CN-370000-HW560-BF04BCO1.pdf
PDF 3 MB Posted
- Contract number
- HW560
- Issued by
- Florida
About this file
This is a Task Assignment Notification Change Order Form for DEP Contract No. HW560, Task Assignment BF-004 B, issued by the State of Florida Department of Environmental Protection. The contractor is Tetra Tech EC, Inc., represented by Gerald Walker, with the work performed at Gateway Holdings, LLC/Former Barracuda, LLC facility. The contract manager is Joe McGarrity. The change order was executed in March 2015 with signatures from all required parties including the DEP Task Manager, DEP Contract Manager, Contractual Authority, and Contractor Representative.
The change order addresses an increase in excavated soil removal and disposal costs resulting from actual tonnage exceeding the original estimate. The original task assignment amount was $28,776.86 for removal of an estimated 250 tons of excavated soils. The actual tonnage disposed increased to 289.88 tons, necessitating a price adjustment of $2,412.74 to accommodate the additional volume. The revised total task amount with all change orders is $31,189.60. Deliverables include Field Notes due April 15, 2015, and a Completion Report due April 30, 2015. Invoice requirements specify $24,587.44 for submittal of field notes and sampling results, and $6,602.16 for submittal of the completion report, totaling $31,189.60. The task completion date remained unchanged at April 30, 2015.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .