This document is a Task Assignment Notification Form (WCP TAFORM 01_18) issued by the Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for environmental remediation services at the Dry Cleaning Depot facility located at 3470 W Broward Boulevard in Fort Lauderdale, Broward County, Florida. The contract is identified as HW557, with Task Assignment DC041K, Module D000, and Grant N/A. Key personnel include DEP Contract Manager Theresa C. Pepe, Contractor Representative Gus Suarez, and Contractual Authority William E. Burns, Jr. The site, identified by DEP Site # ERIC_4160 and FACID NO. 06-9502029, is in the Monitoring phase of environmental cleanup.
The task assignment authorizes Arcadis to conduct a comprehensive groundwater monitoring event and submit a final deliverable, which consists of a Groundwater Monitoring Report and IDW (Investigative-Derived Waste) manifest. Work will be performed according to Arcadis's December 17, 2021 Work Plan and includes sampling twenty-three on and off-site monitor wells for drycleaning solvents, measuring water levels to determine groundwater flow, and proper disposal of investigative-derived waste. The total task assignment value is $13,091.45, structured as a Fixed Price contract with no retainage. The contract provides two invoicing milestones: $7,648.27 upon FDEP approval of Fieldwork Activities (due January 31, 2022) and $5,443.18 upon FDEP approval of the Groundwater Monitoring Report and IDW manifest (due April 15, 2022). The task assignment period runs through May 31, 2022. Cost estimates detail labor, overhead, general and administrative costs, travel, laboratory analysis through Jupiter Labs, and subcontractor services including Clark Environmental for investigative-derived waste disposal at $150.00.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW557
D000 N/ADC041K
Arcadis U.S., Inc.
Gus Suarez
(850) 245-8705Theresa C. Pepe
ERIC_4160
Dry Cleaning Depot
3470 W Broward Blvd, Fort Lauderdale, Broward County
Monitoring
Arcadis will conduct a groundwater monitoring event from select wells at the site.
All activities will be performed according to the December 17, 2021, Work Plan submitted by Arcadis.
Groundwater Monitoring Report/IDW manifest
04/15/2022
05/31/2022
$ 13,091.45 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Theresa C. Pepe Digitally signed by Theresa C. Pepe Date: 2021.12.20 15:20:10 -05'00'
Theresa C. Pepe Digitally signed by Theresa C. Pepe Date: 2021.12.20 15:20:22 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.12.21 11:19:33 -05'00'
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2021.12.21 11:36:42 -05'00'
$ 13,091.45
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number: HW557 Task Assignment #: DC041K
Deliverables:
Deliverable Deliverable Due Date Fieldwork Activities 31-Jan-22 Groundwater Monitoring Report/IDW manifest/Project Management 15-Apr-22
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
FDEP approval of Fieldwork Activities $7,648.27
FDEP approval of Groundwater Monitoring Report/IDW manifest/Project Management $5,443.18
TOTAL COST $13,091.45
BWC TAFORM 01/18
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Dry Cleaning Depot
FACID NO. 06-9502029; ERIC_4160
Fort Lauderdale, Broward County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment DC041K (HW557) DATE: December 20, 2021
Arcadis U.S., Inc. will perform a comprehensive groundwater sampling event with the goal of determining if additional well installations are needed. This work will be conducted in accordance with the December 17, 2021, Work Plan submitted by Doug McGlone of Arcadis.
The final task assignment total is $13,091.45. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Groundwater Monitoring Arcadis will sample twenty-three on and off-site wells for drycleaning solvents. Water levels will be sampled across the site to determine groundwater flow. IDW will be drummed and disposed by a licensed waste hauler per FDEP’s preference.
Subtask 3: Groundwater Monitoring Report Arcadis will submit a groundwater monitoring report as the final deliverable. This subtask provides costs for tabulating data, drafting updated figures and considering remedial strategy based on the groundwater sampling results.
Hours and costs are comparable to past task assignments of similar work.
FDEP COST ESTIMATE
Contractor: Arcadis U.S., Inc.
Date: 12/17/2021
Task #: SubTask 1 Project Management
Site: Dry Clean Depot SubTask 2 Annual Groundwater Monitoring
Activity/Phase: Monitoring SubTask 3 Reporting
Project Manager: Gus Suarez SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category Staff Member
$79.12 Project Manager Suarez, Gus (GS) 4 4.4
$96.76 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0
$81.24 Principal Engineer Burtnett, Susan (SB) 0 0 0 0 0
$79.12 Principal Engineer Suarez, Gus (GS) 1 0 1 0 0$75.11 Principal Scientist McManus, Andrew (ATM) 0 0 0 0 0
$61.69 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0
$61.38 Principal Scientist McGlone, Douglas (DMc) 21 3 18 0 0
$28.94 Scientist McBath, Brandon (BMc) 36 36 0 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 5 0 5 0 0$30.99 Drafter/Designer Richards, Jim (JR) 0 0 0 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 5 1 4 0 0
Total Hours 72 4 40 28 0 0
Direct Labor $3,108.48 $345.39 $1,256.94 $1,506.15 $0.00 $0.00
Overhead 57.95% $2,470.21 $274.47 $998.85 $1,196.89 $0.00 $0.00
Gen & Admin 21.29% $1,433.43 $159.27 $579.62 $694.54 $0.00 $0.00
Fringe 37.13% $1,154.17 $128.24 $466.70 $559.23 $0.00 $0.00
Total Labor $8,166.29 $907.37 $3,302.11 $3,956.81 $0.00 $0.00
Other Direct Costs $155.43 $17.27 $62.85 $75.31 $0.00 $0.00
Travel
Vehicle Rental $291.00 $291.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $291.00 $291.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
Clark Env IDW $150.00 $150.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
Geo-Tek Utility Locate / GPR Survey $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $150.00 $150.00 $0.00 $0.00 $0.00
Handling Fee $15.00 $15.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $165.00 $165.00 $0.00 $0.00 $0.00
Laboratory
Jupiter Labs Analytical Costs $1,584.00 $1,584.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $208.00 $208.00 $0.00 $0.00 $0.00
Total Laboratory $1,792.00 $1,792.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $97.50 $97.50 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $1,607.60 $1,607.60 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other - MAGS, recon) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $1,705.10 $1,705.10 $0.00 $0.00 $0.00
Subtotal $12,274.82 $924.64 $7,318.06 $4,032.12 $0.00 $0.00
Completion Fee $816.63 $90.74 $330.21 $395.68 $0.00 $0.00
Total Estimated Cost $13,091.45 $1,015.38 $7,648.27 $4,427.80 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE: Dry Clean Depot
SUBTASK 2: Annual Groundwater Monitoring
DATE: 12/17/21
LABOR
Category/Staff Work Description Hours
Groundwater Sampling Principal / GS 0
Senior / DMc Owner/operator communication/notification (1hr), field sched/support (2 hrs) 3
Scientist / BMc Prep, mob/demob (2 hrs x 3), sample 23 wells, drum purge water, and WL measurements in all site wells (30 hrs) 36
Project Assistant / MMc Field notes processing, sample tracking 1
TOTAL LABOR: 40
TRAVEL
Vehicle Type Rate Unit Usage Totals
Automobile $68.00 Per Day 0 $0.00
Van/Truck $97.00 Per Day 3 $291.00
Van/Truck $420.00 Per Week 0 $0.00
Total Vehicle: $291.00
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$90.00 Per Day 0 $0.00
$90.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL TRAVEL: $291.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
0 $0.00
Total Equip.: $0.00
Services Procurement Name Purpose Rate Units Usage Totals
NAME OF COMPANY IDW $150.00 Drum 1 $150.00
Handling Fee $20.00 Per Month 0 $0.00
Total Services: $150.00
TOTAL SUB: $150.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Soil/Sediment $135.00 1.00 0 $0.00
VOC (halocarbons only) 8260 Aqueous $66.00 1.00 24 $1,584.00
TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $1,584.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 2 $208.00
Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 0 $0.00
Total Shipping: $208.00
TOTAL LAB: $1,792.00
FIELD EXPENSES
Personal Protection Item Rate Unit Usage Totals
Total PPE: $0.00
Equipment Item Rate Unit Usage Totals
Expendables Miscellaneous Expendables $32.50 Per Day 3 $97.50
Total Expendables: $97.50
Equipment ItemsPID/FID Combo or FID $106.70 Per Day 0 $0.00
Tubing, Poly/HDPE $0.25 Per Foot 2000 $500.00 Tubing, Silicon 3/16x3/8 $2.00 Per Foot 30 $60.00
Total Equipment Items: $560.00
Equipment KitsSite Reconnaissance Kit $81.48 Day 0 $0.00
Deep Groundwater Sampling Kit $349.20 Day 3 $1,047.60
Total Equipment Kits: $1,047.60
TOTAL EQUIPMENT: $1,607.60
SITE: Dry Clean Depot
SUBTASK 3: Reporting
DATE: 12/17/21
LABOR
Category/Staff Work Description Hours
Annual Report Principal / GS PG review/certification of report, report recommendations 1
Senior / DMc Reprt / table / figures markups, data analysis, report text, conclusions 18
Project Assistant / MMc Data entry, report assembly, formating, upload ADaPT deliverables 4
Designer / BO Develop figures for report - COC contours, x-sections, site wide gw data 5
TOTAL LABOR: 28
TRAVEL
Vehicle Type Rate Unit Usage Totals
Automobile $68.00 Per Day 0 $0.00
Van/Truck $97.00 Per Day 0 $0.00
Van/Truck $420.00 Per Week 0 $0.00
Total Vehicle: $0.00
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$90.00 Per Day 0 $0.00
$90.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL TRAVEL: $0.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
0 $0.00
Total Equip.: $0.00
Services Procurement Name Purpose Rate Units Usage Totals
NAME OF COMPANY Direct-push services $0.00 Unit pricing 0 $0.00
Total Services: $0.00
TOTAL SUB: $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples TotalsVOC (Halocarbons Only) 8260C Aqueous/Non $66.00 1.00 0 $0.00
TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB: $0.00
FIELD EXPENSES
Personal Protection Item Rate Unit Usage TotalsPPE Level D $28.00 Per Man Day 0 $0.00PPE Level C $110.00 Per Man Day 0 $0.00
Total PPE: $0.00
Equipment Item Rate Unit Usage Totals
Expendables Miscellaneous Expendables $32.50 Per Day 0 $0.00
Total Expendables: $0.00
Equipment ItemsPID/FID Combo or FID $106.70 Per Day 0 $0.00
Total Equipment Items: $0.00
Equipment KitsSite Reconnaissance Kit $81.48 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT: $0.00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
Arcadis U.S., Inc.
1500 Gateway Boulevard
Suite 200
Boynton Beach
Florida 33426
Tel 561 697 7000
Fax 561 369 4731 www.arcadis.com
Page:
1/2
Ms. Theresa Pepe, Contract Manager Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400
Subject:
Proposal for Annual Groundwater Monitoring, and Reporting Dry Clean Depot 3470 W. Broward Boulevard, Fort Lauderdale, Florida Facility ID No.: ERIC_4160 Contract No.: HW557
Dear Ms. Pepe:
As requested on December 13, 2021 email, enclosed is a proposal/cost estimate for annual groundwater monitoring for the subject facility. This proposal includes a description of the proposed scope of services, estimated cost and schedule for services completion.
SCOPE OF WORK
Task 1: Project Management
This task consists of project management-related activities in relation to the completion of Tasks 2 through 3.
Task 2: Annual Groundwater Monitoring Event
To evaluate the current state of the solvent plume and its migration, groundwater samples will be collected from twenty-three (23) monitor wells in January 2022:
MW-1, MW003I, MW004I, MW005, MW008D, MW009I, MW010D, MW011I,
MW012D, MW013I, MW014I, MW014D, MW015I, MW015D, MW016D, MW017I,
MW017D, MW018D, MW019I, MW019D, MW020D, MW021D, and MW022D.
One duplicate sample will be collected from MW014D for quality assurances purposes. Groundwater field quality parameters will be collected during well purging; purge water will be stored in a 55-gallon drum for removal by Clark
ENVIRONMENT
Date:
December 17, 2021
Contact:
Doug McGlone
Phone:
561.662.7978
Email:
Douglas.mcglone@arcadis.com
Our ref:
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com C:\Users\Pepe_T\Desktop\Dry Clean Depot Annual gw monitoring Proposal_2021-12-17.docx
Proposal for Annual Groundwater Monitoring and Reporting 17 December 2021
Page:
2/2
Environmental. Groundwater samples will be submitted to a NELAC-accredited laboratory for analysis by EPA Method 8260.
Task 3: Reporting
Arcadis will summarize results of field activities and laboratory analytical data in data tables and depict results on figures to be included in an Annual Groundwater Monitoring Report for submittal to FDEP.
SCHEDULE
Arcadis will complete the field activities in January 2022 after receipt of a Task Assignment (TA). A Groundwater Monitoring Report will be submitted approximately 60 days following receipt of laboratory analytical data.
COST ESTIMATE
Level of Effort (LOE) Forms and a Cost Estimate Form (CEF) that present estimated project costs are presented as Attachment A.
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP in addressing remaining drycleaner contamination at this site. If you have any questions or wish to discuss this proposal, please contact us.
Sincerely, Arcadis U.S., Inc.
Douglas J. McGlone, P.G.
Senior Geologist
Enclosures:
Attachments
1 CEF-LOE
2 Figure of proposed wells
FORMER
DRYCLEAN MACHINE
(Pre 1996)
FORMER
FLOOR DRAINS
FORMER
DRYCLEAN MACHINES
(1996-2008)
FORMER
SPOTTING BOARD
(1996-2008)
FORMER
PRESSES
FORMER
WET WASH
AREA
CLOTHS
RACKS
FORMER
BOILER
ROOM
FORMER
COVERED SHED
(boiler room)
FORMER
ON-SITE
DUMPSTER
SANITARY SEWER
LIFT STATION
CONCRETE
PAD
ELECT.
PANEL
UP
MH
W. BROWARD BOULEVARD
BUILDING
DRYCLEAN
DEPOT
MW-1
MW-2
RESTROOM
ACTIVE
FLOOR DRAIN
HISTORICAL
DOCUMENTED
RELEASE
LP
WM
WM
WM
FH
FH
FORMER
GAS METER
LOCATION
TABLE
MW011I
MW010D
MW005
MW004I
MW012D
MW009I
MW008D
MW006IMW007D
MAG07
MAG03
MAG04
MAG06
MAG05
MAG01
MAG02
MW013I
MW014D
SVE001
UNK
UNK
LP
UP
DRIVE
THROUGH
CANOPY
WM
MH
MH
MH
MW016I
MW018I
MW015D
MW018D
MW014I
MW016D
MW019D
MW019I
MW017D
MW020D
MW021D
ABOVE GRADE ELECTRICAL
CONDUIT MOUNTED ON THE
FACILITY EXTERIOR WALL
WEATHERHEAD /
METER BASE
8.6'
16.0'
REMEDIATION SYSTEM
COMPOUND (7' x 12') AND
EQUIPMENT SKID WITH
±8' SETBACK FROM
PROPERTY BOUNDARY
SVE002
SVE003
MW017I
MW003I
MW022D
MW015I
FIGURE
SITE LAYOUT
PROPOSED WELLS TO BE SAMPLED
C I T
Y
B
B
F
L
D
I V
G
R O
U P
E
N
B
B
O
L I V
A
O p t
P
C
W
V
O G
E L
S O
G
M
D
M
C G
L O
T
T
H
A Y
S
R
O p t O
N
O
F F
R
E F
C U s e r s b o l i v a
B
A r c a d i s A
F
L O
R I D
A
D
E P
T
O
F
E
N V
I R
O N
M E
N T
R O
T E
C T
I O
N P r o j e c t
F i l e s D
C
D e p o t
D
W G
S
M d w g
Y
O U
T
A
U G
F
S
V
E D
C A
D V
E R
S
L
C
H
G
E S
E T
U P
O
T S
T Y
L E
T A
B L
E
A
C S
C
O L
O R
A
N A
L Y
T I C
A L
C
O
T T
E D
O
L I V
A
B
R I A
N
20'
40'0
GRAPHIC SCALE
DRY CLEANING DEPOT
3470 W. BROWARD BLVD.
FT. LAUDERDALE, BROWARD COUNTY, FLORIDA
ANNUAL GROUNDWATER MONITORING PROPOSAL
MW-1
LEGEND
MW005
MW007D
MW003I
MAG01
SVE001
EXISTING MONITOR WELL LOCATION
SHALLOW MONITOR WELL
INTERMEDIATE MONITOR WELL
DEEP MONITOR WELL
MAGS WELL LOCATION (5/2016) SOIL
VAPOR EXTRACTION WELL
UNDERGROUND ELECTRIC OVERHEAD
ELECTRIC
SANITARY SEWER
UNDERGROUND POTABLE WATER
UNDERGROUND NATURAL GAS
UNDERGROUND COMMUNICATION
UNDERGROUND UNKNOWN
REMEDIATION SYSTEM TRENCH ROUTE
REMEDIATION SYSTEM PIPE ROUTE
(ABOVE GRADE)
Proposed monitor wells highlighted in yellow bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight
6/9/2021 Clark Environmental Inc.: Quote Builder file:///C:/Users/channa/AppData/Local/Microsoft/Windows/INetCache/Content.Outlook/55TP28C8/Arcadis 1530 1st.html 1/2
Quote Number: 18737
QUOTE
QUOTED TO: Chad Hanna QUOTE DATE: 6/9/2021 COMPANY NAME: Arcadis QUOTED BY: Steve Harris PHONE NUMBER: 813-480-8498 Ext.
FAX NUMBER: email only PROJECT REFERENCE: Transportation and Disposal of Non Haz. Water Drum.
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: 1530 1st Street Sarasota FL
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE
FOLLOWING COST ESTIMATE FOR THE SITE/ PROJECT LISTED
ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ. "WATER" DRUM DISPOSAL W/CUSTOMER SUPPLIED
ACCEPTABLE NON HAZ. ANALYTICAL AND PROFILE STATING SAME.
$60.00 1 55 GAL $60.00
DRUM TRANSPORTTATION <100 MILES FROM CLARK ENVIRONMENTAL
INC. DRUM LOCATED ON HARD BLACK TOP OR CONCRETE SURFACE
EASILY ACCESSIBLE WITH 53 FOOT TRACTOR TRAILER WITH
LIFTGATE NO CURBS, GRASS OR DIRT TO CROSS.
$40.00 1 55 GAL $40.00
DRUM LOW VOLUME STOP CHARGE FOR 5 DRUMS OR LESS. $50.00 1 FLAT RATE $50.00
TOTAL REQUIRED ITEMS $150.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $150.00
NOTES: Quote is based on acceptable customer supplied non haz. analyticals and matching profile. TCLP Metals and Volatiles Analitical Testing will be required .Quote based on DOT shippable drums from this location easily accessable with 53 foot tractor trailer with no grass, curbs or sand to cross.If Required, I will need a signed accepted quote with purchase order and non haz. profile. Please call with any questions. Thanks. Steve Harris 863-559-
This quote will remain valid for thirty (30) days from the date listed above except for transportation which is subject to weekly change and is based on upon payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Groundwater Monitoring |
| Subtask 3: Groundwater Monitoring Report |
| Dry Clean Depot Annual gw monitoring Proposal_2021-12-17.pdf |
| scope of work |
| Task 1: Project Management |
| Task 2: Annual Groundwater Monitoring Event |
| Task 3: Reporting |
| Schedule |
| Cost Estimate |
| Closing Remarks |