This document is a Task Assignment Notification Form (WCP TAFORM 01_18) issued by the Florida Department of Environmental Protection (FDEP) to Arcadis U.S., Inc. for environmental remediation services at the Dry Cleaning Depot facility located at 3470 W Broward Boulevard in Fort Lauderdale, Broward County, Florida. The contract is identified as HW557, with Task Assignment DC041K, Module D000, and Grant N/A. Key personnel include DEP Contract Manager Theresa C. Pepe, Contractor Representative Gus Suarez, and Contractual Authority William E. Burns, Jr. The site, identified by DEP Site # ERIC_4160 and FACID NO. 06-9502029, is in the Monitoring phase of environmental cleanup.

The task assignment authorizes Arcadis to conduct a comprehensive groundwater monitoring event and submit a final deliverable, which consists of a Groundwater Monitoring Report and IDW (Investigative-Derived Waste) manifest. Work will be performed according to Arcadis's December 17, 2021 Work Plan and includes sampling twenty-three on and off-site monitor wells for drycleaning solvents, measuring water levels to determine groundwater flow, and proper disposal of investigative-derived waste. The total task assignment value is $13,091.45, structured as a Fixed Price contract with no retainage. The contract provides two invoicing milestones: $7,648.27 upon FDEP approval of Fieldwork Activities (due January 31, 2022) and $5,443.18 upon FDEP approval of the Groundwater Monitoring Report and IDW manifest (due April 15, 2022). The task assignment period runs through May 31, 2022. Cost estimates detail labor, overhead, general and administrative costs, travel, laboratory analysis through Jupiter Labs, and subcontractor services including Clark Environmental for investigative-derived waste disposal at $150.00.

View the file

Other files

File Type Posted
CN-370000-HW557-0A002CO2.pdf PDF
CN-370000-HW557-A4.pdf PDF
CN-370000-HW557-A6.pdf PDF
CN-370000-HW557-CO2.pdf PDF
CN-370000-HW557-D14B.pdf PDF
CN-370000-HW557-DC008I.pdf PDF
CN-370000-HW557-DC008O.pdf PDF
CN-370000-HW557-DC008P.pdf PDF
CN-370000-HW557-DC009M.pdf PDF
CN-370000-HW557-DC010F.pdf PDF
CN-370000-HW557-DC011I.pdf PDF
CN-370000-HW557-DC013S.pdf PDF
CN-370000-HW557-DC013T.pdf PDF
CN-370000-HW557-DC013X.pdf PDF
CN-370000-HW557-DC014J.pdf PDF
CN-370000-HW557-DC016J.pdf PDF
CN-370000-HW557-DC019I.pdf PDF
CN-370000-HW557-DC019K.pdf PDF
CN-370000-HW557-DC01ACO4.pdf PDF
CN-370000-HW557-DC022I.pdf PDF
CN-370000-HW557-DC022L.pdf PDF
CN-370000-HW557-DC02F.pdf PDF
CN-370000-HW557-DC02H.pdf PDF
CN-370000-HW557-DC02I.pdf PDF
CN-370000-HW557-DC02JCO3.pdf PDF
CN-370000-HW557-DC02NCO3.pdf PDF
CN-370000-HW557-DC030N.pdf PDF
CN-370000-HW557-DC030O.pdf PDF
CN-370000-HW557-DC031C.pdf PDF
CN-370000-HW557-DC035G.pdf PDF
CN-370000-HW557-DC036H.pdf PDF
CN-370000-HW557-DC037C.pdf PDF
CN-370000-HW557-DC037D.pdf PDF
CN-370000-HW557-DC038D.pdf PDF
CN-370000-HW557-DC03H.pdf PDF
CN-370000-HW557-DC03L.pdf PDF
CN-370000-HW557-DC042C.pdf PDF
CN-370000-HW557-DC043D.pdf PDF
CN-370000-HW557-DC044B.pdf PDF
CN-370000-HW557-DC047B.pdf PDF
CN-370000-HW557-DC06B.pdf PDF
CN-370000-HW557-DC07C.pdf PDF
CN-370000-HW557-DC07DCO1.pdf PDF
CN-370000-HW557-DC07E.pdf PDF
CN-370000-HW557-DC07I.pdf PDF
CN-370000-HW557-DC07L.pdf PDF
CN-370000-HW557-DC08ECO2.pdf PDF
CN-370000-HW557-DC08ICO1.pdf PDF
CN-370000-HW557-DC08J.pdf PDF
CN-370000-HW557-DC09A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW557

D000 N/ADC041K

Arcadis U.S., Inc.

Gus Suarez

(850) 245-8705Theresa C. Pepe

ERIC_4160

Dry Cleaning Depot

3470 W Broward Blvd, Fort Lauderdale, Broward County

Monitoring

Arcadis will conduct a groundwater monitoring event from select wells at the site.

All activities will be performed according to the December 17, 2021, Work Plan submitted by Arcadis.

Groundwater Monitoring Report/IDW manifest

04/15/2022

05/31/2022

$ 13,091.45 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Theresa C. Pepe Digitally signed by Theresa C. Pepe Date: 2021.12.20 15:20:10 -05'00'

Theresa C. Pepe Digitally signed by Theresa C. Pepe Date: 2021.12.20 15:20:22 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.12.21 11:19:33 -05'00'

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2021.12.21 11:36:42 -05'00'

$ 13,091.45

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number: HW557 Task Assignment #: DC041K

Deliverables:

Deliverable Deliverable Due Date Fieldwork Activities 31-Jan-22 Groundwater Monitoring Report/IDW manifest/Project Management 15-Apr-22

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

FDEP approval of Fieldwork Activities $7,648.27

FDEP approval of Groundwater Monitoring Report/IDW manifest/Project Management $5,443.18

TOTAL COST $13,091.45

BWC TAFORM 01/18

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File Dry Cleaning Depot

FACID NO. 06-9502029; ERIC_4160

Fort Lauderdale, Broward County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment DC041K (HW557) DATE: December 20, 2021

Arcadis U.S., Inc. will perform a comprehensive groundwater sampling event with the goal of determining if additional well installations are needed. This work will be conducted in accordance with the December 17, 2021, Work Plan submitted by Doug McGlone of Arcadis.

The final task assignment total is $13,091.45. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.

Subtask 2: Groundwater Monitoring Arcadis will sample twenty-three on and off-site wells for drycleaning solvents. Water levels will be sampled across the site to determine groundwater flow. IDW will be drummed and disposed by a licensed waste hauler per FDEP’s preference.

Subtask 3: Groundwater Monitoring Report Arcadis will submit a groundwater monitoring report as the final deliverable. This subtask provides costs for tabulating data, drafting updated figures and considering remedial strategy based on the groundwater sampling results.

Hours and costs are comparable to past task assignments of similar work.

FDEP COST ESTIMATE

Contractor: Arcadis U.S., Inc.

Date: 12/17/2021

Task #: SubTask 1 Project Management

Site: Dry Clean Depot SubTask 2 Annual Groundwater Monitoring

Activity/Phase: Monitoring SubTask 3 Reporting

Project Manager: Gus Suarez SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category Staff Member

$79.12 Project Manager Suarez, Gus (GS) 4 4.4

$96.76 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0

$81.24 Principal Engineer Burtnett, Susan (SB) 0 0 0 0 0

$79.12 Principal Engineer Suarez, Gus (GS) 1 0 1 0 0$75.11 Principal Scientist McManus, Andrew (ATM) 0 0 0 0 0

$61.69 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0

$61.38 Principal Scientist McGlone, Douglas (DMc) 21 3 18 0 0

$28.94 Scientist McBath, Brandon (BMc) 36 36 0 0 0

$39.67 Drafter/Designer Oliva, Brian (BO) 5 0 5 0 0$30.99 Drafter/Designer Richards, Jim (JR) 0 0 0 0 0

$30.96 Project Assistant McLemore, Michele (MMc) 5 1 4 0 0

Total Hours 72 4 40 28 0 0

Direct Labor $3,108.48 $345.39 $1,256.94 $1,506.15 $0.00 $0.00

Overhead 57.95% $2,470.21 $274.47 $998.85 $1,196.89 $0.00 $0.00

Gen & Admin 21.29% $1,433.43 $159.27 $579.62 $694.54 $0.00 $0.00

Fringe 37.13% $1,154.17 $128.24 $466.70 $559.23 $0.00 $0.00

Total Labor $8,166.29 $907.37 $3,302.11 $3,956.81 $0.00 $0.00

Other Direct Costs $155.43 $17.27 $62.85 $75.31 $0.00 $0.00

Travel

Vehicle Rental $291.00 $291.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $291.00 $291.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

Clark Env IDW $150.00 $150.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

Geo-Tek Utility Locate / GPR Survey $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $150.00 $150.00 $0.00 $0.00 $0.00

Handling Fee $15.00 $15.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $165.00 $165.00 $0.00 $0.00 $0.00

Laboratory

Jupiter Labs Analytical Costs $1,584.00 $1,584.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $208.00 $208.00 $0.00 $0.00 $0.00

Total Laboratory $1,792.00 $1,792.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $97.50 $97.50 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $1,607.60 $1,607.60 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other - MAGS, recon) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $1,705.10 $1,705.10 $0.00 $0.00 $0.00

Subtotal $12,274.82 $924.64 $7,318.06 $4,032.12 $0.00 $0.00

Completion Fee $816.63 $90.74 $330.21 $395.68 $0.00 $0.00

Total Estimated Cost $13,091.45 $1,015.38 $7,648.27 $4,427.80 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE: Dry Clean Depot

SUBTASK 2: Annual Groundwater Monitoring

DATE: 12/17/21

LABOR

Category/Staff Work Description Hours

Groundwater Sampling Principal / GS 0

Senior / DMc Owner/operator communication/notification (1hr), field sched/support (2 hrs) 3

Scientist / BMc Prep, mob/demob (2 hrs x 3), sample 23 wells, drum purge water, and WL measurements in all site wells (30 hrs) 36

Project Assistant / MMc Field notes processing, sample tracking 1

TOTAL LABOR: 40

TRAVEL

Vehicle Type Rate Unit Usage Totals

Automobile $68.00 Per Day 0 $0.00

Van/Truck $97.00 Per Day 3 $291.00

Van/Truck $420.00 Per Week 0 $0.00

Total Vehicle: $291.00

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$90.00 Per Day 0 $0.00

$90.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL TRAVEL: $291.00

SUBCONTRACTOR COSTS

Equipment Procurement Name Equipment Rate Units Usage Totals

0 $0.00

Total Equip.: $0.00

Services Procurement Name Purpose Rate Units Usage Totals

NAME OF COMPANY IDW $150.00 Drum 1 $150.00

Handling Fee $20.00 Per Month 0 $0.00

Total Services: $150.00

TOTAL SUB: $150.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

VOC 8260 Soil/Sediment $135.00 1.00 0 $0.00

VOC (halocarbons only) 8260 Aqueous $66.00 1.00 24 $1,584.00

TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $1,584.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 2 $208.00

Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 0 $0.00

Total Shipping: $208.00

TOTAL LAB: $1,792.00

FIELD EXPENSES

Personal Protection Item Rate Unit Usage Totals

Total PPE: $0.00

Equipment Item Rate Unit Usage Totals

Expendables Miscellaneous Expendables $32.50 Per Day 3 $97.50

Total Expendables: $97.50

Equipment ItemsPID/FID Combo or FID $106.70 Per Day 0 $0.00

Tubing, Poly/HDPE $0.25 Per Foot 2000 $500.00 Tubing, Silicon 3/16x3/8 $2.00 Per Foot 30 $60.00

Total Equipment Items: $560.00

Equipment KitsSite Reconnaissance Kit $81.48 Day 0 $0.00

Deep Groundwater Sampling Kit $349.20 Day 3 $1,047.60

Total Equipment Kits: $1,047.60

TOTAL EQUIPMENT: $1,607.60

SITE: Dry Clean Depot

SUBTASK 3: Reporting

DATE: 12/17/21

LABOR

Category/Staff Work Description Hours

Annual Report Principal / GS PG review/certification of report, report recommendations 1

Senior / DMc Reprt / table / figures markups, data analysis, report text, conclusions 18

Project Assistant / MMc Data entry, report assembly, formating, upload ADaPT deliverables 4

Designer / BO Develop figures for report - COC contours, x-sections, site wide gw data 5

TOTAL LABOR: 28

TRAVEL

Vehicle Type Rate Unit Usage Totals

Automobile $68.00 Per Day 0 $0.00

Van/Truck $97.00 Per Day 0 $0.00

Van/Truck $420.00 Per Week 0 $0.00

Total Vehicle: $0.00

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00

$36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$90.00 Per Day 0 $0.00

$90.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL TRAVEL: $0.00

SUBCONTRACTOR COSTS

Equipment Procurement Name Equipment Rate Units Usage Totals

0 $0.00

Total Equip.: $0.00

Services Procurement Name Purpose Rate Units Usage Totals

NAME OF COMPANY Direct-push services $0.00 Unit pricing 0 $0.00

Total Services: $0.00

TOTAL SUB: $0.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples TotalsVOC (Halocarbons Only) 8260C Aqueous/Non $66.00 1.00 0 $0.00

TAT 24-hr=100% (2.0) 3-day=50% (1.5) 1-week=15% (1.15) Total Lab: $0.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $104.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $63.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB: $0.00

FIELD EXPENSES

Personal Protection Item Rate Unit Usage TotalsPPE Level D $28.00 Per Man Day 0 $0.00PPE Level C $110.00 Per Man Day 0 $0.00

Total PPE: $0.00

Equipment Item Rate Unit Usage Totals

Expendables Miscellaneous Expendables $32.50 Per Day 0 $0.00

Total Expendables: $0.00

Equipment ItemsPID/FID Combo or FID $106.70 Per Day 0 $0.00

Total Equipment Items: $0.00

Equipment KitsSite Reconnaissance Kit $81.48 Day 0 $0.00

Total Equipment Kits: $0.00

TOTAL EQUIPMENT: $0.00

Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.

Arcadis U.S., Inc.

1500 Gateway Boulevard

Suite 200

Boynton Beach

Florida 33426

Tel 561 697 7000

Fax 561 369 4731 www.arcadis.com

Page:

1/2

Ms. Theresa Pepe, Contract Manager Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400

Subject:

Proposal for Annual Groundwater Monitoring, and Reporting Dry Clean Depot 3470 W. Broward Boulevard, Fort Lauderdale, Florida Facility ID No.: ERIC_4160 Contract No.: HW557

Dear Ms. Pepe:

As requested on December 13, 2021 email, enclosed is a proposal/cost estimate for annual groundwater monitoring for the subject facility. This proposal includes a description of the proposed scope of services, estimated cost and schedule for services completion.

SCOPE OF WORK

Task 1: Project Management

This task consists of project management-related activities in relation to the completion of Tasks 2 through 3.

Task 2: Annual Groundwater Monitoring Event

To evaluate the current state of the solvent plume and its migration, groundwater samples will be collected from twenty-three (23) monitor wells in January 2022:

MW-1, MW003I, MW004I, MW005, MW008D, MW009I, MW010D, MW011I,

MW012D, MW013I, MW014I, MW014D, MW015I, MW015D, MW016D, MW017I,

MW017D, MW018D, MW019I, MW019D, MW020D, MW021D, and MW022D.

One duplicate sample will be collected from MW014D for quality assurances purposes. Groundwater field quality parameters will be collected during well purging; purge water will be stored in a 55-gallon drum for removal by Clark

ENVIRONMENT

Date:

December 17, 2021

Contact:

Doug McGlone

Phone:

561.662.7978

Email:

Douglas.mcglone@arcadis.com

Our ref:

This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.

arcadis.com C:\Users\Pepe_T\Desktop\Dry Clean Depot Annual gw monitoring Proposal_2021-12-17.docx

Proposal for Annual Groundwater Monitoring and Reporting 17 December 2021

Page:

2/2

Environmental. Groundwater samples will be submitted to a NELAC-accredited laboratory for analysis by EPA Method 8260.

Task 3: Reporting

Arcadis will summarize results of field activities and laboratory analytical data in data tables and depict results on figures to be included in an Annual Groundwater Monitoring Report for submittal to FDEP.

SCHEDULE

Arcadis will complete the field activities in January 2022 after receipt of a Task Assignment (TA). A Groundwater Monitoring Report will be submitted approximately 60 days following receipt of laboratory analytical data.

COST ESTIMATE

Level of Effort (LOE) Forms and a Cost Estimate Form (CEF) that present estimated project costs are presented as Attachment A.

CLOSING REMARKS

Arcadis appreciates the opportunity to assist the FDEP in addressing remaining drycleaner contamination at this site. If you have any questions or wish to discuss this proposal, please contact us.

Sincerely, Arcadis U.S., Inc.

Douglas J. McGlone, P.G.

Senior Geologist

Enclosures:

Attachments

1 CEF-LOE

2 Figure of proposed wells

FORMER

DRYCLEAN MACHINE

(Pre 1996)

FORMER

FLOOR DRAINS

FORMER

DRYCLEAN MACHINES

(1996-2008)

FORMER

SPOTTING BOARD

(1996-2008)

FORMER

PRESSES

FORMER

WET WASH

AREA

CLOTHS

RACKS

FORMER

BOILER

ROOM

FORMER

COVERED SHED

(boiler room)

FORMER

ON-SITE

DUMPSTER

SANITARY SEWER

LIFT STATION

CONCRETE

PAD

ELECT.

PANEL

UP

MH

W. BROWARD BOULEVARD

BUILDING

DRYCLEAN

DEPOT

MW-1

MW-2

RESTROOM

ACTIVE

FLOOR DRAIN

HISTORICAL

DOCUMENTED

RELEASE

LP

WM

WM

WM

FH

FH

FORMER

GAS METER

LOCATION

TABLE

MW011I

MW010D

MW005

MW004I

MW012D

MW009I

MW008D

MW006IMW007D

MAG07

MAG03

MAG04

MAG06

MAG05

MAG01

MAG02

MW013I

MW014D

SVE001

UNK

UNK

LP

UP

DRIVE

THROUGH

CANOPY

WM

MH

MH

MH

MW016I

MW018I

MW015D

MW018D

MW014I

MW016D

MW019D

MW019I

MW017D

MW020D

MW021D

ABOVE GRADE ELECTRICAL

CONDUIT MOUNTED ON THE

FACILITY EXTERIOR WALL

WEATHERHEAD /

METER BASE

8.6'

16.0'

REMEDIATION SYSTEM

COMPOUND (7' x 12') AND

EQUIPMENT SKID WITH

±8' SETBACK FROM

PROPERTY BOUNDARY

SVE002

SVE003

MW017I

MW003I

MW022D

MW015I

FIGURE

SITE LAYOUT

PROPOSED WELLS TO BE SAMPLED

C I T

Y

B

B

F

L

D

I V

G

R O

U P

E

N

B

B

O

L I V

A

O p t

P

C

W

V

O G

E L

S O

G

M

D

M

C G

L O

T

T

H

A Y

S

R

O p t O

N

O

F F

R

E F

C U s e r s b o l i v a

B

A r c a d i s A

F

L O

R I D

A

D

E P

T

O

F

E

N V

I R

O N

M E

N T

R O

T E

C T

I O

N P r o j e c t

F i l e s D

C

D e p o t

D

W G

S

M d w g

Y

O U

T

A

U G

F

S

V

E D

C A

D V

E R

S

L

C

H

G

E S

E T

U P

O

T S

T Y

L E

T A

B L

E

A

C S

C

O L

O R

A

N A

L Y

T I C

A L

C

O

T T

E D

O

L I V

A

B

R I A

N

20'

40'0

GRAPHIC SCALE

DRY CLEANING DEPOT

3470 W. BROWARD BLVD.

FT. LAUDERDALE, BROWARD COUNTY, FLORIDA

ANNUAL GROUNDWATER MONITORING PROPOSAL

MW-1

LEGEND

MW005

MW007D

MW003I

MAG01

SVE001

EXISTING MONITOR WELL LOCATION

SHALLOW MONITOR WELL

INTERMEDIATE MONITOR WELL

DEEP MONITOR WELL

MAGS WELL LOCATION (5/2016) SOIL

VAPOR EXTRACTION WELL

UNDERGROUND ELECTRIC OVERHEAD

ELECTRIC

SANITARY SEWER

UNDERGROUND POTABLE WATER

UNDERGROUND NATURAL GAS

UNDERGROUND COMMUNICATION

UNDERGROUND UNKNOWN

REMEDIATION SYSTEM TRENCH ROUTE

REMEDIATION SYSTEM PIPE ROUTE

(ABOVE GRADE)

Proposed monitor wells highlighted in yellow bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight bmcbath Highlight

6/9/2021 Clark Environmental Inc.: Quote Builder file:///C:/Users/channa/AppData/Local/Microsoft/Windows/INetCache/Content.Outlook/55TP28C8/Arcadis 1530 1st.html 1/2

Quote Number: 18737

QUOTE

QUOTED TO: Chad Hanna QUOTE DATE: 6/9/2021 COMPANY NAME: Arcadis QUOTED BY: Steve Harris PHONE NUMBER: 813-480-8498 Ext.

FAX NUMBER: email only PROJECT REFERENCE: Transportation and Disposal of Non Haz. Water Drum.

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: 1530 1st Street Sarasota FL

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE

FOLLOWING COST ESTIMATE FOR THE SITE/ PROJECT LISTED

ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ. "WATER" DRUM DISPOSAL W/CUSTOMER SUPPLIED

ACCEPTABLE NON HAZ. ANALYTICAL AND PROFILE STATING SAME.

$60.00 1 55 GAL $60.00

DRUM TRANSPORTTATION <100 MILES FROM CLARK ENVIRONMENTAL

INC. DRUM LOCATED ON HARD BLACK TOP OR CONCRETE SURFACE

EASILY ACCESSIBLE WITH 53 FOOT TRACTOR TRAILER WITH

LIFTGATE NO CURBS, GRASS OR DIRT TO CROSS.

$40.00 1 55 GAL $40.00

DRUM LOW VOLUME STOP CHARGE FOR 5 DRUMS OR LESS. $50.00 1 FLAT RATE $50.00

TOTAL REQUIRED ITEMS $150.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $150.00

NOTES: Quote is based on acceptable customer supplied non haz. analyticals and matching profile. TCLP Metals and Volatiles Analitical Testing will be required .Quote based on DOT shippable drums from this location easily accessable with 53 foot tractor trailer with no grass, curbs or sand to cross.If Required, I will need a signed accepted quote with purchase order and non haz. profile. Please call with any questions. Thanks. Steve Harris 863-559-

This quote will remain valid for thirty (30) days from the date listed above except for transportation which is subject to weekly change and is based on upon payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
negsum.pdf
Subtask 1: Project Management
Subtask 2: Groundwater Monitoring
Subtask 3: Groundwater Monitoring Report
Dry Clean Depot Annual gw monitoring Proposal_2021-12-17.pdf
scope of work
Task 1: Project Management
Task 2: Annual Groundwater Monitoring Event
Task 3: Reporting
Schedule
Cost Estimate