This document is a Task Assignment Notification Form under Florida Department of Environmental Protection (FDEP) Contract HW558, issued to Earth Systems for environmental consulting services at the Moses Cleaners site located at 989 South First Street, Lake City, Columbia County, Florida. The task assignment authorizes work under an indefinite delivery vehicle contract mechanism with FDEP's Bureau of Waste Cleanup serving as the contracting agency. Key personnel include DEP Contract Manager Killian Talley and Contractor Representative Jim Paxton from Earth Systems.

Task Assignment DC004M authorizes Earth Systems to conduct annual groundwater monitoring activities consisting of two subtasks: Subtask 1 addresses project management costs, while Subtask 2 encompasses groundwater sampling and reporting. The work involves collecting water level measurements from monitoring wells, analyzing seven groundwater samples for volatile organic compounds via EPA Method 8260B, and producing a Natural Attenuation Monitoring Report with GIS/ADaPT updates. The total contract value is $5,112.79 on a fixed-price basis, with no retainage, comprising $459.15 for project management and $4,653.64 for sampling and analysis activities. Labor costs total $3,692.52 based on 43 hours, supplemented by other direct costs including $528.00 for laboratory analytical services, $355.55 for field equipment, and $97.00 for vehicle rental. The final deliverable, the Natural Attenuation Monitoring Report with GIS/ADaPT updates, is due April 30, 2021, with task completion authorized through July 30, 2021.

View the file

Other files

File Type Posted
CN-370000-HW558-A3.pdf PDF
CN-370000-HW558-A5.pdf PDF
CN-370000-HW558-A7.pdf PDF
CN-370000-HW558-CO2.pdf PDF
CN-370000-HW558-DC001G.pdf PDF
CN-370000-HW558-DC005G.pdf PDF
CN-370000-HW558-DC005i.pdf PDF
CN-370000-HW558-DC012FCO.pdf PDF
CN-370000-HW558-DC013F.pdf PDF
CN-370000-HW558-DC017E.pdf PDF
CN-370000-HW558-DC017F.pdf PDF
CN-370000-HW558-DC017H.pdf PDF
CN-370000-HW558-DC018C.pdf PDF
CN-370000-HW558-DC019F.pdf PDF
CN-370000-HW558-DC019H.pdf PDF
CN-370000-HW558-DC01ACO4.pdf PDF
CN-370000-HW558-DC01E.pdf PDF
CN-370000-HW558-DC01F.pdf PDF
CN-370000-HW558-DC022D.pdf PDF
CN-370000-HW558-DC023F.pdf PDF
CN-370000-HW558-DC025B.pdf PDF
CN-370000-HW558-DC027G.pdf PDF
CN-370000-HW558-DC028A.pdf PDF
CN-370000-HW558-DC028F.pdf PDF
CN-370000-HW558-DC02C.pdf PDF
CN-370000-HW558-DC02E.pdf PDF
CN-370000-HW558-DC02EC01.pdf PDF
CN-370000-HW558-DC02L.pdf PDF
CN-370000-HW558-DC03J.pdf PDF
CN-370000-HW558-DC03L.pdf PDF
CN-370000-HW558-DC04G.pdf PDF
CN-370000-HW558-DC04J.pdf PDF
CN-370000-HW558-DC04L.pdf PDF
CN-370000-HW558-DC04MCO1.pdf PDF
CN-370000-HW558-DC05C.pdf PDF
CN-370000-HW558-DC08ECO1.pdf PDF
CN-370000-HW558-DC09GCO1.pdf PDF
CN-370000-HW558-DC09H.pdf PDF
CN-370000-HW558-DC09I.pdf PDF
CN-370000-HW558-DC09ICO1.pdf PDF
CN-370000-HW558-DC09ICO2.pdf PDF
CN-370000-HW558-DC10E.pdf PDF
CN-370000-HW558-DC11G.pdf PDF
CN-370000-HW558-DC11GCO1.pdf PDF
CN-370000-HW558-DC11GCO2.pdf PDF
CN-370000-HW558-DC11H.pdf PDF
CN-370000-HW558-DC11J.pdf PDF
CN-370000-HW558-DC11MCO1.pdf PDF
CN-370000-HW558-DC11oCO1.pdf PDF
CN-370000-HW558-DC12B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93)

Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW558

D000 N/ADC004M

Earth Systems

Jim Paxton

850-245-8928Killian Talley

ERIC_4289

Moses Cleaners

989 South First Street, Lake City, Columbia

Monitoring

This Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring activities in accordance with the attached scope of work and cost estimate.

Natural Attenuation Monitoring Report; GIS/ADaPT

04/30/2021

07/30/2021

$ 5,112.79 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Killian Talley Digitally signed by Killian Talley Date: 2020.12.09 14:45:21 -05'00'

Killian Talley Digitally signed by Killian Talley Date: 2020.12.09 14:45:30 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2020.12.09 15:22:01 -05'00'

Mark A. Tumeo Digitally signed by Mark A. Tumeo Date: 2020.12.11 14:14:45 -05'00'

$ 5,112.79

Task Assignment Notification/Change Order

Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1-2: Submittal of Natural Attenuation Monitoring Report; GIS/ADaPT 04/30/2021

Subtasks 1-2: FDEP receipt and approval of Natural Attenuation Monitoring Report;

GIS/ADaPT, $ 5,112.79

$ 5,112.79

HW558

DC004M

Florida Department of Memorandum Environmental Protection

Printed on recycled paper.

To: HW558 Contract Negotiation File Moses Cleaners Lake City, Columbia County

ERIC_4289

From: Killian Talley, Project Manager Date: December 9, 2020 Subject: Negotiation Summary

HW558 DC004M

Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring at the Moses Cleaners site.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Groundwater Sampling & Reporting Subtask includes costs and labor for Earth Systems to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, and seven (7) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B. Upon receipt of the groundwater analytical data, Earth Systems will generate an Annual Monitoring of Natural Attenuation Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $5,112.79 with 43 labor hours.

Earth Systems may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTI MATE

Contractor: Earth Systems

Date: 9-Dec-20

Task #: SubTask 1 Project Management SubTask 6

Site: Moses Cleaners SubTask 2 Annual Monitoring 2021 SubTask 7

Activity/Phase: 2021 - MNA SubTask 3 SubTask 8

Project Manager: Killian Talley SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$40.62 Project Manager (Paxton) 0 3.9 $42.30 Principal Manager (Tumeo) 3 3 0 0 0 0 0 0 0 0 $30.80 Associate Eng./Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $42.06 Senior Engineer 0 0 0 0 0 0 0 0 0 0 $40.62 Project Manager (Paxton) 18 18 0 0 0 0 0 0 0 0 $18.00 Eng./Geologist/Scientist Technician 0 0 0 0 0 0 0 0 0 0 $23.02 Senior Technician (Byrnes) 13 13 0 0 0 0 0 0 0 0 $25.44 Staff Geologist (Russell) 1 1 0 0 0 0 0 0 0 0 $18.00 Technician/Draftsperson II (Morse) 2 2 0 0 0 0 0 0 0 0 $12.75 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0 $17.00 Administrative Assistant (Meserve) 2 2 0 0 0 0 0 0 0 0

$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 43 4 39 0 0 0 0 0 0 0 0

Direct Labor $1,409.36 $156.60 $1,252.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 63.00% $887.90 $98.66 $789.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $916.08 $101.79 $814.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $479.18 $53.24 $425.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,692.52 $410.29 $3,282.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $70.47 $7.83 $62.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

FDEP COST ESTI MATE

Contractor: Earth Systems

Date: 9-Dec-20

Task #: SubTask 1 Project Management SubTask 6

Site: Moses Cleaners SubTask 2 Annual Monitoring 2021 SubTask 7

Activity/Phase: 2021 - MNA SubTask 3 SubTask 8

Project Manager: Killian Talley SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Contract Rate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $528.00 $528.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $528.00 $528.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $114.50 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $355.55 $355.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $4,743.54 $418.12 $4,325.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $369.25 $41.03 $328.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $5,112.79 $459.15 $4,653.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Moses Cleaners SUBTASK -2: Annual Monitoring 2021

DATE: 12/9/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Tech - Terry Byrnes Mobilization to and from site (2 hours each way, 4 hours total) 4

WLs (03, 04, 10, 042) & GW samples (MW008, 09, 011, 021, 038, 160, 171) 9 plus Trip Blank. Analyses for VOHs via 8260C. Purge water treated and disposed on-site as non-haz per generator's knowledge.

Report:

Principal Manager - M. Tumeo Senior report Review 3

Project Manager - J Paxton Report preparation and ADaPT and GIS updating 18

Admin - S. Meserve Compiling PDF of MNA report, printing and shipping hard copy 2

Drafting - Katherine Morse Figures 1-4 2

Staff Geo.- L. Russell ADaPT preparation (7 samples x 8 min/ sample) 1

TOTAL LABOR 39.0

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow GW sampling kit $208.55 day 1 $208.55

Portable Compressor $48.50 day 1 $48.50

Expendables $32.50 day 1 $32.50

Portable Generator $66.00 day 1 $66.00

TOTAL EQUIPMEN $355.55

VEHICLE TYPE RATE UNIT USEAGE

Truck $97.00 day 1 $97.00

TOTAL VEHICLE $97.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

7 wells, 1 TB, VOH by 8260B $66.00 7 1 $528.00

TOTAL LAB $528.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650

Florida • Colorado • North Dakota • New Jersey

December 7, 2020

Mr. Killian Talley Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400

Subject: Proposal for Annual Natural Attenuation Monitoring (NAM) 2021

Moses Cleaners 989 South First Street, Lake City, Columbia County, Florida

ERIC_4289

Dear Mr. Talley:

Earth Systems has prepared this proposal for conducting annual NAM sampling at the subject site. The tasks associated with this scope of work are as follows:

SUBTASK 1 – Project Management

Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.

SUBTASK 2 – Groundwater Sampling and Reporting

Earth Systems will mobilize a senior technician to the site to collect water level data from 3 wells (MW009, MW004, and MW042) and groundwater samples (with water level data) from 7 additional wells (MW008, MW009, MW011, MW021, MW038, MW160, and MW171). The samples will be analyzed for VOHs using EPA Method 8260. One trip blank will also be analyzed. All VOH samples will be analyzed by one of Earth Systems’ contract laboratories (Pace Analytical or Accutest).

After receipt of the analytical results, Earth Systems will provide an Annual Natural Attenuation Monitoring Report. The report will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.

Proposal to Conduct Annual NAM Sampling Moses Cleaners, Lake City, Florida

ERIC_4289

Cost and Schedule

The proposed cost and schedule for this project are provided in the table below.

Task Proposed

Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $459.15

April 30, 2021

Subtask 2 – NAM Sampling $4,653.64 April 30, 2021 NAM Report 2021

Total/Completion Date $5,112.79

June 30, 2021

If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.

Sincerely, EARTH SYSTEMS

James Paxton Operations Manager

GROUNDWATER

ANALYTICAL RESULTS

(MARCH 2004 - MARCH 2020)

Figure 2

0 10050

( SCALE IN FEET )

LEGEND

ESTIMATED EXTENT OF DISSOLVED

IMPACTS ABOVE GCTLs

BOLD

4.8 11457 11

5.4 302 1383.8

6.2 7.335

420 63.2 98.5

3.4 16.3

89.9

73.5 3.0

886 310 74.611911,700 66 30

7.9

38.1

13.2

34.3

41.1

36.7

20.9

17.8

34.6

5.0

24.8

4.2

16.916 11 8798 3.63

6.86

7.29

4.03

28.0

12.5

9.97 40.4

14.0

31.5

12.6

16.6

4.1

18.2

4.3

22.6

51.2

11.5

8.9

6.6

3.9

7.8

File details come from the government source that posted it. Updated .