This document package contains task assignment notifications and change orders for contract HW560, a statewide indefinite delivery vehicle managed by the Florida Department of Environmental Protection (FDEP) for Waste Cleanup Programs. The contractor is Tetra Tech, Inc., with Gerry Walker, P.G. serving as the contractor representative. The work is being performed at the Regency Artistic Metal Finishing facility (ERIC_7532) located in Holiday, Pasco County, Florida, with site management overseen by FDEP contract managers Kelly Crain and Ginger Shirah.
The task assignment CSS-30A encompasses a site inspection with soil and groundwater sampling activities, including project management, development of a Quality Assurance Project Plan and Health and Safety Plan, fieldwork with drilling and groundwater sampling, and preparation of a final Site Inspection Report. The original task assignment value was $24,965.81 on a fixed-price basis. Three change orders were issued: Change Order #01 (April 1, 2021) extended deliverable due dates by 32 days with no cost change; Change Order #02 (April 19, 2021) reduced costs by $1,541.00 due to decreased drilling and well installation expenses and laboratory shipping savings, resulting in a revised total of $23,424.81; and Change Order #03 (May 3, 2021) reduced costs by an additional $420.00 due to the accidental omission of cyanide analyses from the original scope, establishing a final task value of $23,004.81. The final deliverable due date was established as June 15, 2021, with invoice payments contingent upon FDEP approval of specific deliverables and subtasks.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Change Order No.:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
Site Name:
Site ID / Facility ID::
Description of Change [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverable:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
Cost Reimbursement Fixed Fee
Original Task Amount
Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00
Original Task Completion Date:
Completion Date Prior to this Change:
Net Increase/Decrease in Task Period:
Completion Date with all Change Orders:
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
FIXED PRICE
TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM
ITEM
$0.00
$0.00
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
Final Deliverable Due Date:
$0.00
$0.00
CHANGE IN TASK TIME
FEE SCHEDULE
COST PLUS FIXED FEE
TOTAL
WCP TAFORM 01_18
HW560
03CSS-30A
Tetra Tech, Inc.
Gerry Walker, P.G. Phone #: (850) 385-9899
(850) 245-8899Ginger Shirah
Regency Artistic Metal Finishing
ERIC_7532
The Department approves this Task Assignment Change Order (TACO) in accordance with the attached correspondence submitted by Tetra Tech, Inc. on April 30, 2021. Cost reductions in subtask 3 result from the decrease in laboratory costs due to the accidental omission of one of the analyses (cyanide) that was originally scoped for the soil and groundwater samples. This change results in an overall decrease in the total Task Assignment amount. This TACO also formally extends the final deliverable due date by 7 days.
Final Site Inspection Report 05/13/2021
$ 24,965.81 $ 0.00 $ 0.00 $ 0.00
$ 23,424.81 $ 0.00 $ 0.00 $ 0.00 $ 23,424.81
($ 420.00) $ 0.00 $ 0.00 $ 0.00 ($ 420.00)
$ 23,004.81
05/14/2021
06/15/2021
N/A
06/15/2021
Ginger Shirah Digitally signed by Ginger Shirah Date: 2021.05.03 15:31:45 -04'00'
Ginger Shirah Digitally signed by Ginger Shirah Date: 2021.05.03 15:31:54 -04'00'
Digitally signed by Jennifer Farrell Date: 2021.05.03 16:02:48 -04'00'
Digitally signed by: Gerald Walker DN: CN = Gerald Walker email = gerry.walker@tetratech.com C = US O = Tetra Tech OU = 112-NUS Date: 2021.05.03 16:46:57 -04'00'
Gerald Walker
$ 23,004.81 $ 0.00 $ 0.00 $ 0.00
$ 24,965.81
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01_18
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW560
CSS-30A
$ 23,004.81
Site Inspection Workplan/Quality Assurance Project Plan (QAPP) and Site Health and Safety Plan (HASP)
Field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities
Site Inspection Report
FDEP Approval of the Site Inspection Workplan/QAPP & HASP (Subtask 2)
FDEP Approval of the Site Inspection Report (Subtasks 1 and 4)
FDEP Approval of field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities (Subtask 3)
02/12/2021
04/16/2021
05/13/2021
$ 14,537.67
$ 2,396.17
$ 6,070.97
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
TO:
FROM:
DATE:
SUBJECT:
Tetra Tech, Inc., HW560 Contract File CERCLA Site Screening
Ginger Shirah for Kelly Crain, Contract Manager
May 3, 2021
Negotiation Summary – Task Assignment (TA) CSS-30A_CO3 Regency Artistic Metal Refinishing, ERIC_7532, Holiday, Pasco County Site Inspection (SI) with Soil & Groundwater Sampling
This change order is requested for the overall cost decrease of the subject Task Assignment (TA) to account for a decrease in laboratory costs due to the accidental omission of the Cyanide analyses that was originally scoped in Subtask 3. The removal of Cyanide analysis costs for soil, groundwater and the QA samples results in a cost reduction of $420.00 under Subtask 3. This subtask has not yet been invoiced. This TACO will also formally extend the final deliverable due date to May 13, 2021.
This TACO accounts for the total decrease of $420.00 in Subtask 3 of the TA. The final cost this TA is $23,004.81 and is reasonable for the scope of services.
www.floridadep.gov http://www.floridadep.gov/
Tetra Tech, Inc.
1558 Village Square Blvd., Ste. 2, Tallahassee, FL 32309-2478
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
TetraTech/TAL-21-27-112IC09400
April 30, 2021
Department of Environmental Protection Waste Cleanup Programs ATTN: Ms. Ginger Shirah MS #4535 Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Reference: Florida Department of Environmental Protection (DEP) Waste Cleanup Programs Consolidated Contract HW560
Subject: Request for Change Order #2 – Site Inspection at Regency Artistic Metal Refinishing, Holiday, Pasco County, Florida
Dear Ms. Shirah:
Tetra Tech Inc., (Tetra Tech) is requesting an additional change order for this task assignment to adjust costs related to a reduction in laboratory cost due to the omission of Cyanide analyses from the scope of work under Subtask 3. The removal of Cyanide analysis cost for soil, groundwater and QA samples results in a cost reduction of $420.00 under Subtask 3. This subtask has not yet been invoiced. The new Task Assignment amount is $23,004.81.
We apologize for this oversight. If you have any questions, please call myself or Richard Hicks
(850) 385-9899.
Sincerely yours, Gerald Walker, P.G.
Brownfields Program Manager rh/GAW
Attachments c: Kelly Crain, FDEP Richard Hicks, Tetra Tech Tallahassee File FDEP Contract HW560
Tetra Tech, Inc.
1558 Village Square Blvd., Ste. 2, Tallahassee, FL 32309-2478
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
Attachment A
Contract HW560 Cost Estimate Spreadsheets and Backup Documentation
FDEP COST ESTIMATE
Contractor: Tetra Tech, Inc.
Date: April 30 2020
Task #: HW560 TA CSS- SubTask 1 Project Management
Site: Regency Artistic Metal Refinishing SubTask 2 Work Plan and HASP
Activity/Phase: Change Order #2 SubTask 3 Fieldwork - Drilling and Groundwater Sampling
Project Manager: Ginger Shirah SubTask 4 Report
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$61.82 Project Manager (GW) 8 8.0 1 2
$55.00 Scientist V (RH) 10 4 2 4 0
$46.95 Scientist IV (GB) 32 0 32 0 0
$31.25 Scientist II (JE) 0 0 0 0 0
$26.81 Engineer I (MQ) 54 16 2 36 0
$37.54 Staff GIS Specialist (JM) 7 2 0 5 0$0.00 Engineer I 0$0.00 Engineer II 0$0.00 Engineer III 0$0.00 Engineer V 0$0.00 00 0 0 0 0
Total Hours 114 8 23 36 47 0
Direct Labor $4,442.94 $494.56 $785.86 $1,666.02 $1,496.50 $0.00
Overhead 143.00% $6,353.41 $707.22 $1,123.78 $2,382.41 $2,140.00 $0.00
Gen & Admin 12.20% $1,317.16 $146.62 $232.98 $493.91 $443.65 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $12,113.51 $1,348.40 $2,142.62 $4,542.34 $4,080.15 $0.00
Other Direct Costs $222.15 $24.73 $39.29 $83.30 $74.83 $0.00
Travel
Vehicle Rental $194.00 $0.00 $194.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $194.00 $0.00 $194.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00
Drilling and Well Installation $2,220.00 $0.00 $2,220.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $750.00 $0.00 $750.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,970.00 $0.00 $2,970.00 $0.00 $0.00
Handling Fee $297.00 $0.00 $297.00 $0.00 $0.00
Total Subcontractor Cost $3,267.00 $0.00 $3,267.00 $0.00 $0.00
Laboratory
Laboratory $5,147.00 $0.00 $5,147.00 $0.00 $0.00
Encore Samplers $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $5,147.00 $0.00 $5,147.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $65.00 $0.00 $65.00 $0.00 $0.00
Equipment (Drilling related) $184.30 $0.00 $184.30 $0.00 $0.00
Equipment (Analytical related) $417.10 $0.00 $417.10 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $183.40 $0.00 $183.40 $0.00 $0.00
Total Field Expenses $849.80 $0.00 $849.80 $0.00 $0.00
Subtotal $21,793.46 $1,373.13 $2,181.91 $14,083.44 $4,154.98 $0.00
Completion Fee $1,211.35 $134.84 $214.26 $454.23 $408.02 $0.00
Total Estimated Cost $23,004.81 $1,507.97 $2,396.17 $14,537.67 $4,563.00 $0.00
REV: 03/23/17 Page 1
SITE :
SUBTASK 2: Work Plan and HASP
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager (GW) 1
Scientist V (RH) Tallahassee Office; Develop/review Work Plan [2]; Coordination, teleconference with staff, FDEP [2] 4
Scientist IV (GB)
Scientist II (JE)
Engineer I (MQ) Tallahassee Office; Work Plan text, draft figures and tables [12], prepare HASP, coordinate HASP review [4] 16
Staff GIS Specialist (JM) Jacksonville Office; Figure preparation [2] 2
TOTAL LABOR 23
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Total GPS Station $141.65 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist V (RH) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
Regency Artistic Metal Refinishing
Tallahassee Office; Review Work Plan [1]
SUBTASK 3: Fieldwork - Drilling and Groundwater Sampling
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office: Coordination with field team and subs, Review field task deliverable [2] 2
Scientist IV (GB) 32
Scientist II (JE)
Engineer I (MQ) Prepare field task deliverable 2
Staff GIS Specialist (JM) 0
TOTAL LABOR 36
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Soil Assessment Kit $208.55 Day 1 $208.55
Monitoring Well Installation Kit $184.30 Day 1 $184.30
Shallow Groundwater Sampling Kit $208.55 Day 1 $208.55
Expendables $32.50 Day 2 $65.00
Personal Protection (Level D) $28.00 Per Person x Day 0 $0.00
Teflon Tubing (1/4-inch diameter) $1.95 Foot 0 $0.00
Total Survey Station $41.75 Each 1 $41.75
Peristaltic Pump $29.10 Each 0 $0.00
Hammer Drill $50.95 Each $0.00
MiniRae 3000 PID $87.30 Each Included in MW and Soil kits $0.00
Total GPS Station $141.65 Each 1 Trimble GeoXH $141.65
TOTAL EQUIPMENT $849.80
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 2 Staff from Tampa for field work (2 days) $194.00
Car $68.00 day 0 $0.00
Subtotal $194.00
Mileage Miles 0
TOTAL VEHICLE $194.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist IV $36.00 Day 0 $0.00
Scientist II $36.00 Day 0 $0.00
Engineer I $36.00 Day 0 $0.00
HOTEL
Scientist IV $120.00 Day 0 $0.00
Scientist II $120.00 Day 0 $0.00
Engineer I $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Metals ($11.50/analyte x 22) Liquid 6010B $253.00 3 2 22 TAL Metals + QA (1 dup, 1 EB) $1,265.00
VOC Liquid 8260B $135.00 3 3 TCL VOCs + QA (1 dup, 1 EB, 1 TB) $810.00
Cyanide Liquid 9012B $35.00 0 0 CN + QA (1 dup, 1 EB) $0.00
Mercury Liquid 7470 $23.00 3 2 Hg + QA (1 dup, 1 EB) $115.00
Metals ($11.50/analyte x 22) Soil 6010B $253.00 5 2 22 TAL Metals + QA (1 dup, 1 EB) $1,771.00
VOC Soil 8260B $135.00 5 2 TCL VOCs + QA (1 dup, 1 EB) $945.00
Cyanide Soil 9012B $35.00 0 0 CN + QA (1 dup, 1 EB) $0.00
Mercury Soil 7470 $25.00 5 2 Hg + QA (1 dup, 1 EB) $175.00
% Moisture Soil D2216 $11.00 5 1 Moisture + QA (1 dup, 1 EB) $66.00
$0.00
$0.00
$0.00
Subtotal $5,147.00
Unit Cost Quantity
Sample Containers Lot $0.00 $0.00
Encore Samplers Each $8.75 $0.00
Sample Shipping Coolers $104.00 0 priority overnight shipping FedEx $0.00
Subtotal $0.00
Note: Analysis cost includes Level IV QA package deliverable. TOTAL LAB $5,147.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Cascade Drilling $2,220.00 $2,220.00
GeoTek Utility Locate $750 1 $750.00
TOTAL $2,970.00
Regency Artistic Metal Refinishing
Tampa Office; Field work (prep for field[1], mobe/demobe[3], site walkover, utilities [6], well installation/sampling/survey/sample packing[14], field documentation package [2])
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 4: Report
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager (GW) Tallahassee Office; Document review and seal 2
Scientist V (RH) Tallahassee Office; Document review and editing 4
Scientist IV (GB)
Scientist II (JE)
Engineer I (MQ)
Staff GIS Specialist (JM) Jacksonville Office; Process GPS data, figure preparation 5
TOTAL LABOR 47
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (WO) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Volatiles Liquid 8260 $135.00 Standard Turn Around $0.00
Semivolatiles Liquid 8270 $100.00 Standard Turn Around $0.00
Pesticides Liquid 8081 $90.00 Standard Turn Around $0.00
Herbicides Liquid 8151 $150.00 Standard Turn Around $0.00
TRPH Liquid Florida PRO $84.00 Standard Turn Around $0.00
Lead Liquid 6010 $11.50 Standard Turn Around $0.00
Total Dissolved Fe and Mn Liquid 6010 $23.00 Standard Turn Around $0.00
COD Liquid SM5220 $25.00 Standard Turn Around $0.00
BOD (5 day) Liquid SM5210 $25.00 Standard Turn Around $0.00
Methane/CO2/02 Liquid 3810 $110.00 Standard Turn Around $0.00
In-line Filter (0.45 Micron) Each $17.50 $0.00
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
Regency Artistic Metal Refinishing
Tallahassee Office; Draft and Final document preparation; description of field activities including monitoring well installation, groundwater sampling and laboratory analysis and text [24], tables[6] and figures[2]
REV: 03/23/17 Page 2
Date: April 30 2021
Task #: HW560 TA CSS-30A SubTask 1 Project Management
Site: Regency Artistic Metal Refinishing SubTask 2 Work Plan and HASP
Activity/Phase: Change Order #2 Delta SubTask 3 Fieldwork - Drilling and Groundwater Sampling
Project Manager: Ginger Shirah SubTask 4 Report
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$61.82 Project Manager (GW) 0 0.0 0 0
$55.00 Scientist V (RH) 0 0 0 0 0
$46.95 Scientist IV (GB) 0 0 0 0 0
$31.25 Scientist II (JE) 0 0 0 0 0
$26.81 Engineer I (MQ) 0 0 0 0 0
$37.54 Staff GIS Specialist (JM) 0 0 0 0 0$0.00 Engineer I 0$0.00 Engineer II 0$0.00 Engineer III 0$0.00 Engineer V 0$0.00 00 0 0 0 0
Total Hours 0 0 0 0 0 0
Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 143.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 12.20% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00
Drilling and Well Installation $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Laboratory ($420.00) $0.00 ($420.00) $0.00 $0.00
Encore Samplers $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory ($420.00) $0.00 ($420.00) $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal ($420.00) $0.00 $0.00 ($420.00) $0.00 $0.00
Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost ($420.00) $0.00 $0.00 ($420.00) $0.00 $0.00
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager (GW) 0
Scientist V (RH) Tallahassee Office; Develop/review Work Plan [2]; Coordination, teleconference with staff, FDEP [2] 0
Scientist IV (GB)
Scientist II (JE)
Engineer I (MQ) Tallahassee Office; Work Plan text, draft figures and tables [12], prepare HASP, coordinate HASP review [4] 0
Staff GIS Specialist (JM) Jacksonville Office; Figure preparation [2] 0
TOTAL LABOR 0
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Total GPS Station $141.65 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist V (RH) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office: Coordination with field team and subs, Review field task deliverable [2] 0
Scientist IV (GB) 0
Scientist II (JE)
Engineer I (MQ) Prepare field task deliverable 0
Staff GIS Specialist (JM) 0
TOTAL LABOR 0
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Soil Assessment Kit $208.55 Day 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Per Person x Day 0 $0.00
Teflon Tubing (1/4-inch diameter) $1.95 Foot 0 $0.00
Total Survey Station $41.75 Each 0 $0.00
Peristaltic Pump $29.10 Each 0 $0.00
Hammer Drill $50.95 Each $0.00
MiniRae 3000 PID $87.30 Each Included in MW and Soil kits $0.00
Total GPS Station $141.65 Each 0 Trimble GeoXH $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 Staff from Tampa for field work (2 days) $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist IV $36.00 Day 0 $0.00
Scientist II $36.00 Day 0 $0.00
Engineer I $36.00 Day 0 $0.00
HOTEL
Scientist IV $120.00 Day 0 $0.00
Scientist II $120.00 Day 0 $0.00
Engineer I $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Metals ($11.50/analyte x 22) Liquid 6010B $253.00 0 0 22 TAL Metals + QA (1 dup, 1 EB) $0.00
VOC Liquid 8260B $135.00 0 0 TCL VOCs + QA (1 dup, 1 EB, 1 TB) $0.00
Cyanide Liquid 9012B $35.00 -3 -2 CN + QA (1 dup, 1 EB) ($175.00)
Mercury Liquid 7470 $23.00 0 0 Hg + QA (1 dup, 1 EB) $0.00
Metals ($11.50/analyte x 22) Soil 6010B $253.00 0 0 22 TAL Metals + QA (1 dup, 1 EB) $0.00
VOC Soil 8260B $135.00 0 0 TCL VOCs + QA (1 dup, 1 EB) $0.00
Cyanide Soil 9012B $35.00 -5 -2 CN + QA (1 dup, 1 EB) ($245.00)
Mercury Soil 7470 $25.00 0 0 Hg + QA (1 dup, 1 EB) $0.00
% Moisture Soil D2216 $11.00 0 0 Moisture + QA (1 dup, 1 EB) $0.00
$0.00
$0.00
$0.00
Subtotal ($420.00)
Unit Cost Quantity
Sample Containers Lot $0.00 $0.00
Encore Samplers Each $8.75 $0.00
Sample Shipping Coolers $104.00 priority overnight shipping FedEx $0.00
Subtotal $0.00
Note: Analysis cost includes Level IV QA package deliverable. TOTAL LAB ($420.00)
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Cascade Drilling
GeoTek Utility Locate $0.00
TOTAL $0.00
Regency Artistic Metal Refinishing
Tampa Office; Field work (prep for field[1], mobe/demobe[3], site walkover, utilities [6], well installation/sampling/survey/sample packing[14], SUBTASK 4: Report
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager (GW) Tallahassee Office; Document review and seal 0
Scientist V (RH) Tallahassee Office; Document review and editing 0
Scientist IV (GB)
Scientist II (JE)
Engineer I (MQ)
Staff GIS Specialist (JM) Jacksonville Office; Process GPS data, figure preparation 0
TOTAL LABOR 0
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (WO) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Volatiles Liquid 8260 $135.00 Standard Turn Around $0.00
Semivolatiles Liquid 8270 $100.00 Standard Turn Around $0.00
Pesticides Liquid 8081 $90.00 Standard Turn Around $0.00
Herbicides Liquid 8151 $150.00 Standard Turn Around $0.00
TRPH Liquid Florida PRO $84.00 Standard Turn Around $0.00
Lead Liquid 6010 $11.50 Standard Turn Around $0.00
Total Dissolved Fe and Mn Liquid 6010 $23.00 Standard Turn Around $0.00
COD Liquid SM5220 $25.00 Standard Turn Around $0.00
BOD (5 day) Liquid SM5210 $25.00 Standard Turn Around $0.00
Methane/CO2/02 Liquid 3810 $110.00 Standard Turn Around $0.00
In-line Filter (0.45 Micron) Each $17.50 $0.00
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
Regency Artistic Metal Refinishing
Tallahassee Office; Draft and Final document preparation; description of field activities including monitoring well installation, groundwater
Date: April 16 2020
Task #: HW560 TA CSS- SubTask 1 Project Management
Site: Regency Artistic Metal Refinishing SubTask 2 Work Plan and HASP
Activity/Phase: Change Order SubTask 3 Fieldwork - Drilling and Groundwater Sampling
Project Manager: Ginger Shirah SubTask 4 Report
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$61.82 Project Manager (GW) 8 8.0 1 2
$55.00 Scientist V (RH) 10 4 2 4 0
$46.95 Scientist IV (GB) 32 0 32 0 0
$31.25 Scientist II (JE) 0 0 0 0 0
$26.81 Engineer I (MQ) 54 16 2 36 0
$37.54 Staff GIS Specialist (JM) 7 2 0 5 0 0 0 0 0 0
Total Hours 114 8 23 36 47 0
Direct Labor $4,442.94 $494.56 $785.86 $1,666.02 $1,496.50 $0.00
Overhead 143.00% $6,353.41 $707.22 $1,123.78 $2,382.41 $2,140.00 $0.00
Gen & Admin 12.20% $1,317.16 $146.62 $232.98 $493.91 $443.65 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $12,113.51 $1,348.40 $2,142.62 $4,542.34 $4,080.15 $0.00
Other Direct Costs $222.15 $24.73 $39.29 $83.30 $74.83 $0.00
Travel
Vehicle Rental $194.00 $0.00 $194.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $194.00 $0.00 $194.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00
Drilling and Well Installation $2,220.00 $0.00 $2,220.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $750.00 $0.00 $750.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,970.00 $0.00 $2,970.00 $0.00 $0.00
Handling Fee $297.00 $0.00 $297.00 $0.00 $0.00
Total Subcontractor Cost $3,267.00 $0.00 $3,267.00 $0.00 $0.00
Laboratory
Laboratory $5,567.00 $0.00 $5,567.00 $0.00 $0.00
Encore Samplers $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $5,567.00 $0.00 $5,567.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $65.00 $0.00 $65.00 $0.00 $0.00
Equipment (Drilling related) $184.30 $0.00 $184.30 $0.00 $0.00
Equipment (Analytical related) $417.10 $0.00 $417.10 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $183.40 $0.00 $183.40 $0.00 $0.00
Total Field Expenses $849.80 $0.00 $849.80 $0.00 $0.00
Subtotal $22,213.46 $1,373.13 $2,181.91 $14,503.44 $4,154.98 $0.00
Completion Fee $1,211.35 $134.84 $214.26 $454.23 $408.02 $0.00
Total Estimated Cost $23,424.81 $1,507.97 $2,396.17 $14,957.67 $4,563.00 $0.00
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager (GW) 1
Scientist V (RH) Tallahassee Office; Develop/review Work Plan [2]; Coordination, teleconference with staff, FDEP [2] 4
Scientist IV (GB)
Scientist II (JE)
Engineer I (MQ) Tallahassee Office; Work Plan text, draft figures and tables [12], prepare HASP, coordinate HASP review [4] 16
Staff GIS Specialist (JM) Jacksonville Office; Figure preparation [2] 2
TOTAL LABOR 23
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Total GPS Station $141.65 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist V (RH) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office: Coordination with field team and subs, Review field task deliverable [2] 2
Scientist IV (GB) 32
Scientist II (JE)
Engineer I (MQ) Prepare field task deliverable 2
Staff GIS Specialist (JM) 0
TOTAL LABOR 36
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Soil Assessment Kit $208.55 Day 1 $208.55
Monitoring Well Installation Kit $184.30 Day 1 $184.30
Shallow Groundwater Sampling Kit $208.55 Day 1 $208.55
Expendables $32.50 Day 2 $65.00
Personal Protection (Level D) $28.00 Per Person x Day 0 $0.00
Teflon Tubing (1/4-inch diameter) $1.95 Foot 0 $0.00
Total Survey Station $41.75 Each 1 $41.75
Peristaltic Pump $29.10 Each 0 $0.00
Hammer Drill $50.95 Each $0.00
MiniRae 3000 PID $87.30 Each Included in MW and Soil kits $0.00
Total GPS Station $141.65 Each 1 Trimble GeoXH $141.65
TOTAL EQUIPMENT $849.80
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 2 Staff from Tampa for field work (2 days) $194.00
Car $68.00 day 0 $0.00
Subtotal $194.00
Mileage Miles 0
TOTAL VEHICLE $194.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist IV $36.00 Day 0 $0.00
Scientist II $36.00 Day 0 $0.00
Engineer I $36.00 Day 0 $0.00
HOTEL
Scientist IV $120.00 Day 0 $0.00
Scientist II $120.00 Day 0 $0.00
Engineer I $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Metals ($11.50/analyte x 22) Liquid 6010B $253.00 3 2 22 TAL Metals + QA (1 dup, 1 EB) $1,265.00
VOC Liquid 8260B $135.00 3 3 TCL VOCs + QA (1 dup, 1 EB, 1 TB) $810.00
Cyanide Liquid 9012B $35.00 3 2 CN + QA (1 dup, 1 EB) $175.00
Mercury Liquid 7470 $23.00 3 2 Hg + QA (1 dup, 1 EB) $115.00
Metals ($11.50/analyte x 22) Soil 6010B $253.00 5 2 22 TAL Metals + QA (1 dup, 1 EB) $1,771.00
VOC Soil 8260B $135.00 5 2 TCL VOCs + QA (1 dup, 1 EB) $945.00
Cyanide Soil 9012B $35.00 5 2 CN + QA (1 dup, 1 EB) $245.00
Mercury Soil 7470 $25.00 5 2 Hg + QA (1 dup, 1 EB) $175.00
% Moisture Soil D2216 $11.00 5 1 Moisture + QA (1 dup, 1 EB) $66.00
$0.00
$0.00
$0.00
Subtotal $5,567.00
Unit Cost Quantity
Sample Containers Lot $0.00 $0.00
Encore Samplers Each $8.75 $0.00
Sample Shipping Coolers $104.00 0 priority overnight shipping FedEx $0.00
Subtotal $0.00
Note: Analysis cost includes Level IV QA package deliverable. TOTAL LAB $5,567.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Cascade Drilling $2,220.00 $2,220.00
GeoTek Utility Locate $750 1 $750.00
TOTAL $2,970.00
Regency Artistic Metal Refinishing
Tampa Office; Field work (prep for field[1], mobe/demobe[3], site walkover, utilities [6], well installation/sampling/survey/sample packing[14], SUBTASK 4: Report
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager (GW) Tallahassee Office; Document review and seal 2
Scientist V (RH) Tallahassee Office; Document review and editing 4
Scientist IV (GB)
Scientist II (JE)
Engineer I (MQ)
Staff GIS Specialist (JM) Jacksonville Office; Process GPS data, figure preparation 5
TOTAL LABOR 47
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (WO) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Volatiles Liquid 8260 $135.00 Standard Turn Around $0.00
Semivolatiles Liquid 8270 $100.00 Standard Turn Around $0.00
Pesticides Liquid 8081 $90.00 Standard Turn Around $0.00
Herbicides Liquid 8151 $150.00 Standard Turn Around $0.00
TRPH Liquid Florida PRO $84.00 Standard Turn Around $0.00
Lead Liquid 6010 $11.50 Standard Turn Around $0.00
Total Dissolved Fe and Mn Liquid 6010 $23.00 Standard Turn Around $0.00
COD Liquid SM5220 $25.00 Standard Turn Around $0.00
BOD (5 day) Liquid SM5210 $25.00 Standard Turn Around $0.00
Methane/CO2/02 Liquid 3810 $110.00 Standard Turn Around $0.00
In-line Filter (0.45 Micron) Each $17.50 $0.00
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
Regency Artistic Metal Refinishing
Tallahassee Office; Draft and Final document preparation; description of field activities including monitoring well installation, groundwater
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
Site Name:
Site ID / Facility ID::
Description of Change [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverable:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
Cost Reimbursement Fixed Fee
Original Task Amount
Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00
Original Task Completion Date:
Completion Date Prior to this Change:
Net Increase/Decrease in Task Period:
Completion Date with all Change Orders:
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
FIXED PRICE
TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM
ITEM
$0.00
$0.00
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
Final Deliverable Due Date:
$0.00
$0.00
CHANGE IN TASK TIME
FEE SCHEDULE
COST PLUS FIXED FEE
TOTAL
WCP TAFORM 01_18
HW560
02CSS-30A
Tetra Tech, Inc.
Gerry Walker, P.G. Phone #: (850) 385-9899
(850) 245-8899Ginger Shirah Regency Artistic Metal Finishing
ERIC_7532
The Department approves this Task Assignment Change Order (TACO) in accordance with the attached correspondence submitted by Tetra Tech, Inc. on April 16, 2021. Cost reductions in subtask 3 result from the decrease in subcontractor drilling/well installation costs associated with the reduction in number of monitor wells/sampling locations on site due to concrete encountered around one sampling location (RAM-02) and the decrease in laboratory shipping costs due to samples being hand delivered. These changes result in an overall decrease in the total Task Assignment amount.
Final Site Inspection Report 05/06/2021
$ 24,965.81 $ 0.00 $ 0.00 $ 0.00
$ 24,965.81 $ 0.00 $ 0.00 $ 0.00 $ 24,965.81
($ 1,541.00) $ 0.00 $ 0.00 $ 0.00 ($ 1,541.00)
$ 23,424.81
05/14/2021
06/15/2021
N/A
06/15/2021
Ginger Shirah Digitally signed by Ginger Shirah Date: 2021.04.19 16:51:24 -04'00'
Ginger Shirah Digitally signed by Ginger Shirah Date: 2021.04.19 16:51:30 -04'00'
Digitally signed by Jennifer Farrell Date: 2021.04.20 12:59:41 -04'00'
Digitally signed by: Gerald Walker DN: CN = Gerald Walker email = gerry.walker@tetratech.com C = US O = Tetra Tech OU = 112-NUS Date: 2021.04.20 14:56:39 -04'00'
Gerald Walker
$ 23,424.81 $ 0.00 $ 0.00 $ 0.00
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW560
CSS-30A
$ 23,424.81
Site Inspection Workplan/Quality Assurance Project Plan (QAPP) and Site Health and Safety Plan (HASP)
Field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities
Site Inspection Report
FDEP Approval of the Site Inspection Workplan/QAPP & HASP (Subtask 2)
FDEP Approval of the Site Inspection Report (Subtasks 1 and 4)
FDEP Approval of field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities (Subtask 3)
02/12/2021
04/16/2021
05/06/2021
$ 14,957.67
$ 2,396.17
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
Site Name:
Site ID / Facility ID::
Description of Change [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverable:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
Cost Reimbursement Fixed Fee
Original Task Amount
Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00
Original Task Completion Date:
Completion Date Prior to this Change:
Net Increase/Decrease in Task Period:
Completion Date with all Change Orders:
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
FIXED PRICE
TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM
ITEM
$0.00
$0.00
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
Final Deliverable Due Date:
$0.00
$0.00
CHANGE IN TASK TIME
FEE SCHEDULE
COST PLUS FIXED FEE
TOTAL
WCP TAFORM 01_18
HW560
01CSS-30A
Tetra Tech, Inc.
Gerry Walker, P.G. Phone #: (850) 385-9899
(850) 245-8953Kelly Crain Regency Artistic Metal Finishing
ERIC_7532
The Department approves this Task Assignment Change Order (TACO) in accordance with the attached correspondence submitted by Tetra Tech, Inc. on March 31, 2021. Delays in receiving an approved QAPP from FDEP and EPA resulted in a later field work date than originally anticipated, and therefore a date extension has been issued for the last two deliverables. The deliverable for subtask 2 is now due on April 16, 2021 and the final deliverable is now due on May 6, 2021. There is no change in Task Assignment amount.
Final Site Inspection Report 05/06/2021
$ 24,965.81 $ 0.00 $ 0.00 $ 0.00
$ 24,965.81 $ 0.00 $ 0.00 $ 0.00 $ 24,965.81
$ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00
$ 24,965.81
05/14/2021
05/14/2021
06/15/2021
Ginger Shirah Digitally signed by Ginger Shirah Date: 2021.04.01 07:32:33 -04'00'
Kelly Crain Digitally signed by Kelly Crain Date: 2021.04.01 08:39:33 -04'00'
Digitally signed by Jennifer Farrell Date: 2021.04.01 11:43:00 -04'00'
Digitally signed by: Gerald Walker DN: CN = Gerald Walker email = gerry.walker@tetratech.com C = US O = Tetra Tech OU = 112-NUS Date: 2021.04.01 14:02:53 -04'00'
Gerald Walker
$ 24,965.81 $ 0.00 $ 0.00 $ 0.00
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW560
CSS-30A
$ 24,965.81
Site Inspection Workplan/Quality Assurance Project Plan (QAPP) and Site Health and Safety Plan (HASP)
Field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities
Site Inspection Report
FDEP Approval of the Site Inspection Workplan/QAPP & HASP (Subtask 2)
FDEP Approval of the Site Inspection Report (Subtasks 1 and 4)
FDEP Approval of field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities (Subtask 3)
02/12/2021
04/16/2021
05/06/2021
$ 16,498.67
$ 2,396.17
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Inspection Workplan/Quality Assurance Project Plan (QAPP) and Site Health and Safety Plan (HASP) 02/12/2021
Field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities 03/19/2021
Site Inspection Report 04/09/2021
FDEP Approval of the Site Inspection Workplan/QAPP & HASP (Subtask 2) $ 2,396.17
FDEP Approval of field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities (Subtask 3) $ 16,498.67
FDEP Approval of the Site Inspection Report (Subtasks 1 and 4) $ 6,070.97
$ 24,965.81
HW560
CSS-30A
| Task Assignment CHANGE ORDER |
| BWC Task Assignment Change Order Form (Rev 02-17).pdf |
| Task Assignment CHANGE ORDER |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |