CN-370000-HW558-DC009N.pdf
PDF 330 KB Posted
- Contract number
- HW558
- Issued by
- Florida
About this file
This document is a Task Assignment Notification Form for Contract No. HW558 issued by the Florida Department of Environmental Protection (FDEP), Bureau of Waste Cleanup. The task assignment authorizes Earth Systems, a contractor specializing in environmental engineering services, to conduct annual groundwater monitoring activities at the Koretizing Cleaners II facility located at 2261 Edgewood Avenue West in Jacksonville, Duval County, Florida (ERIC Site No. 4575). The FDEP Contract Manager is Killian Talley, and the contractor representative is Mark A. Tumeo, with Jim Paxton serving as the contractor's Project Manager.
The task assignment (DC009N) requires Earth Systems to perform two subtasks: Project Management and Annual Monitoring of Natural Attenuation (MNA) Sampling and Reporting. The services include collecting water level data from six monitoring wells, collecting groundwater samples from six additional wells, conducting volatile organic compound analysis via EPA Method 8260B on six samples plus one trip blank, and preparing a comprehensive Natural Attenuation Monitoring Report with updated tables, figures, laboratory data, and recommendations. The total fixed-price cost for this task assignment is $4,765.27, comprising $427.87 for Project Management (Subtask 1) and $4,337.40 for Annual MNA Sampling and Reporting (Subtask 2), based on 39 total labor hours. The final deliverable is due on August 31, 2021, with full execution of the task assignment through November 19, 2021. Invoice payment is contingent upon FDEP receipt and approval of the Natural Attenuation Monitoring Report and GIS/ADaPT deliverables. No retainage is applied to this task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93)
Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW558
D000 N/ADC009N
Earth Systems
Jim Paxton
850-245-8928Killian Talley
ERIC_4575
Koretizing Cleaners II
2261 Edgewood Avenue West, Jacksonville, Duval
Monitoring
This Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring activities in accordance with the attached scope of work and cost estimate.
Natural Attenuation Monitoring Report; GIS/ADaPT
08/31/2021
11/19/2021
$ 4,765.27 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Killian Talley Digitally signed by Killian Talley Date: 2020.12.15 14:31:06 -05'00'
Killian Talley Digitally signed by Killian Talley Date: 2020.12.15 14:31:16 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2020.12.16 09:18:34 -05'00'
Mark A. Tumeo Digitally signed by Mark A. Tumeo Date: 2020.12.17 13:05:47 -05'00'
$ 4,765.27
Task Assignment Notification/Change Order
Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1-2: Submittal of Natural Attenuation Monitoring Report; GIS/ADaPT 08/31/2021
Subtasks 1-2: FDEP receipt and approval of Natural Attenuation Monitoring Report;
GIS/ADaPT $ 4,765.27
$ 4,765.27
HW558
DC009N
Florida Department of Memorandum Environmental Protection
Printed on recycled paper.
To: HW558 Contract Negotiation File Koretizing Cleaners II Jacksonville, Duval County
ERIC_4575
From: Killian Talley, Project Manager Date: December 15, 2020 Subject: Negotiation Summary
HW558 DC009N
Task Assignment authorizes Earth Systems to conduct annual groundwater monitoring at the Koretizing Cleaners II site.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Annual MNA Sampling & Reporting Subtask includes costs and labor for Earth Systems to conduct groundwater sampling along with analysis and reporting. Field event will be comprised of the following activities; collection of depth to water will be measured from site monitoring wells, field parameters for geochemical data, and six (6) groundwater samples for analysis of volatile organic compounds via EPA Method 8260B. Upon receipt of the groundwater analytical data, Earth Systems will generate an Natural Attenuation Monitoring Report outlining and describing the field event, procedures, and analytical results. The report will also provide conclusion and recommendations.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $4,765.27 with 39 labor hours.
Earth Systems may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATEContractor: Earth Systems
Date: 12/15/2020
Task #: SubTask 1 Project Management SubTask 6
Site: Koretizing Cleaners II ERIC_4575 SubTask 2 Annual MNA Sampling 2021 SubTask 7
Activity/Phase: Annual MNA - 2021 SubTask 3 SubTask 8
Project Manager: Killian Talley SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$40.62 Project Manager (Jim Paxton ) 4 3.6 $42.30 Principal Manager (Tumeo) 3 3 0 0 0 0 0 0 0 0 $30.80 Associate Eng./Geologist/Scientist 0 0 0 0 0 0 0 0 0 0 $42.30 Senior Engineer (M Tumeo) 0 0 0 0 0 0 0 0 0 0 $40.62 Project Manager J Paxton 18 18 0 0 0 0 0 0 0 0 $26.15 Staff Geologist (L. Russell) 1 1.0 0 0 0 0 0 0 0 0 $23.02 Senior Technician (T. Byrnes) 10 10 0 0 0 0 0 0 0 0 $17.60 Eng./Geologist/Scientist Technician 0 0 0 0 0 0 0 0 0 0 $18.00 Technician/Draftsperson II (K. Morse) 2 2 0 0 0 0 0 0 0 0 $12.75 Technician/Draftsperson I 0 0 0 0 0 0 0 0 0 0 $17.00 Administrative Assistant (S. Meserve) 1 1 0 0 0 0 0 0 0 0
$0.00 General Office Clerk 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 39 4 35.0 0 0 0 0 0 0 0 0
Direct Labor $1,313.34 $145.93 $1,167.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 63.00% $827.41 $91.94 $735.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 65.00% $853.67 $94.85 $758.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 34.00% $446.54 $49.62 $396.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,440.96 $382.34 $3,058.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate
FDEP COST ESTI MATEContractor: Earth Systems
Date: 12/15/2020
Task #: SubTask 1 Project Management SubTask 6
Site: Koretizing Cleaners II ERIC_4575 SubTask 2 Annual MNA Sampling 2021 SubTask 7
Activity/Phase: Annual MNA - 2021 SubTask 3 SubTask 8
Project Manager: Killian Talley SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Other Direct Costs $65.67 $7.30 $58.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $462.00 $462.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $462.00 $462.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $114.50 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $355.55 $355.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $4,421.18 $389.64 $4,031.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $344.09 $38.23 $305.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $4,765.27 $427.87 $4,337.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Koretizing Cleaners II - ERIC_4575 SUBTASK: Annual MNA 2020
DATE: 12/15/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Terry Byrnes - Sr. Tech. Travel time to and from site 1
WLs (MW003, 005, 007, 012, 013, 014) & GW samples (MW002, 004, 006, 008, 009, & 017) 9 plus Trip Blank. Analyses for VOHs via 8260. Purge water treated and disposed on-site as non-haz per generator's knowledge.
Report:
M. Tumeo - Principal Manager Annual MNA report review 3
J Paxton Project Manager Annual MNA report preparation 18
L. Russell - Field Geologist ADaPT (10 mins/well * 6 wells) 1
S Meserve - Admin Compiling PDF of MNA report, printing and shipping hard copy 1
Kath Morse - Drafting Figures 1-4 2
TOTAL LABOR 35.0
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Shallow GW sampling kit $208.55 day 1 $208.55
Portable Compressor $48.50 day 1 $48.50
Expendables $32.50 day 1 $32.50
Portable Generator $66.00 day 1 $66.00
TOTAL EQUIPMENT $355.55
VEHICLE TYPE RATE UNIT USEAGE
Truck $97.00 day 1 $97.00
TOTAL VEHICLE $97.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
6 MWs, 1 TB, VOH by 8260B $66.00 6 1 $462.00
TOTAL LAB $462.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LOE WORKSHEET
223 12th Avenue North, Jacksonville Beach, Florida 32250, Tel 904.247.0740, Fax 904.247.7650
Florida • Colorado • North Dakota • New Jersey`
December 7, 2020
Mr. Killian Talley Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M. S. 4520 Tallahassee, Florida 32399-2400
Subject: Proposal to Conduct Annual MNA Sampling - 2021 Koretizing Cleaners II 2261 Edgewood Ave. West, Jacksonville, Duval County, Florida
ERIC_4575
Dear Mr. Talley:
Earth Systems has prepared this proposal for conducting annual Monitoring of Natural Attenuation (MNA) sampling at the subject site. The tasks associated with this scope of work are as follows:
SUBTASK 1 – Project Management
Allowable costs for Project Management according to the Bureau of Waste Cleanup’s (BWC) contract with Earth Systems.
SUBTASK 2 – Annual MNA Sampling and Reporting
Earth Systems will mobilize a senior technician to the site to collect water level data from 6 wells (MW003, MW005, MW007, MW012, MW013, and MW014) and groundwater samples (with water level data) from 6 additional wells (MW002, MW004, MW006, MW008, MW009, and MW017). The samples will be analyzed for VOHs using EPA Method 8260. One trip blank will also be analyzed. All VOH samples will be analyzed by one of Earth Systems’ contract laboratories, Pace Analytical.
After receipt of the analytical results, Earth Systems will provide an Annual Monitoring of Natural Attenuation Report. The report will include updated tables and figures, the laboratory analytical data, and recommendations for additional work.
Proposal to Conduct Annual MNA Sampling - 2021 Koretizing Cleaners II, Jacksonville, Florida
ERIC_4575
Cost and Schedule
The proposed cost and schedule for this project are provided in the table below.
Task Proposed
Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $427.87 October 30, 2021
Subtask 2 – Conduct 2020 MNA sampling and prepare MNA Report
$4,337.40
August 31, 2021 Groundwater sampling documentation, Laboratory Report, Annual MNA Report, GIS Tables, ADaPT Deliverables
Total/Completion Date $4,765.27 October 30, 2021
If you have questions or comments concerning this proposal, please contact me at (904) 247-0740.
Sincerely, James Paxton Oporations Manager