This document is a Task Assignment Notification Form for the Florida Department of Environmental Protection (FDEP) Waste Cleanup Programs under DEP Contract No. HW560. The task assignment CSS-31A was issued to Tetra Tech, Inc. for site inspection and groundwater sampling activities at the Former Aurora Precision Metals facility located at 325 SW 60th Avenue, Ocala, Marion County, Florida. The work is being conducted in accordance with the U.S. EPA Superfund State Political Subdivision and Indian Tribe Site Specific Cooperative Agreement (No. 00D95619), administered by FDEP. Ginger Shirah serves as the DEP Contract Manager, with Gerald Walker, P.G., representing Tetra Tech as the contractor representative.
The task assignment encompasses four subtasks with a total fixed price value of $31,792.71: Subtask 1 covers project management ($1,696.45); Subtask 2 includes site reconnaissance, Quality Assurance Project Plan (QAPP) development, Health and Safety Plan (HASP), and utility location services ($6,743.46); Subtask 3 encompasses well installation, groundwater sampling, laboratory analysis, and field activities ($19,562.99); and Subtask 4 includes preparation of draft and final Site Inspection Reports ($3,789.81). The final deliverable is the Final Site Inspection Report, due July 9, 2021, with an execution period through July 30, 2021. The cost proposal was submitted by Tetra Tech on April 13, 2021, and revised on April 26, 2021, incorporating subcontractor services from Preferred Drilling Solutions ($10,280.00 for well installation and abandonment), Site Lines LLC ($500.00 for utility location), and TestAmerica for laboratory analysis ($2,692.46). Invoicing is contingent upon FDEP approval of deliverables at three milestones: approval of the site reconnaissance field notes and workplan ($6,743.46), approval of field notes and sampling documentation ($19,562.99), and approval of the final Site Inspection Report ($5,486.26).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW560
CERSI CER19CSS-31A
Tetra Tech, Inc.
Gerry Walker, P.G. Phone #: (850) 385-9899
(850) 245-8899Ginger Shirah
ERIC_14988
Aurora Precision Metals
325 SW 60th Ave, Ocala, Marion County 32674
Site Inspection (SI) with Groundwater Sampling
This Task Assignment (TA) is issued in accordance with the Cost Proposal submitted by Tetra Tech, Inc. on April 13, 2021, revised on April 26, 2021. This TA includes Project Management, Site Reconnaissance, Development of a Site Inspection (SI) Quality Assurance Project Plan (QAPP)/Workplan, Well Installation and Groundwater Sampling, and the completion of a draft & final Site Inspection Report. The final deliverable is the Final Site Inspection Report.
Final Site Inspection Report
07/09/2021
07/30/2021
$ 31,792.71 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Ginger Shirah Digitally signed by Ginger Shirah Date: 2021.04.27 13:48:10 -04'00'
Ginger Shirah Digitally signed by Ginger Shirah Date: 2021.04.27 13:48:19 -04'00'
Digitally signed by Jennifer Farrell Date: 2021.04.27 16:30:20 -04'00'
Digitally signed by: Gerald Walker DN: CN = Gerald Walker email = gerry.walker@tetratech.com C = US O = Tetra Tech OU = 112-NUS Date: 2021.04.28 10:34:34 -04'00'
Gerald Walker
$ 31,792.71
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Recon Field Notes,Site Inspection Workplan/Quality Assurance Project Plan (QAPP) and Health and Safety Plan (HASP) 05/17/2021
Field notes, lab shipment receipts, chain of custody, and photographic log from well sampling activities 06/11/2021
Final Site Inspection Report 07/09/2021
FDEP Approval of the Site Recon Field Notes, Site Inspection Workplan/Quality Assurance Project Plan (QAPP) and Health and Safety Plan (HASP) (Subtask 2) $ 6,743.46
FDEP Approval of field notes, lab shipment receipts, chain of custody, and photographic log from well sampling activities (Subtask 3) $ 19,562.99
FDEP Approval of the Final Site Inspection Report (Subtasks 1 and 4) $ 5,486.26
$ 31,792.71
HW560
CSS-31A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
TO:
FROM:
DATE:
SUBJECT:
Tetra Tech, Inc., HW560 Contract File - CERCLA Site Screening
Ginger Shirah for Kelly Crain, Contract Manager
April 27, 2021
Negotiation Summary – Task Assignment (TA) CSS-31A Aurora Precision Metals, ERIC_14988, Ocala, Marion County Site Reconnaissance and Site Inspection (SI) Workplan/QAPP Development www.floridadep.gov
The Scope of Work (SOW) for this TA as agreed by both FDEP and Tetra Tech, Inc., is to perform initial Site Inspection (SI) activities at the above referenced site, in accordance with the U.S. EPA Superfund State Political Subdivision and Indian Tribe Site Specific Cooperative Agreement (No. 00D95619), administered by FDEP.
Subtask 1: Project Management This subtask is for project management and includes a percentage of the overall project fees and has been negotiated as a contract rate. The agreed upon cost of this subtask is $1,696.45.
Subtask 2: Site Recon, QAPP & HASP This subtask includes labor hours for the site recon to evaluate current site features and to stake and survey proposed monitor well locations, as well as the completion of a QAPP and HASP for future SI activities. This subtask also includes subcontractor costs to coordinate and complete a utility location and costs associated with the submittal of a Marion County Right of Way (ROW) Utilization Permit application. The agreed upon cost of this subtask is $6,743.46.
Subtask 3: Well Installation and Groundwater Sampling This subtask includes labor hours, travel, equipment costs and subcontractor costs associated with the installation and abandonment of four temporary monitoring wells, groundwater sampling, and lab costs for the groundwater analysis. Deliverables of this subtask include field notes, monitoring well construction logs, sampling logs, chain of custody, and photographic logs from the SI field activities.
The agreed upon cost of this subtask is $19,562.99.
Subtask 4: Site Inspection Report This subtask includes labor hours associated with the preparation of a Site Inspection Report. The report will document field and laboratory findings and will include maps showing the site and sampling locations, groundwater flow direction, plume maps for groundwater, and tables documenting data from the laboratory analyses, monitoring well construction, depths to and relative elevations of groundwater and analytical results. Deliverables of this subtask include a draft and final Site Inspection Report. The agreed upon cost of this subtask is $3,789.81.
http://www.floridadep.gov/ www.floridadep.gov
Negotiation Summary – Task Assignment (TA) CSS-31A Aurora Precision Metals, ERIC_14988, Ocala, Marion County Site Inspection - Groundwater Sampling April 27, 2021
Summary The FDEP Contract Manager and the Tetra Tech, Inc. Contract Manager agree to the SOW and the final cost. The final cost of the Task Assignment is $31,792.71 per the Cost Proposal and LOE received on April 13, 2021 and revised on April 26, 2021.
The cost associated with the initial Cost Proposal received on April 13, 2021 was $7,728.61. Negotiations between FDEP and Tetra Tech, Inc. concluded with the following modifications:
• The first cost proposal included activities associated with the site recon, the utility locate, ROW permit application and the development of the SI QAPP/HASP development, but did not include the SI field activities or the completion of the SI Report (subtasks 3 and 4 of this TA). Therefore, subtasks 3 and 4 were added to this proposal and incorporated into this task assignment.
• Quotes for the utility locate were not provided. Bids for the utility locate were solicited and the lowest bidder was selected, resulting in a small decrease in this line item amount.
Due to these changes, the agreed upon final cost of this task assignment is $31,792.71.
Tetra Tech, Inc.
1558 Village Square Blvd., Ste. 2, Tallahassee, FL 32309-2478
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
TetraTech/TAL-21-26-112PST9893
April 26, 2021
Department of Environmental Protection Waste Cleanup Programs ATTN: Ms. Ginger Shirah MS #4535 Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Reference: Florida Department of Environmental Protection (DEP) Waste Cleanup Programs Consolidated Contract HW560
Subject: Revised Cost Proposal – Site Inspection at Aurora Precision Metals, Ocala, Marion County, Florida
Dear Ms. Shirah:
Tetra Tech Inc., (Tetra Tech) is pleased to submit to the Florida Department of Environmental Protection (FDEP) this cost proposal to conduct the Site Inspection (SI) at the Former Aurora Precision Metals Site located at 325 SW 60th Avenue, Ocala, Marion County, Florida. Services provided in this proposal will be completed as four subtasks including: Subtask 1, Project Management; Subtask 2, Site Recon, Quality Assurance Project Plan (QAPP), and Health and Safety Plan (HASP); Subtask 3, Fieldwork including Monitoring Well Installation and Groundwater Sampling; and Subtask 4, Report. These subtasks will include the following activities:
Subtask 1 - Project Management: Project Management includes managing the project scope, schedule, and budget; and procurement of subcontractors. The level of effort is based on the HW560 Contract requirements and assumes 9 hours for Task 1.
Subtask 2 – Site Recon, QAPP & HASP: This task includes conducting a site reconnaissance, completion of a QAPP and HASP for the sampling event, submittal of a Marion County Right of Way (ROW) Utilization Permit application and to coordinate utility location. The level of effort assumes 1 hour for a Scientist V (Gerry Walker [GW]), 14 hours for a Scientist V (Rick Hicks [RH]), 36 hours for a Scientist I (David Huggins [DH]), 4 hours for an Engineer I (Misty Quandt [MQ]), and 4 hours for figure and permit site plan preparation (James Madden [JM]). Subcontracted services for a utility locate by Site Lines are also included in this subtask (three bids attached, lowest bidder).
The site reconnaissance will be conducted by the Scientist V and the Scientist I. At that time, proposed monitoring well locations will be staked and surveyed with a GPS. The Scientist I will return to the site to verify utility clearance, make adjustments based on the marked utilities and survey by GeoTek, make detailed site feature measurements for the background well proposed for installation on County ROW, and then prepare the documentation and drawings to submit for the ROW Utilization Permit for the background monitoring well. The cost of the ROW permit or the need for a modification of traffic (MOT) plan have not yet been determined. Any additional costs
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com related to the ROW permit or MOT plan development/implementation will be shared with FDEP in advance for approval.
Subtask 3 – Well Installation and Groundwater Sampling: This subtask includes monitoring well installation, groundwater sampling, and other field activities conducted by a Scientist I (DH).
The field activities and level of effort summary are described below, and the level of effort, subcontractor, equipment, travel, and supplies needed for this subtask are described in the cost estimate worksheets. Proposed monitoring well locations are shown in Figure 1.
Temporary monitoring well installation and abandonment. Four temporary monitoring wells are proposed. Groundwater occurs in the unconfined Floridan aquifer in this area. Based on the available data the site-specific direction of groundwater flow is inconclusive.
According to the regional potentiometric surface contour map for the Ocala area, the groundwater flow gradient is very low, based on regional groundwater flow the direction of groundwater movement from the site could either be eastward or southwestward.
Therefore, the spatial placement of the monitoring wells attempts to account for groundwater movement to the east, south and southwest from the former APM facility and former drainage area southeast of the building, with a background location to the north.
Depth to groundwater at the site is expected to be approximately 40 to 45 feet below land surface (bls) in the site vicinity.
The temporary monitoring wells will be installed as 2-inch diameter PVC wells installed using a rotasonic drilling rig (selected contractor is Preferred Drilling; see attached quotes).
Each well will be completed to an approximate total depth of 60 feet bls. Actual well depths and screen placement will be determined based on lithology and water yielding potential of the material encountered while coring each well boring. Screens will be placed so that the 10-foot screen is placed in the uppermost transmissive zone below the water table.
Each well will be constructed with a 10-foot-long pre-packed well screen. Clean bagged 20-30 grade filter pack will be emplaced around each well screen to a height of 1 foot above the screen and a 3-foot thickness of fine-grained sealer sand will be emplaced on top of the filter pack. Native material will be allowed to collapse into the boreholes on top of the seal. As soon as the wells are installed, they will be developed by pumping and then purged for sampling. After Tetra Tech completes sampling and a top-of-casing/water level survey, the wells will be abandoned in place by grouting using the tremie method, with the well casings pulled or cut off bls, and the surface restored to the pre-existing condition.
Abandonment of the wells will occur after the groundwater samples are collected, the wells are surveyed and the depths to groundwater are measured. It is anticipated that water and soil cuttings from the drilling activities and development and purge water will be spread and allowed to infiltrate into the soil at the well sites. However, if for aesthetic reasons investigation derived waste (IDW) materials from any of the well locations should be containerized for disposal as IDW, FDEP will be notified and an estimated cost provided in advance for approval. Similarly, if Tetra Tech anticipates changes in drilling scope dictated by field conditions that would increase cost, FDEP will be notified in advance and an estimate of the potential cost increase will be provided for approval.
Groundwater sampling. The four temporary wells will be sampled during the site inspection shortly after they have been developed, with no specific waiting period between development and sampling. Each well will be purged with a stainless-steel submersible pump and new high-density polyethylene tubing using low-flow sampling procedures and samples will be collected for laboratory analysis of 22 Target Analyte List of metals per Method 6010D plus Mercury (Hg) per Method 9470A; and Target Compound List Volatile
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
Organic Compounds (VOCs, per Method 8260D). In addition, Quality Control (QC) samples are included in the cost proposal for your consideration. These include one field duplicate, one equipment blank for the water used in well drilling, one equipment rinsate blank for sampling equipment (for all analytical methods identified above), and one trip blank (for VOCs only). FDEP guidance (FC1000 in https://floridadep.gov/dear/quality-assurance/content/dep-sops) defers to programs on selection and number of field duplicate samples needed for a given project, although equipment and trip blanks are required. Temperature blanks will be carried in all coolers. A CLP-Like Level IV analytical data package will be provided by the subcontracted analytical services laboratory (TestAmerica) for their deliverable. There is no additional cost to FDEP for the Level IV deliverable.
Other field activities. A hand-held global positioning system (GPS) will be used by Tetra Tech staff to survey latitude and longitude coordinates of the sampling stations. In addition, all monitoring well tops of casings will be surveyed by Tetra Tech staff to a common onsite datum and depth-to-groundwater measurements will be taken during the study to document groundwater flow direction.
The field personnel will mobilize from Tetra Tech’s Tallahassee, Florida office, arriving on site to conduct a reconnaissance and meet with the utility contractor to locate buried utilities in advance of the sampling work and returning to the site to meet the driller and conduct the monitoring well installation and sampling activities. The proposed hours for this subtask include 8 hours for a Scientist V (RH, for coordination and deliverable review), 33 hours for the Scientist I (DH) (for mobilization and field work) and 3 hours for the Scientist I (DH) for the field task deliverable preparation. Tetra Tech’s Tallahassee staff assigned to this project have extensive experience in working for FDEP’s CERCLA and Brownfields Administration program.
The field work is anticipated to be completed in a three-day period, which includes mobilization, monitoring well installation, surveying, sampling, well abandonment, and demobilization.
Subtask 4 - Report:
The level of effort assumes 2 hours for a Scientist V (GW), 4 hours for a Scientist V (RH), 32 hours for an Scientist I (DH), and 4 hours for figure preparation (JM). Report tasks include preparation of draft and final reports documenting the field activities, site conditions, and results of the sampling effort. The report will adhere to the recently developed template for streamlined CERCLA Site Inspection Reports and will include information on site background and observations and findings of the SI. The document will include a site location map, sampling location map, a map showing direction of groundwater flow, and maps showing contaminant concentrations in groundwater. The report will also contain tables of summary information for the groundwater samples collected, monitoring well construction, depths to and relative elevations of groundwater, summary data from the laboratory analyses, and comparisons of analytical results to background concentrations; Florida Groundwater Cleanup Target Levels; and U.S.
Environmental Protection Agency (USEPA) Maximum Contaminant Levels. Appendices will also be provided that include the laboratory analytical data sheets, copies of field notes, groundwater sampling forms, field equipment calibration sheets, chain of custody forms, and site photographs.
Tetra Tech’s cost proposal is based on the following assumptions:
Site access to three of the monitoring well locations to complete the indicated fieldwork has been obtained by FDEP. Tetra Tech will seek ROW access and a ROW Utilization Permit
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com from Marion County for the background well location. There may be additional cost for the ROW Utilization Permit fee and (if required) an MOT plan for construction of the background wells.
The samples will be analyzed by TestAmerica using rates in Contract HW560. There is no additional cost for a Level IV deliverable package. Tetra Tech will coordinate the laboratory’s reservation and analysis.
Electronic copies of all reports and field information (field notes, well installation logs, groundwater sampling forms, etc.) and laboratory results will be submitted to FDEP. Paper copies of reports and project deliverables will not be submitted.
The drilling and sampling will be scheduled once the QAPP is approved by FDEP and
USEPA.
The selected subcontractors will provide the well installation and utility location services.
IDW is not anticipated to be containerized and the project does not currently include cost for IDW collection or disposal.
If additional costs are anticipated by Tetra Tech during implementation of this task, FDEP will be notified in advance for approval.
Tetra Tech is prepared to begin work on this project following receipt of a signed FDEP task order.
A signed task order will reflect the approval of this proposal and authorize use of associated funding required to commence project activities. The total fixed price cost to complete the activities described above is $31,792.71.
Please find a cost summary attached that provides details concerning this cost proposal. Tetra Tech anticipates completion of this project on a fixed price basis and will invoice costs incurred at 100% completion based on approval of deliverables and in accordance with deliverable due dates.
Period of Performance Tetra Tech will begin work on the QAPP and HASP upon receipt of the signed task assignment.
The draft work plan will be submitted to FDEP within 14 days of task assignment and the subsequent field activities and subcontracted services will be scheduled as soon as the work plan is approved. Draft and final deliverables will be provided promptly after laboratory results are reported from the sampling event.
If you have any questions, please call myself or Richard Hicks (850) 385-9899.
Sincerely yours, Gerald Walker, P.G.
Brownfields Program Manager rh/GAW
Attachments c: Kelly Crain, FDEP
Justin Cross, FDEP Richard Hicks, Tetra Tech Tallahassee File FDEP Contract HW560
Figure 1. Proposed Sampling Locations
A
A
SW 1st Ln
SW
th
Av e
A
³
JAX C:\GIS\MISC\1_AURORA_SITEMAP.MXD 03/29/21
PROPOSED TEMPORARY WELLS AND
GROUNDWATER SAMPLING LOCATIONS
FORMER AURORA PRECISION METALS FACILITY
MARION COUNTY, FLORIDA
CTO
FIGURE NUMBER
DATEDRAWN BY
J.MADDEN 03/29/21
DATECHECKED BY
R.HICKS 03/29/21
100 1000 Feet
Legend
@A Proposed Temporary Monitoring Well/Groundwater Sampling Location Property Boundary Parcels
Aerial provided by Google Earth, dated 12/2018
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
Attachment A
Contract HW560 Cost Estimate Spreadsheets and Backup Documentation
FDEP COST ESTIMATE
Contractor: Tetra Tech, Inc.
Date: April 26, 2021
Task #: HW560 TA CSS- SubTask 1 Project Management
Site: Aurora Precision Metals SubTask 2 Site Recon,QAPP and HASP
Activity/Phase: Site Inspection SubTask 3 Fieldwork - Drilling and Groundwater Sampling
Project Manager: Ginger Shirah SubTask 4 Report
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$61.82 Project Manager (GW) 9 9.0 1 2
$55.00 Scientist V (RH) 26 14 8 4 0
$23.41 Scientist I (DH) 104 36 36 32 0
$31.25 Scientist I (JE) 0 0 0 0 0
$26.81 Engineer I (MQ) 4 4 0 0 0
$37.54 Staff GIS Specialist (JM) 8 4 0 4 0 0 0 0 0 0
Total Hours 154 9 59 44 42 0
Direct Labor $5,014.04 $556.38 $1,931.98 $1,282.76 $1,242.92 $0.00
Overhead 143.00% $7,170.08 $795.62 $2,762.73 $1,834.35 $1,777.38 $0.00
Gen & Admin 12.20% $1,486.46 $164.94 $572.75 $380.29 $368.48 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $13,670.58 $1,516.94 $5,267.46 $3,497.40 $3,388.78 $0.00
Other Direct Costs $250.71 $27.82 $96.60 $64.14 $62.15 $0.00
Travel
Vehicle Rental $427.00 $136.00 $291.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $348.00 $0.00 $348.00 $0.00 $0.00
Total Travel $775.00 $136.00 $639.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00
Drilling and Well Installation $10,280.00 $0.00 $10,280.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $500.00 $500.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $10,780.00 $500.00 $10,280.00 $0.00 $0.00
Handling Fee $1,103.00 $75.00 $1,028.00 $0.00 $0.00
Total Subcontractor Cost $11,883.00 $575.00 $11,308.00 $0.00 $0.00
Laboratory
Laboratory $2,588.46 $0.00 $2,588.46 $0.00 $0.00
Encore Samplers $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $104.00 $0.00 $104.00 $0.00 $0.00
Total Laboratory $2,692.46 $0.00 $2,692.46 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $97.50 $0.00 $97.50 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $698.40 $0.00 $698.40 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $358.00 $141.65 $216.35 $0.00 $0.00
Total Field Expenses $1,153.90 $141.65 $1,012.25 $0.00 $0.00
Subtotal $30,425.65 $1,544.76 $6,216.71 $19,213.25 $3,450.93 $0.00
Completion Fee $1,367.06 $151.69 $526.75 $349.74 $338.88 $0.00
Total Estimated Cost $31,792.71 $1,696.45 $6,743.46 $19,562.99 $3,789.81 $0.00
REV: 03/23/17 Page 1
SITE :
SUBTASK 2: Site Recon,QAPP and HASP
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager (GW) 1
Scientist V (RH) Tallahassee Office; Site recon [10]; Develop/review QAPP [2]; Coordination, updates to FDEP [2] 14
Scientist I (DH) Tallahassee Office: Site recon [10]; QAPP text, draft figures and tables [12]; Utility locate and ROW utilization permitting [14] 36
Scientist I (JE)
Engineer I (MQ) Tallahassee Office; Prepare HASP, coordinate HASP review [4] 4
Staff GIS Specialist (JM) Jacksonville Office; QAPP figure preparation, ROW utilization plans [4] 4
TOTAL LABOR 59
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Total GPS Station $141.65 Each 1 $141.65
TOTAL EQUIPMENT $141.65
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 2 $136.00
Subtotal $136.00
Mileage Miles 0
TOTAL VEHICLE $136.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist 1 (DH) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Site Lines Underground utility locator $500.00 $500.00
TOTAL $500.00
Aurora Precision Metals
Tallahassee Office; Review Work Plan [1]
SUBTASK 3: Fieldwork - Drilling and Groundwater Sampling
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office: Coordination with field personnel and subs, Review field task deliverable [8] 8
Scientist I (DH) 36
Scientist I (JE)
Engineer I (MQ) 0
Staff GIS Specialist (JM) 0
TOTAL LABOR 44
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Soil Assessment Kit $208.55 Day 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Deep Groundwater Sampling Kit $349.20 Day 2 $698.40
Expendables $32.50 Day 3 $97.50
Personal Protection (Level D) $28.00 Per Person x Day 0 $0.00
Teflon Tubing (1/4-inch diameter) $1.95 Foot 0 $0.00
Total Survey Station $41.75 Each 1 $41.75
Peristaltic Pump $29.10 Each 0 $0.00
Hammer Drill $50.95 Each $0.00
MiniRae 3000 PID $87.30 Each 2 $174.60
Total GPS Station $141.65 Each 0 Trimble GeoXH $0.00
TOTAL EQUIPMENT $1,012.25
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 3 Staff from Tallahassee for field work (3 days) $291.00
Car $68.00 day 0 $0.00
Subtotal $291.00
Mileage Miles 0
TOTAL VEHICLE $291.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist I (DH) $36.00 Day 3 $108.00
Scientist II $36.00 Day 0 $0.00
Engineer I $36.00 Day 0 $0.00
HOTEL
Scientist I (DH) $120.00 Day 2 $240.00
Scientist II $120.00 Day 0 $0.00
Engineer I $120.00 Day 0 $0.00
TOTAL PER DIEM $348.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Metals ($11.50/analyte x 22) Liquid 6010D $253.00 4 2 22 TAL Metals + QA (1 dup, 2 EB) $1,518.00
VOC Liquid 8260D $135.00 4 3 TCL VOCs + QA (1 dup, 2 EB, 1 TB) $945.00
Cyanide Liquid 9012B $35.00 $0.00
Mercury Liquid 9470A $20.91 4 2 Hg + QA (1 dup, 2 EB) $125.46
$0.00
$0.00
$0.00
Subtotal $2,588.46
Unit Cost Quantity
Sample Containers Lot $0.00 $0.00
Encore Samplers Each $8.75 $0.00
Sample Shipping Coolers $104.00 1 priority overnight shipping FedEx $104.00
Subtotal $104.00
Note: Analysis cost includes Level IV QA package deliverable. TOTAL LAB $2,692.46
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Preferred Drilling Solutions Drilling $10,280.00 $10,280.00
TOTAL $10,280.00
Aurora Precision Metals
Tallahassee Office; Field work (prep for field[1], Mobe/demobe[8], Well installation/sampling/survey/sample packing /well abandonment [24];
Field task deliverable [3]
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 4: Report
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager (GW) Tallahassee Office; Document review and seal 2
Scientist V (RH) Tallahassee Office; Document review and editing 4
Scientist I (DH) 32
Scientist I (JE)
Engineer I (MQ)
Staff GIS Specialist (JM) Jacksonville Office; Process GPS data, figure preparation 4
TOTAL LABOR 42
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (WO) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Volatiles Liquid 8260 $135.00 Standard Turn Around $0.00
Semivolatiles Liquid 8270 $100.00 Standard Turn Around $0.00
Pesticides Liquid 8081 $90.00 Standard Turn Around $0.00
Herbicides Liquid 8151 $150.00 Standard Turn Around $0.00
TRPH Liquid Florida PRO $84.00 Standard Turn Around $0.00
Lead Liquid 6010 $11.50 Standard Turn Around $0.00
Total Dissolved Fe and Mn Liquid 6010 $23.00 Standard Turn Around $0.00
COD Liquid SM5220 $25.00 Standard Turn Around $0.00
BOD (5 day) Liquid SM5210 $25.00 Standard Turn Around $0.00
Methane/CO2/02 Liquid 3810 $110.00 Standard Turn Around $0.00
In-line Filter (0.45 Micron) Each $17.50 $0.00
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
Aurora Precision Metals
Tallahassee Office; Draft and Final document preparation; description of field activities including monitoring well installation, groundwater sampling and laboratory analysis and text [24], tables[6] and figures[2]
REV: 03/23/17 Page 2
A
SW 1st Ln
SW
th
Av e
A
³
JAX C:\GIS\MISC\1_AURORA_SITEMAP.MXD 03/29/21
PROPOSED TEMPORARY WELLS AND
GROUNDWATER SAMPLING LOCATIONS
FORMER AURORA PRECISION METALS FACILITY
MARION COUNTY, FLORIDA
CTO
FIGURE NUMBER
DATEDRAWN BY
J.MADDEN 03/29/21
DATECHECKED BY
R.HICKS 03/29/21
100 1000 Feet
Legend
@A Proposed Temporary Monitoring Well/Groundwater Sampling Location Property Boundary Parcels
Aerial provided by Google Earth, dated 12/2018
COST QUOTE FOR
ROTASONIC WELL INSTALLATION SUPPORT
FDEP CERCLA Site Screening Site
Former Aurora Precision Metals
325 Southwest 60th Avenue
Ocala, Marion County, FL
BACKGROUND
Tetra Tech is requesting a cost quote for providing drilling, monitoring well installation, and well abandonment services for an FDEP site in Ocala, Marion County, FL. The site is an industrial property northeast of the Ocala Airport. Temporary monitoring wells will be installed at three locations on adjacent properties and county right of way surrounding the subject property. Exact monitoring well locations have not been determined, but the wells will be installed at locations accessible to a track-mounted rotasonic drilling rig and support vehicles. After installation and development, the wells will be sampled by Tetra Tech and then abandoned by the contractor. Level D health and safety protocol should be followed. Tetra Tech representative will be on site to coordinate. All site access will be obtained, and all utilities will be located via One Call by Tetra Tech and/or by a private utility locator in advance of subsurface work. The aquifer at this site is the unconfined Floridan aquifer. Depth to groundwater is approximately 40 to 45 feet below land surface. The material at the site includes sands and clays on top of weathered limestone. Well screens will be set in the upper part of the limestone.
SCOPE OF WORK
The scope of work will include:
1- Installing 4 temporary monitoring wells. Details include the following:
a. Post hole or auger each hole for well installation to confirm utility clearance.
b. Decontaminate casing and tools before and between well locations using liquinox and clean potable quality water.
c. It is anticipated that there will be no onsite source of water. Contractor is responsible for providing water for drilling and decontamination.
d. Using rotasonic drilling method, core and drill to an estimated total depth of 60 feet at each location. Retrieve cores for lithologic description by the onsite Tetra Tech representative. It is preferred that the rig used has a 10-foot stroke.
e. Install 4 temporary monitoring wells. Each well will be constructed of 2-inch-diameter polyvinyl chloride (PVC) with a 10-foot-long, pre-packed, 0.010-inch slotted, PVC screen.
A 20/30 grade sand filter pack will be installed to a height of 1 foot above the top of the screen through the direct push casing, followed by a 3-foot seal of fine sealer sand. The remaining annular space will be not be grouted as these will be abandoned after sampling. Each well will be an estimated 60 feet in total depth.
2- Develop each well with a submersible pump after installation. Develop until the amount of recovered water is approximately the same as the amount lost during drilling, or to the satisfaction of the onsite Tetra Tech representative.
3- Abandon the wells after sampling. The Tetra Tech representative will sample and survey the wells while the drill crew is on site. Abandon the temporary well bore holes by tremie grouting after sampling, survey and water level measurement in accordance with St. Johns River Water
Management District requirements.
4- It is not anticipated that investigation derived soil cuttings, mud or development water will need to be drummed. However, be able to provide drums in case some of the material needs to be drummed.
5- Decontamination site will be on porous ground and rinsate can be allowed to soak into the ground. Remove all trash generated from your activities.
6- Obtain all permits for well construction as appropriate.
7- It is not expected that any of the locations will require cutting of concrete or asphalt.
8- Tetra Tech will have each boring location cleared by a private utility locator in advance of doing the work.
9- Include mobilization and per diem costs as appropriate.
10- Drill crew members must have current health and safety training and medical monitoring, with documentation provided to the Tetra Tech project manager before mobilization.
11- Please provide an estimate of time needed to complete this work.
12- Work is anticipated to be performed during May 2021.
Please provide a quote via email to Richard Hicks (Richard.Hicks@tetratech.com) by March 26, 2021 and email or call (850-509-2720) with questions.
DRILLING COST COMPARISON
Subcontractor Quote Amount
Preferred Drilling Solutions $10,280.00
Betts Environmental $13,940.00
Cascade Remediation $21,590.00
Notes: Preferred Drilling Solutions quote included in cost proposal due to cost.
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
SONIC DRILLING TECHNOLOGY QUOTE FORM
Consultant Name: Tetra Tech
Site Name and Location: Former Aurora Precision Metals Date: 3/30/21 FAC ID#:
325 SW 60th Ave, Ocala, FL
PROPOSED SCOPE OF WORK:
(4) 2" x 60' Temp wells with 10' prepacked screen, 3' of 30/65 sand seal, grout wells In place, soil sampling, Develop wells, IDW to surface however PDS will have drums if needed
Abandon wells via tremie grouting upon sampling
Decon between wells to surface with steam cleaner
*** Some work in ROW, Client responsible for ROW permitting and MOT if needed ***
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Equipment Type: Geoprobe 8140LC, Geoprobe 8150LS, Terrasonci 150CC
Sonic Daily Rate & Crew (up to 10 hours on site) per day $3,000.00 2 $6,000.00 Sonic Half Day Rate & Crew (up to 5 hours on site) per day $2,000.00 $0.00 1" PVC Well Installation (includes all materials) per foot $9.00 $0.00 2" PVC Well Installation (includes all materials) per foot $13.25 240 $3,180.00 4" PVC Well Installation (includes all materials) per foot $20.00 $0.00 Well Completion (includes MH w/ cover, concrete pad, and locking well cap) per well $100.00 $0.00
Mobilization roundtrip $800.00 1 $800.00 Per Diem per crew / per night $300.00 1 $300.00 DOT Approved 55-gal Drum each $45.00 $0.00 Permits each $0.00 $0.00 Other (specify) $0.00 Other (specify) $0.00 Other (specify) $0.00
TOTAL QUOTE PRICE $10,280.00
Notes:
1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, development, standby time.
Days to Complete Scope of Work: 2 Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator
SONIC DRILLING TECHNOLOGY
MISCELLANEOUS
Cost Estimate Date
3/23/2021
Client
Tetra Tech Inc.
Richard Hicks
1558 Village Square Blvd., Ste 2
Tallahassee, Florida 32309
850-385-9897
Spread soils and waters- NO WATER ONSITE
Betts will hand auger or post hole the first 5' of all borings for utility clearance prior to drilling.
Betts is responsible for 811 utility locate call and maintaining an active locate ticket.
Client will provide access to well location as well as as-builts of the site
Payment terms are net 60 days from Betts invoice date.
Prices include a ten hour work day unless otherwise stated in this proposal
Unit QTY Unit Cost TOTAL
Mobilization of Rig/Crew Lump Sum 1 $1,200.00 $1,200.00
Drill Crew Per Diem (3 men) Day 2 $375.00 $750.00
Daily Rate: Sonic Rig Day 2 $3,750.00 $7,500.00
Daily Rate: Sonic Rig (If Needed) 1/2 Day 0 $2,500.00 $0.00
2" Well materials Per Foot 180 $5.00 $900.00
2" x 5' .010" prepack screens Each 6 $125.00 $750.00
Well abandonment Per Foot 180 $8.00 $1,440.00
Well Development (Up to 1 hr per well) Each 3 $125.00 Included
Drums (Includes Staging) Each 0 $60.00 $0.00
Hydrant Meter and Water Usage Lump Sum 1 $1,250.00 $1,250.00
Well Permits- Wells (SJRWMD) Each 3 $50.00 $150.00
Total $13,940.00
Thank you for this opportunity
David Boggs
David Boggs
Sr. Project Manager/Safety Specialist
Orlando, Florida
407-493-9673
DESCRIPTION
Completion - 2-2.5 Days on site plus travel
Estimate No.
Site Information
Corporate Office - 361 Airport Square, Adel, GA 31620
Scope of Work
FL0321001
Ocala, Florida
325 SW 60th Avenue
Abandon wells by tremie grout once sampled
Former Aurora Precision Metals
Sonic Sampling & Temporary Well Installations
(3) Sonic Soil Borings to 60'bgs and install a temporary 2" MW in each w/10' of 2" prepacked screen and sandpack in each
Cascade Rep Contact Information
Scope of Work
Quantity Unit Sales Price Optional Subtotal Mobilization/Demobilization 1 Each 1,250.00$ 1,250.00$ Sonic casing advance (overburden) 200 Feet 32.00$ 6,400.00$ Sonic casing advance (rock) 40 Feet 45.00$ 1,800.00$ Temporary Override casing (if needed) Feet 45.00$ -$ 2" Sch40 PVC 200 Feet 15.00$ 3,000.00$ 2"x5' Prepack Screen 8 Each 165.00$ 1,320.00$ Removal of PVC and Sand 4 Hours 525.00$ 2,100.00$ Grout Abandoned Borehole 240 Feet 8.00$ 1,920.00$ Decon Time ESTIMATE ONLY 4 Hours 300.00$ 1,200.00$ Well development ESTIMATE ONLY 4 Hours 275.00$ 1,100.00$ Waste Management ESTIMATE ONLY 4 Hours 375.00$ 1,500.00$ 55-gallon DOT Drums (if needed) Each 75.00$ -$ Standby Delays/Time Filling Voids/Standby for Water Sampling Hours 525.00$ -$
Pre-Tax Total $21,590.00
Tax Percentage
Taxes
Quote Total $21,590.00
Ocala Florida
Former Aurora Precious Metals
3/23/2021 PN210323-99789rev1
3/29/2021
325 Southwest 60th Ave
Account Name Bid Date Address Quote Number
Quote Revision Date
Tetra Tech 1558 Village Square Boulevard
Suite 2
Email Work Site City Phone Work Site State
Tallahassee, Florida 32309
Richard Hicks richard.hicks@tetratech.com
850.385.9897
Opportunity/Project Name
Contact Name Work Site Address
850.509.2720 34474Mobile phone Work Site Zip
Florida: 5785 SW 6TH PL STE 101, OCALA FL 34474 ♦ (352) 237-1995
Prepared By Email wburdette@cascade-env.com
Drill and Install four temporary 2" monitoring wells to 60' with 50' of Sch40 PVC riser and two 2"x5' Prepack screens. Well will not be grouted in.
Cascade will develop the well and the client will collect water samples.
The well will be abandoned and grouted to the surface. Any voids encountered in the limestone will result in lengthy abandonment time.
Cascade will decon tooling between holes.
Description
Will Burdette, Southeast Region Estimator mailto:richard.hicks@tetratech.com mailto:richard.hicks@tetratech.com mailto:richard.hicks@tetratech.com mailto:richard.hicks@tetratech.com mailto:richard.hicks@tetratech.com mailto:richard.hicks@tetratech.com
SITE LINES LLC
Utility Locating 1143 59th Avenue North (727) 432-9482 St. Petersburg, FL 33703 bhardy@sitelinesllc.com
Mr. Richard Hicks, P.G.
Tetra Tech 1558 Village Square Boulevard Suite 2 Tallahassee, FL 32309
April 18, 2021
SITE: Aurora Precision Metals Site – Ocala, Florida PROPOSAL: 0904p
Dear Mr. Hicks:
Thank you for contacting Site Lines LLC regarding the private utility locate at your project site. Attached is our proposal in response to your inquiry.
Please review the proposal to ensure I have accurately captured the project details.
If you agree to the proposal, including the terms and conditions, and the statement of work, please sign, initial and date where indicated. Upon signing, the proposal will serve as the Agreement of the parties as to the above-referenced Project.
If you have any questions, please feel free to contact me. I look forward to working with you.
Sincerely, Site Lines LLC
William L. Hardy II Geophysicist President
Enclosure
SITE LINES LLC PROPOSAL
SITE LOCATION
Aurora Precision Metals Site – 325 SW 60th Avenue, Ocala, FL
PROPOSED SCOPE OF WORK
Site Lines (“Company”) will use Ground Penetrating Radar (GPR) and conventional electromagnetic (EM) pipe and cable locators to determine the location of underground utilities at the site identified by Tetra Tech (“Client”). Of specific concern is the utilities within the area of approximately 4 proposed monitoring well locations. A map of the locations was provided and is attached to the back of this document.
RESULTS OF THE INVESTIGATION
The estimated depth and location of utilities identified during the investigation will be marked on the ground surface using spray paint or other method to be agreed upon by the parties. Designated utilities will also be documented on a field sketch.
The American Public Works Association Uniform Color Codes for the marking of underground utilities will be used.
PROJECT FEE
The fee to complete the project as described within this proposal is: Five Hundred Dollars [$500.00].
Client shall pay Company in full within thirty (30) days of the invoice date, unless the parties have agreed to another payment arrangement in writing. If during the investigation, Company determines that the goals of the project cannot be achieved with the resources available to Company, Company will notify Client as soon as reasonably possible. Under such circumstances, Company will charge Client only for time expended and materials used to date.
CLIENT REQUIREMENTS
Client is responsible for all site access, maintenance of traffic (MOT), site clearing and/or any other logistical considerations necessary to conduct the utility locate.
Client will also provide all pertinent maps of the project site, including those that show the boundaries of the utility locate, pertinent landmarks, and known utilities (if available). Company is not a substitute for Chapter 556, Florida Statutes.
Accordingly, Client is responsible for calling Sunshine State One Call of Florida
(811) before undertaking any invasive activities, whether through Company, any other entity, or on its own.
DESCRIPTION OF COMPANY INVESTIGATION AND LIMITATIONS
A GSSI SIR-4000 GPR system will be used with a 900, 400, or 270 megahertz antenna configuration depending on site conditions and desired targets. The GPR will assist in locating nonmetallic and metallic utilities. Physical surface conditions, subsurface conditions and technical limitations effect the ability of GPR to resolve targeted utilities and/or subsurface structures. Depth and/or diameter of the utility, soil type, moisture/ionic content of the soil, and electrical properties of the soil compared to that of the utility can prevent the GPR from identifying utilities at the site. The diameter of a utility cannot be determined by GPR data. Estimated depths of utilities are directly affected by soil conditions and the material of the utility. A margin of error of +/- 20-25% in depth should be expected when performing invasive activities.
An RD 8000 will be used for the EM survey. Electromagnetic induction which transmits a signal directly into the desired target and passive power detection which locates naturally occurring magnetic fields in energized lines will be identified by detecting and following the signals with a receiver. The EM survey will assist in finding only metallic utilities. The magnetic field and/or induced signal should emanate from the target in a circular geometry. When this occurs, the receiver will receive its peak signal directly above the target. However, when metallic utilities are running near each other, or there is environmental interference from fences, cars or overhead power lines, the signal can become distorted and the peak no longer can be directly over the utility. Care must be taken when doing any invasive work around the utilities. A margin of error of +/- 20-25% in depth should be expected when performing invasive activities. Company’s personnel are highly experienced and certified operators of GPR and EM pipe and cable locators.
Due to the limitations described above, when Client is working around indicated utilities, a minimum of two (2)-feet clearance from either side of the marked utility will be maintained. For absolute confirmation, Client is responsible for exposing any indicated underground utility.
Company will conduct utility investigations in accordance with the level of care and generally accepted professional practices as ordinarily exercised by members of the same profession practicing in the same locality under similar conditions.
REPRESENTATIONS AND WARRANTIES
Neither Company nor its employees or agents are licensed surveyors under Florida law, nor do they represent themselves as such. Accordingly, the work Company is to perform is not a substitute for work typically completed by a licensed surveyor.
Company specifically and expressly disclaims any liability for any type of property damage or personal injury, including but not limited to death, arising from client’s failure to determine that the services of a licensed surveyor are necessary or to retain a licensed surveyor to perform necessary services.
Limitations in technology, complexity of the physical characteristics of the subsurface conditions, and circumstances beyond Company’s control may limit the performance of Company’s utility investigation. For these reasons, Company expresses no guarantee that all utilities and underground structures will be identified and located during this project.
Company is responsible only for locating underground utilities, the presence of which is both known and indicated on site maps to be provided by Client to Company before Company performs the utility locate. Company will use its best efforts to locate both known and unknown utilities within the project boundaries. However, Company will only be responsible for locating utilities, the presence of which is known before Company undertakes its investigation.
Company expressly disclaims any and all warranties regarding specific or desired results.
TERMS AND CONDITIONS
Additional Insured: If requested, Company will name Client as an additional insured with respect to the services to be performed under this agreement.
Indemnity: Company agrees to indemnify, protect and hold harmless Client from and against all liabilities, claims or demands of every kind of injury, including death, or damages to any person or property related in any way to Company’s performance of this Agreement, except to the extent such liabilities, claims or demands are caused by the negligence or willful misconduct of Client.
Client agrees to indemnify, protect and hold harmless Company from and against all liabilities, claims or demands of every kind of injury, including death, or damages to any person or property related in any way to Client’s performance of this Agreement, except to the extent such liabilities, claims or demands are caused by the negligence or willful misconduct of Company.
Release of Information. Client authorizes Company to release any information regarding Client and this Agreement as may be permitted by Company's privacy policy or as may be required by law or requested by governmental authorities or agencies, law enforcement agencies or courts including, but not limited to, officials from local and state code enforcement agencies.
Governing Law; Jurisdiction; Severability; Waiver of Jury Trial. This Agreement shall be governed and construed in accordance with the laws of the State of Florida. Whenever possible, each provision of this Agreement shall be interpreted in such manner as to be effective and valid under Florida law, but if any provision of this Agreement shall be invalid or prohibited under Florida law, such provision shall be ineffective only as to the invalid portion of the provision without invalidating the remainder of such provision or the remaining provisions of this Agreement.
Client agrees to waive his or her rights to a jury trial for any and all claims made against or through Company.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .