This is a Task Assignment Notification Form under Florida Department of Environmental Protection (FDEP) Contract No. HW558, issued to Earth Systems Inc. for environmental monitoring services at the Walgreens Store site located at 7212 Merrill Road, Jacksonville, Duval County, Florida (ERIC_4599). The task assignment was executed on January 11, 2021, with Killian Talley serving as the DEP Contract Manager and James Paxton as the Contractor Representative.
The task authorizes Earth Systems to conduct annual groundwater monitoring activities consisting of two subtasks: Project Management ($394.70) and 2021 MNA (Monitored Natural Attenuation) Sampling and Reporting ($3,813.83), for a total task assignment value of $4,440.60 under a fixed price arrangement. The scope of work includes collecting groundwater samples from five monitoring wells, measuring depth to water, conducting field geochemical analysis, and performing volatile organic compound testing via EPA Method 8260B on two samples plus one trip blank through contract laboratory Pace Analytical. Deliverables consist of a Natural Attenuation Monitoring Report with GIS/ADaPT data, due December 1, 2021, with final execution through March 25, 2022. Invoice payment is conditioned upon FDEP receipt and approval of the completed monitoring report. The contract allocation comprises 37 total labor hours distributed across project management and field sampling activities, including travel, laboratory analysis at $198.00, equipment rental at $194.00, and field expendables totaling $496.20.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93)
Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW558
D000 N/ADC008H
Earth Systems
Jim Paxton
850-245-8928Killian Talley
ERIC_4599
Walgreens Store
7212 Merill Road, Jacksonville, Duval
Monitoring
This Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring activities in accordance with the attached scope of work and cost estimate.
Natural Attenuation Monitoring Report; GIS/ADaPT
12/01/2021
03/25/2022
4440.60 0 0 0
Killian Talley Digitally signed by Killian Talley Date: 2021.01.11 05:58:12 -05'00'
Killian Talley Digitally signed by Killian Talley Date: 2021.01.11 05:58:23 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.01.11 13:43:12 -05'00'
James Paxton Digitally signed by James Paxton DN: C=US, E=jpaxton@eathsys.net, O=Earth Systems Inc, CN=James Paxton Date: 2021.01.18 07:47:31-05'00'
4440.6
Task Assignment Notification/Change Order
Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1-2: Submittal of Natural Attenuation Monitoring Report; GIS/ADaPT 12/01/2021
Subtasks 1-2: FDEP receipt and approval of Natural Attenuation Monitoring Report;
GIS/ADaPT $ 4,440.60
$ 4,440.60
HW558
DC008H
Florida Department of Memorandum Environmental Protection
Printed on recycled paper.
To: HW558 Contract Negotiation File Walgreens Store Jacksonville, Duval County
ERIC_4599
From: Killian Talley, Project Manager Date: January 11, 2021 Subject: Negotiation Summary
HW558 DC008H
Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring at the Walgreens Store site.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Annual MNA Sampling & Reporting Subtask includes costs and labor for Earth Systems to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, and two (2) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B. Upon receipt of the groundwater analytical data, Earth Systems will generate a Natural Attenuation Monitoring Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $4,440.60 with 37 labor hours.
Earth Systems may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Earth Systems
Date: 11-Jan-21
Task #: SubTask 1 Project Management SubTask 6
Site: Walgreens Store SubTask 2 2021 MNA Sampling Annual SubTask 7
Activity/Phase: MNA Sampling 2021 SubTask 3 SubTask 8
Project Manager: Killian Talley SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$40.62 Project Manager - Paxton 0 3.3 $0.00 Principal Manager 0 0 0 0 0 0 0 0 0 0
$30.80 Associate Eng./Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $42.30 Principal Manager - Mark Tumeo 2 2 0 0 0 0 0 0 0 0 $40.62 Project Manager - J Paxton 16 16 0 0 0 0 0 0 0 0 $23.02 Senior Tech - T. Byrnes 8 8 0 0 0 0 0 0 0 0 $21.15 Senior Technician/Field Geologist 0 0 0 0 0 0 0 0 0 0 $26.15 Field Geologist - L. Russell 2 1 1 0 0 0 0 0 0 0 $18.00 Draftsperson II - K. Morse 4 2 2 0 0 0 0 0 0 0 $12.75 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0 $17.00 Admin. Assistant - S. Meserve 2 1 1 0 0 0 0 0 0 0
$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 37 3 30 4 0 0 0 0 0 0 0
Direct Labor $1,211.60 $134.62 $997.83 $79.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 63.00% $763.30 $84.81 $628.63 $49.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $787.54 $87.50 $648.59 $51.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $411.94 $45.77 $339.26 $26.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,174.38 $352.70 $2,614.31 $207.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $60.58 $6.73 $49.89 $3.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTIMATEContractor: Earth Systems
Date: 11-Jan-21
Task #: SubTask 1 Project Management SubTask 6
Site: Walgreens Store SubTask 2 2021 MNA Sampling Annual SubTask 7
Activity/Phase: MNA Sampling 2021 SubTask 3 SubTask 8
Project Manager: Killian Talley SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Contract Rate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $198.00 $198.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $198.00 $198.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $114.50 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $349.20 $349.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $496.20 $496.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $4,123.16 $359.43 $3,552.40 $211.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $317.44 $35.27 $261.43 $20.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $4,440.60 $394.70 $3,813.83 $232.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Walgreens Store SUBTASK -2: 2021 MNA Sampling Annual
DATE: 1/11/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Tech - T. Byrnes Travel time to and from site (Sampling) 1
WLs (MW009, IW001 and IW002) & GW samples (MW011 and MW012) 7 plus Trip Blank. Analyses for VOHs via 8260C. Purge water treated and disposed on-site as non-haz per generator's knowledge.
Report:
Principal Manager - Mark Tumeo Senior Report Review 2
Project Manager- J. Paxton Report Writing 16
Field Geologist - L. Russell ADaPT 1
Drafting - Katherine Morse Create maps and figures 2
Admin - S Meserve Scanning, copying, mailing 1
TOTAL LABOR 30.0
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Deep GW Sampling Kit $349.20 day 1 $349.20
Portable Compressor $48.50 day 1 $48.50
Expendables $32.50 day 1 $32.50
Portable Generator $66.00 day 1 $66.00
TOTAL EQUIPMENT $496.20
VEHICLE TYPE RATE UNIT USEAGE
Truck $97.00 day 2 $194.00
TOTAL VEHICLE $194.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
2 wells, 1 TB, VOH by 8260B $66.00 2 1 $198.00
TOTAL LAB $198.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650
Florida • Colorado • North Dakota • New Jersey
January 8, 2021
Mr. Killian Talley Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M. S. 4520 Tallahassee, Florida 32399-2400
Subject: Proposal for Annual MNA Sampling - 2021 Walgreens Store 7212 Merrill Road, Jacksonville, Duval County, Florida
ERIC_4599
Dear Mr. Talley:
Earth Systems has prepared this proposal for conducting Annual Monitoring of Natural Attenuation (MNA) sampling at the subject site. The tasks associated with this scope of work are as follows:
SUBTASK 1 – Project Management
Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.
SUBTASK 2 – Annual MNA Sampling and Reporting
Earth Systems will mobilize a senior technician to the site to collect a groundwater sample (with water level data) from well MW011 and MW012 and gauge wells MW009, IW001, and IW002. The samples will be analyzed for VOHs using EPA Method 8260. One trip blank will also be analyzed. All VOH samples will be analyzed by one of Earth Systems contract laboratories, Pace Analytical.
After receipt of the analytical results, Earth Systems will provide Annual Monitoring of Natural Attenuation Reports. The reports will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.
Cost and Schedule
The proposed cost and schedule for this project are provided in the table below.
Proposal to Conduct Annual MNA Sampling - 2021 Walgreens Store, Jacksonville, Florida FDEP Facility ERIC_4599
Task Proposed
Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $394.70
February 21, 2022
Subtask 2 – Conduct October 2021 MNA sampling and prepare MNA Report
$3,813.83 December 1, 2021 Annual MNA Report, GIS Tables, ADaPT Deliverables
Total/Completion Date $4,440.60
February 21, 2022
If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.
Sincerely, James Paxton Operations Manager
DISTRIBUTION OF
CHLORINATED ETHENES
IN GROUNDWATER
Figure 2
0 6030
( SCALE IN FEET )
21 32 46 29 19 27
7.4
13251620274887
LEGEND
BOLD
7.77.5
7.4
210775 42.9
3037.2
629416086110140160310
10.4 5.02 3.8
9.6
4.0 9.5
3.58.16.513209.911
6.2 10.8 10.7 3.7
12.7
File details come from the government source that posted it. Updated .