This document is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract No. HW554, issued to APTIM Environmental & Infrastructure, Inc. for work at the Blue Ribbon Cleaners site (FDEP Site No. ERIC_5462) located at 160 S. Highway 17-92, Longwood, Seminole County, Florida. The task assignment was executed on April 6, 2020, with John Sykes III serving as the DEP Contract Manager and Eric Kramer, PE as the Contractor Representative. The contract operates under the indefinite delivery vehicle structure established between FDEP and APTIM.
Task Assignment DC011i requires APTIM to sample two monitoring wells (MW006 and MW009) and submit an Annual Groundwater Monitoring Report with DEP Electronic Data Deliverables (EDDs) and properly dispose of investigative-derived waste (IDW) generated during the sampling activities. The scope includes groundwater sampling scheduled for June 2020, laboratory analysis using EPA Method 8260 for volatile organic halocarbons, and a final report due by August 14, 2020. The total task assignment value is $6,433.00 on a fixed-price basis with no retainage. Labor costs comprise $5,122.51, subcontractor services for IDW disposal total $110.00 (with Erwin Remediation selected as the low-cost provider at $100.00 per drum), laboratory analytical costs are $198.00, and field expenses including equipment and expendables total $299.25. The period of performance extends through October 30, 2020. Invoice payment of the full $6,433.00 is contingent upon FDEP approval of the Annual Groundwater Monitoring Report and final IDW manifest.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW554
D000 NADC011i
APTIM
Eric Kramer, PE
245-8960John Sykes III
ERIC_5462
Blue Ribbon Cleaners
160 S. Hwy 17-92, Longwood, Seminole County
MON
APTIM will sample 2 monitoring wells and submit an Annual Groundwater Monitoring Report w/DEP EDDs and properly dispose of the IDW generated, per the APTIM 4/2/2020, scope, schedule, level of effort and cost estimate.
Annual Groundwater Monitoring Report w/DEP EDDs & final IDW manifest
08/14/2020
10/30/2020
$ 6,433.00 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Digitally signed by John Sykes III Date: 2020.04.06 09:52:34 -04'00'
Digitally signed by John Sykes III Date: 2020.04.06 09:52:48 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.04.06 11:18:53 -04'00'
Digitally signed by Kramer, Eric K Date: 2020.04.06 12:38:28 -04'00'
$ 6,433.00
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Groundwater Monitoring Report w/DEP EDDs & final IDW manifest - ST 2 08/14/2020
DEP Approval of Annual Groundwater Monitoring Report w/DEP EDDs & final IDW manifest - ST 1 & 2 $ 6,433.00
$ 6,433.00
HW554
DC011i
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: Blue Ribbon Cleaners DSCP Site File FROM: John Sykes III, Project Manager SUBJECT: Negotiation Summary, HW554, TA DC011i DATE: April 6, 2020
APTIM will sample 2 monitoring wells and submit an Annual Groundwater Monitoring Report w/DEP EDDs and properly dispose of the IDW generated, per the April 2, 2020, scope, schedule, level of effort (LOE) and cost estimate (CE).
Subtask 2 & Summary:
Erwin Remediation was selected as the low-cost provider of IDW transportation and disposal services out of four bids requested and two received.
Final LOE and CE for this TA are 39 hours and $6433.00, respectively. This LOE and CE are reasonable for the associated scope.
FDEP COST ESTIMATE
Contractor: Aptim Environmental & Infrastructure, Inc
Date: 4/2/2020
Task #: HW554-DC011I SubTask 1 Project Management
Site: Blue Ribbon Cleaners SubTask 2 2-Annual Sampling
Activity/Phase: Sampling SubTask 3
Project Manager: Eric Kramer SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$61.78 Client Program Manager E. Kramer 3 3.4 $68.68 Engineer/Scientist 5 G. Dever 0 0 0 0 0 $61.78 Engineer/Scientist 5 E. Kramer 2 2 0 0 0 $63.58 Engineer/Scientist 5 D. Rodgers 0 0 0 0 0 $59.42 Engineer/Scientist 5 G. Roberts 17 17 0 0 0 $41.62 Engineer/Scientist 3 A. Blackford 0 0 0 0 0 $37.54 Engineer/Scientist 3 B. Dempsey 0 0 0 0 0 $36.33 Engineer/Scientist 3 J. Jordan 0 0 0 0 0 $32.77 Engineer/Scientist 2 K. Howard 13 13 0 0 0 $29.24 Engineer/Scientist 2 J. Hall 0 0 0 0 0 $22.57 Engineer/Scientist 2 G. Roney 0 0 0 0 0 $26.95 Engineer/Scientist 1 C. Parker 0 0 0 0 0 $21.80 Engineer/Scientist 1 J. Harris 0 0 0 0 0 $25.29 Engineer/Scientist 1 K. McDonald 0 0 0 0 0 $34.45 Engineering Technician 4 A. Escobar 0 0 0 0 0 $25.03 Engineering Technician 2 J. Bell 0 0 0 0 0 $23.75 Engineering Technician 2 C. Ramey 0 0 0 0 0 $26.27 Engineering Technician 2 B. Skipper 0 0 0 0 0 $19.41 Engineering Technician 1 D. Mconnaugh 0 0 0 0 0 $31.07 Designer 2 S. Ferianc 2 2 0 0 0 $38.88 Geospatial Analyst 3 H. Vollmer 0 0 0 0 0 $24.55 Tech Publications Specialis H. Vining 2 2 0 0 0
$0.00 0 0 0 0 0 $0.00 0 0 0 0 0 $0.00 0 0 0 0 0
0 0 0 0 0
Total Hours 39 3 36 0 0 0
Direct Labor $1,879.82 $208.87 $1,670.95 $0.00 $0.00 $0.00
Fringe 119.00% $2,236.99 $248.56 $1,988.43 $0.00 $0.00 $0.00 Overhead 20.90% $392.88 $43.65 $349.23 $0.00 $0.00 $0.00 Gen & Admin 32.60% $612.82 $68.09 $544.73 $0.00 $0.00 $0.00
Total Labor $5,122.51 $569.17 $4,553.34 $0.00 $0.00 $0.00
Other Direct Costs $93.99 $10.44 $83.55 $0.00 $0.00 $0.00
Travel Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 (Equipment Procurement)
Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 (Services Procurement)
Subcontractor Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $198.00 $198.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $198.00 $198.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $32.50 $32.50 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $266.75 $266.75 $0.00 $0.00 $0.00 Total Field Expenses $299.25 $299.25 $0.00 $0.00 $0.00
$5,920.75 $579.61 $5,341.14 $0.00 $0.00 $0.00 Subtotal $512.25 $56.92 $455.33 $0.00 $0.00 $0.00 Completion Fee
Total Estimated Cost $6,433.00 $636.53 $5,796.47 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 2 DC011I est.xlsx
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Blue Ribbon Cleaners
SUBTASK:
DATE: April 02, 2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 G. Dever Engineer/Scientist 5 E. Kramer 2 Engineer/Scientist 5 D. Rodgers
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 3 A. Blackford Engineer/Scientist 3 B. Dempsey Engineer/Scientist 3 J. Jordan
Engineer/Scientist 2 K. Howard
Engineer/Scientist 2 J. Hall Engineer/Scientist 2 G. Roney Engineer/Scientist 1 C. Parker Engineer/Scientist 1 J. Harris Engineer/Scientist 1 K. McDonald Engineering Technician 4 A. Escobar Engineering Technician 2 J. Bell Engineering Technician 2 C. Ramey Engineering Technician 2 B. Skipper Engineering Technician 1 D. Mconnaughey Designer 2 S. Ferianc Groundwater Sample Reporting (Drafting) 2 Geospatial Analyst 3 H. Vollmer Tech Publications Specialist 3 H. Vining Groundwater Sample Report (Document Production) 2
TOTAL LABOR 36
EQUIPMENT ITEM RATE UNIT USAGE
Expendables $32.50 Day 1 $32.50 Shallow GW Sampling Kit $208.55 day 1 $208.55 Deep Groundwater Sampling Kit $349.20 Day 0 $0.00 Water Level Indicator $19.40 Day 0 $0.00 Bladder Pump $106.70 Day 0 $0.00 Portable Compressor $48.50 Day 0 $0.00 Portable Generator $66.00 Day 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 1 $58.20
TOTAL EQUIPMENT: $299.25
VEHICLE TYPE RATE UNIT USAGE
Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 1 $97.00
TOTAL VEHICLE: $97.00
PER DIEM STAFF RATE UNIT USAGE
Hotel $110.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00
TOTAL PER DIEM: $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Halos Only) $66.00 2 1 $198.00 EPA Method 8260 (Halos Only) IDW $66.00 0 0 $0.00 EPA Method 6020 (As, Cd, Cr and Pb) IDW $50.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00
TOTAL LAB: $198.00
SUBCONTRACTOR COSTS
NAME PURPOSE Rate UNIT USAGE TOTALS
Erwin Remediation Drum Pickup and Disposal $100.00 Lump 1 $100.00
TOTAL SUB: $100.00
2-Annual Sampling
Technical Report Review and Recommenedations including Remedial Options
Preparation of GW Flow Maps and GW Analytical Results Maps (2 hrs). Update of GW Elevation, Analytical Summary Tables (2 hrs), Letter Report Text and Preparation of Recommendations and conclusions (9 hrs). Preparation of IDW manifest and profile (1 hr), CD/Database Tables Update and Upload, ADaPT Laboratory Data Check (2 hrs), preparation of Deliverables document for
Proposed Sampling Monitoring Well MW006 and MW009.
Travel Preparation and Mobilization (1 hr), Round trip travel (2 hrs). Collect Depth to Groundwater Measurements from all wells (2 hrs). Preparation and Testing/Calibration of GW Sampling Field Equipment, Groundwater sampling from MW006 and MW009 (5 hrs), Purge Water Handling and Site Restoration and Cleanup (1 hr), Prepare chain of custody preparation, sample packaging (1 hr), Sample Delivery (1 hr).
2-AnnualGW Page 2 of 2 DC011I est.xlsx
Item Description Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total
Amount Transporation Disposal (soil) None None Disposal (liquid) 3 $90.00 $270.00 3 $100.00 $300.00 Additional Drum Costs Additional Costs/Fees 1 $50.00 $50.00
Total No Bid Response $320.00 No Bid Response $300.00
None
Included in Disposal
Erwin Remediation
Included in Disposal
IDW Pickup and Disposal Bid Summary Blue Ribbon Cleaners (former) 160 South U.S. Highway 17-92
Longwood, Florida 32750 FDEP Site No. ERIC_5462 (Former FAC ID #599500616)
None
US Ecology Clark Environmental Safety-Kleen
October 17, 2019
None
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Gregg Roberts, PG
Aptim
725 US Hwy 301 South
Tampa, FL 33619
October 17, 2019
Re: Drum Disposal – Blue Ribbon Cleaners (former) - Longwood, FL
Mr. Roberts:
The price for disposal of drums of non-hazardous groundwater located in Longwood, FL will be
$100.00 per drum. This price is a flat-rate that includes all profiling, manifesting, transportation and disposal costs.
Please feel free to contact me on my direct line at 850-292-6511 if you have any questions. We look forward to working with you in the future.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
Proposed Scope of Work Blue Ribbon Cleaners Annual Groundwater Sampling Task Assignment DC011I ERIC_5462 (Former FAC ID No. 599500616) APTIM Environmental & Infrastructure, Inc.
4/2/20
The former Blue Ribbon Cleaners facility is sampled on an annual basis. The following proposed scope of work for Task Assignment DC011I is collection and sampling of groundwater samples from two (2) monitoring wells. The groundwater sampling will be scheduled for June 2020.
The wells were selected in accordance with the recommendations from the most recent Well Redevelopment and Sampling Report dated January 17, 2020, prepared for the Blue Ribbon Cleaners and approved by the FDEP on March 25, 2020. The following wells are recommended for annual sampling: MW006 and MW009. Monitoring well MW002 was also recommended in the report but was eliminated from annual sampling by the FDEP based on the upgradient location and previous results being below target analytes over the past few years.
Prior to groundwater sample collection, depth to water measurements will be collected from all monitor wells. Groundwater samples from the monitoring wells will be collected in accordance with the DEP Standard Operating Procedures for Field Activities utilizing a peristaltic pump and a field-calibrated YSI multi-parameter instrument. The samples will be delivered to a NELAP Certified Laboratory for volatile organic halocarbons (VOHs) analysis by EPA Method 8260 (halocarbons only).
Purge water will be placed into a drum for storage onsite and future pickup and disposal.
Erwin Remediation has been selected to provide IDW transportation and disposal, based on bids procured in October 2019 for the previous Blue Ribbon Cleaners task. The analytical results from the monitoring wells will be used for characterization of the waste.
An Annual Groundwater Sampling Report will be provided summarizing the groundwater measurements and analytical results in tables, figures and text including conclusions and recommendations. APTIM recommends the following schedule:
Description Due Date
Collection of GW Samples 6/27/2020
Submit Letter Report 8/14/2020
Submit GIS/Data Base Update 8/14/2020
Task Expiration Date 10/30/2020
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, Inc.
and Florida Department of Environmental Protection No. HW554. APTIM will begin the proposed scope of work upon written authorization.
Please call should you have any questions.
| Cost Estimate |
| 2-AnnualGW |
File details come from the government source that posted it. Updated .