CN-370000-HW560-DC005K.pdf
PDF 761 KB Posted
- Contract number
- HW560
- Issued by
- Florida
About this file
This document package comprises a Task Assignment Notification Form and supporting cost estimates for groundwater sampling services under Florida Department of Environmental Protection (FDEP) Contract No. HW560. The primary parties involved are the FDEP, contractor Tetra Tech, Inc., and the site operator Webbs Cleaners located at 1601 Broadway Avenue, Riviera Beach, Palm Beach County, Florida (ERIC_5175). The task assignment was executed on April 27, 2021, with supporting cost documentation dated April 19, 2021. The DEP Contract Manager is Walsta Jean-Baptiste, and the contractor representative is Shawn Ouellette, P.G.
The task assignment authorizes Tetra Tech to conduct groundwater sampling at the Webbs Cleaners site in accordance with the contractor's scope of work, cost estimate, and bid documentation. The work is divided into three subtasks: Project Management (Subtask 1), Biennial Groundwater Sampling (Subtask 2), and Disposal of Investigation-Derived Waste (Subtask 3). The scope includes sampling seven monitoring wells, generating tables, preparing a report with findings and recommendations, and disposing of purge water and other investigation-derived waste. The total task assignment value is $7,127.78 on a fixed-price basis with no retainage, covering 48 hours of labor and associated costs. The final deliverable—a Groundwater Sampling Report and ADaPT/GIS update for Subtasks 1-3—is due August 6, 2021, with task assignment execution through November 1, 2021. Costs are itemized for labor (Project Manager, Senior CADD Specialist, Scientist II, Senior Technician, and Scientist IV), equipment, vehicle rental, laboratory analysis, field expenses, and subcontractor services including IDW disposal estimated at $100 per drum through Erwin Remediation, Inc.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW560
D000 NADC005K
Tetra Tech, Inc.
Shawn Ouellette
850-245-8705Walsta Jean-Baptiste
ERIC_5175
Webbs Cleaners
1601 Broadway Avenue, Riviera Beach, Palm Beach County
Monitoring
This Task Assignment authorizes Tetra Tech to conduct groundwater sampling in accordance with the Tetra Tech scope of work, cost estimate, bid documentation, and schedule received on April 19, 2021.
Groundwater Sampling Report and ADaPT/GIS update - Subtasks 1-3
08/06/2021
11/01/2021
$ 7,127.78 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.04.27 08:57:57 -04'00'
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.04.27 08:58:08 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.04.27 10:22:42 -04'00'
Shawn Ouellette Digitally signed by Shawn Ouellette Date: 2021.04.27 12:08:40 -04'00'
$ 7,127.78
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Sampling Report and ADaPT/GIS update - Subtasks 1-3 08/06/2021
FDEP approval of Groundwater Sampling Report and ADaPT/GIS update - Subtasks 1-3 $ 7,127.78
$ 7,127.78
HW560
DC005K
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: HW560 Contract File FROM: Walsta Jean-Baptiste, Contract Manager SUBJECT: Groundwater Sampling Webbs Cleaners ERIC_5175
DC005K
DATE: April 27, 2021
This Task Assignment authorizes Tetra Tech to conduct groundwater sampling in accordance with the Tetra Tech scope of work, cost estimate, bid documentation, and schedule received on April 19, 2021.
The proposed scope of work was amended to divide the sampling effort between two samplers.
Based on past site work Tetra Tech proposed the use of two samplers.
The total cost related to this Task Assignment is $7,127.78 with 48 hours.
FDEP COST ESTI MATEContractor: Tetra Tech
Date: April 19, 2021
Task #: HW560-DC005K SubTask 1 Project Management SubTask 6
Site: Webbs, Riviera Beach (ERIC_5175) SubTask 2 Biennial Groundwater Sampling SubTask 7
Activity/Phase: Groundwater Sampling SubTask 3 Disposal of IDW SubTask 8
Project Manager: Walsta Jean-Baptiste SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$48.08 Project Manager (SO) 4 4.3 $34.86 Senior CADD Specialist (FM) 3 3 0 0 0 0 0 0 0 0 $32.19 Scientist II (JE) 18 15.00 3 0 0 0 0 0 0 0 $34.10 Senior Technician 9 9.00 0 0 0 0 0 0 0 0 $48.08 Scientist IV (SO) 14 13.0 1 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 48 4.3 40.0 4 0 0 0 0 0 0 0
Direct Labor $1,872.02 $208.00 $1,519.37 $144.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 143.00% $2,676.99 $297.44 $2,172.70 $206.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 12.20% $554.97 $61.66 $450.43 $42.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $5,103.98 $567.10 $4,142.50 $394.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $93.60 $10.40 $75.97 $7.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $165.00 $97.00 $68.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $165.00 $97.00 $68.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 Page 1
FDEP COST ESTI MATEContractor: Tetra Tech
Date: April 19, 2021
Task #: HW560-DC005K SubTask 1 Project Management SubTask 6
Site: Webbs, Riviera Beach (ERIC_5175) SubTask 2 Biennial Groundwater Sampling SubTask 7
Activity/Phase: Groundwater Sampling SubTask 3 Disposal of IDW SubTask 8
Project Manager: Walsta Jean-Baptiste SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $0.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $528.00 $528.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $109.00 $109.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $637.00 $637.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $417.10 $417.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $507.80 $507.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $6,617.38 $577.50 $5,460.27 $579.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $510.40 $56.71 $414.25 $39.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $7,127.78 $634.21 $5,874.52 $619.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 Page 2
LEVEL OF EFFORT WORKSHEET
SITE : Webbs, Riviera Beach (ERIC_5175) SUBTASK 2: Groundwater Sampling
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist II (JE) Mobilization (2 hrs field prep - 1 hr travel) 3 prep includes gathering cal solutions, lab glassware, coolers, h2o meter, flow thru cell, Senior Technician ( MM) Mobilization (.5 hrs field prep - 1 hr travel) 1.5
Scientist II (JE) Monitoring well sampling and gauging (7 wells / 1.5 hr per well)(purge waters will be placed in Drum) 6
(MW001, MW002, MW003, MW005, MW008, MW009, & MW102)
Senior Technician ( MM) Assist with sampling for safety in Urban area. 6
Scientist II (JE) Demobilization (1 hr travel, 1 hr equipment return, 1 hr demob) 3 Senior Technician ( MM) Demobilization (1 hr travel, .5 hr demob) 1.5 Scientist II (JE) Table Generation/ Gis Tables 3
Scientist IV (SO) General Data Report of Findings with Reccomendations 12
Scientist IV (SO) Data management (7 samples @ 8 min/sample) 1
Senior Cadd Specialist Graphics ( 1.5 Hrs per drawing) 3
TOTAL LABOR 40.0
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment Shallow Groundwater sampling Kit $208.55 day 2 $417.10 Drum (Purge Water to be containerized) $58.20 Each 1 $58.20 Field expendables $32.50 day 1 $32.50
TOTAL EQUIPMENT $507.80
VEHICLE TYPE RATE UNIT USAGE
Truck $97.00 Day 1 $97.00
TOTAL VEHICLE $97.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist II (JE) $36.00 Day 0 $0.00
HOTEL
Scientist II (JE) $157.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC
Organics Air TO15 $200.00 0 0 $0.00 Organics Aqueous 8260* $66.00 7 1 $528.00
* = Dry Clean Short List
Natural Attenuation Parameters:
Conductivity Aqueous Field Measurement 7 0 Dissolved Oxygen Aqueous Field Measurement 7 0 Fe+2 Aqueous Field Measurement 7 0 ORP Aqueous Field Measurement 7 0 pH Aqueous Field Measurement 7 0 Temperature Aqueous Field Measurement 7 0
Shipping, FedEx, 50 lb @ 24 hrs, plus ice $109.00 1 $109.00
TOTAL LAB $637.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
Webbs Sampling 2021modified.xlsx LOE 2
LEVEL OF EFFORT WORKSHEET
SITE : Webbs, Riviera Beach (ERIC_5175) SUBTASK 3:Disposal of IDW
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist II (JE) Round trip travel from Stuart 2 Drum removal 1
Scientist IV (SO) Disposal profile review and approval, manifests for FDEP submittal 1
TOTAL LABOR 4
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Car $68.00 Day 1 $68.00
TOTAL VEHICLE $68.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW Disposal Dispose of 1 drums of IDW (estimated) Erwin 1 drum of non-haz water (estimated) $100.00 drum $100.00
TOTAL $100.00
Webbs Sampling 2021modified.xlsx LOE 3
Tetra Tech, Inc.
759 South Federal Highway, Suite 314 Stuart, FL 34994
Tel 772.781.3400 Fax 772.781.3411 www.tetratech.com
April 19, 2021 TTST-HW560-21-036 Rev1
Mr. Dean Cox, P.E.
Contract Manager Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400
SUBJECT: TA REQUEST GROUNDWATER SAMPLING
WEBBS CLEANERS
1601 BROADWAY AVENUE, RIVIERA BEACH,
PALM BEACH COUNTY, FLORIDA
ERIC_5175
Dear Mr. Cox:
Tetra Tech is requesting a Task Assignment to sample (7) monitor wells the former Webbs Cleaners (DC005) site in Riviera Beach, FL. The proposed activities include groundwater sampling, table generation, report preparation and IDW disposal.
The proposed deliverables and deliverable due dates are summarized below:
• Subtask 1 – Project Management
• Subtask 2 – Submittal of a Letter Report with evaluations and recommendations for a path forward:
Deliverable due date June 30, 2021
• Subtask 3– IDW Disposal:
Deliverable (Final IDW Manifests) due date July 30, 2021
Should you have any questions, please contact me at 772.781.3412.
Tetra Tech, Inc.
Sincerely, Shawn Ouellette, P.G.
Project Manager
Enclosure c: File
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Jay McGovern
Tetra Tech
759 South Federal Hwy, Suite 314
Stuart, FL 34994
February 13, 2020
Re: Drum Disposal – Non-Hazardous Material - Florida
Mr. McGovern:
The price for transportation and disposal of drums of either non-hazardous soil or groundwater located in the State of Florida (excluding the Florida Keys) will be $100.00 per drum for both transportation and disposal.
Please feel free to contact me on my direct line at 850-292-6511 if you have any questions.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| Webbs Sampling 2021modified.pdf |
| CE |
| LOE 2 |
| LOE 3 |
File details come from the government source that posted it. Updated .