technician 0 0 0 0 0 $26.09 Engineering Tech 0 0 0 0 0 $20.00 Project Assistant 0 0 0 0 0 $19.23 Field Technician 0 0 0 0 0 $39.27 Project Accountant 0 0 0 0 0 $21.94 Contracts/Purchasing 0 0 0 0 0 $21.94 Clerical RP 2 1 0 1 0 $85.84 Surveyor 0 0 0 0 0

$0.00 0 0 0 0 0 $0.00 0 0 0 0 0 $0.00 0 0 0 0 0

Total Hours 60 4 7 26 23 0

Direct Labor $1,982.45 $228.07 $300.38 $500.26 $953.74 $0.00

Overhead 127.30% $2,523.65 $290.33 $382.38 $636.83 $1,214.11 $0.00 Gen & Admin 6.81% $135.01 $15.53 $20.46 $34.07 $64.95 $0.00 Fringe 37.50% $743.42 $85.53 $112.64 $187.60 $357.65 $0.00 Total Labor $5,384.53 $619.46 $815.86 $1,358.76 $2,590.45 $0.00

REV: 02/03 CEF ARCADIS Page 1

FDEP COST ESTIMATEContractor: Wood Environment & Infrastructure Solutions, Inc.

Date: February 18, 2022

Task #: SubTask 1 Project Management

Site: Colt's Station SubTask 2 SA QAPP Workplan

Activity/Phase: Supplemental Site Assessment SubTask 3 Groundwater Sampling

Project Manager: Justin Cross (FDEP/Geoff Schaefer (Wood) SubTask 4 Supplemental Site Assessment Report

Wood Project # 6783227021 SubTask 5

Totals 1 2 3 4 5 Travel

Vehicle Rental $120.00 $0.00 $120.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $0.00 $120.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $2,629.00 $0.00 $2,629.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $300.00 $0.00 $300.00 $0.00 $0.00 Total Laboratory $2,929.00 $0.00 $2,929.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $0.00 $40.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $290.00 $0.00 $290.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) (ODCs not covered by G&A) $21.00 $3.50 $10.50 $7.00 $0.00 Total Field Expenses $351.00 $3.50 $340.50 $7.00 $0.00

Subtotal $8,784.53 $619.46 $819.36 $4,748.26 $2,597.45 $0.00 Completion Fee $538.47 $61.95 $81.59 $135.88 $259.05 $0.00

Total Estimated Cost $9,323.00 $681.41 $900.95 $4,884.14 $2,856.50 $0.00

REV: 02/03 CEF ARCADIS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Colt's Station SUBTASK: SA QAPP Workplan

DATE: 2/18/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE STAFF WORK DESCRIPTION HOURS

Consulting Eng/Sci RW 5 Drafter/GIS GB 1 Clerical RP 1

TOTAL LABOR 7

VEHICLE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL SUBS $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

Fast Turn-Around

TOTAL FAST TURN $0.00

SHIPPING RATE COSTING UNIT USEAGE TOTALS

TOTAL SHIPPING $0.00

EQUIPMENT RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

FIELD EXPENSES RATE COSTING UNIT USEAGE TOTALS

Equipment (Other) ODCs not covered by G&A copies, computer, cell phone, etc. $3.50 Man-Day 1 $3.50

SUBTOTAL $3.50

TOTAL FIELD EXPENSES $3.50

ITEM

STAFF

Figures Prepare QAPP, HASP and WP

Document formating

ITEM

ITEM

TYPE

FINAL --7/24/96

SUBTASK: Groundwater Sampling

DATE: 2/18/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE STAFF WORK DESCRIPTION HOURS

Staff Scientist ZL 12 Staff Scientist CP 14

TOTAL LABOR 26

VEHICLE RATE UNIT USEAGE

$480.00 week 0 $0.00 $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL SUBS $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Groundwater VOAs TCL (8260) $73.00 7 3 Dup/TripBlk/EqBlk $730.00 PAHs TCL (8270) $110.00 7 2 Duplicate $990.00 TRPH (FL-PRO) $88.00 7 2 Duplicate $792.00 Lead (6010) $13.00 7 2 Duplicate $117.00

TOTAL LAB $2,629.00

Fast Turn-Around

TOTAL FAST TURN $0.00

SHIPPING RATE COSTING UNIT USEAGE TOTALS

Large - 25 to 50 LBS $150.00 Overnight 2 $300.00

TOTAL SHIPPING $300.00

EQUIPMENT RATE COSTING UNIT USEAGE TOTALS

$1,160.00 week 0 $0.00 $290.00 day 1 $290.00

TOTAL EQUIPMENT $290.00

FIELD EXPENSES RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables $40.00 day 1 $40.00

SUBTOTAL $40.00

Equipment (Other) Office ODCs copies, computer, cell phone, etc. $3.50 Man-Day 3 $10.50

SUBTOTAL $10.50

TOTAL FIELD EXPENSES $50.50

ITEM

Shallow GW Sampling Kit

ITEM

samples to lab

ITEM

STAFF

TYPE

Equipment Van

Mobilization, collect water levels and samples from 7 monitoirng wells, stage/destage for fiel Mobilization, collect water levels and samples from 7 monitoirng wells

SUBTASK: Supplemental Site Assessment Report

DATE: 2/18/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE STAFF WORK DESCRIPTION HOURS

Consulting Eng/Sci RW 14 Project Scientist AH 4 Drafter/GIS GB 4 Clerical GS 1

TOTAL LABOR 23

VEHICLE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL SUBS $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

Fast Turn-Around

TOTAL FAST TURN $0.00

SHIPPING RATE COSTING UNIT USEAGE TOTALS

TOTAL SHIPPING $0.00

EQUIPMENT RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

FIELD EXPENSES RATE COSTING UNIT USEAGE TOTALS

Equipment (Other) Office ODCs copies, computer, cell phone, etc. $3.50 Man-Day 2 $7.00

SUBTOTAL $7.00

TOTAL FIELD EXPENSES $7.00

ITEM

ITEM

ITEM

STAFF

Document formating

TYPE

Figures

Site Assessment Report text Data entry, GW log, Adapt upload

Formula Sheet

Project Management Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Labor Costs $228.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$247.80 $0.00 $693.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $230.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $115.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $269.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $30.64 $0.00 $122.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$21.94 $0.00 $21.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dol $228.60 $300.38 $500.26 $953.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Project Management $1,754.38 = sum of Direct Labor Costs from Subtasks 2 through 10 $228.07 =13% of Direct Labor Costs (Project Management)

3.991 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Service Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00