CN-370000-HW558-DC04L.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW558|146f330b53bd60a9234ae2599bc7c6cc
Contract number
HW558
Issued by
Florida

About this file

This document is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract HW558, assigned to Earth Systems Inc. as the contractor. The assignment authorizes Earth Systems to conduct an annual groundwater monitoring event at the Moses Cleaners facility (989 South First Street, Lake City, Columbia County, Florida), a contaminated site under FDEP's Bureau of Waste Cleanup oversight. Crystal Posey serves as the FDEP Contract Manager, and Jim Paxton represents Earth Systems. The contract falls under the state's indefinite delivery vehicle framework, allowing for task-specific assignments with defined scopes and costs.

The task assignment (DC004L) requires Earth Systems to collect water level data from three monitoring wells (MW009, MW033, and MW042) and groundwater samples from seven additional wells (MW008, MW021, MW030, MW058, MW160, and MW171) for volatile organic hydrocarbon analysis using EPA Method 8260. The contractor will deliver a Natural Attenuation Monitoring Report with updated tables, figures, laboratory analytical data, and recommendations for future work. The total task value is $4,973.27, consisting of $443.65 for Project Management (Subtask 1) and $4,529.62 for Groundwater Sampling and Reporting (Subtask 2). Costs are structured as fixed price with no fee schedule, cost reimbursement, or additional fees. The deliverable due date is April 30, 2020, with final task completion by June 30, 2020. Invoice payment is contingent upon FDEP approval of the NAM Report and GIS/ADaPT data submission.

View the file

Other files

File Type Posted
CN-370000-HW558-A3.pdf PDF
CN-370000-HW558-A5.pdf PDF
CN-370000-HW558-A7.pdf PDF
CN-370000-HW558-CO2.pdf PDF
CN-370000-HW558-DC001G.pdf PDF
CN-370000-HW558-DC005G.pdf PDF
CN-370000-HW558-DC005i.pdf PDF
CN-370000-HW558-DC012FCO.pdf PDF
CN-370000-HW558-DC013F.pdf PDF
CN-370000-HW558-DC017E.pdf PDF
CN-370000-HW558-DC017F.pdf PDF
CN-370000-HW558-DC017H.pdf PDF
CN-370000-HW558-DC018C.pdf PDF
CN-370000-HW558-DC019F.pdf PDF
CN-370000-HW558-DC019H.pdf PDF
CN-370000-HW558-DC01ACO4.pdf PDF
CN-370000-HW558-DC01E.pdf PDF
CN-370000-HW558-DC01F.pdf PDF
CN-370000-HW558-DC022D.pdf PDF
CN-370000-HW558-DC023F.pdf PDF
CN-370000-HW558-DC025B.pdf PDF
CN-370000-HW558-DC027G.pdf PDF
CN-370000-HW558-DC028A.pdf PDF
CN-370000-HW558-DC028F.pdf PDF
CN-370000-HW558-DC02C.pdf PDF
CN-370000-HW558-DC02E.pdf PDF
CN-370000-HW558-DC02EC01.pdf PDF
CN-370000-HW558-DC02L.pdf PDF
CN-370000-HW558-DC03J.pdf PDF
CN-370000-HW558-DC03L.pdf PDF
CN-370000-HW558-DC04G.pdf PDF
CN-370000-HW558-DC04J.pdf PDF
CN-370000-HW558-DC04MCO1.pdf PDF
CN-370000-HW558-DC05C.pdf PDF
CN-370000-HW558-DC08ECO1.pdf PDF
CN-370000-HW558-DC09GCO1.pdf PDF
CN-370000-HW558-DC09H.pdf PDF
CN-370000-HW558-DC09I.pdf PDF
CN-370000-HW558-DC09ICO1.pdf PDF
CN-370000-HW558-DC09ICO2.pdf PDF
CN-370000-HW558-DC10E.pdf PDF
CN-370000-HW558-DC11G.pdf PDF
CN-370000-HW558-DC11GCO1.pdf PDF
CN-370000-HW558-DC11GCO2.pdf PDF
CN-370000-HW558-DC11H.pdf PDF
CN-370000-HW558-DC11J.pdf PDF
CN-370000-HW558-DC11MCO1.pdf PDF
CN-370000-HW558-DC11oCO1.pdf PDF
CN-370000-HW558-DC12B.pdf PDF
CN-370000-HW558-DC12CCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jim Image

Jim Typewritten Text 11-8-19

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW558 Task Assignment #: DC004L

Deliverables:

Deliverable Deliverable Due Date Natural Attenuation Monitoring (NAM) Report; GIS/ADaPT 30-Apr-20

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

FDEP approval of NAM Report; GIS/ADaPT - Subtask 1-2 $4,973.27

TOTAL COST $4,973.27

BWC TAFORM 01/18

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Noah Valenstein Secretary

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 3

2399-2400

Memorandum

TO:

FROM:

SUBJECT:

DATE:

HW558 Contract File

Crystal Posey, Project Manager

Moses Cleaners

ERIC_4289

HW558 DC004L

Task Assignment

November 6th, 2019

This Task Assignment authorizes Earth Systems to conduct an annual groundwater sampling event.

Water level data will be collected from 3 wells (MW009, MW033, and MW042) and groundwater samples will be collected with water level data from 7 wells (MW008, MW021, MW030, MW058, MW160, and MW171).

Earth Systems will provide an Annual Monitoring of Natural Attenuation Report, which will include updated tables and figures, the laboratory analytical data, and recommendations for additional work. The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment (TA), total task amount is $4,973.27.

The final task completion date is June 30th, 2020.

FDEP COST ESTI MATE

Contractor: Earth Systems

Date: 6-Nov-19

Task #: SubTask 1 Project Management SubTask 6

Site: Moses Cleaners SubTask 2 Annual Monitoring 2020 SubTask 7

Activity/Phase: 2020 - MNA SubTask 3 SubTask 8

Project Manager: Crystal Posey SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$42.30 Project Manager (Beardall) 0 3.6 $42.30 Principal Manager (Beardall) 2 2 0 0 0 0 0 0 0 0 $30.80 Associate Eng./Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $42.06 Senior Engineer 0 0 0 0 0 0 0 0 0 0 $40.62 Project Manager (Paxton) 18 18 0 0 0 0 0 0 0 0 $18.00 Eng./Geologist/Scientist Technician 0 0 0 0 0 0 0 0 0 0 $23.02 Senior Technician (Byrnes) 13 13 0 0 0 0 0 0 0 0 $25.44 Staff Geologist (Russell) 1 1 0 0 0 0 0 0 0 0 $18.00 Technician/Draftsperson II (Morse) 2 2 0 0 0 0 0 0 0 0 $12.75 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0 $17.00 Administrative Assistant (Meserve) 2 2 0 0 0 0 0 0 0 0

$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 42 4 38 0 0 0 0 0 0 0 0

Direct Labor $1,361.77 $151.31 $1,210.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 63.00% $857.92 $95.33 $762.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $885.15 $98.35 $786.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $463.01 $51.45 $411.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,567.85 $396.44 $3,171.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $68.09 $7.57 $60.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

FDEP COST ESTI MATE

Contractor: Earth Systems

Date: 6-Nov-19

Task #: SubTask 1 Project Management SubTask 6

Site: Moses Cleaners SubTask 2 Annual Monitoring 2020 SubTask 7

Activity/Phase: 2020 - MNA SubTask 3 SubTask 8

Project Manager: Crystal Posey SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Contract Rate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $528.00 $528.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $528.00 $528.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $114.50 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $355.55 $355.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $4,616.49 $404.01 $4,212.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $356.78 $39.64 $317.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $4,973.27 $443.65 $4,529.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Moses Cleaners SUBTASK -2: Annual Monitoring 2020

DATE: 11/6/2019

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Tech - Terry Byrnes Mobilization to and from site (2 hours each way, 4 hours total) 4 WLs (MW009, 033, 042) & GW samples (MW008, 011, 021, 038, 058, 160, 171) 9 plus Trip Blank. Analyses for VOHs via 8260C. Purge water treated and disposed on-site as non-haz per generator's knowledge.

Report:

Principal Manager - G. Beardall Senior report Review 2 Project Manager - J Paxton Report preparation and ADaPT and GIS updating 18 Admin - S. Meserve Compiling PDF of MNA report, printing and shipping hard copy 2 Drafting - Katherine Morse Figures 1-4 2 Staff Geo.- L. Russell ADaPT preparation (7 samples x 8 min/ sample) 1

TOTAL LABOR 38.0

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow GW sampling kit $208.55 day 1 $208.55 Portable Compressor $48.50 day 1 $48.50 Expendables $32.50 day 1 $32.50 Portable Generator $66.00 day 1 $66.00

TOTAL EQUIPMEN $355.55

VEHICLE TYPE RATE UNIT USEAGE

Truck $97.00 day 1 $97.00

TOTAL VEHICLE $97.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

7 wells, 1 TB, VOH by 8260B $66.00 7 1 $528.00

TOTAL LAB $528.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650

Florida • Colorado • North Dakota • New Jersey

October 23, 2019

Ms. Crystal Posey Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400

Subject: Proposal for Annual Natural Attenuation Monitoring (NAM) 2020

Moses Cleaners 989 South First Street, Lake City, Columbia County, Florida

ERIC_4289

Dear Ms. Posey:

Earth Systems has prepared this proposal for conducting annual NAM sampling at the subject site. The tasks associated with this scope of work are as follows:

SUBTASK 1 – Project Management

Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.

SUBTASK 2 – Groundwater Sampling and Reporting

Earth Systems will mobilize a senior technician to the site to collect water level data from 3 wells (MW009, MW033, and MW042) and groundwater samples (with water level data) from 7 additional wells (MW008, MW021, MW030, MW038, MW058, MW160, and MW171). If well MW030 is not found, a sample will be collected from MW011. The samples will be analyzed for VOHs using EPA Method 8260. One trip blank will also be analyzed. All VOH samples will be analyzed by one of Earth Systems’ contract laboratories (Pace Analytical or Accutest).

After receipt of the analytical results, Earth Systems will provide an Annual Natural Attenuation Monitoring Report. The report will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.

Proposal to Conduct Annual NAM Sampling Moses Cleaners, Lake City, Florida

ERIC_4289

Cost and Schedule

The proposed cost and schedule for this project are provided in the table below.

Task Proposed

Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $443.65

April 30, 2020

Subtask 2 – NAM Sampling $4,529.62 April 30, 2019 NAM Report 2020

Total/Completion Date $4,973.27

June 30, 2020

If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.

Sincerely, EARTH SYSTEMS

James Paxton Operations Manager

GROUNDWATER

ANALYTICAL RESULTS

(MARCH 2004 - MARCH 2018)

Figure 2

0 10050

( SCALE IN FEET )

LEGEND

ESTIMATED EXTENT OF DISSOLVED

IMPACTS ABOVE GCTLs

AutoCAD SHX Text Residence

AutoCAD SHX Text

MONTGOMERY ST.

AutoCAD SHX Text

EL PRADO STREET

AutoCAD SHX Text

MARION STREET

AutoCAD SHX Text

ST.

AutoCAD SHX Text

BAYA AVENUE

AutoCAD SHX Text

COLUMBIA ST.

AutoCAD SHX Text Stevens

AutoCAD SHX Text Risser

AutoCAD SHX Text Shell

AutoCAD SHX Text Former

AutoCAD SHX Text Richardson BP

AutoCAD SHX Text

ALACHUA

AutoCAD SHX Text Residence

AutoCAD SHX Text Giebeig's

AutoCAD SHX Text Drainage Ditch

AutoCAD SHX Text

ALAMO DR.

AutoCAD SHX Text

PARKING LOT

AutoCAD SHX Text Residence

AutoCAD SHX Text Residence

AutoCAD SHX Text Residence

AutoCAD SHX Text Wheeler's

AutoCAD SHX Text Restaurant

AutoCAD SHX Text Residence

AutoCAD SHX Text Richardson

AutoCAD SHX Text Grocery

AutoCAD SHX Text Store

AutoCAD SHX Text Auto

AutoCAD SHX Text Center

AutoCAD SHX Text Ins.

AutoCAD SHX Text Daniel Crapps

AutoCAD SHX Text Realty

AutoCAD SHX Text Residences

AutoCAD SHX Text Bank

AutoCAD SHX Text Former

AutoCAD SHX Text Dry Cleaner

AutoCAD SHX Text Former

AutoCAD SHX Text Lake City

AutoCAD SHX Text Laundry

AutoCAD SHX Text

S. FIRST ST. (US HIGHWAY 41)

AutoCAD SHX Text Winn-Dixie

AutoCAD SHX Text

ALACHUA ST.

AutoCAD SHX Text Restaurant

AutoCAD SHX Text Lake City, Florida

AutoCAD SHX Text

03/18 FIG2

AutoCAD SHX Text 989 South First Street

AutoCAD SHX Text Moses Cleaners

AutoCAD SHX Text Cleaners

AutoCAD SHX Text

PARKING LOT

AutoCAD SHX Text Exxon

AutoCAD SHX Text

MONITORING WELL LOCATION

AutoCAD SHX Text

MW023

AutoCAD SHX Text

MW024

AutoCAD SHX Text

MW021

AutoCAD SHX Text

MW033

AutoCAD SHX Text

MW011

AutoCAD SHX Text

MW010

AutoCAD SHX Text

MW042

AutoCAD SHX Text

MW037

AutoCAD SHX Text

MW036

AutoCAD SHX Text

MW001

AutoCAD SHX Text

MW038

AutoCAD SHX Text

MW009

AutoCAD SHX Text

MW002

AutoCAD SHX Text

MW004

AutoCAD SHX Text

MW003

AutoCAD SHX Text

MW170

AutoCAD SHX Text

MW160

AutoCAD SHX Text

(CNL)

AutoCAD SHX Text

MW008

AutoCAD SHX Text

MW058

AutoCAD SHX Text

PCE

AutoCAD SHX Text

TETRACHLOROETHENE

AutoCAD SHX Text

VC

AutoCAD SHX Text

TCE

AutoCAD SHX Text

TRICHLOROETHENE

AutoCAD SHX Text

VINYL CHLORIDE

AutoCAD SHX Text

CONCENTRATIONS IN BOLD EXCEED GCTL

AutoCAD SHX Text I

AutoCAD SHX Text

MDL < RESULTS < REPORTING LIMIT

AutoCAD SHX Text

RESULT BELOW DETECTION LIMIT

AutoCAD SHX Text U

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

CIS-1,2-DICHLOROETHENE

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

TRANS-1,2-DICHLOROETHENE

AutoCAD SHX Text NOTE: CONCENTRATIONS IN ug/L

AutoCAD SHX Text GCTLs

AutoCAD SHX Text

GROUNDWATER CLEANUP TARGET LEVELS

AutoCAD SHX Text

PCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text 2/08

AutoCAD SHX Text <1

AutoCAD SHX Text

VC

AutoCAD SHX Text <1

AutoCAD SHX Text 2/09

AutoCAD SHX Text <1

AutoCAD SHX Text 2/10

AutoCAD SHX Text 4/11

AutoCAD SHX Text

0.26 U

AutoCAD SHX Text

0.35 U

AutoCAD SHX Text

0.22 U

AutoCAD SHX Text 4/12

AutoCAD SHX Text

0.26 U

AutoCAD SHX Text

0.35 U

AutoCAD SHX Text

0.22 U

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text 2.2

AutoCAD SHX Text 1.2

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text

0.26 U

AutoCAD SHX Text

PCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text 2/08

AutoCAD SHX Text <1

AutoCAD SHX Text

VC

AutoCAD SHX Text <1

AutoCAD SHX Text 2/09

AutoCAD SHX Text <1

AutoCAD SHX Text 2/10

AutoCAD SHX Text 4/11

AutoCAD SHX Text

1.3 U

AutoCAD SHX Text

1.8 U

AutoCAD SHX Text

1.1 U

AutoCAD SHX Text 4/12

AutoCAD SHX Text

0.26 U

AutoCAD SHX Text

0.35 U

AutoCAD SHX Text

0.22 U

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text

0.92 I

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text

1.3 U

AutoCAD SHX Text 2.6

AutoCAD SHX Text

PCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text 5/07

AutoCAD SHX Text <1

AutoCAD SHX Text

VC

AutoCAD SHX Text <1

AutoCAD SHX Text 2/08

AutoCAD SHX Text <1

AutoCAD SHX Text 2/09

AutoCAD SHX Text 4/11

AutoCAD SHX Text 1.6

AutoCAD SHX Text

0.35 U

AutoCAD SHX Text

0.22 U

AutoCAD SHX Text 4/12

AutoCAD SHX Text 1.2

AutoCAD SHX Text

0.35 U

AutoCAD SHX Text

0.22 U

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text 4.3

AutoCAD SHX Text

0.93 I

AutoCAD SHX Text 2.1

AutoCAD SHX Text 9.3

AutoCAD SHX Text <1

AutoCAD SHX Text 1.5

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text

0.61 I

AutoCAD SHX Text 2/10

AutoCAD SHX Text 4/11

AutoCAD SHX Text 65.9

AutoCAD SHX Text

0.70 U

AutoCAD SHX Text

0.44 U

AutoCAD SHX Text <5

AutoCAD SHX Text <5

AutoCAD SHX Text 4/12

AutoCAD SHX Text 15.9

AutoCAD SHX Text

0.35 U

AutoCAD SHX Text

0.22 U

AutoCAD SHX Text

PCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

VC

AutoCAD SHX Text 1.6

AutoCAD SHX Text 2.8

AutoCAD SHX Text 2.2

AutoCAD SHX Text 4/13

AutoCAD SHX Text

0.24 U

AutoCAD SHX Text

0.23 U

AutoCAD SHX Text

0.44 U

AutoCAD SHX Text

0.94 I

AutoCAD SHX Text 4/13

AutoCAD SHX Text

0.24 U

AutoCAD SHX Text

0.23 U

AutoCAD SHX Text

0.44 U

AutoCAD SHX Text

0.31 U

AutoCAD SHX Text

0.32 U

AutoCAD SHX Text 4/13

AutoCAD SHX Text 20.5

AutoCAD SHX Text

0.23 U

AutoCAD SHX Text

0.44 U

AutoCAD SHX Text

PCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text 3/04

AutoCAD SHX Text <1

AutoCAD SHX Text

VC

AutoCAD SHX Text <1

AutoCAD SHX Text 12/04

AutoCAD SHX Text <1

AutoCAD SHX Text 2/06

AutoCAD SHX Text 2/08

AutoCAD SHX Text

AutoCAD SHX Text <1

AutoCAD SHX Text <1

AutoCAD SHX Text 4/13

AutoCAD SHX Text

0.24 U

AutoCAD SHX Text

0.23 U

AutoCAD SHX Text

0.44 U

AutoCAD SHX Text

AutoCAD SHX Text

0.31 U

AutoCAD SHX Text

AutoCAD SHX Text 1.0

AutoCAD SHX Text 4.0

AutoCAD SHX Text <1

AutoCAD SHX Text

MW171

AutoCAD SHX Text Moses

AutoCAD SHX Text Dry

AutoCAD SHX Text 4/14

AutoCAD SHX Text

0.33 U

AutoCAD SHX Text

0.34 U

AutoCAD SHX Text

0.33 U

AutoCAD SHX Text

0.30 U

AutoCAD SHX Text 4/14

AutoCAD SHX Text 9.6

AutoCAD SHX Text

0.34 U

AutoCAD SHX Text

0.33 U

AutoCAD SHX Text

0.56 I

AutoCAD SHX Text 4/14

AutoCAD SHX Text

0.33 U

AutoCAD SHX Text

0.34 U

AutoCAD SHX Text

0.33 U

AutoCAD SHX Text

0.30 U

AutoCAD SHX Text 4/14

AutoCAD SHX Text

0.33 U

AutoCAD SHX Text

0.34 U

AutoCAD SHX Text

0.33 U

AutoCAD SHX Text

0.60 I

AutoCAD SHX Text 1.9

AutoCAD SHX Text 4/14

AutoCAD SHX Text

0.33 U

AutoCAD SHX Text

0.34 U

AutoCAD SHX Text

0.33 U

AutoCAD SHX Text

0.32 I

AutoCAD SHX Text

PCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

VC

AutoCAD SHX Text 4/15

AutoCAD SHX Text 19.8

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 1.8

AutoCAD SHX Text 4/15

AutoCAD SHX Text 2.6

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 4/15

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 4/15

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 4/15

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.82 I

AutoCAD SHX Text 3/16

AutoCAD SHX Text 12.3

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 1.5

AutoCAD SHX Text 3/16

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 3/16

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 3/16

AutoCAD SHX Text 1.6

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 3/16

AutoCAD SHX Text

0.83 I

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 3/16

AutoCAD SHX Text

0.52 I

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 3/16

AutoCAD SHX Text 4.0

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 2.7

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

PCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

VC

AutoCAD SHX Text 2/06

AutoCAD SHX Text

1.0 U

AutoCAD SHX Text 5/07

AutoCAD SHX Text 2/08

AutoCAD SHX Text 4.5

AutoCAD SHX Text

1.0 U

AutoCAD SHX Text

1.0 U

AutoCAD SHX Text 2/10

AutoCAD SHX Text 2.9

AutoCAD SHX Text

1.0 U

AutoCAD SHX Text

1.0 U

AutoCAD SHX Text

1.0 U

AutoCAD SHX Text

1.0 U

AutoCAD SHX Text 5.1

AutoCAD SHX Text 1.2

AutoCAD SHX Text

AutoCAD SHX Text

1.0 U

AutoCAD SHX Text

1.0 U

AutoCAD SHX Text 3/17

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text 3/17

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.31 I

AutoCAD SHX Text 3/17

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text 3/17

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text 3/17

AutoCAD SHX Text 10.5

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.92 I

AutoCAD SHX Text 3/17

AutoCAD SHX Text 2.1

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.96 I

AutoCAD SHX Text 3/17

AutoCAD SHX Text

0.44 I

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.16 U

AutoCAD SHX Text N

AutoCAD SHX Text 3/18

AutoCAD SHX Text 3.2

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 2.8

AutoCAD SHX Text 3/18

AutoCAD SHX Text 1.8

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.55 I

AutoCAD SHX Text 3/18

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 3/18

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 3/18

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

PCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

VC

AutoCAD SHX Text 3/18

AutoCAD SHX Text

0.51 I

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.55 I

AutoCAD SHX Text

PCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

VC

AutoCAD SHX Text 3/18

AutoCAD SHX Text 1.7

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.93 I

AutoCAD SHX Text

MW030

AutoCAD SHX Text

(CNL)

AutoCAD SHX Text

COULD NOT LOCATE

Task Assignment Notification
Deliverable & Invoice Schedule
Moses MNA 2020 CEF.pdf
Cost Estimate
LOE SubTask 2

File details come from the government source that posted it. Updated .