This is a Task Assignment Change Order (TACO) No. 01 for the Florida Department of Environmental Protection (FDEP) under Consolidated Contract HW560, managed by Tetra Tech, Inc. The change order pertains to a Limited Site Inspection at the former Wakulla Cleaners site in Crawfordville, Wakulla County, Florida (ERIC_5541). The document includes cost estimates, detailed level-of-effort worksheets, and supporting invoices for subcontractor services provided by GeoTek Services, LLC.
The change order increases the total task assignment cost by $905.57, from $10,781.34 to $11,686.91, and extends the project completion date by 30 days from March 31, 2020 to April 30, 2020. Key modifications include: (1) addition of $750.00 for GeoTek Services utility locating services at the site on February 21, 2020; (2) three additional labor hours for an Engineer to mobilize and coordinate with the utility locator; (3) one additional day of vehicle usage at $68.00; (4) removal of two hours of Project Assistant labor (1 hour in Subtask 2 and 1 hour in Subtask 4) due to the employee not being listed in current approved contract labor rates; and (5) removal of three man-days of Level D personal protective equipment costs totaling $84.00. The final deliverable is a Limited Site Inspection Report due April 24, 2020. Invoicing occurs in three tranches totaling $11,686.91: $1,335.28 upon FDEP approval of the Site Inspection Work Plan and HASP; $7,665.62 upon approval of field notes and documentation; and $2,686.01 upon approval of the final report.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Change Order No.:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
Site Name:
Site ID / Facility ID::
Description of Change [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverable:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
Cost Reimbursement Fixed Fee
Original Task Amount
Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00
Original Task Completion Date:
Completion Date Prior to this Change:
Net Increase/Decrease in Task Period:
Completion Date with all Change Orders:
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
FIXED PRICE
TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM
ITEM
$0.00
$0.00
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
Final Deliverable Due Date:
$0.00
$0.00
CHANGE IN TASK TIME
FEE SCHEDULE
COST PLUS FIXED FEE
TOTAL
WCP TAFORM 01_18
HW560
01CSS-25A
Tetra Tech, Inc.
Gerald Walker, P.G.
8502458953Kelly Crain
Wakulla Cleaners
ERIC_5541
The Department approves this Task Assignment Change Order (TACO) in accordance with the attached revised Cost Proposal and Level of Effort (CP/LOE) submitted by Tetra Tech, Inc. on March 24, 2020. This TACO will increase labor, travel and subcontractor costs associated with the private utility locate (subtask 3), remove costs for labor hours for one Project Assistant (subtasks 2 & 4), remove costs for PPE (subtask 3) and extend the deliverable due date. This results in an overall increase of the total Task Assignment amount and extends the Task Completion Date by thirty days.
Limited Site Inspection Report 04/24/2020
$ 10,781.34 $ 0.00 $ 0.00 $ 0.00
$ 10,781.34 $ 0.00 $ 0.00 $ 0.00 $ 10,781.34
$ 905.57 $ 0.00 $ 0.00 $ 0.00 $ 905.57
$ 11,686.91
03/31/2020
03/31/2020
04/30/2020
Ginger Shirah Digitally signed by Ginger Shirah Date: 2020.03.25 10:40:20 -04'00'
Kelly Crain Digitally signed by Kelly Crain Date: 2020.03.27 08:10:02 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.03.30 08:41:46 -04'00'
Digitally signed by: Gerald Walker DN: CN = Gerald Walker email = gerry.walker@tetratech.com C = US O = Tetra Tech OU = Tetra Tech Date: 2020.03.30 13:18:46 -04'00'
Gerald Walker
$ 11,686.91 $ 0.00 $ 0.00 $ 0.00
$ 10,781.34
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01_18
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW560
CSS-25A
$ 11,686.91
Site Inspection Work Plan and HASP
Site Inspection field notes, lab shipment receipts, chain of custody, and photographic log from Site Inspection activities
Final Limited Site Inspection Report
FDEP Approval of the Site Inspection Work Plan and HASP (Subtask 2)
FDEP Approval of the Final Limited Site Inspection Report (Subtasks 1 and 4)
FDEP Approval of Site Inspection field notes, lab shipment receipts, chain of custody, and photographic log from Site Inspection activities (Subtask 3)
01/31/2020
02/21/2020
04/24/2020
$ 7,665.62
$ 1,335.28
$ 2,686.01 www.floridadep.gov
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
TO:
FROM:
DATE:
SUBJECT:
Tetra Tech, Inc., HW560 Contract File CERCLA Site Screening
Kelly Crain, Contract Manager
March 25, 2020
Negotiation Summary – Task Assignment (TA) CSS-25A_CO1 Wakulla Cleaners, ERIC_5541, Crawfordville, Wakulla County Site Inspection (SI)
This change order is requested for the addition of labor, travel and subcontractor costs related to the private utility locate at the site, the removal of labor costs for a Project Assistant (LC), the removal of PPE costs, and to extend the due date of the final deliverable. GeoTek Services, LLC was asked to provide the utility locate services on site after the original Task Assignment was executed. Labor hours and travel costs were incurred so that a Tetra Tech employee could mobilize to the site to be present during the utility locate activities. The Project Assistant (LC) is not included on the most recent approved labor rates for HW560 and therefore the associated project hours in Subtasks 2 and 4 are being removed. The PPE charge is being removed at the request of the Department. The deliverable due date is being extended to allow additional time for the laboratory to provide analytical results.
The overall change in cost of this task assignment is an increase of $905.57.
The final cost for this TA is $11,686.91 and is reasonable for the scope of services.
http://www.floridadep.gov/
Tetra Tech, Inc.
1558 Village Square Blvd., Ste. 2, Tallahassee, FL 32309-2478
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
TetraTech/TAL-20-23 HW560-10
March 24, 2020
Department of Environmental Protection Waste Cleanup Programs ATTN: Ms. Ginger Shirah MS #4535 Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Reference: Florida Department of Environmental Protection (DEP) Waste Cleanup Programs Consolidated Contract HW560
Subject: Change Order Request – Limited Site Inspection at Former Wakulla Cleaners Site, Crawfordville, Wakulla County, Florida
Dear Ms. Shirah:
Tetra Tech is providing this documentation to support our request for a change order for Task Assignment CSS-25A. The change order will cover changes in labor cost, equipment, vehicle, and subcontracted services. These are described below and shown in the attached Change Order Delta and Change Order Summary workbooks.
Subtask 1 - Project Management: No change.
Subtask 2 - Work Plan & HASP: Removal of one hour labor for a Project Assistant (LC), who is ot included in Tetra Tech’s most recent labor rates table under HW560 (Tetra Tech will be submitting new contract labor rates for a Project assistant shortly).
Subtask 3 – Passive Soil Gas Sampling and Analysis:
At FDEP’s request, a private utility locator was subcontracted to clear passive soil gas sample boring locations. A Tetra Tech employee met the locator on February 21, 2020 as documented in the field deliverable. This resulted in:
Addition of $750.00 subcontractor cost (invoice attached).
Three additional labor hours for an Engineer to travel to the site, be with the locator, and return to the office.
One day car usage to visit the site. A company vehicle was used.
Full Level D PPE (including Tyvek coveralls) was not used at the site. Three man-days of Level D PPE were removed from the project cost.
Subtask 4 - Report: Removal of one hour labor for a Project Assistant (LC), who is not included in Tetra Tech’s most recent labor rates table under HW560.
Tetra Tech, Inc.
1558 Village Square Blvd., Ste. 2, Tallahassee, FL 32309-2478
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
These changes result in a net increase of $905.57 in the total Task Assignment Cost. With this addition, the total Task Assignment cost is $11,686.91.
If you have any questions, please call myself or Richard Hicks (850) 385-9899.
Sincerely yours, Gerald Walker, P.G.
Brownfields Program Manager rh/GAW
Attachments c: Kelly Crain, FDEP Justin Cross, FDEP Jay McGovern, Tetra Tech Tallahassee File FDEP Contract HW560
Attachment A
Contract HW560 Cost Estimate Spreadsheets and Backup Documentation
FDEP COST ESTI MATE
Contractor: Tetra Tech, Inc.
Date: December 23, 2019
Task #: HW560 TA CSS- SubTask 1 Project Management
Site: Wakulla Cleaners SubTask 2 Work Plan & HASP
Activity/Phase: Site Inspection and Report SubTask 3 Fieldwork - Passive Soil Gas sampling & analysis
Project Manager: Ginger Shirah SubTask 4 Report
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$60.14 Project Manager (GW) 4 4.2 $55.00 Scientist V (RH) 11 1 9 1 0 $24.52 Scientist I (DH) 0 0 0 0 0 $32.26 Scientist II (QK) 0 0 0 0 0 $25.83 Engineer I (MQ) 43 12 16 15 0 $36.48 Staff GIS Specialist (JM) 7 2 0 5 0 $24.67 Project Assistant (LC) 2 1 0 1 0
Total Hours 67 4 16 25 22 0
Direct Labor $2,272.94 $252.55 $462.59 $908.28 $649.52 $0.00
Overhead 143.00% $3,250.30 $361.15 $661.50 $1,298.84 $928.81 $0.00 Gen & Admin 12.20% $673.84 $74.87 $137.14 $269.27 $192.56 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,197.08 $688.57 $1,261.23 $2,476.39 $1,770.89 $0.00
Other Direct Costs $113.65 $12.63 $23.13 $45.41 $32.48 $0.00 Travel
Vehicle Rental $194.00 $0.00 $194.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $0.00 $194.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00 Drilling and Well Installation $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 Beacon Environmental $2,840.00 $0.00 $2,840.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,840.00 $0.00 $2,840.00 $0.00 $0.00 Handling Fee $284.00 $0.00 $284.00 $0.00 $0.00 Total Subcontractor Cost $3,124.00 $0.00 $3,124.00 $0.00 $0.00
Laboratory Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Encore Samplers $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $104.00 $0.00 $104.00 $0.00 $0.00 Total Laboratory $104.00 $0.00 $104.00 $0.00 $0.00
Field Expenses Personal Protection (Level D) $84.00 $0.00 $84.00 $0.00 $0.00 Expendables $65.00 $0.00 $65.00 $0.00 $0.00 Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $279.90 $0.00 $279.90 $0.00 $0.00 Total Field Expenses $428.90 $0.00 $428.90 $0.00 $0.00
Subtotal $10,161.63 $701.20 $1,284.36 $6,372.70 $1,803.37 $0.00 Completion Fee $619.71 $68.86 $126.12 $247.64 $177.09 $0.00
Total Estimated Cost $10,781.34 $770.06 $1,410.48 $6,620.34 $1,980.46 $0.00
REV: 03/23/17 Page 1
SITE :
SUBTASK 2: Work Plan & HASP
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Review Work Plan and HASP[1] 1
Scientist I (DH) 0
Scientist II (QK) 0
Engineer I (MQ) Tallahassee Office; Prepare Draft, Final Work Plan[4], utility locates [2], prepare HASP[6] 12
Staff GIS Specialist (JM) Jacksonville Office; Figure preparation[2] 2
Project Assistant (LC) Jacksonville Office; Document editing & publication[4] 1
TOTAL LABOR 16
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment Hand Auger $8.25 Each 0 $0.00 Monitoring Well Installation Kit $184.30 Day 0 $0.00 Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00 Expendables $32.50 Day 0 $0.00 Personal Protection (Level D) $28.00 Day 0 $0.00 Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00 Van/Truck $97.00 day 0 $0.00 Car $68.00 day 0 $0.00
Subtotal $0.00 Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00 Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist V (RH) $120.00 Day 0 $0.00 Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00 Encore Samplers Each $8.75 0 $0.00 Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
Wakulla Cleaners
SUBTASK 3: Fieldwork - Passive Soil Gas sampling & analysis
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Field work (prep for field[1], mobe/demobe[2], site walkover [1], PSG instal/documentation/H&S [4], documentation deliverab 9
Scientist I (DH)
Scientist II (QK) 0
Engineer I (MQ) Tallahassee, Office; Field work (prep for field[1], mobe/demobe[4], site walkover [1], psg instal [3], GPS/survey [1], PSG retrieve and hole restora 16 sample packing/shipping [1], documentation deliverable [2])
Staff GIS Specialist (JM) 0
Project Assistant (LC) 0
TOTAL LABOR 25
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment Hand Auger $8.25 Each 0 5 locations, 2 depths $0.00 Monitoring Well Installation Kit $184.30 Day 0 $0.00 Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00 Expendables $32.50 Day 2 $65.00 Personal Protection (Level D) $28.00 Per Person x Day 3 RH 1 dys onsite, MQ 2 dys onsite $84.00 Teflon Tubing (1/4-inch diameter) $1.95 Foot 0 $0.00 Total Survey Station $41.75 Each 0 $0.00 Peristaltic Pump $29.10 Each 0 Extra pump for well purging $0.00 Hammer Drill $50.95 Each 1 $50.95 MiniRae 3000 PID $87.30 Each 1 for soil bore holes/H&S $87.30 Total GPS Station $141.65 Each 1 Trimble GeoXH $141.65
TOTAL EQUIPMENT $428.90
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00 Van/Truck $97.00 day 2 $194.00 Car $68.00 day 0 $0.00
Subtotal $194.00 Mileage Miles 0
TOTAL VEHICLE $194.00
Scientist (DH) $36.00 Day 0 $0.00 Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (RH) $120.00 Day 0 $0.00 Scientist (DH) $120.00 Day 0 $0.00 Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis Metals Liquid 6010 $80.50 $0.00 Volatile Organics Liquid 8260 $109.00 $0.00 TRPH Liquid Florida PRO $84.00 $0.00 SVOC Liquid 8270 $100.00 $0.00 Mercury Liquid 7470 $23.00 $0.00 Pesticides Liquid 8081 $90.00 $0.00 Metals Soil 6010 $80.50 $0.00 Volatile Organics Soil 8260 $109.00 $0.00 TRPH Soil Florida PRO $84.00 $0.00 SVOC Soil 8270 $100.00 $0.00 Mercury Soil 7471 $25.00 $0.00 Pesticides Soil 8081 $90.00 $0.00
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 $0.00 Encore Samplers Each $8.75 TerraCore kits (1 per VOA sample); (10+1 dup) $0.00 Sample Shipping Coolers $104.00 1 priority overnight shipping FedEx $104.00
Subtotal $104.00
TOTAL LAB $104.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Beacon Environmental Passive Soil Gas $2,840.00 $2,840.00
TOTAL $2,840.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 4: Report
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Document review by a PG[4] 1
Scientist I (DH)
Scientist II (QK)
Engineer I (MQ) 15
Staff GIS Specialist (JM) Jacksonville Office; Figure preparation and potable well inventory 5
Project Assistant (LC) Jacksonville Office; Document editing & publication 1
TOTAL LABOR 22
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment Hand Auger $8.25 Each 0 $0.00 Monitoring Well Installation Kit $184.30 Day 0 $0.00 Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00 Expendables $32.50 Day 0 $0.00 Personal Protection (Level D) $28.00 Day 0 $0.00 Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00 Van/Truck $97.00 day 0 $0.00 Car $68.00 day 0 $0.00
Subtotal $0.00 Mileage Miles 0
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (WO) $120.00 Day 0 $0.00 Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis Volatiles Liquid 8260 $135.00 Standard Turn Around $0.00 Semivolatiles Liquid 8270 $100.00 Standard Turn Around $0.00 Pesticides Liquid 8081 $90.00 Standard Turn Around $0.00 Herbicides Liquid 8151 $150.00 Standard Turn Around $0.00 TRPH Liquid Florida PRO $84.00 Standard Turn Around $0.00 Lead Liquid 6010 $11.50 Standard Turn Around $0.00 Total Dissolved Fe and Mn Liquid 6010 $23.00 Standard Turn Around $0.00 COD Liquid SM5220 $25.00 Standard Turn Around $0.00 BOD (5 day) Liquid SM5210 $25.00 Standard Turn Around $0.00 Methane/CO2/02 Liquid 3810 $110.00 Standard Turn Around $0.00 In-line Filter (0.45 Micron) Each $17.50 $0.00
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00 Encore Samplers Each $8.75 0 $0.00 Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Tallahassee Office; Letter report preparation; description of field activities, summary of passive soil gas results, eval drinking water targets
REV: 03/23/17 Page 2
FDEP COST ESTIMATE
Date: March 24, 2020
Task #: HW560 TA CSS-25A SubTask 1 Project Management
Site: Wakulla Cleaners SubTask 2 Work Plan & HASP
Activity/Phase: Change Order Delta SubTask 3 Fieldwork - Passive Soil Gas sampling & analysis
Project Manager: Ginger Shirah SubTask 4 Report
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$60.14 Project Manager (GW) 0 0.1 $55.00 Scientist V (RH) 0 0 0 0 0 $24.52 Scientist I (DH) 0 0 0 0 0 $32.26 Scientist II (QK) 0 0 0 0 0 $25.83 Engineer I (MQ) 3 0 3 0 0 $36.48 Staff GIS Specialist (JM) 0 0 0 0 0 $24.67 Project Assistant (LC) -2 -1 0 -1 0
Total Hours 1 0 -1 3 -1 0
Direct Labor $31.67 $3.52 ($24.67) $77.49 ($24.67) $0.00
Overhead 143.00% $45.28 $5.03 ($35.28) $110.81 ($35.28) $0.00 Gen & Admin 12.20% $9.39 $1.04 ($7.31) $22.97 ($7.31) $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $86.34 $9.59 ($67.26) $211.27 ($67.26) $0.00
Other Direct Costs $1.60 $0.19 ($1.23) $3.87 ($1.23) $0.00 Travel
Vehicle Rental $68.00 $0.00 $68.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $68.00 $0.00 $68.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00 Drilling and Well Installation $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $750.00 $0.00 $750.00 $0.00 $0.00 Beacon Environmental $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $750.00 $0.00 $750.00 $0.00 $0.00 Handling Fee $75.00 $0.00 $75.00 $0.00 $0.00 Total Subcontractor Cost $825.00 $0.00 $825.00 $0.00 $0.00
Laboratory Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Encore Samplers $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection (Level D) ($84.00) $0.00 ($84.00) $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses ($84.00) $0.00 ($84.00) $0.00 $0.00
Subtotal $896.94 $9.78 ($68.49) $1,024.14 ($68.49) $0.00 Completion Fee $8.63 $0.96 ($6.73) $21.13 ($6.73) $0.00
Total Estimated Cost $905.57 $10.74 ($75.22) $1,045.27 ($75.22) $0.00
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Review Work Plan and HASP[1] 0
Scientist I (DH) 0
Engineer I (MQ) 0
Staff GIS Specialist (JM) 0
Project Assistant (LC) Jacksonville Office; Document editing & publication[-1] Employee not in current contract labor rates -1
TOTAL LABOR -1
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment Hand Auger $8.25 Each 0 $0.00 Monitoring Well Installation Kit $184.30 Day 0 $0.00 Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00 Expendables $32.50 Day 0 $0.00 Personal Protection (Level D) $28.00 Day 0 $0.00 Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00 Van/Truck $97.00 day 0 $0.00 Car $68.00 day 0 $0.00
Subtotal $0.00 Mileage Miles 0
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist V (RH) $120.00 Day 0 $0.00 Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00 Encore Samplers Each $8.75 0 $0.00 Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) 0
Scientist I (DH)
Scientist II (QK) 0
Engineer I (MQ) Tallahassee, Office; Mobilization and time onsite to meet GeoTek utility locator, not included in original task assignment 3
Staff GIS Specialist (JM) 0
Project Assistant (LC) 0
TOTAL LABOR 3
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment Hand Auger $8.25 Each 0 5 locations, 2 depths $0.00 Monitoring Well Installation Kit $184.30 Day 0 $0.00 Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00 Expendables $32.50 Day 2 $0.00 Personal Protection (Level D) $28.00 Per Person x Day -3 RH 1 dys onsite, MQ 2 dys onsite ($84.00) Teflon Tubing (1/4-inch diameter) $1.95 Foot 0 $0.00 Total Survey Station $41.75 Each 0 $0.00 Peristaltic Pump $29.10 Each 0 Extra pump for well purging $0.00 Hammer Drill $50.95 Each 1 $0.00 MiniRae 3000 PID $87.30 Each 1 for soil bore holes/H&S $0.00 Total GPS Station $141.65 Each 1 Trimble GeoXH $0.00
TOTAL EQUIPMENT ($84.00)
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00 Van/Truck $97.00 day 0 $0.00 Car $68.00 day 1 vehicle use to meet utility locator $68.00
Subtotal $68.00 Mileage Miles 0
TOTAL VEHICLE $68.00
Scientist (DH) $36.00 Day 0 $0.00 Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (RH) $120.00 Day 0 $0.00 Scientist (DH) $120.00 Day 0 $0.00 Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis Metals Liquid 6010 $80.50 $0.00 Volatile Organics Liquid 8260 $109.00 $0.00 TRPH Liquid Florida PRO $84.00 $0.00 SVOC Liquid 8270 $100.00 $0.00 Mercury Liquid 7470 $23.00 $0.00 Pesticides Liquid 8081 $90.00 $0.00 Metals Soil 6010 $80.50 $0.00 Volatile Organics Soil 8260 $109.00 $0.00 TRPH Soil Florida PRO $84.00 $0.00 SVOC Soil 8270 $100.00 $0.00 Mercury Soil 7471 $25.00 $0.00 Pesticides Soil 8081 $90.00 $0.00
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 $0.00 Encore Samplers Each $8.75 TerraCore kits (1 per VOA sample); (10+1 dup) $0.00 Sample Shipping Coolers $104.00 1 priority overnight shipping FedEx $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Beacon Environmental Passive Soil Gas $2,840.00 $0.00 GeoTek Utility Locator $750 1 $750.00
TOTAL $750.00
SUBTASK 4: Report
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) 0
Scientist I (DH)
Scientist II (QK)
Engineer I (MQ)
Staff GIS Specialist (JM)
Project Assistant (LC) Jacksonville Office; Document editing & publication. Employee not included in current labor rate table -1
TOTAL LABOR -1
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment Hand Auger $8.25 Each 0 $0.00 Monitoring Well Installation Kit $184.30 Day 0 $0.00 Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00 Expendables $32.50 Day 0 $0.00 Personal Protection (Level D) $28.00 Day 0 $0.00 Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00 Van/Truck $97.00 day 0 $0.00 Car $68.00 day 0 $0.00
Subtotal $0.00 Mileage Miles 0
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (WO) $120.00 Day 0 $0.00 Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis Volatiles Liquid 8260 $135.00 Standard Turn Around $0.00 Semivolatiles Liquid 8270 $100.00 Standard Turn Around $0.00 Pesticides Liquid 8081 $90.00 Standard Turn Around $0.00 Herbicides Liquid 8151 $150.00 Standard Turn Around $0.00 TRPH Liquid Florida PRO $84.00 Standard Turn Around $0.00 Lead Liquid 6010 $11.50 Standard Turn Around $0.00 Total Dissolved Fe and Mn Liquid 6010 $23.00 Standard Turn Around $0.00 COD Liquid SM5220 $25.00 Standard Turn Around $0.00 BOD (5 day) Liquid SM5210 $25.00 Standard Turn Around $0.00 Methane/CO2/02 Liquid 3810 $110.00 Standard Turn Around $0.00 In-line Filter (0.45 Micron) Each $17.50 $0.00
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00 Encore Samplers Each $8.75 0 $0.00 Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
FDEP COST ESTIMATE
Date: March 24, 2020
Task #: HW560 TA CSS-25A SubTask 1 Project Management
Site: Wakulla Cleaners SubTask 2 Work Plan & HASP
Activity/Phase: Change Order SubTask 3 Fieldwork - Passive Soil Gas sampling & analysis
Project Manager: Ginger Shirah SubTask 4 Report
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$60.14 Project Manager (GW) 4 4.3 $55.00 Scientist V (RH) 11 1 9 1 0 $24.52 Scientist I (DH) 0 0 0 0 0 $32.26 Scientist II (QK) 0 0 0 0 0 $25.83 Engineer I (MQ) 46 12 19 15 0 $36.48 Staff GIS Specialist (JM) 7 2 0 5 0 $24.67 Project Assistant (LC) 0 0 0 0 0
Total Hours 68 4 15 28 21 0
Direct Labor $2,304.61 $256.07 $437.92 $985.77 $624.85 $0.00
Overhead 143.00% $3,295.60 $366.18 $626.23 $1,409.65 $893.54 $0.00 Gen & Admin 12.20% $683.22 $75.91 $129.83 $292.24 $185.24 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,283.43 $698.16 $1,193.98 $2,687.66 $1,703.63 $0.00
Other Direct Costs $115.23 $12.80 $21.90 $49.29 $31.24 $0.00 Travel
Vehicle Rental $262.00 $0.00 $262.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $262.00 $0.00 $262.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00 Drilling and Well Installation $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $750.00 $0.00 $750.00 $0.00 $0.00 Beacon Environmental $2,840.00 $0.00 $2,840.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $3,590.00 $0.00 $3,590.00 $0.00 $0.00 Handling Fee $359.00 $0.00 $359.00 $0.00 $0.00 Total Subcontractor Cost $3,949.00 $0.00 $3,949.00 $0.00 $0.00
Laboratory Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Encore Samplers $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $104.00 $0.00 $104.00 $0.00 $0.00 Total Laboratory $104.00 $0.00 $104.00 $0.00 $0.00
Field Expenses Personal Protection (Level D) $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $0.00 $65.00 $0.00 $0.00 Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $279.90 $0.00 $279.90 $0.00 $0.00 Total Field Expenses $344.90 $0.00 $344.90 $0.00 $0.00
Subtotal $11,058.56 $710.96 $1,215.88 $7,396.85 $1,734.87 $0.00 Completion Fee $628.35 $69.82 $119.40 $268.77 $170.36 $0.00
Total Estimated Cost $11,686.91 $780.78 $1,335.28 $7,665.62 $1,905.23 $0.00
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Review Work Plan and HASP[1] 1
Scientist I (DH) 0
Engineer I (MQ) Tallahassee Office; Prepare Draft, Final Work Plan[4], utility locates [2], prepare HASP[6] 12
Staff GIS Specialist (JM) Jacksonville Office; Figure preparation[2] 2
Project Assistant (LC) Jacksonville Office; Document editing & publication (not in contract) 0
TOTAL LABOR 15
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment Hand Auger $8.25 Each 0 $0.00 Monitoring Well Installation Kit $184.30 Day 0 $0.00 Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00 Expendables $32.50 Day 0 $0.00 Personal Protection (Level D) $28.00 Day 0 $0.00 Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00 Van/Truck $97.00 day 0 $0.00 Car $68.00 day 0 $0.00
Subtotal $0.00 Mileage Miles 0
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist V (RH) $120.00 Day 0 $0.00 Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00 Encore Samplers Each $8.75 0 $0.00 Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Field work (prep for field[1], mobe/demobe[2], site walkover [1], PSG instal/documentation/H&S [4], documentation deliverab 9
Scientist I (DH)
Scientist II (QK) 0
Engineer I (MQ) Tallahassee, Office; Field work (prep for field[1], mobe/demobe[4], site walkover [1], psg instal [3], GPS/survey [1], PSG retrieve and hole restora 19 sample packing/shipping [1], documentation deliverable [2]) + private utility locate [3]
Staff GIS Specialist (JM) 0
Project Assistant (LC) 0
TOTAL LABOR 28
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment Hand Auger $8.25 Each 0 5 locations, 2 depths $0.00 Monitoring Well Installation Kit $184.30 Day 0 $0.00 Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00 Expendables $32.50 Day 2 $65.00 Personal Protection (Level D) $28.00 Per Person x Day 3 Removed $0.00 Teflon Tubing (1/4-inch diameter) $1.95 Foot 0 $0.00 Total Survey Station $41.75 Each 0 $0.00 Peristaltic Pump $29.10 Each 0 Extra pump for well purging $0.00 Hammer Drill $50.95 Each 1 $50.95 MiniRae 3000 PID $87.30 Each 1 for soil bore holes/H&S $87.30 Total GPS Station $141.65 Each 1 Trimble GeoXH $141.65
TOTAL EQUIPMENT $344.90
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00 Van/Truck $97.00 day 2 $194.00 Car $68.00 day 1 Additional day for meeting utility locator $68.00
Subtotal $262.00 Mileage Miles 0
TOTAL VEHICLE $262.00
Scientist (DH) $36.00 Day 0 $0.00 Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (RH) $120.00 Day 0 $0.00 Scientist (DH) $120.00 Day 0 $0.00 Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis Metals Liquid 6010 $80.50 $0.00 Volatile Organics Liquid 8260 $109.00 $0.00 TRPH Liquid Florida PRO $84.00 $0.00 SVOC Liquid 8270 $100.00 $0.00 Mercury Liquid 7470 $23.00 $0.00 Pesticides Liquid 8081 $90.00 $0.00 Metals Soil 6010 $80.50 $0.00 Volatile Organics Soil 8260 $109.00 $0.00 TRPH Soil Florida PRO $84.00 $0.00 SVOC Soil 8270 $100.00 $0.00 Mercury Soil 7471 $25.00 $0.00 Pesticides Soil 8081 $90.00 $0.00
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 $0.00 Encore Samplers Each $8.75 TerraCore kits (1 per VOA sample); (10+1 dup) $0.00 Sample Shipping Coolers $104.00 1 priority overnight shipping FedEx $104.00
Subtotal $104.00
TOTAL LAB $104.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Beacon Environmental Passive Soil Gas $2,840.00 $2,840.00 GeoTek Utility Locator $750 1 Added after Task assigned $750.00
TOTAL $3,590.00
SUBTASK 4: Report
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Document review by a PG[4] 1
Scientist I (DH)
Scientist II (QK)
Engineer I (MQ) 15
Staff GIS Specialist (JM) Jacksonville Office; Figure preparation and potable well inventory 5
Project Assistant (LC) Jacksonville Office; Document editing & publication (removed, not in contract) 0
TOTAL LABOR 21
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment Hand Auger $8.25 Each 0 $0.00 Monitoring Well Installation Kit $184.30 Day 0 $0.00 Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00 Expendables $32.50 Day 0 $0.00 Personal Protection (Level D) $28.00 Day 0 $0.00 Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00 Van/Truck $97.00 day 0 $0.00 Car $68.00 day 0 $0.00
Subtotal $0.00 Mileage Miles 0
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (WO) $120.00 Day 0 $0.00 Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis Volatiles Liquid 8260 $135.00 Standard Turn Around $0.00 Semivolatiles Liquid 8270 $100.00 Standard Turn Around $0.00 Pesticides Liquid 8081 $90.00 Standard Turn Around $0.00 Herbicides Liquid 8151 $150.00 Standard Turn Around $0.00 TRPH Liquid Florida PRO $84.00 Standard Turn Around $0.00 Lead Liquid 6010 $11.50 Standard Turn Around $0.00 Total Dissolved Fe and Mn Liquid 6010 $23.00 Standard Turn Around $0.00 COD Liquid SM5220 $25.00 Standard Turn Around $0.00 BOD (5 day) Liquid SM5210 $25.00 Standard Turn Around $0.00 Methane/CO2/02 Liquid 3810 $110.00 Standard Turn Around $0.00 In-line Filter (0.45 Micron) Each $17.50 $0.00
Subtotal $0.00 Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00 Encore Samplers Each $8.75 0 $0.00 Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Tallahassee Office; Letter report preparation; description of field activities, summary of passive soil gas results, eval drinking water targets
| Task Assignment CHANGE ORDER |
| BWC Task Assignment Change Order Form (Rev 02-17).pdf |
| Task Assignment CHANGE ORDER |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| TACO package.pdf |
| Wakulla_Cleaners_LSI_cost_estimate_12-23-19.pdf |
| CE |
| FS |
| LOE 2 |
| LOE 3 |
| LOE 4 |
| Wakulla_Cleaners_LSI_change_order_delta_.pdf |
| CE |
| FS |
| LOE 2 |
| LOE 3 |
| LOE 4 |
| Wakulla_Cleaners_LSI_change_order_new.pdf |
| CE |
| FS |
| LOE 2 |
| LOE 3 |
| LOE 4 |
File details come from the government source that posted it. Updated .