This document is a Task Assignment Notification Change Order Form for the Florida Department of Environmental Protection (FDEP) under Contract HW558. The contractor is Earth Systems, Inc., with Jim Paxton serving as the Contractor Representative and Billy Hessman as the FDEP Contract Manager. The change order, numbered DC011o-1, was executed on January 31, 2022, and modifies the original task assignment DC011o for remedial equipment management and property inventory activities.
Change Order DC011o-1 reduces the total task cost by $135.59, bringing the final task amount from $27,667.30 to $27,531.71. The reduction reflects decreased shipping costs associated with mailing FDEP scanners under Subtask 2: Scanning Equipment Statewide, specifically a decrease in Federal Express shipping charges. The task maintains a fixed-price structure with no changes to the completion date of February 4, 2022. The deliverable remains the Equipment Inventory Report/Project Management, with a final deliverable due date of January 7, 2022. Invoice payment of $27,531.71 is due upon FDEP's receipt and approval of the Equipment Inventory Report/Project Management, and no retainage is applied to this task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Change Order No.:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
Site Name:
Site ID / Facility ID::
Description of Change [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverable:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
Cost Reimbursement Fixed Fee
Original Task Amount
Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00
Original Task Completion Date:
Completion Date Prior to this Change:
Net Increase/Decrease in Task Period:
Completion Date with all Change Orders:
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
FIXED PRICE
TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM
ITEM
$0.00
$0.00
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
Final Deliverable Due Date:
$0.00
$0.00
CHANGE IN TASK TIME
FEE SCHEDULE
COST PLUS FIXED FEE
TOTAL
WCP TAFORM 01_18
HW558
1DC011o
Earth Systems
Jim Paxton
850-245-8972Billy Hessman
N/A
N/A
This Change Order reduces shipping costs associated with the annual property inventory event.
Equipment Inventory Report 01/07/2022
27667.30 0 0 0
27667.30 0 0 0 27667.3
-135.59 0 0 0 -135.59
27531.71
02/04/2022
02/04/2022
N/A
02/04/2022
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.01.31 11:32:04 -05'00'
James Paxton Digitally signed by James Paxton DN: C=US, E=jpaxton@eathsys.net, O=Earth Systems Inc, CN=James Paxton Date: 2022.01.31 11:34:56-05'00'
27531.71 0 0 0
27667.3
Billy Hessman Digitally signed by Billy Hessman Date: 2022.01.31 11:22:36 -05'00'
Billy Hessman Digitally signed by Billy Hessman Date: 2022.01.31 11:23:12 -05'00'
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01_18
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW558
DC011o
$ 27,531.71
Equipment Inventory Report/Project Management
Upon submittal and FDEP approval of Equipment Inventory Report/Project Management
01/07/2022
$ 27,531.71
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
TO: HW558 Contract File
FROM: Billy Hessman, Project Manager
DATE: January 31, 2022
SUBJECT: Task Assignment DC011o
Change Oder #1 Property Inventory
Change Order DC011o-1 reduces shipping costs associated with the annual property inventory event. Specific subtasks are detailed below:
Subtask 2: Scanning Equipment Statewide Costs under subtask 2 decreased $135.59 for a reduction in shipping costs associated with mailing the FDEP scanners.
There are no other changes associated with this Change Order.
Task Assignment Change Order DC011o-1 results in a total cost decrease of $135.59.
The final cost total for Task Assignment DC011o is $27,531.71.
FDEP COST ESTIMATE
Contractor: Earth Systems 0
Date: 1/31/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Scanning Equipment Multiple SubTask 2 Scanning Equipment Statewide Subtask 7
Activity/Phase: N/A Subtask 3 Subtask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$40.62 Project Manager (Paxton) 24 23.5 $42.30 Principal Manager (Beardall) 0 0 0 0 0 0 0 0 0 0
$40.62 Project Manager (Paxton) 0 0 0 0 0 0 0 0 0 0
$37.75 Senior Engineer/Geologist/Scientist 0 0 0 0 0 0 0 0 0 0
$32.21 Associate Geologist/Scientist (Dinning) 90 90 0 0 0 0 0 0 0 0
$25.24 Staff Scientist (Kyle Edwards) 40 40 0 0 0 0 0 0 0 0
$20.43 Senior Tech (Mojock) 30 30 0 0 0 0 0 0 0 0
$23.02 Senior Tech (Byrnes) 70 70 0 0 0 0 0 0 0 0
$21.63 Senior Tech (Hooker) 70 70 0 0 0 0 0 0 0 0
$0.00 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0
$0.00 Administrative Assistant 0 0 0 0 0 0 0 0 0 0
$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 324 24 300 0 0 0 0 0 0 0 0
Direct Labor $8,602.76 $955.86 $7,646.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 63.00% $5,419.74 $602.19 $4,817.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 65.00% $5,591.80 $621.31 $4,970.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 34.00% $2,924.94 $324.99 $2,599.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $22,539.24 $2,504.36 $20,034.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $430.14 $47.79 $382.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $1,680.00 $1,680.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $544.00 $544.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $2,224.00 $2,224.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Killian Talley
REV: 02/03 CEF EARTH SYSTEMS Page 1
FDEP COST ESTIMATE$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fed Ex $76.74 $76.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $76.74 $76.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $7.67 $7.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $84.41 $84.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $25,277.79 $2,552.15 $22,725.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $2,253.92 $250.44 $2,003.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $27,531.71 $2,802.59 $24,729.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF EARTH SYSTEMS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Multiple SUBTASK Scanning Equipment Statewide
DATE: 1/31/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Associate Geol (Dinning) Scanning equipment inventory logistics, scheduling 90 Sr. Tech (Terry Byrnes ) Perform scanning at East Coast FL and Orlando 7 days 70 Sr. Tech (Matt Mojock ) Perform scanning at Panhandle, Tally I-10 Corridor 3 days 30 Sr. Tech (Scott Hooker ) Perform scanning at Storage Yard, Tampa/W Orlando/SW Florida) 7 days 70 Staff Scientist (Kyle Edwards) Perform scanning at South Florida 4 days 40
TOTAL LABOR 300.0
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USEAGE
20 days Truck $420.00 week 4 $1,680.00
TOTAL VEHICLE $1,680.00
PER DIEM STAFF RATE UNIT USEAGE
Sr. Tech - Terry Byrnes -Meals $36.00 per day 4 $144.00 Sr. Tech - Terry Byrnes - Hotel $100.00 per day 4 $400.00
TOTAL PER DIEM $544.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00 76.74
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Shipping Scanner Fed Ex $76.74 $76.74
TOTAL $76.74
FINAL --7/24/96
Date: 1/31/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Scanning Equipment Multiple SubTask 2 Scanning Equipment Statewide Subtask 7
Activity/Phase: N/A Subtask 3 Subtask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$40.62 Project Manager (Paxton) 0 0.0 $42.30 Principal Manager (Beardall) 0 0 0 0 0 0 0 0 0 0
$40.62 Project Manager (Paxton) 0 0 0 0 0 0 0 0 0 0
$37.75 Senior Engineer/Geologist/Scientist 0 0 0 0 0 0 0 0 0 0
$32.21 Associate Geologist/Scientist (Dinning) 0 0 0 0 0 0 0 0 0 0
$25.24 Staff Scientist (Kyle Edwards) 0 0 0 0 0 0 0 0 0 0
$20.43 Senior Tech (Mojock) 0 0 0 0 0 0 0 0 0 0
$23.02 Senior Tech (Byrnes) 0 0 0 0 0 0 0 0 0 0
$21.63 Senior Tech (Hooker) 0 0 0 0 0 0 0 0 0 0
$0.00 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0
$0.00 Administrative Assistant 0 0 0 0 0 0 0 0 0 0
$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 0 0 0 0 0 0 0 0 0 0 0
Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 63.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 65.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 34.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF EARTH SYSTEMS Page 4
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fed Ex ($123.26) ($123.26) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal ($123.26) ($123.26) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee ($12.33) ($12.33) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost ($135.59) ($135.59) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal ($135.59) $0.00 ($135.59) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost ($135.59) $0.00 ($135.59) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF EARTH SYSTEMS Page 5
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Multiple SUBTASK:Scanning Equipment Statewide
DATE: 1/31/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0.0
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00 76.74
SUBCONTRACTOR COSTS
NAME PURPOSE COST
123.26
Shipping Scanner Fed Ex ($123.36) ($123.26)
TOTAL ($123.26)
FINAL --7/24/96
Date: 1/31/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Scanning Equipment Multiple SubTask 2 Scanning Equipment Statewide Subtask 7
Activity/Phase: N/A Subtask 3 Subtask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$40.62 Project Manager (Paxton) 24 23.5 $42.30 Principal Manager (Beardall) 0 0 0 0 0 0 0 0 0 0
$40.62 Project Manager (Paxton) 0 0 0 0 0 0 0 0 0 0
$37.75 Senior Engineer/Geologist/Scientist 0 0 0 0 0 0 0 0 0 0
$32.21 Associate Geologist/Scientist (Dinning) 90 90 0 0 0 0 0 0 0 0
$25.24 Staff Scientist (Kyle Edwards) 40 40 0 0 0 0 0 0 0 0
$20.43 Senior Tech (Mojock) 30 30 0 0 0 0 0 0 0 0
$23.02 Senior Tech (Byrnes) 70 70 0 0 0 0 0 0 0 0
$21.63 Senior Tech (Hooker) 70 70 0 0 0 0 0 0 0 0
$0.00 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0
$0.00 Administrative Assistant 0 0 0 0 0 0 0 0 0 0
$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 324 24 300 0 0 0 0 0 0 0 0
Direct Labor $8,602.76 $955.86 $7,646.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 63.00% $5,419.74 $602.19 $4,817.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 65.00% $5,591.80 $621.31 $4,970.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 34.00% $2,924.94 $324.99 $2,599.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $22,539.24 $2,504.36 $20,034.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $430.14 $47.79 $382.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $1,680.00 $1,680.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $544.00 $544.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $2,224.00 $2,224.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF EARTH SYSTEMS Page 7
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fed Ex $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $20.00 $20.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $25,413.38 $2,552.15 $22,861.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $2,253.92 $250.44 $2,003.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $27,667.30 $2,802.59 $24,864.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF EARTH SYSTEMS Page 8
| Cost Estimate Final (2) |
| Subtask 2 Final (2) |
| Cost Estimate Delta (1) |
| Subtask 2 Delta (1) |
| Cost Estimate Final |
File details come from the government source that posted it. Updated .