Task Assignment DC024C Summary
This is a Task Assignment Notification Form and supporting documentation for contract HW554 issued by the Florida Department of Environmental Protection (FDEP). The agreement is between FDEP and APTIM Environmental & Infrastructure, Inc., with Melissa A. Walsh serving as the FDEP Contract Manager and Eric Kramer, P.E., as the contractor representative. The work is located at the Former Oasis Cleaners facility at 3210 1st Street West, Bradenton, Florida (Manatee County), FAC# ERIC_4885, under the Remedial Phase designation for an Interim Source Removal (ISR) project.
The task assignment covers the installation of interior soil vapor extraction (SVE) infrastructure, including piping, wells, and related remedial system components within the building to avoid conflicts with tenant renovation. The work is divided into three subtasks: Project Management, Interior SVE Piping Installation, and Construction Completion Documentation. The fixed price contract is valued at $64,074.24 with no retainage. The final deliverable—a Construction Completion Report and As-builts—is due July 9, 2021, with the overall task completion date of October 11, 2021. The contract includes detailed cost estimates covering labor (402 total hours across multiple staff categories), travel, equipment rental, subcontractor services (concrete, dumpsters, pumping, utilities clearance), materials (concrete, PVC piping, well components, excavation supplies), and field expenses. No options or renewals are specified.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW554
D000 N/ADC024C
APTIM
Eric Kramer, P.E.
(850)-245-8960Melissa A Walsh
ERIC_4885
Oasis Cleaners, Inc.
3210 1ST ST W BRADENTON, Manatee
ISR
APTIM will install the interior piping and SVE wells for the construction of the interior part of the SVE system while the bay is vacant. Work will be done according to the attached scope of work dated June 10, 2021.
Construction Completion Report and As-builts
07/09/2021
10/11/2021
$ 64,074.24 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Melissa Walsh Digitally signed by Melissa Walsh Date: 2021.06.17 11:11:29 -04'00'
Melissa Walsh Digitally signed by Melissa Walsh Date: 2021.06.17 11:13:36 -04'00'
Digitally signed by Jennifer Farrell Date: 2021.06.18 09:53:12 -04'00'
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2021.06.23 16:18:20 -04'00'
$ 64,074.24
Walsh_M Highlight
Walsh_M Highlight
Walsh_M Highlight
Walsh_M Highlight
Walsh_M Highlight
Walsh_M Highlight
Walsh_M Highlight
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Construction Completion Report and As-builts 07/09/2021
Upon completion of construction and FDEP approval of the Construction Completion Report and as-builts $ 64,074.24
$ 64,074.24
HW554
DC024C
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: APTIM Contract File Contract No. HW554
FROM: Melissa A Walsh, Project Manager
SUBJECT: Oasis Cleaners, INC
FAC # ERIC_4885
Task Assignment #DC024C
ISR
DATE: June 15, 2021
Under this Task Assignment, APTIM will install the interior portion and components of the Soil Vapor Extraction (SVE) system. Work will be done according to the attached scope of work dated June 10, 2021.
Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate.
Subtask 2: Interior SVE Piping Installation APTIM and DEP agreed to the proposed scope of work and level of effort. This is task allows for Interior SVE Piping Installation.
Subtask 3: Construction Completion Documentation APTIM and DEP agreed to the proposed scope of work and level of effort. This is task allows for the submittal of construction completion report and as-builts.
This work will be conducted in line with the scope of work included in the APTIM proposal, received June 10, 2021.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the APTM proposal. The final deliverable due date is July 9, 2021 and the completion date for the Task Assignment is October 11, 2021.
The final cost total for Task Assignment DC024C is $64,074.24.
FDEP COST ESTIMATE
Contractor: APTIM Environmental & Infrastructure, Inc
Date: 6/10/2021
Task #: HW554-DC024C (ERIC_4885) SubTask 1 Project Management
Site: Former Oasis Cleaners SubTask 2 2-Interior SVE Piping Installation
Activity/Phase: ISR Installation Interior Only SubTask 3 3-Construction Completion Documentation
Project Manager: Eric Kramer SubTask 4
SubTask 5
Totals 1 2 3 4 5 6 Labor Rate Category
$63.32 Client Program Manager E. Kramer 23 22.6 $63.32 Engineer/Scientist 5 E. Kramer 22 20 2 0 0 0 $60.61 Engineer/Scientist 5 G. Roberts 3 3 0 0 0 0 $25.92 Engineer/Scientist 1 K. McDonald 90 84 6 0 0 0 $33.36 Engineer/Scientist 3 K. Howard 92 92 0 0 0 0 $27.18 Engineering Technician 2 B. Skipper 84 84 0 0 0 0 $24.47 Engineering Technician 2 C. Ramey 84 84 0 0 0 0 $31.69 Designer 2 S. Ferianc 3 0 3 0 0 0 $25.04 Tech Pub. Specialist 3 H. Vining 1 0 1 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 0 0
Total Hours 402 23 367 12 0 0 0
Direct Labor $12,864.94 $1,429.44 $11,033.23 $402.27 $0.00 $0.00 $0.00
Fringe 119.00% $15,309.27 $1,701.03 $13,129.54 $478.70 $0.00 $0.00 $0.00 Overhead 20.90% $2,688.77 $298.75 $2,305.95 $84.07 $0.00 $0.00 $0.00 Gen & Admin 32.60% $4,193.97 $466.00 $3,596.83 $131.14 $0.00 $0.00 $0.00
Total Labor $35,056.95 $3,895.22 $30,065.55 $1,096.18 $0.00 $0.00 $0.00
Other Direct Costs $643.24 $71.47 $551.66 $20.11 $0.00 $0.00 $0.00
Travel Vehicle Rental $1,422.00 $1,422.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $4,472.00 $4,472.00 $0.00 $0.00 $0.00 $0.00 Total Travel $5,894.00 $5,894.00 $0.00 $0.00 $0.00 $0.00 (Equipment Procurement)
Subcontractor Equipment (See LOE) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Materials (See LOE) $6,548.93 $6,548.93 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $6,548.93 $6,548.93 $0.00 $0.00 $0.00 $0.00 Procurement Fee $654.89 $654.89 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $7,203.82 $7,203.82 $0.00 $0.00 $0.00 $0.00 (Services Procurement)
Subcontractor Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 4 DC024C_ 2
FDEP COST ESTIMATE
Contractor: APTIM Environmental & Infrastructure, Inc
Date: 6/10/2021
Task #: HW554-DC024C (ERIC_4885) SubTask 1 Project Management
Site: Former Oasis Cleaners SubTask 2 2-Interior SVE Piping Installation
Activity/Phase: ISR Installation Interior Only SubTask 3 3-Construction Completion Documentation
Project Manager: Eric Kramer SubTask 4
SubTask 5
Totals 1 2 3 4 5 6 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractors (See LOE) $1,130.00 $1,130.00 $0.00 $0.00 $0.00 $0.00 Rental Equipment $4,837.75 $4,837.75 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $5,967.75 $5,967.75 $0.00 $0.00 $0.00 $0.00 Handling Fee $596.78 $596.78 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $6,564.53 $6,564.53 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $896.00 $896.00 $0.00 $0.00 $0.00 $0.00
Expendables $260.00 $260.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $4,050.00 $4,050.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $5,206.00 $5,206.00 $0.00 $0.00 $0.00 $0.00
$60,568.54 $3,966.69 $55,485.56 $1,116.29 $0.00 $0.00 $0.00 Subtotal $3,505.70 $389.52 $3,006.56 $109.62 $0.00 $0.00 $0.00 Completion Fee
Total Estimated Cost $64,074.24 $4,356.21 $58,492.12 $1,225.91 $0.00 $0.00 $0.00
Cost Estimate Page 2 of 4 DC024C_ 2
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE :
SUBTASK:
DATE: June 10, 2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts 3
Engineer/Scientist 3 K. McDonald
Engineer/Scientist 3 K. Howard
Engineering Technician 2 B. Skipper
Engineering Technician 2 C. Ramey
Designer 2 S. Ferianc Tech Publications Specialist 3 H. Vining
TOTAL LABOR: 367
EQUIPMENT ITEM RATE UNIT USAGE
Expendables $32.50 Day 8 $260.00 PPE (4 person crew), contract rate $28.00 Person day 32 $896.00 Construction/O&M Kit $1,200.00 Week 1 $1,200.00 Construction/O&M Kit $300.00 Day 3 $900.00 Construction/O&M Supplies $260.00 Week 1 $260.00 Construction/O&M Supplies $65.00 Day 3 $195.00 Portable Generator (15 KW), contract rate $464.00 Week 1 $464.00 Portable Generator (15 KW) contract rate $116.00 Day 3 $348.00 Concrete core drill, contract rate $408.00 Week 1 $408.00 Concrete core bit, contract rate $83.00 event 1 $83.00 Jack hammer, contract rate $192.00 Week 1 $192.00
Concrete (Davis Concrete) Materials Concrete $1,732.50 Lump 1 $1,732.50 Piping (Hole Products) Materials Piping & Fittings $3,653.50 Lump 1 $3,653.50 Well manholes(Hole Products) Materials SVE Well Manholes (16) $928.00 Lump 1 $928.00 Exhasust Piping (Carid) Materials Exhast Piping (75 ft) $234.93 Lump 1 $234.93
TOTAL EQUIPMENT: $11,754.93
VEHICLE TYPE RATE UNIT USAGE
Automobile $68.00 Day $0.00 Automobile $272.00 Week $0.00 Van or Truck $97.00 Day 6 $582.00 Van or Truck $420.00 Week 2 $840.00
TOTAL VEHICLE: $1,422.00
PER DIEM STAFF RATE UNIT USAGE
Hotel $99.00 Day 32 $3,168.00 Day One leave before 06:00 AM $36.00 Day $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 4 $120.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 24 $864.00 Return Day $80.00 Day 4 $320.00
TOTAL PER DIEM: $4,472.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Full List) $135.00 0 $0.00 EPA Method 6020 (As, Cd, Cr and Pb) $50.00 0 $0.00 EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs) $48.00 0 $0.00 EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals) $40.00 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00
TOTAL LAB: $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE Rate UNIT USAGE TOTALS Concrete pumping (Plycrete Pumpin Concrete pumping $330.00 Lump 1 $330.00 Porta-toilet (Doodie Calls) Portable Toilets $100.00 Lump 1 $100.00 Utility Clear (Site Lines) GPR Survey $700.00 Lump 1 $700.00 Rental Equipment (HERC) Trench cut, excavate, load $2,092.25 Lump 1 $2,092.25 Rental Dumpster (Heart of FL) 20 CYD dumpster concrete $951.00 Lump 1 $951.00 Rental Dumpster (Heart of FL) 20 CYD dumpster soil $1,794.50 Lump 1 $1,794.50
TOTAL SUB: $5,967.75
Prepare loadout of tools & equipment (2 hrs.), Mob to site twice and stage equipment and materials (6 hrs.), Install SVE infrastructure as designed in ISR design including 230 feet linear trenching, concrete removal, excavation of trenches and SVE vertical & horizontal wells, assemble conveyance piping duration of seven days (70 hrs)., Demob twice (6 hrs.), Former Oasis Cleaners
Travel to site and markout trench alignment as requested by property manager (8 hrs.), Review Scope of Work with crew, Prepare install schedule, Procure project materials/equipment (4 hrs.), Site visit during construction layout and final (8 hrs.)
Preparation of the LOE and Scope of Work
2-Interior SVE Piping Installation
Amend HASP for construction work (2 hrs.), Travel to site to mark trench alignment prior to tenant remodel (8 hrs.), Mob to site twice (6 hrs.), Install SVE infrastructure as designed in ISR design including 230 feet of linear trenching, concrete removal, excavation of trenches and vertical & horzintal SVE wells, assemble conveyance piping, compaction of backfill, duration seven days (70 hrs.), Demob from site twice (6 hrs.)
Prepare loadout of tools & equipment (2 hrs.), Mob to site twice and stage equipment and materials (6 hrs.), Install SVE infrastructure as designed in ISR design including 230 feet linear trenching, concrete removal, excavation of trenches and SVE vertical & horizontal wells, assemble conveyance piping duration of seven days (70 hrs)., Demob twice (6 hrs.), Prepare loadout of tools & equipment (2 hrs.), Mob to site twice and stage equipment and materials (6 hrs.), Install SVE infrastructure as designed in ISR design including 230 feet linear trenching, concrete removal, excavation of trenches and SVE vertical & horizontal wells, assemble conveyance piping duration of sevendays (70 hrs)., Demob twice (6 hrs.), 2-Interior SVE Install Page 3 of 4 DC024C_ 2]
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Former Oasis Cleaners SUBTASK: 3-Construction Completion Documentation
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 3 K. McDonald
Engineer/Scientist 3 K. Howard
Engineering Technician 2 B. Skipper Engineering Technician 2 C. Ramey Designer 2 S. Ferianc 3 Tech Publications Specialist 3H. Vining 1
TOTAL LABOR: 12
EQUIPMENT ITEM RATE UNIT USAGE
Expendables $32.50 Day $0.00 Construction/O&M Kit $291.00 Day $0.00 Construction/O&M Supplies $63.05 Day $0.00 Shallow GW Sampling Kit $208.65 day $0.00 Well Caps (2") $10.20 each $0.00 Well Locks $3.40 each $0.00 55-gallon Drum $58.20 each $0.00
TOTAL EQUIPMENT: $0.00
VEHICLE TYPE RATE UNIT USAGE
Automobile $68.00 Day $0.00 Van or Truck $97.00 Day $0.00
TOTAL VEHICLE: $0.00
PER DIEM STAFF RATE UNIT USAGE
Hotel $99.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00
TOTAL PER DIEM: $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Halos Only) 0 0 $0.00 EPA Method 8260 (Volatiles-Full List) 0 0 $0.00 EPA Method TO-15 (VOCs) (SVE Influent/Effluent) 20 $0.00 Ice 0 $0.00 Sample Shipping (small) 0 $0.00 Sample Shipping (large) 3 $0.00
TOTAL LAB: $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE Rate UNIT USAGE TOTALS Misc. Supplies Home Depot/Lowes/Equivilent each 0 $0.00 Clark Environmental Non-Haz soil disposal Drum 0 $0.00 Clark Environmental Non-Haz water disposal Drum 0 $0.00 Clark Environmental Pickup fee Lump 0 $0.00 Clark Environmental Transportation Drum 0 $0.00
TOTAL SUB: $0.00
Prepare As Built drawings and Construction Completion Report (CCR) of completed installation of SVE remedial system
June 10, 2021
Review CCR and seal As Builts (4 hr).
Assemble Construction Completion Report and format Prepare As Built drawings of completed installation of SVE remedial system
3-Rpt Page 4 of 4 DC024C_ 2
Item Description Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total Amount Concrete 4ksi, 11.5 yds 1 LS $1,859.13 11.5 $140.00 $1,610.00 1 $2,769.16 $2,769.16 tax 0 7.00% Incl. 1 7.00% $122.50 included Shipping 1 included 1 included 1 included
Total $1,859.13 $1,732.50 $2,769.16
Item Description Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total Amount Concrete Pump Service, 11.5 yds 3 $110.00 $330.00 3 $220/$110 $440.00 3 $225.00 $675.00 tax 0 included 0 included 0 included
Total $330.00 $440.00 $675.00
Item Description Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total Amount Porta Potty 1 $100.00 $100.00 1 $85.00 $85.00 1 LS No Bid tax included $0.00 0 included $0.00 0 included $0.00 Shipping 1 included $0.00 1 $35.00 1 included $0.00
Total $100.00 $120.00 $0.00
Sanitary Bid Summary Oasis Cleaners
3210 1st Street West Bradenton, Florida 34208
Plycrete Pumping LLC OnCall/Scott Ryan Pumping
Doodie Calls Guys Hauling United Site Services
Davis Concrete Inc.
Concrete OnCall Davis Concrete Cemex*
Concrete Pumping Oasis Cleaners
3210 1st Street West Bradenton, Florida 34208
Oasis Cleaners 3210 1st Street West
Bradenton, Florida 34208
Concrete Bid Summary
Amount Units Unit Price Total
Amount Units Unit Price Total Amount PVC piping 1 LS $3,430.52 1 LS $5,019.69 1 LS Incomplete bid tax 6.50% $222.98 1 LS $351.38 6.50% $0.00 Shipping 1 $0.00 1 $190.00 1 NA
Total $3,653.50 $5,561.07 $0.00
Note: Incomplete bid submitted
Item Description Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total Amount 20 Yd Rolloff 2 LS $418.80 2 $150.00 $300.00 2 $195.00 $390.00 Disposal weight (15 tons) 16 $69.50 $1,112.00 2 $165.00 $330.00 17 $52.00 $884.00 tax 7.00% $29.32 7.00% $21.00 7.00% $27.30 Drop-off/Pickup Included 2 $150.00 $300.00 Included
Total $1,560.12 $951.00 $1,301.30
Note: * 1.5 tons included in dumpster price
Item Description Units Unit Price
(ton) Total
Amount Units Unit Price
(ton) Total
Amount Units Unit Price
(ton) Total Amount 20 Yd Rolloff 1 $1,150.00 $1,150.00 1 LS $2,720.00 1 $225.00 $225.00 Disposal weight (17 tons) 17 $17.00 $289.00 17 $0.04 $1,120.00 17 $70.00 $1,190.00 liner 1 $50.00 $50.00 tax 7.00% $80.50 7.00% $190.40 7.00% $15.75 Franchise fee/Enviro Charge 1 $75.00 $75.00 1 20%/17.5% $530.63 Shipping 1 $150.00 $150.00 1 1.00% $125.00 1 $150.00 $150.00
Total $1,794.50 $4,155.40 $2,111.38
Bradenton, Florida 34208
Alpha Dumpsters* Heart of Florida Guys Hauling
Heart of Florida Clark Waste Management
Hole Products Toney Drilling Supply Atlantic Drilling Supply*
Dumpster Bid Summary (C&D only) Oasis Cleaners
3210 1st Street West
Oasis Cleaners 3210 1st Street West
PVC Pipes Bid Summary
Bradenton, Florida 34208
Dumpster Bid Summary (Contaminated Soil) Oasis Cleaners
3210 1st Street West
Amount Units Unit Price Total
Amount Units Unit Price Total Amount Utility survey LS $700.00 $700.00 LS $860.00 LS No Bid
Total $700.00 $860.00 $0.00 Note: * GeoTek cannot meet schedule so declined to bid
** Two bid requests sent to GRPS with no response
Item Description Units Units Unit Price Total
Amount Units Unit Price
Total Amount Units Unit Price
Total Amount
Concrete saw 16" blade 1 week(s) $350.00 $350.00 1 week(s) $415.00 $415.00 1 week(s) $325.00 $325.00 Blade 1 week(s) $60.00 $60.00 1 week(s) $88.00 $88.00 1 week(s) $210.00 $210.00 Plate Compactor 1 week(s) $335.00 $335.00 1 week(s) $180.00 $180.00 1 week(s) $182.00 $182.00 Mini excavator 1 week(s) $490.00 $490.00 1 week(s) $550.00 $550.00 1 week(s) $580.00 $580.00 Skidsteer 1 week(s) $595.00 $595.00 2 week(s) $825.00 $1,650.00 2 week(s) $780.00 $1,560.00 Delivery 2 trip $90.00 $180.00 2 trip $145.00 $290.00 2 trip $150.00 $300.00 tax 7% $82.25 7% $80.15 7% $53.34
Total $2,092.25 $3,253.15 $3,210.34
Item Description Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total Amount Walker Exhaust Flex Tubing 40008 75 ft. 3 $76.99 $230.97 3 $82.90 $248.70 3 $57.61 $172.83 tax 7.00% $16.17 7.00% $17.41 7.00% $12.10 Shipping (estimated) 1 $50.00 1 $50.00 1 0 $50.00
Total $297.14 $316.11 $234.93
Construction Equipment Oasis Cleaners
3210 1st Street West Bradenton, Florida 34208
Utility Survey Oasis Cleaners
3210 1st Street West Bradenton, Florida 34208
GeoTek, LLC*
UnitedHERC Sunbelt
Site Lines GPRS**
Exhaust Flex Tubing Oasis Cleaners
3210 1st Street West
Summit Racing Amazon Carid
From: Buck@DavisConcreteInc.com To: Kramer, Eric Subject: 3210 1st St W Bradenton Date: Wednesday, June 2, 2021 11:56:45 AM
EXTERNAL SENDER
Eric, 4000psi w/ fiber: $140 per yard. You get one hour to discharge each load/truck.
No delivery if the order is over 5yds Pump: $225 minimum gets you 150’ of hose, an operator, 1hr pump time, 30mins set up, 30mins breakdown. Pump guy will need dedicated help to pull hose. Absolutely must have a washout spot on site and a potable water source.
Tax applies of course. These are cash/check prices. If you need to use a credit card, an additional 4% will be added to the total.
Regards, Buck Walz Operations Manager Davis Concrete, Inc.
CGC 1526331
Main Office 1670 Sunshine Dr.
Clearwater, FL 33765 727-733-3141 www.davisconcreteinc.com
Virus-free. www.avast.com mailto:Buck@DavisConcreteInc.com mailto:Eric.Kramer@aptim.com https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.avast.com%2Fsig-email%3Futm_medium%3Demail%26utm_source%3Dlink%26utm_campaign%3Dsig-email%26utm_content%3Demailclient%26utm_term%3Dicon&data=04%7C01%7Ceric.kramer%40aptim.com%7C5c36456c045749d16ca508d925df0453%7C722bb117d3964e7c982b8c9f8038294d%7C0%7C1%7C637582462049906257%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0&sdata=FONYUQiKKCW4lBPdIT4UGb%2Fo146cYauFSmKKAXip9Uw%3D&reserved=0 https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.avast.com%2Fsig-email%3Futm_medium%3Demail%26utm_source%3Dlink%26utm_campaign%3Dsig-email%26utm_content%3Demailclient%26utm_term%3Dlink&data=04%7C01%7Ceric.kramer%40aptim.com%7C5c36456c045749d16ca508d925df0453%7C722bb117d3964e7c982b8c9f8038294d%7C0%7C1%7C637582462049906257%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0&sdata=zw4Gem9LW0qaHkBRQe0jvskQyMxPPkdYGJ1BfFw%2FH0c%3D&reserved=0
From: Dayana Carmona
Subject: QUOTE APTIM Date: Wednesday, June 9, 2021 4:10:41 PM Attachments: image001.png image002.png
EXTERNAL SENDER
Good afternoon Eric, As our conversation, this will be the price out of door, with delivery fee and estimate taxes: $2,769.16
Let me know if you have any questions, Thank you
Dayana Carmona - Inside Sales Professional- Florida Division 10100 Katy Fwy, 3rd Fl
Houston, TX 77043 Phone Number: 855-292-8453 ext. 10 Email: dayana.carmona@ext.cemex.com
CONFIDENTIALITY: The information contained in this transmission may contain privileged and confidential information. It is intended only for the use of the person(s) named above. If you are not the intended recipient, you are hereby notified that any review, dissemination, distribution or duplication of this communication, and the information contained in it, is strictly prohibited. If you are not the intended recipient, please contact the sender and immediately destroy all copies of the original message.
mailto:dayana.carmona@ext.cemex.com mailto:Eric.Kramer@aptim.com mailto:dayana.carmona@ext.cemex.com https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.cemexusa.com%2Fgo&data=04%7C01%7CERIC.KRAMER%40APTIM.COM%7Ca7ff59f2ad9c4de0ffe108d92b82a5b7%7C722bb117d3964e7c982b8c9f8038294d%7C0%7C0%7C637588662402278475%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=Je9fp89x2c58NnYz8odR1GMHY642qYv2P7WRgiIbPxI%3D&reserved=0 https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fitunes.apple.com%2Fus%2Fapp%2Fcemex-track%2Fid1162557307&data=04%7C01%7CERIC.KRAMER%40APTIM.COM%7Ca7ff59f2ad9c4de0ffe108d92b82a5b7%7C722bb117d3964e7c982b8c9f8038294d%7C0%7C0%7C637588662402278475%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=Mahpl2QUK8fwdExJMq8RQYW5SVjvaHvQz837PTX9rCY%3D&reserved=0 https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.cemexusa.com%2Fgo&data=04%7C01%7CERIC.KRAMER%40APTIM.COM%7Ca7ff59f2ad9c4de0ffe108d92b82a5b7%7C722bb117d3964e7c982b8c9f8038294d%7C0%7C0%7C637588662402288469%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=%2FIYeFPq1do51FRQs1txgNxq9lWsWF%2BbNQ3BHm13MaHY%3D&reserved=0 https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fplay.google.com%2Fstore%2Fapps%2Fdetails%3Fid%3Dcom.cemex.foreman&data=04%7C01%7CERIC.KRAMER%40APTIM.COM%7Ca7ff59f2ad9c4de0ffe108d92b82a5b7%7C722bb117d3964e7c982b8c9f8038294d%7C0%7C0%7C637588662402298466%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=v0mDSsWQ%2BA6KvFvBRTW3v8Q2TFZTQbs7b6P4eIKwcu8%3D&reserved=0
MEMO
SUBJECT TO
Concrete Quote from Concrete On Call file
DATE
June 10, 2021 COPIES TO
FROM
file Steve
Telephone quote from Concrete OnCall (941.746.0288) for 11.5 CY of 4ksi fibermesh concrete.
Concrete delivered to site (Oasis Cleaners) $1,859.13 with tax Pump service by Scott Ryan $220 1st hr., $110 each hr. thereafter. Estimate 3 hrs. total $440.00 file
DATE
June 10, 2021 COPIES TO
FROM
Eric.Kramer
From: Buck@DavisConcreteInc.com
Subject: 3210 1st St W Bradenton Date: Wednesday, June 2, 2021 11:56:45 AM
EXTERNAL SENDER
Eric, 4000psi w/ fiber: $140 per yard. You get one hour to discharge each load/truck.
No delivery if the order is over 5yds Pump: $225 minimum gets you 150’ of hose, an operator, 1hr pump time, 30mins set up, 30mins breakdown. Pump guy will need dedicated help to pull hose. Absolutely must have a washout spot on site and a potable water source.
Tax applies of course. These are cash/check prices. If you need to use a credit card, an additional 4% will be added to the total.
Regards, Buck Walz Operations Manager Davis Concrete, Inc.
CGC 1526331
Main Office 1670 Sunshine Dr.
Clearwater, FL 33765 727-733-3141 www.davisconcreteinc.com
Virus-free. www.avast.com mailto:Buck@DavisConcreteInc.com mailto:Eric.Kramer@aptim.com https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.avast.com%2Fsig-email%3Futm_medium%3Demail%26utm_source%3Dlink%26utm_campaign%3Dsig-email%26utm_content%3Demailclient%26utm_term%3Dicon&data=04%7C01%7Ceric.kramer%40aptim.com%7C5c36456c045749d16ca508d925df0453%7C722bb117d3964e7c982b8c9f8038294d%7C0%7C1%7C637582462049906257%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0&sdata=FONYUQiKKCW4lBPdIT4UGb%2Fo146cYauFSmKKAXip9Uw%3D&reserved=0 https://nam10.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.avast.com%2Fsig-email%3Futm_medium%3Demail%26utm_source%3Dlink%26utm_campaign%3Dsig-email%26utm_content%3Demailclient%26utm_term%3Dlink&data=04%7C01%7Ceric.kramer%40aptim.com%7C5c36456c045749d16ca508d925df0453%7C722bb117d3964e7c982b8c9f8038294d%7C0%7C1%7C637582462049906257%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0&sdata=zw4Gem9LW0qaHkBRQe0jvskQyMxPPkdYGJ1BfFw%2FH0c%3D&reserved=0
From: Accounting Plycrete
Subject: Plycrete Pumping price quote Date: Wednesday, May 19, 2021 5:19:36 PM
EXTERNAL SENDER
Thank you for inquiring about our pumping services.
We quote the following...
Job address: 3201 1st St, Bradenton.
Trailer pump (small rock pump mix) is $110/hr 2 hr minimum plus 1 hr mobilization (3 hrs)
If you are in need of a boom pump that handles regular rock mix, let me know.
My number is: 941-400-2823.
Thanks, Tim Yoder
Plycrete Pumping, LLC 7440 Richardson Rd Sarasota, FL 34240
Accounting 941 371 7959 Facsimile 888 366 2865 Dispatch 941 685 4511 http://plycrete.com
Keep Looking Up!
P Please consider the environment before printing this email mailto:accounting@plycrete.com mailto:Eric.Kramer@aptim.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fplycrete.com%2F&data=04%7C01%7Ceric.kramer%40aptim.com%7C79d4baaf60c44f75d68108d91b0bccc6%7C722bb117d3964e7c982b8c9f8038294d%7C0%7C1%7C637570559758551477%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=WolzMkxutahFs2iqLmO0EgB0dsnLlou2jwUAIMWdBIk%3D&reserved=0
Doodie Calls, Inc.
312 Maraviya Blvd, North Venice, FL 34275
813-800-7667 www.doodie-calls.com
DATE: 5/20/2021
Customer Name Eric Kramer
Customer Company
Billing Address
Phone 407-287-3216
Email Eric.Kramer@aptim.com
Delivery Address
Delivery Date
QTY ITEM DESCRIPTION PRICE TOTAL COST
1 Standard Unit with 1x a week service 100.00$ 100.00$
TOTAL COST* 100.00$
*Sales tax not included, if applicable. If exempt, email certificate to kyle@doodie-calls.com
Price includes: Delivery, service and pickup of all equipment
TERM & CONDITIONS
DAMAGE
ACCEPTANCE
Amanda Kirkland 5/20/2021
Contractor (Doodie Calls, Inc.) Date
Customer Date
DOODIE CALLS PROPOSAL
If you are a new customer, please send credit card information and business license number. By signing this proposal both parties agree to abide by the terms and conditions outlined in proposal. Doodie Calls, Inc.
agrees to supply the sanitation agreed upon. Customer agrees to assume the risk of and hold Doodie Calls, Inc. harmless for property damage and personal injuries caused by the equipment, and/or rising out of
Contractor's non-negligent acts.
Customer agrees to pay for any damage to or loss of the goods, as an insurer, regardless of cause, except reasonable wear and tear, while equipment is out of the possession of Contractor. The cost of repairs will be born by Customer, whether performed by Contractor, or at Contractor's option, by others. Equipment damage beyone repair will be paid for at the replacement cost. Customer agrees to accept Contractor's decision as to whether damage is repairable.
Thank you for the opportunity!
You are hereby authorized to furnish all equipment and labor required to complete the services described in the above proposal, for which the undersigned agrees to pay the amount stated in said proposal and according to the terms thereof.
POTTY PRICING
Sarasota / Bradenton=
Tier 1 Pricing
Osprey / Nokomis /
Siesta / Longboat Key
/ Holmes‐Bradenton
Beach /Anna Maria
Island / Palmetto=
Tier 2 Pricing
Englewood / North
Port / Venice /
Myakka / Ellenton /
Parrish=
Tier 3 Pricing
Units w/ Weekly Service 1‐7 Days on site are prorated ½ price on monthly cost, any units 8+ days will be full price.
TIER
TIER
MONTHLY
REG 1xw 85 105 125
2xw 105 125 145
REG w/ HWS 1xw 125 145 165
2xw 145 165 185
HC 1xw 145 165 185
2xw 165 185 205
HWS 1xw 65 85 105
2xw 85 105 125
SE 1xw 185 205 245
2xw 205 225 265
Trailer‐2REG & HWS 1xw 230 250 270
2xw 250 270 290
Tank 1xw 325 375 425
2xw 425 475 525
EVENT
RE 105 125 145
REG w/ HWS 125 145 165
HC 165 185 205
HWS 85 105 125
Comfort Station 185 205 225
TIER
MONTHLY
DELIVERY 25 30 35
EVENT
DELIVERY / SET UP /
PICK UP ON 1st UNIT
ALL ADDITIONAL
UNITS + $10 PER UNIT 35 40 45
WWW.TONEYDf«Li»l©.CW
1 4 0 6 0 N W 1 9 t h A v e .
O p a L o c k a F L . 3 3 0 5 4 P h o n e : ( 3 0 5 ) 6 8 5 - 2 4 5 3 F a x : ( 3 0 5 ) 6 8 7 - 5 2 3 1
QUOTATION
Q u o t e M Q 0 2 2 0 1
Date 6 / 9 / 2 0 2 1
Bill To :
A P T I M
1 2 2 8 W i n t e r G a r d e n V i n e l a n d R o a d
W I N T E R G A R D E N F L 3 4 7 8 7
Ship To:
A P T I M
1 2 2 8 W i n t e r G a r d e n V i n e l a n d R o a d
W I N T E R G A R D E N F L 3 4 7 8 7
Purchase Order No. Customer ID Salesperson ID Shipping Method Payment Terms Req Ship Date Master No.
4 0 7 2 8 7 3 2 1 6 D T 1 6 R e m a n e n t C O D 0 / 0 / 0 0 0 0 1 5 , 9 5 5
Quantity 6 4 0
1 8 1 8 3 0
1 5
2 0
1 0 1 6
1 1 0 1 5
Item Number M X X M X X M X X M X X M X X M X X
W S 4 X 5 - 2
W S 2 X 5 - 2
M X X
M X X M X X M X X S 6 2 0 5 0 M X X
M X X
Description 2 " X 2 0 ' B E L L E D E N D S C H . 4 0 P V C
T E E , P V C S C H 4 0 S
R E D U C E R B U S H I N G 2 X 4 S C H 2 0 E L B O W , P V C S C H . 4 0 9 0 D E C P V C C E M E N T Q U A R T , P V C P R I M E R - Q U A R T P V C S C R E E N 4 " X 5 ' . 0 2 0
P V C S C R E E N 2 " X 5 ' , 0 2 0
1 " X 2 0 ' P V C S C H 4 0 B E L L E D E N D
T E E , P V C 2 X 2 X 1 S 2 " P V C C O U P L I N G 4 " X 1 0 " A L U M I N U M F L U S H M O U N T M A N H O L E S A N D 6 / 2 0 5 0 L B 6 4 / P L T 4 " P V C S L I P C A P 2 " P V C S L I P C A P
UOM
E A C H E A C H E A C H E A C H E A C H E A C H E A C H E A C H E A C H E A C H E A C H E A C H E A C H E A C H E A C H
Unit Price $ 3 . 0 1
$ 1 8 . 5 3 $ 1 1 . 7 5
$ 3 . 0 5 $ 1 4 . 7 8 $ 1 0 . 5 5 $ 4 4 . 5 0 $ 1 8 . 8 9
$ 1 . 9 5 $ 2 . 5 6 $ 1 . 8 0
$ 4 5 . 2 0 $ 7 . 4 5 $ 7 . 7 6 $ 1 . 0 5
Ext. Price $ 1 , 9 2 6 . 4 0
$ 3 3 3 . 5 4 $ 2 1 1 . 5 0
$ 9 1 . 5 0 $ 2 9 . 5 5 $ 2 1 . 1 0
$ 6 6 7 . 5 0 $ 1 8 . 8 9 $ 3 9 . 0 0
$ 2 . 5 6 $ 1 8 . 0 0
$ 7 2 3 . 2 0 $ 8 1 9 . 5 0 $ 1 1 6 . 4 0
$ 1 . 0 5
Subtotal Mlsc Tax Freight
$ 5 , 0 1 9 . 6 9 $ 0 . 0 0
$ 3 5 1 . 3 8 $ 1 9 0 . 0 0
• Trade Discount $ 0 . 0 0
A p p r o v e d : Total $ 5 , 5 6 1 . 0 7 D i S C L A I M E R : A i [ P r i c e s a r e e s l i m a t e s a n d a r e s u b j e c t t o c h a n g e .
P l e a s e b e a d v i s e d t h a t I n b o u n d f r e i g h t T D S M i a m i a n d O u t b o u n d f r e i g h t i s a d d i t i o n a l .
T a x e s w i l l b e c h a r g e d w h e r e a p p l i c a b l e . O r i a i n a l >
Primed from Dynamics through PrinlBoss
Hole Products 6835 S. Conway Rd. Suite 200 Orlando FL 32812 Phone: 407-792-2670 Fax: 407-286-2956
Quote
Account # 1004603
Date 5/21/2021
Quote #
SQ-5HPU006892
Bill To
APTIM
1228 WINTER GARDEN VINELAND RD
WINTER GARDEN FL 34787
Ship To
APTIM CPU
6835 S CONWAY RD
SUITE 200
ORLANDO FL 32812
Quote Exp. Date 6/20/2021
Currency
USD
Terms
CREDIT CARD
Account Rep David Marlette
Fax NumberPhone Number
(407) 832-3072
Customer Contact
KURTIS MCDONALD
MemoShipping Method Customer Pick-Up
Quantity
Item # 5900030
5700274
4750006 ****
5650600
4750006 ****
4750006 ****
5950026
5950006
5900095
4220120
5700176
7800005
3500073
5650038
5650040
Description
CASING,PVC 2X20 S40 BELL END PER FOOT
TEE,PVC 4 S40 SXSXS
BUSHING REDUCER, PVC 4 X 2 S40
ELBOW,PVC 2 S40 90 ELL
CEMENT, PVC QUART
PRIMER,PVC CEMENT QUART
SCREEN,PVC 4X5 ASTM S40 2TPI .020
SCREEN,PVC 2X5 ASTM S40 2TPI .020
CASING,PVC 1 X 20 S40 BELL END PER FOOT
TEE,2 X 2 X 1 SKT
COUPLING,PVC 2 SLIP S40
FLUSHMOUNT,4X10 CAST ALUM BOLT,WT
SAND,6/20 50LB BAG
CAP,PVC 4 SLIP S40
CAP,PVC 2 SLIP S40
Customer Pick-Up
Unit Price 1.95
12.42
4.74
1.58
18.00
13.55
59.02
27.93
1.25
2.25
1.06
58.00
6.57
5.88
1.16
0.00
Amount 1,248.00
223.56
85.32
47.40
36.00
27.10
885.30
27.93
25.00
2.25
10.60
928.00
722.70
88.20
1.16
0.00
Hole Products 6835 S. Conway Rd. Suite 200 Orlando FL 32812 Phone: 407-792-2670 Fax: 407-286-2956
Quote
Account # 1004603
Date 5/21/2021
Quote #
SQ-5HPU006892
Quantity Item # Description Unit Price Amount
Subtotal Total Tax Total
4,358.52 283.37
$4,641.89
Due to the current volatility in the petrochemical industry, all PVC quotes are valid for 24 hours from the date of quotation.
Thread Armour biodegradable thread joint compound available to ship with your order.
Visit https://www.holeproducts.com/brands/threadarmour or contact your sales rep for additional information.
Quantity Product Description Unit Price Ext Price
QUOTED TO: SHIP TO:
APTIM CORPORATION
1228 WINTER GARDEN VINELAND RD
WINTER GARDEN, FL 34787
ORANGE
KURTIS MACDONALDATTN:
ORANGE
ORLANDO, FL 32811
3315 MAGGIE BLVD., STE. 1000
407-246-6516
***PICK UP***
ATLANTIC SUPPLY
800-752-9416
PO BOX 17620
CLEARWATER, FL 33762
Disc
QUOTATION
Number: 23492
06/09/21Date:
Page: 1 of 1
Q-
SalespersonTerms
VISA/MC 31
Your Reference Ship Via
PICK UP
Description
Product Code
64.00 SCH40 2"X10' FT CASING 1241.60 19.40A2CT4020010
*** NOTE: FLUSH-THREADED PIPE QUOTED AS SUBSTITUE FOR BELL-ENDED
PIPE. DOES NOT REQUIRE COUPLINGS OR GLUE.
15.00 SCH40 4"X5' .020 FT SCREEN 738.75 49.25A2ST4040005020
1.00 SCH40 2"X5' .020 FT SCREEN 22.75 22.75A2ST4020005020
2.00 SCH40 1"X10' FT CASING 27.70 13.85A8CT4010010
*** NOTE: FLUSH-THREADED PIPE QUOTED AS SUBSTITUE FOR BELL-ENDED
PIPE. DOES NOT REQUIRE COUPLINGS OR GLUE.
10.00 COUPLING, 2" SLIP PVC 12.00 1.20429020
*** ITEM ONLY AVAILABLE IN JACKSONVILLE. SHIPPING WOULD APPLY.
110.00 SAND, SILICA 6-20 SIEVE 50LB 611.33 5.00 % 5.85620SSORL
15.00 CAP, 4" SLIP PVC SCH. 40 104.25 6.95447040
1.00 CAP, 2" SLIP PVC 1.00 1.00447020
QUOTATION TOTAL: $2,938.74
Subtotal: $2,759.38TAMPA BAY 727-530-9581
RIVIERA BEACH 561-844-3130
ORLANDO 407-246-6516
JACKSONVILLE 904-260-4288
ALABAMA 334-280-2712
Sales Tax: $179.36
THIS QUOTE IS GOOD FOR 30 DAYS
PLEASE CALL THE ORIGINATING
STORE TO PLACE YOUR ORDER,
OR IF YOU HAVE ANY QUESTIONS
REGARDING THIS QUOTE.
Incomplete bid - missing well manholes, bushings, elbows, cement/primer
Heart of Florida Environmental
835 County Road 529 Lake Panasoffkey, FL 33538
352-569-0465
8/3/2021Quote Valid Until00041438Quote Number roger.oconnor@wasteconnections.com
(407) 908-3666
Special Waste Account Manager
Roger O'Connor
All waste will be disposed of at our Heart of Florida Environmental Facility, located at 1032 CR 529A, Lake Panasoffkee, FL, 33538.
All prices are subject to any Federal, State and local fees.
Should you have any questions regarding this quotation, please do not hesitate to contact me.
Thank you, 1 - A Processing Fee of $75.00 applies to this waste profile.
2 - Container Delivery Fee - $150.00 each.
3 - Transportation - Includes Dump & Return or Dump & Removal. (Load must not exceed 12 tons)
4 - Inactivity Fee - $5.00 per day after 30 days without a haul.
5 – Container Liner - $50.00 each.
Additional Provisions
Pursuant to your request regarding the above referenced subject and on behalf of Heart of Florida Environmental, I am pleased to submit the price schedule for the following services:
Eric Kramer
APTIM (Winter Garden Office): FL-Manatee- 8 CY's, Contaminated Soil, Dry Cleaner Project, 3210 First. St. W., Bradenton
Quote Name eric.kramer@aptim.comEmail
(407) 287-3216Phone
1228 Winter Garden Vineland Rd Winter Garden
FL
34787
USA
Address
APTIM (Winter Garden Office)Quoted To
Eric KramerContact Name
6/4/2021Created
Rate Information
Landfill Type Unit of Measure (UOM) Waste Stream Disposal Rate (ton/unit) Minimum Amount
Heart of Florida Environmental Disposal Tons Contaminated Soil, other $17.00 1
Heart of Florida Environmental Transportation Load Contaminated Soil, other $1,150.00
Heart of Florida Environmental Disposal Tons Clean Concrete $0.00
Heart of Florida Environmental Transportation Load Clean Concrete $165.00
Comments
Eric.Kramer Highlight
Eric.Kramer Highlight
Guy's Hauling & Dumpster Service, Inc.
941-355-6061 / fax: 941- 359-8503
Dumpster Dimensions:
5yd: 7x7x4 Heavier Duty 10yd: 6x12x4 ½ 10yd Standard: 8x12x5 Lid: 7x12x7 15yd: 7x14x4 ½ 15yd Standard: 8x16x5 20yd: 7x16x5 ½ 20yd Standard: 8x22x4 ½ 30yd: 7x16x8 ½ 30yd Standard: 8x22x6
Monthly Billing Due to nonactivity/no dump is $100
Sarasota / Bradenton *Fuel Fee -- $25
*5yd dumpster---------------------------------- $115 plus tonnage & fuel fee per pull *10yd dumpster-------------------------------- $125 plus tonnage & fuel fee per pull
$175 Clean concrete debris only *10yd lockable lidded boxes------------------$135 plus tonnage & fuel fee per pull *15yd dumpster---------------------------------$135 plus tonnage & fuel fee per pull
$185 Clean concrete debris only *20yd dumpster-------------------------------- $145 plus tonnage & fuel fee per pull
$195 Clean concrete debris only *30yd dumpster-------------------------------- $155 plus tonnage & fuel fee per pull
Dump Fee Rates and Definitions -- Sarasota / Bradenton C&D: $52 per ton = Construction Debris, Building Materials CLASS 3: $61 per ton = Mixture of Debris, MSW, Household clean outs (Furniture…etc), non-construction / non- yard waste debris CLASS 1: $68 per ton = Garbage BRUSH and/or CLEAN PALLETTS: $50 per ton= strictly organic or clean pallets BRUSH w/ Excessive Amount of Dirt: $60 per ton = strictly organic yard waste and dirt MANURE: $72 per ton TIRES: $90 per ton CARDBOARD: $50 per ton
Osprey / Nokomis / Siesta / Longboat Key / Anna Maria Island / Holmes-Bradenton Beach / Palmetto:
*Fuel surcharge -- $30
*5yd dumpster---------------------------------- $135 plus tonnage & fuel fee per pull *10yd dumpster-------------------------------- $145 plus tonnage & fuel fee per pull
$200 Clean concrete debris only *10yd lockable lidded boxes------------------$155 plus tonnage & fuel fee per pull *15yd dumpster---------------------------------$155 plus tonnage & fuel fee per pull
$210 Clean concrete debris only *20yd dumpster-------------------------------- $165 plus tonnage & fuel fee per pull
$220 Clean concrete debris only *30yd dumpster-------------------------------- $175 plus tonnage & fuel fee per pull
Venice / Englewood / North Port / Ellenton / Parrish / Myakka:
*Fuel surcharge -- $35
*5yd dumpster---------------------------------- $155 plus tonnage & fuel fee per pull *10yd dumpster-------------------------------- $165 plus tonnage & fuel fee per pull
$220 Clean concrete debris only *10yd lockable lidded boxes------------------$175 plus tonnage & fuel fee per pull *15yd dumpster---------------------------------$175 plus tonnage & fuel fee per pull
$230 Clean concrete debris only *20yd dumpster-------------------------------- $185 plus tonnage & fuel fee per pull
$240 Clean concrete debris only *30yd dumpster-------------------------------- $195 plus tonnage & fuel fee per pull
Dump Fees Rates and Definitions -- Osprey / Nokomis / Siesta / Longboat Key / Anna Maria Island / Holmes-Bradenton Beach / Palmetto / Ellenton /
Parrish / Myakka / Venice / Englewood / North Port
C&D: $61 per ton = Construction Debris, Building Materials CLASS 3: $65 per ton = Mixture of Debris, MSW, Household clean outs (Furniture…etc), non-construction / non- yard waste debris CLASS 1: $72 per ton = Garbage BRUSH: $58 per ton = strictly organic yard waste
From: Alpha Dumpsters Info
Subject: Alpha Dumpsters - Quote for 20 yd Dumpster Date: Tuesday, May 18, 2021 4:25:20 PM Attachments: image001.png
EXTERNAL SENDER
Hello, Thank you for your inquiry. Our 20 yard dumpster measures 8’ wide, 22’ long and 4’ high. It rents for $418.80 and that includes up to 1.5 tons of debris. If you load it up and it goes over 1.5 tons there is an additional charge of $69.50 per ton.
You can keep this dumpster for up to 14 days. If you want to keep it longer, there is a $10 per day rental fee.
YOU CANNOT PUT ANY OF THE FOLLOWING IN THE DUMPSTER:
- Appliances (fridges, stove, washer, dryer, etc.)
- Tires
- Aerosol/Paint Cans
- Batteries
- Electronics
- TV’s
- Fluorescent Light Bulbs
- Food Trash
- Lawn Mowers (push or riding)
- Hazardous Materials (gas, oil, etc.)
- Pressure Treated Wood
- Auto parts
- Propane Tanks
Please call the office at 866-544-7732 or email info@alphadumpsters.com if you have any questions or would like to arrange for delivery. We accept checks and credit cards (Visa, MasterCard, Discover and Amex). All credit card transactions will have a 3% processing fee added.
Thank you
Alpha Dumpsters Office:866-544-7732 info@alphadumpsters.com
Your Roll-Off Dumpster Experts mailto:info@alphadumpsters.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Finfo%40alphadumpsters.com%2F&data=04%7C01%7Ceric.kramer%40aptim.com%7C80f399e3b6054d41497d08d91a3b0d2c%7C722bb117d3964e7c982b8c9f8038294d%7C0%7C1%7C637569663192630188%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0&sdata=yOy4ozOK9wjvLViQ%2B9ov04VGaavLHFi5o3mdXCa3CWo%3D&reserved=0 mailto:info@alphadumpsters.com
7202 East 8th Avenue, Tampa, FL 33619 P 813.319.3400 F 813.628.0842
6/9/2021
Eric K. Kramer, P.E.
Senior Environmental Engineer APTIM l Environmental Services 1228 Winter Garden Vineland Road Winter Garden, FL 34787 M 352-235-1789 E Eric.kramer@aptim.com
Scope of Work:
● Provide 3 - 25 cubic yard roll off containers
● Provide 1 roll off liner for impacted soil
● Deliver roll off containers to job site
● Transport and dispose of waste in accordance with local state and federal regulations
● Pricing is contingent on an approved waste profile
● Concrete will be recycled for no disposal charge, must be clean recyclable material
● Disposal of un-recyclable concrete will be at additional charges
● Quantities are estimates, actual quantities will be invoiced
Supplies / Equipment / Services Quantity Unit Rate Total Roll Off Rental (3 boxes for 15 days) 45 Daily Rate 16.00$ 720.00$ Roll Off Liners 1 Each 58.00$ 58.00$
778.00$ Disposal Quantity Unit Rate Total Non Regulated Solids - Soil 10 Tons 80.00$ 800.00$ (10 Ton Minimum Per Load) Non Regulated Solids - Clean Concrete for Recycle 17 Tons -$ -$
800.00$ Transportation Quantity Unit Rate Total Delivery Of Roll Offs (single box drop) 3 Per Box 675.00$ 2,025.00$ Roll Off Loads To USE Tampa 1 Per Load 775.00$ 775.00$ Roll Off Loads To Concrete Recycler 2 Per Load 775.00$ 1,550.00$
4,350.00$ Labor, Equipment, and Supplies Subtotal: $5,928.00 Florida Hazardous Waste Fee 3% of haz disposal
(on disposal only) 13.0% Energy Surcharge $104.00 (on disposal only)
Estimated Project Total: $6,032.00
Subtotal:
RE: T&D of Clean Concrete & Contaminated Soil 3210 1st Street West, Bradenton, FL
US Ecology Tampa, Inc. is pleased to submit this quotation letter to you for your waste disposal services. The scope of work is as follows;
Subtotal:
Subtotal:
mailto:Eric.kramer@aptim.com
Heart of Florida Environmental
835 County Road 529 Lake Panasoffkey, FL 33538
352-569-0465
8/3/2021Quote Valid Until00041438Quote Number roger.oconnor@wasteconnections.com
(407) 908-3666
Special Waste Account Manager
Roger O'Connor
All waste will be disposed of at our Heart of Florida Environmental Facility, located at 1032 CR 529A, Lake Panasoffkee, FL, 33538.
All prices are subject to any Federal, State and local fees.
Should you have any questions regarding this quotation, please do not hesitate to contact me.
Thank you, 1 - A Processing Fee of $75.00 applies to this waste profile.
2 - Container Delivery Fee - $150.00 each.
3 - Transportation - Includes Dump & Return or Dump & Removal. (Load must not exceed 12 tons)
4 - Inactivity Fee - $5.00 per day after 30 days without a haul.
5 – Container Liner - $50.00 each.
Additional Provisions
Pursuant to your request regarding the above referenced subject and on behalf of Heart of Florida Environmental, I am pleased to submit the price schedule for the following services:
Eric Kramer
APTIM (Winter Garden Office): FL-Manatee- 8 CY's, Contaminated Soil, Dry Cleaner Project, 3210 First. St. W., Bradenton
Quote Name eric.kramer@aptim.comEmail
(407) 287-3216Phone
1228 Winter Garden Vineland Rd Winter Garden
FL
34787
USA
Address
APTIM (Winter Garden Office)Quoted To
Eric KramerContact Name
6/4/2021Created
Rate Information
Landfill Type Unit of Measure (UOM) Waste Stream Disposal Rate (ton/unit) Minimum Amount
Heart of Florida Environmental Disposal Tons Contaminated Soil, other $17.00 1
Heart of Florida Environmental Transportation Load Contaminated Soil, other $1,150.00
Heart of Florida Environmental Disposal Tons Clean Concrete $0.00
Heart of Florida Environmental Transportation Load Clean Concrete $165.00
Comments
Eric.Kramer Highlight
Eric.Kramer Highlight
Eric.Kramer Highlight
SITE LINES LLC
Utility Locating 1143 59th Avenue North (727) 432-9482 St. Petersburg, FL 33703 bhardy@sitelinesllc.com
Mr. Eric K. Kramer, P.E.
APTIM
1228 Winter Garden Vineland Road Winter Garden, FL 34787
June 4, 2021
SITE: Former Oasis Cleaners Site – Bradenton, Florida PROPOSAL: 0931p
Dear Mr. Kramer:
Thank you for contacting Site Lines LLC regarding the private utility locate at your project site. Attached is our proposal in response to your inquiry.
Please review the proposal to ensure I have accurately captured the project details.
If you agree to the proposal, including the terms and conditions, and the statement of work, please sign, initial and date where indicated. Upon signing, the proposal will serve as the Agreement of the parties as to the above-referenced Project.
If you have any questions, please feel free to contact me. I look forward to working with you.
Sincerely, Site Lines LLC
William L. Hardy II Geophysicist President
Enclosure
SITE LINES LLC PROPOSAL
SITE LOCATION
Former Oasis Cleaners Site – 3210 1st Street West, Bradenton, FL.
PROPOSED SCOPE OF WORK
Site Lines (“Company”) will use Ground Penetrating Radar (GPR) and conventional electromagnetic (EM) pipe and cable locators to determine the location of underground utilities at the site identified by APTIM (“Client”). Of specific concern is the utilities within the area of a proposed soil vapor extraction trench. The location of the trench was provided by Aptim and is attached to the back of this document.
RESULTS OF THE INVESTIGATION
The estimated depth and location of utilities identified during the investigation will be marked on the ground surface using spray paint or other method to be agreed upon by the parties. Designated utilities will also be documented on a field sketch.
A scaled AutoCAD figure of the results can be prepared if requested. The American Public Works Association Uniform Color Codes for the marking of underground utilities will be used.
PROJECT FEE
The fee to complete the project as described within this proposal is:
Seven Hundred Dollars [$700.00] includes markings on the ground and field sketch
Nine Hundred Dollars [$900.00] includes scaled AutoCAD figure of the results
Client shall pay Company in full within thirty (30) days of the invoice date, unless the parties have agreed to another payment arrangement in writing. If during the investigation, Company determines that the goals of the project cannot be achieved with the resources available to Company, Company will notify Client as soon as reasonably possible. Under such circumstances, Company will charge Client only for time expended and materials used to date.
CLIENT REQUIREMENTS
Client is responsible for all site access, maintenance of traffic (MOT), site clearing and/or any other logistical considerations necessary to conduct the utility locate.
Client will also provide all pertinent maps of the project site, including those that show the boundaries of the utility locate, pertinent landmarks, and known utilities (if available). Company is not a substitute for Chapter 556, Florida Statutes.
June 9, 2021 Submitted By:
Josh Walker
407.375.0131
Josh.walker@gprsinc.com
Client: Aptim Environmental Services
Attn: Eric Kramer
Eric.kramer@aptim.com, 352-235-1789
Project: Former Oasis Cleaners
GPRS appreciates the opportunity to provide this proposal. I encourage you to visit our website (www.gprsinc.com) and contact any of the numerous references listed. Our insurance certificate and W-9 can also be downloaded here. Please feel free to contact me if you have any questions, or if you need additional information.
SCOPE OF WORK
We understand the scope to be to search for underground utilities within the two tenant spaces, and the 20 feet outward from the western building wall. There will be ~18 sample locations done within the scope of work that will be cleared in the process. We will attempt to trace any utilities/obstructions for which there are structures visible from the work area. Utilities will be marked on the surface using paint, flags, markers, or other appropriate means. The client will be responsible to provide drawings or notify GPRS of any utilities known to be entering the work area for which there are no apparent surface features or structures that are visible from the work area.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .