CN-370000-HW558-DC015F.pdf

PDF 916 KB Posted

Attached to
Master Agreement FL|HW558|146f330b53bd60a9234ae2599bc7c6cc
Contract number
HW558
Issued by
Florida

About this file

Document Summary

This is a Task Assignment Notification (DC015F) issued under Florida Department of Environmental Protection (FDEP) Contract HW558, executed between FDEP and Earth Systems for environmental services at the Sunland Cleaners facility (ERIC_5475) located at 895 Fox Valley Drive, Suite 113, Longwood, Florida. The task assignment was authorized on October 2, 2019, with Crystal Posey serving as the FDEP Project Manager and Jim Paxton as the Contractor Representative.

The contract authorizes Earth Systems to conduct annual groundwater monitoring at the Sunland Cleaners site, including sampling from six monitoring wells (MW001, MW002, MW003, MW004, MW005, and MW010) and one piezometer (PZ003), with samples analyzed for volatile organic compounds (VOHs) using EPA Method 8260. Earth Systems will provide an Annual Monitoring of Natural Attenuation Report with updated tables, figures, analytical data, and recommendations for additional work. The sampling event is combined with a nearby Adams Cleaners site visit to reduce mobilization costs, with one hour of mobilization time included for travel between sites. The total task assignment value is $4,604.30 under a fixed-price compensation structure, with no cost reimbursement or fixed fees. The final deliverable—the Annual Groundwater Monitoring Report and ADaPT/GIS update submitted electronically and in hardcopy—is due on March 31, 2020, with final project completion scheduled for May 31, 2020. Cost components include $3,297.11 in total labor, $462.00 in laboratory analytical costs, $97.00 in vehicle rental, and $355.55 in field equipment and expendables, plus applicable overhead, general and administrative, and fringe benefit markups totaling $2,296.67.

View the file

Other files

File Type Posted
CN-370000-HW558-A3.pdf PDF
CN-370000-HW558-A5.pdf PDF
CN-370000-HW558-A7.pdf PDF
CN-370000-HW558-CO2.pdf PDF
CN-370000-HW558-DC001G.pdf PDF
CN-370000-HW558-DC005G.pdf PDF
CN-370000-HW558-DC005i.pdf PDF
CN-370000-HW558-DC012FCO.pdf PDF
CN-370000-HW558-DC013F.pdf PDF
CN-370000-HW558-DC017E.pdf PDF
CN-370000-HW558-DC017F.pdf PDF
CN-370000-HW558-DC017H.pdf PDF
CN-370000-HW558-DC018C.pdf PDF
CN-370000-HW558-DC019F.pdf PDF
CN-370000-HW558-DC019H.pdf PDF
CN-370000-HW558-DC01ACO4.pdf PDF
CN-370000-HW558-DC01E.pdf PDF
CN-370000-HW558-DC01F.pdf PDF
CN-370000-HW558-DC022D.pdf PDF
CN-370000-HW558-DC023F.pdf PDF
CN-370000-HW558-DC025B.pdf PDF
CN-370000-HW558-DC027G.pdf PDF
CN-370000-HW558-DC028A.pdf PDF
CN-370000-HW558-DC028F.pdf PDF
CN-370000-HW558-DC02C.pdf PDF
CN-370000-HW558-DC02E.pdf PDF
CN-370000-HW558-DC02EC01.pdf PDF
CN-370000-HW558-DC02L.pdf PDF
CN-370000-HW558-DC03J.pdf PDF
CN-370000-HW558-DC03L.pdf PDF
CN-370000-HW558-DC04G.pdf PDF
CN-370000-HW558-DC04J.pdf PDF
CN-370000-HW558-DC04L.pdf PDF
CN-370000-HW558-DC04MCO1.pdf PDF
CN-370000-HW558-DC05C.pdf PDF
CN-370000-HW558-DC08ECO1.pdf PDF
CN-370000-HW558-DC09GCO1.pdf PDF
CN-370000-HW558-DC09H.pdf PDF
CN-370000-HW558-DC09I.pdf PDF
CN-370000-HW558-DC09ICO1.pdf PDF
CN-370000-HW558-DC09ICO2.pdf PDF
CN-370000-HW558-DC10E.pdf PDF
CN-370000-HW558-DC11G.pdf PDF
CN-370000-HW558-DC11GCO1.pdf PDF
CN-370000-HW558-DC11GCO2.pdf PDF
CN-370000-HW558-DC11H.pdf PDF
CN-370000-HW558-DC11J.pdf PDF
CN-370000-HW558-DC11MCO1.pdf PDF
CN-370000-HW558-DC11oCO1.pdf PDF
CN-370000-HW558-DC12B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW558 Task Assignment #: DC015F

Deliverables:

Deliverable Deliverable Due Date Annual Groundwater Monitoring Report and ADaPT/GIS update (submitted electronically and hardcopy)

31-Mar-20

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced Subtasks 1 and 2: FDEP approval of Annual Groundwater Monitoring Report and ADaPT/GIS update (submitted electronically and hardcopy)

$4,604.30

TOTAL COST $4,604.30

BWC TAFORM 01/18

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Noah Valenstein Secretary

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 3

2399-2400

Memorandum

TO:

FROM:

SUBJECT:

DATE:

HW558 Contract File

Crystal Posey, Project Manager

Sunland Cleaners

ERIC_5475

HW558 DC015F

Task Assignment

October 2, 2019

This Task Assignment authorizes Earth Systems to conduct annual groundwater sampling (with water level data) from 6 wells (MW001, MW002, MW003, MW004, MW005, MW010, and PZ003) and one trip blank. The samples will be analyzed for VOHs using EPA Method 8260.

The sampling event will be combined with the DC017F Adams Cleaners sampling event that is nearby to reduce the cost of mobilizing from Jacksonville to the Orlando area. One hour of mobilization time is included for travel from the Sunland site to the Adams Cleaners site. The remaining mobilization time is incorporated in to the DC017F Adams Cleaners Sampling Task Assignment.

Earth Systems will provide an Annual Monitoring of Natural Attenuation Report, which will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.

This Task Assignment is in accordance with the Earth Systems scope of work and cost estimate form attached and dated September 11, 2019.

The cost of this Task Assignment is $4,604.30.

FDEP COST ESTIMATEContractor: Earth Systems

Date: 10/3/2019

Task #: SubTask 1 Project Management SubTask 6

Site: Sunland Cleaners SubTask 2 Annual MNA Sampling and Reporting SubTask 7

Activity/Phase: Annual MNA - 2020 SubTask 3 SubTask 8

Project Manager: Crystal Posey SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$42.30 Project Manager (Beardall) 3 3.3 $0.00 Principal Manager 0 0 0 0 0 0 0 0 0 0

$42.06 Principal Manager(B Marshall) 2 2 0 0 0 0 0 0 0 0 $0.00 Senior Engineer/Geologist/Scientist 0 0 0 0 0 0 0 0 0 0

$40.62 Project Manager (J Paxton) 18 18 0 0 0 0 0 0 0 0 $0.00 Staff Engineer/Geolgist/Scientist 0 0 0 0 0 0 0 0 0 0

$23.02 Senior Technician (Byrnes) 9 9 0 0 0 0 0 0 0 0 $26.15 Staff Scientist (Russell) 1 1 0 0 0 0 0 0 0 0

$0.00 Technician/Draftsperson II 0 0 0 0 0 0 0 0 0 0 $18.00 Technician/Draftsperson Ii (Morse) 2 2 0 0 0 0 0 0 0 0 $17.00 Administrative Assistant (Meserve) 2 2 0 0 0 0 0 0 0 0

$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 37 3 34 0 0 0 0 0 0 0 0

Direct Labor $1,258.44 $139.83 $1,118.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 63.00% $792.81 $88.09 $704.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $817.99 $90.89 $727.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $427.87 $47.54 $380.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,297.11 $366.35 $2,930.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $62.92 $6.99 $55.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF EARTH SYSTEMS Page 1

FDEP COST ESTIMATEContractor: Earth Systems

Date: 10/3/2019

Task #: SubTask 1 Project Management SubTask 6

Site: Sunland Cleaners SubTask 2 Annual MNA Sampling and Reporting SubTask 7

Activity/Phase: Annual MNA - 2020 SubTask 3 SubTask 8

Project Manager: Crystal Posey SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $462.00 $462.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $462.00 $462.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $114.50 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $355.55 $355.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $4,274.58 $373.34 $3,901.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $329.72 $36.64 $293.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $4,604.30 $409.98 $4,194.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF EARTH SYSTEMS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Sunland Cleaners SUBTASK: Annual MNA Sampling and Reporting

DATE: 10/3/2019

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

J Paxton - Project Manager Schedule job and notify off-site property owners 2

Terry Byrnes - Sr. Tech. Travel time to site (1 hr from Adams Cleaners) 1 GW samples (MW001, 002, 003, 004, 005, and PZ003) plus Trip Blank. 8 Analyses for VOHs via 8260C. Purge water treated and disposed on-site as non-haz per generator's knowledge.

Report:

B Marshall - Principal Manager Annual MNA report review 2 J Paxton - Project Manager Annual MNA report preparation 16 L. Russell - Staff Scientist ADaPT (8 mins/well * 8 wells) 1 S Meserve - Admin Compiling PDF of MNA report, printing and shipping hard copy 2 Kath Morse - Drafting Figures 1-4 2

34.0

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow GW sampling kit $208.55 day 1 $208.55 Portable Compressor $48.50 day 1 $48.50 Expendables $32.50 day 1 $32.50 Portable Generator $66.00 day 1 $66.00

TOTAL EQUIPMENT $355.55

VEHICLE TYPE RATE UNIT USEAGE

Truck $97.00 day 1 $97.00 $0.00

TOTAL VEHICLE $97.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

6 wells, 1 TB, VOH by 8260B $66.00 6 1 $462.00

TOTAL LAB $462.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

FINAL --7/24/96

223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650

Florida • Colorado • North Dakota • New Jersey

September 11, 2019

Ms. Crystal Posey Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M. S. 4520 Tallahassee, Florida 32399-2400

Subject: Proposal to Conduct 2019 Natural Attenuation Monitoring Sunland Cleaners

895 Fox Valley Drive, Suite 113, Longwood, Florida

FDEP Identification ERIC_5475

Dear Ms. Posey:

Earth Systems has prepared this proposal for conducting annual Natural Attenuation Monitoring (NAM) sampling at the subject site. The tasks associated with this scope of work are as follows:

SUBTASK 1 – Project Management

Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.

SUBTASK 2 – Annual MNA Sampling and Reporting

Earth Systems will mobilize a senior technician to the site to collect groundwater samples (with water level data) from 6 wells (MW001, MW002, MW003, MW004, MW005, and PZ003). The samples will be analyzed for VOHs using EPA Method 8260. One trip blank will also be analyzed. All VOH samples will be analyzed by one of Earth Systems’ contract laboratories, Pace Analytical or Accutest.

Note that this sampling will be conducted as a “milk run” by combining it with a sampling event at the nearby Adams Cleaners site. Combining the two sampling events will reduce the cost of mobilizing to the Orlando area. In this proposal, Earth Systems requests one hour to mobilize from Adams Cleaners to the Sunland site. The remaining mobilization time from Jacksonville to Orlando is incorporated into the Adams Cleaners sampling proposal.

Proposal to Conduct 2019 Annual MNA Sampling Sunland Cleaners, Longwood, Florida FDEP Facility No. ERIC_5475

After receipt of the analytical results, Earth Systems will provide a Natural Attenuation Monitoring Report. The report will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.

Task Proposed

Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management

$409.98

May 31, 2020

Subtask 2 – 2020 NAM GWS Sampling

$4194.32 March 31, 2020 Submittal of NAM Report.

Total/Completion Date $4,604.30

May 31, 2020

If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.

Sincerely, James Paxton Operations Manager

GROUNDWATER

ANALYTICAL MAP

(MARCH 2013 - FEBRUARY 2019)

Figure 2

0 6030

( SCALE IN FEET )

BOLD

11.4 5.2

5.5

11.7 4.6

13.4 26.9 16.1

AutoCAD SHX Text

FOX VALLEY DR.

AutoCAD SHX Text

WEKIVA SPRINGS RD.

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

PZ002

AutoCAD SHX Text

PLAYGROUND

AutoCAD SHX Text

MW002

AutoCAD SHX Text

MW001

AutoCAD SHX Text

MW004

AutoCAD SHX Text

MW005

AutoCAD SHX Text

MW003

AutoCAD SHX Text

MW007

AutoCAD SHX Text

PZ001

AutoCAD SHX Text

PZ004

AutoCAD SHX Text

PZ003

AutoCAD SHX Text

MW006

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

GAS STATION

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

02/19 FIG2

AutoCAD SHX Text 895 Fox Valley Drive, Suite 113

AutoCAD SHX Text Sunland Cleaners

AutoCAD SHX Text Longwood, Florida

AutoCAD SHX Text %%uLEGEND

AutoCAD SHX Text

MONITORING WELL LOCATION

AutoCAD SHX Text

PCE

AutoCAD SHX Text TETRACHLOROETHENE (ug/L)

AutoCAD SHX Text

VC

AutoCAD SHX Text

TCE

AutoCAD SHX Text TRICHLOROETHENE (ug/L)

AutoCAD SHX Text VINYL CHLORIDE (ug/L)

AutoCAD SHX Text

CONCENTRATIONS IN BOLD EXCEED LIMITS

AutoCAD SHX Text I

AutoCAD SHX Text

MDL < RESULTS < REPORTING LIMIT

AutoCAD SHX Text

RESULT BELOW DETECTION LIMIT

AutoCAD SHX Text U

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text CIS-1,2-DICHLOROETHENE (ug/L)

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text TRANS-1,2-DICHLOROETHENE (ug/L)

AutoCAD SHX Text

PIEZOMETER WELL LOCATION

AutoCAD SHX Text

VC

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

PCE

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 10/15

AutoCAD SHX Text

VC

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

PCE

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 10/15

AutoCAD SHX Text

VC

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

PCE

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 10/15

AutoCAD SHX Text

VC

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

PCE

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.54 I

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 10/15

AutoCAD SHX Text 1 U

AutoCAD SHX Text 1 U

AutoCAD SHX Text 1 U

AutoCAD SHX Text 1 U

AutoCAD SHX Text 1 U

AutoCAD SHX Text

VC

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

PCE

AutoCAD SHX Text 3/13

AutoCAD SHX Text

0.4 U

AutoCAD SHX Text

0.4 U

AutoCAD SHX Text

0.4 U

AutoCAD SHX Text

0.4 U

AutoCAD SHX Text

0.4 U

AutoCAD SHX Text 6/13

AutoCAD SHX Text

VC

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

PCE

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 10/15

AutoCAD SHX Text

PARKING

AutoCAD SHX Text 1 U

AutoCAD SHX Text 1 U

AutoCAD SHX Text 1 U

AutoCAD SHX Text 1 U

AutoCAD SHX Text 1 U

AutoCAD SHX Text

VC

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

PCE

AutoCAD SHX Text 3/13

AutoCAD SHX Text

0.4 U

AutoCAD SHX Text

0.4 U

AutoCAD SHX Text

0.4 U

AutoCAD SHX Text

0.4 U

AutoCAD SHX Text

0.4 U

AutoCAD SHX Text 6/13

AutoCAD SHX Text N

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text 11/16

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.45 I

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text 11/16

AutoCAD SHX Text

0.37 I

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text 11/16

AutoCAD SHX Text

0.33 I

AutoCAD SHX Text

0.65 I

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text 11/16

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.16 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text 11/16

AutoCAD SHX Text

VC

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

PCE

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 10/15

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.31 I

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text 11/16

AutoCAD SHX Text

VC

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

PCE

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 10/15

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.16 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text 11/16

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.89 I

AutoCAD SHX Text 2/18

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.78 I

AutoCAD SHX Text 2/18

AutoCAD SHX Text 1.8

AutoCAD SHX Text 2.4

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 1.2

AutoCAD SHX Text 2/18

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.66 I

AutoCAD SHX Text 2/18

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 1.0

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 2/18

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 1.0

AutoCAD SHX Text 2/18

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 1.6

AutoCAD SHX Text 2/18

AutoCAD SHX Text

VC

AutoCAD SHX Text

T-DCE

AutoCAD SHX Text

C-DCE

AutoCAD SHX Text

TCE

AutoCAD SHX Text

PCE

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 10/15

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.16 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text

0.19 U

AutoCAD SHX Text

0.21 U

AutoCAD SHX Text 11/16

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 1.5

AutoCAD SHX Text 2/18

AutoCAD SHX Text 1.4

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 2/19

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 2/19

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.66 I

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 2/19

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 2/19

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text

0.50 U

AutoCAD SHX Text 2/19

AutoCAD SHX Text

0.36 U

AutoCAD SHX Text

0.38 U

AutoCAD SHX Text

0.23 U

AutoCAD SHX Text

0.39 U

AutoCAD SHX Text

0.27 U

AutoCAD SHX Text 2/19

Task Assignment Notification
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .