This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW560. The task assignment (CSS-18A) was awarded to Tetra Tech, Inc., with Gerald Walker, P.G. serving as the contractor representative and Carrie Kruchell, P.G. as the FDEP Contract Manager. The work is located at QMS Circuits, 40 Hill Ave, Fort Walton Beach, Okaloosa County, Florida (DEP Site #COM_6123), and falls under the CERSI module with Grant #CER17.

The task assignment encompasses a site inspection phase with a fixed-price value of $33,878.00 and no retainage. The scope includes project management, a Site Inspection Work Plan and Health and Safety Plan, soil sampling, well installation, and groundwater sampling, with the final deliverable being a Site Inspection Report due November 16, 2018, and execution through December 28, 2018. The deliverables and invoice schedule is structured in three components: Site Inspection Workplan and HASP ($3,998.79, due September 4, 2018); Field notes, monitoring well construction logs, well sampling logs, chain of custody, and photographic documentation ($21,704.85, due September 24, 2018); and the Final Site Inspection Report ($8,174.36, due November 16, 2018). All invoicing is contingent upon FDEP approval of the respective deliverables.

View the file

Other files

File Type Posted
CN-370000-HW560-A12.pdf PDF
CN-370000-HW560-A2.pdf PDF
CN-370000-HW560-A7.pdf PDF
CN-370000-HW560-A8.pdf PDF
CN-370000-HW560-BF02B.pdf PDF
CN-370000-HW560-BF03B.pdf PDF
CN-370000-HW560-BF04A.pdf PDF
CN-370000-HW560-BF04ACO1.pdf PDF
CN-370000-HW560-BF04D.pdf PDF
CN-370000-HW560-BF05.pdf PDF
CN-370000-HW560-BF05ACO4.pdf PDF
CN-370000-HW560-BF06.pdf PDF
CN-370000-HW560-BF06CO1.pdf PDF
CN-370000-HW560-BF07BCO1.pdf PDF
CN-370000-HW560-BF602A.pdf PDF
CN-370000-HW560-BF62BCO1.pdf PDF
CN-370000-HW560-BF62CCO1.pdf PDF
CN-370000-HW560-BF62CCO2.pdf PDF
CN-370000-HW560-CO4.pdf PDF
CN-370000-HW560-CO5.pdf PDF
CN-370000-HW560-CS19ACO1.pdf PDF
CN-370000-HW560-CSS-19A.pdf PDF
CN-370000-HW560-CSS-31A.pdf PDF
CN-370000-HW560-CSS-32A.pdf PDF
CN-370000-HW560-CSS3ACO1.pdf PDF
CN-370000-HW560-DC006I.pdf PDF
CN-370000-HW560-DC007P.pdf PDF
CN-370000-HW560-DC008R.pdf PDF
CN-370000-HW560-DC009A.pdf PDF
CN-370000-HW560-DC010O.pdf PDF
CN-370000-HW560-DC01ACO1.pdf PDF
CN-370000-HW560-DC01ACO5.pdf PDF
CN-370000-HW560-DC01ACO6.pdf PDF
CN-370000-HW560-DC01ACO9.pdf PDF
CN-370000-HW560-DC021C.pdf PDF
CN-370000-HW560-DC025A.pdf PDF
CN-370000-HW560-DC025D.pdf PDF
CN-370000-HW560-DC027J.pdf PDF
CN-370000-HW560-DC030K.pdf PDF
CN-370000-HW560-DC031B.pdf PDF
CN-370000-HW560-DC032B.pdf PDF
CN-370000-HW560-DC035B.pdf PDF
CN-370000-HW560-DC036F.pdf PDF
CN-370000-HW560-DC03CCO1.pdf PDF
CN-370000-HW560-DC03I.pdf PDF
CN-370000-HW560-DC04CCO1.pdf PDF
CN-370000-HW560-DC04CCO2.pdf PDF
CN-370000-HW560-DC04D.pdf PDF
CN-370000-HW560-DC04E.pdf PDF
CN-370000-HW560-DC05D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW560

CERSI CER17CSS 18-A

Tetra Tech

Gerald Walker, P.G. 850-385-9889

850-245-8765Carrie Kruchell, P.G.

COM_6123

QMS Circuits

40 Hill Ave. Ft. Walton Beach, Okaloosa County

Site Inspection

The Department approves this Task Assignment (TA) in accordance with the attached Cost Proposal and Level of Effort (WP/LOE) submitted by Tetra Tech, Inc. on August 6, 2018 and revised on August 16, 2018, and August 27, 2018. This TA includes Project Management, a Site Inspection Work Plan and Health and Safety Plan, and Soil Sampling, Well installation, and Groundwater Sampling. The final deliverable is the Site Inspection Report.

Site Inspection Report

11/16/2018

12/28/2018

$ 33,878.00 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Padraic Conner Digitally signed by Padraic Conner Date: 2018.08.23 13:44:26 -04'00'

Laura K Barrett Digitally signed by Laura K Barrett Date: 2018.08.28 09:28:08 -04'00'

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2018.08.28 13:30:53 -04'00'

Digitally signed by: gerry.walker@tetratech.com DN: CN = gerry.walker@tetratech.com Date: 2018.08.28 14:04:18 -05'00' gerry.walker@tetratech.com

$ 33,878.00

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Site Inspection Workplan and HASP 09/04/2018

Field notes, monitoring well construction logs, well sampling logs, chain of custody, and photographic log from the Site Inspection Activities 09/24/2018

Final Site Inspection Report 11/16/2018

FDEP approval of the Site Inspection Work Plan and HASP (Subtask 2) $ 3,998.79

FDEP approval of the Site Inspection field notes, monitoring well construction logs, well sampling logs, chain of custody, and photographic log (Subtask 3) $ 21,704.85

FDEP approval of the Final Site Inspection Report (Subtasks 1 and 4) $ 8,174.36

$ 33,878.00

HW560

CSS-18A

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .