CN-370000-HW554-DC007G.pdf

PDF 884 KB Posted

Attached to
Master Agreement FL|HW554|b8491b6aee5cca18e2fd02a5beae48f4
Contract number
HW554
Issued by
Florida

About this file

This Task Assignment Notification Form (DC007G) is issued under Florida Department of Environmental Protection (FDEP) Contract No. HW554 between FDEP and APTIM Environmental & Infrastructure, Inc. The assignment covers environmental monitoring work at the Former Dry Clean USA facility located at 12020 Anderson Road, Tampa, Hillsborough County, Florida (DEP Site #ERIC_4747). The work is managed by FDEP Project Manager Melissa A Walsh and APTIM Project Manager Eric Kramer, P.E.

The task assignment requires APTIM to remove passive diffusion bag samplers and conduct quarterly Natural Attenuation Monitoring (NAM) sampling at the site according to a scope of work dated May 10, 2021. The assignment is structured as three subtasks: Subtask 1 covers project management as a negotiated percentage of overall project costs; Subtask 2 requires removal of passive diffusion bag samplers and quarterly sampling #1 with an interim deliverable of a quarterly NAM report due June 4, 2021; and Subtask 3 requires quarterly sampling #2 with final deliverables including the Quarterly #2 NAM Report, GIS tables, and ADaPT logs due September 2, 2021. The total fixed-price contract value is $12,540.65, with no retainage. Payment is divided into two invoicing milestones: $5,659.21 upon submittal and FDEP approval of Quarterly NAM report #1, and $6,881.44 upon submittal and FDEP approval of Quarterly NAM report #2, ADaPT logs, and GIS tables. The task period extends from execution through November 2, 2021.

View the file

Other files

File Type Posted
CN-370000-HW554-A10.pdf PDF
CN-370000-HW554-A5.pdf PDF
CN-370000-HW554-A6.pdf PDF
CN-370000-HW554-CO1.pdf PDF
CN-370000-HW554-CO2.pdf PDF
CN-370000-HW554-CO3.pdf PDF
CN-370000-HW554-DC003J.pdf PDF
CN-370000-HW554-DC004F.pdf PDF
CN-370000-HW554-DC007F.pdf PDF
CN-370000-HW554-DC008I.pdf PDF
CN-370000-HW554-DC009G.pdf PDF
CN-370000-HW554-DC010G.pdf PDF
CN-370000-HW554-DC010I.pdf PDF
CN-370000-HW554-DC010K.pdf PDF
CN-370000-HW554-DC012I.pdf PDF
CN-370000-HW554-DC012J.pdf PDF
CN-370000-HW554-DC014F.pdf PDF
CN-370000-HW554-DC014H.pdf PDF
CN-370000-HW554-DC01ACO4.pdf PDF
CN-370000-HW554-DC01ACO5.pdf PDF
CN-370000-HW554-DC01ACO8.pdf PDF
CN-370000-HW554-DC01C.pdf PDF
CN-370000-HW554-DC01G.pdf PDF
CN-370000-HW554-DC01i.pdf PDF
CN-370000-HW554-DC021C.pdf PDF
CN-370000-HW554-DC022C.pdf PDF
CN-370000-HW554-DC024C.pdf PDF
CN-370000-HW554-DC02BCO1.pdf PDF
CN-370000-HW554-DC02BCO7.pdf PDF
CN-370000-HW554-DC02BCO8.pdf PDF
CN-370000-HW554-DC02F.pdf PDF
CN-370000-HW554-DC02FCO2.pdf PDF
CN-370000-HW554-DC02ICO3.pdf PDF
CN-370000-HW554-DC02L.pdf.crdownload CRDOWNLOAD file
CN-370000-HW554-DC02LCO1.pdf PDF
CN-370000-HW554-DC03D.pdf PDF
CN-370000-HW554-DC03DCO1.pdf PDF
CN-370000-HW554-DC03E.pdf PDF
CN-370000-HW554-DC03ECO2.pdf PDF
CN-370000-HW554-DC03FCO2.pdf PDF
CN-370000-HW554-DC03FCO3.pdf PDF
CN-370000-HW554-DC03L.pdf PDF
CN-370000-HW554-DC04D.pdf PDF
CN-370000-HW554-DC05C.pdf PDF
CN-370000-HW554-DC05CCO1.pdf PDF
CN-370000-HW554-DC05CCO4.pdf PDF
CN-370000-HW554-DC05E.pdf PDF
CN-370000-HW554-DC05HCO1.pdf PDF
CN-370000-HW554-DC07B.pdf PDF
CN-370000-HW554-DC07D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW554

D000 N/ADC007G

APTIM

Eric Kramer, P.E.

(850)-245-8960Melissa A Walsh

ERIC_4747

Dry Clean USA

12020 Anderson Road, Tampa, Hillsborough

Monitoring

APTIM will remove the passive diffusion bag samplers and conduct quarterly NAM sampling. Work will be done according to the attached scope of work dated May 10, 2021.

Quarterly #2 NAM Report, GIS tables, ADaPT Logs

09/02/2021

11/02/2021

$ 12,540.65 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Melissa Walsh Digitally signed by Melissa Walsh Date: 2021.05.17 15:45:24 -04'00'

Melissa Walsh Digitally signed by Melissa Walsh Date: 2021.05.17 15:48:35 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.05.18 10:01:38 -04'00'

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2021.05.18 16:49:33 -04'00'

$ 12,540.65

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Quarterly NAM report #1- Subtask 2 06/04/2021

Quarterly NAM report #2, ADaPT Logs, GIS Tables- Subtask 3 09/02/2021

Submittal and FDEP approval of Quarterly NAM report #1- Subtask 2 $ 5,659.21

Submittal and FDEP approval of Quarterly NAM report #2, ADaPT Logs, GIS Tables- Subtasks 1 and 3 $ 6,881.44

$ 12,540.65

HW554

DC007G

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

Memorandum

TO: APTIM Contract File Contract No. HW554

FROM: Melissa A Walsh, Project Manager

SUBJECT: Dry Clean USA

FAC # ERIC_4747

Task Assignment #DC0007G Monitoring

DATE: May 17, 2021

Under this task assignment, APTIM will remove the passive diffusion bag (PDB) samplers and conduct quarterly NAM sampling. Work will be done according to the attached scope of work dated May 10, 2021.

Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate.

Subtask 2: Quarterly Sampling #1 and reporting APTIM and DEP agreed to the proposed scope of work and level of effort. APTIM will remove the PDBs and conduct quarterly sampling #1. Interim deliverable is quarterly NAM report.

Subtask 3: Quarterly Sampling #2 and reporting APTIM and DEP agreed to the proposed scope of work and level of effort. APTIM will conduct quarterly sampling #2. Final deliverable is quarterly NAM report. If levels are below GCTLs, APTIM will conduct a TACO for a SRCR.

The Task Assignment is for the fixed price of $12,540.65. Cost details are included in the attached Cost Estimate Forms, supporting Level-of-Effort subtasks, and the Proposed Scope of Work.

FDEP COST ESTIMATE

Contractor: APTIM Environmental & Infrastructure, In

Date: 5/10/2021

Task #: HW554-DC007G SubTask 1 Project Management SubTask 6

Site: DCUSA Anderson Rd (ERIC_4747) SubTask 2 2-Quarterly Sampling #1 SubTask 7

Activity/Phase: NAM Sampling SubTask 3 3-Quarterly Sampling #2 SubTask 8

Project Manager: Eric Kramer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$63.32 Client Program Manager E. Kramer 6 6.3 $63.32 Engineer/Scientist 5 E. Kramer 4 2 2 0 0 0 0 0 0 0 $60.61 Engineer/Scientist 5 G. Roberts 30 15 15 0 0 0 0 0 0 0 $35.00 Engineering Technician 4 A. Escobar 26 13 13 0 0 0 0 0 0 0 $31.69 Designer 2 S. Ferianc 4 2 2 0 0 0 0 0 0 0 $25.04 Tech Publications Speciali H. Vining 4 2 2 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 Total Hours 74 6 34 34 0 0 0 0 0 0 0

Direct Labor $3,609.56 $401.06 $1,604.25 $1,604.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 119.00% $4,295.38 $477.26 $1,909.06 $1,909.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 20.90% $754.40 $83.82 $335.29 $335.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 32.60% $1,176.73 $130.75 $522.99 $522.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $9,836.07 $1,092.89 $4,371.59 $4,371.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $180.47 $20.05 $80.21 $80.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $194.00 $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Equipment Procurement)

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Services Procurement)

Subcontractor Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $200.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $200.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $20.00 $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $220.00 $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $528.00 $264.00 $264.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $528.00 $264.00 $264.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost Estimate Page 1 of 4 DC007G est

FDEP COST ESTIMATE

Contractor: APTIM Environmental & Infrastructure, In

Date: 5/10/2021

Task #: HW554-DC007G SubTask 1 Project Management SubTask 6

Site: DCUSA Anderson Rd (ERIC_4747) SubTask 2 2-Quarterly Sampling #1 SubTask 7

Activity/Phase: NAM Sampling SubTask 3 3-Quarterly Sampling #2 SubTask 8

Project Manager: Eric Kramer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Expendables $65.00 $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $417.10 $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $116.40 $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $598.50 $299.25 $299.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$11,557.04 $1,112.94 $5,222.05 $5,222.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal $983.61 $109.29 $437.16 $437.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee

Total Estimated Cost $12,540.65 $1,222.23 $5,659.21 $5,659.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost Estimate Page 2 of 4 DC007G est

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : DCUSA Anderson Rd (ERIC_4747)

SUBTASK:

DATE: May 10, 2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2

Engineer/Scientist 5 G. Roberts

Engineering Technician 4 A. Escobar

Designer 2 S. Ferianc 2 Tech Publications Specialist 2 H. Vining 2

TOTAL LABOR 34

EQUIPMENT ITEM RATE UNIT USAGE

Expendables $32.50 Day 1 $32.50 Shallow GW Sampling Kit $208.55 day 1 $208.55 Water Level Indicator $19.40 Day 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 1 $58.20

TOTAL EQUIPMENT: $299.25

VEHICLE TYPE RATE UNIT USAGE

Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 1 $97.00

TOTAL VEHICLE: $97.00

PER DIEM STAFF RATE UNIT USAGE

Hotel $99.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00

TOTAL PER DIEM: $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Halos Only) $66.00 3 1 $264.00 EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00

TOTAL LAB: $264.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USAGE TOTALS

Erwin Remediation IDW Pickup and Disposal $100.00 Drumm 1 $100.00 Columbia Analytical Protective Mesh Covers $2.00 each 0 $0.00

TOTAL SUB: $100.00

Travel Preparation and Mobilization (1 hr). Round trip travel to site (2 hrs). Open Wells and Collect Depth to Groundwater Measurements (1 hr). Collection of Groundwater Samples from Monitoring Wells MW001, MW003, MW004 for VOHs by EPA Method 8260 (6 hrs). Sample preparation, Chain of custody preparation, Sample Packaging (1 hr). Site Restoration, Drum Storage and Cleanup (1 hr), Sample Delivery (1 hr).

Drafting GW Flow and Analytical Results Maps

Notes: Proposed GW Samples from Monitoring Wells MW001, MW003 and MW004 for VOHs Only (EPA Method 8260).

2-Quarterly Sampling #1

Technical Review of Quarterly Report and Recommendations (2 hrs)

Preparation of GW Flow Map and GW Analytical Results Maps (2 hrs). Update of GW Elevation, Analytical Summary Tables gradient Calulations (1 hr) Letter Report Text and Preparation of Recommendations and conclusions (10 hrs). CD/Database Tables Update, Data Check and Upload, ADaPT Laboratory Data Check (1 hr), Complete IDW Manifesting Documentation (1 hr).

Report Document Production

2-Quarterly #1 Page 3 of 4 DC007G est

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : DCUSA Anderson Rd (ERIC_4747)

SUBTASK:

DATE: May 10, 2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2

Engineer/Scientist 5 G. Roberts

Engineering Technician 4 A. Escobar

Designer 2 S. Ferianc 2 Tech Publications Specialist 2 H. Vining 2

TOTAL LABOR 34

EQUIPMENT ITEM RATE UNIT USAGE

Expendables $32.50 Day 1 $32.50 Shallow GW Sampling Kit $208.55 day 1 $208.55 Water Level Indicator $19.40 Day 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 1 $58.20

TOTAL EQUIPMENT: $299.25

VEHICLE TYPE RATE UNIT USAGE

Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 1 $97.00

TOTAL VEHICLE: $97.00

PER DIEM STAFF RATE UNIT USAGE

Hotel $99.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00

TOTAL PER DIEM: $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Halos Only) $66.00 3 1 $264.00 EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00

TOTAL LAB: $264.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USAGE TOTALS

Erwin Remediation IDW Pickup and Disposal $100.00 Drumm 1 $100.00 Columbia Analytical Protective Mesh Covers $2.00 each 0 $0.00

TOTAL SUB: $100.00

3-Quarterly Sampling #2

Technical Review of Quarterly Report and Recommendations (2 hrs)

Preparation of GW Flow Map and GW Analytical Results Maps (2 hrs). Update of GW Elevation, Analytical Summary Tables gradient Calulations (1 hr) Letter Report Text and Preparation of Recommendations and conclusions (10 hrs). CD/Database Tables Update, Data Check and Upload, ADaPT Laboratory Data Check (1 hr), Complete IDW Manifesting Documentation (1 hr).

Notes: Proposed GW Samples from Monitoring Wells MW001, MW003 and MW004 for VOHs Only (EPA Method 8260).

Travel Preparation and Mobilization (1 hr). Round trip travel to site (2 hrs). Open Wells and Collect Depth to Groundwater Measurements (1 hr). Collection of Groundwater Samples from Monitoring Wells MW001, MW003, MW004 for VOHs by EPA Method 8260 (6 hrs). Sample preparation, Chain of custody preparation, Sample Packaging (1 hr). Site Restoration, Drum Storage and Cleanup (1 hr), Sample Delivery (1 hr).

Drafting GW Flow and Analytical Results Maps Report Document Production

3-Quarterly #2 Page 4 of 4 DC007G est

Item Description Units Unit Price Total

Amount Units Unit Price Total

Amount Units Unit Price Total

Amount Transporation 1 $35.00 $35.00 1 $90.00 $90.00 Disposal (Liquid) 1 $350.00 $350.00 1 $110.00 $110.00 1 Lump $100.00 Disposal (Soil) Additional Paperwork Costs 1 Lump $200.00 Additional Costs/Fees 1 13% $45.50 Low Volume Stop $50.00

Total $630.50 $250.00 $100.00

Included in Disposal

IDW Pickup and Disposal Bid Summary

None

US Ecology Clark Environmental

None None

NoneNoneNone

Erwin Remediation

Roberts, Gregg

From: Ross Harvey <Ross.Harvey@usecology.com> Sent: Friday, May 15, 2020 1:14 PM To: Roberts, Gregg Subject: RE: Request for Quotation for Non-Hazardous IDW Drums T&D – Oasis Cleaners, Bradenton

EXTERNAL SENDER

a) 2 drums of soil/drilling IDW (solid) $70.00/drum $140.00 (Non‐Haz)

b) 2 drums of purge/decon water (liquid) $70.00/drum $140.00 (Non‐Haz)

c) Please include transportation, disposal and preparation of the waste profiles and manifests in the cost estimate. $350.00 Flat Fee / $200 paperwork

13% EIR (Waste): $36.40

Esitmated Total: $866.40

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the https://www.usecology.com/images/email_signature/blank01.gif

Ross Harvey Senior Account Executive Reg(FL), Terr 34 ross.harvey@usecology.com p: 813.319.3425 | c: 727.415.0234 | f: 813.628.0842

7202 East Eighth Ave. Tampa, FL 33619

Emergency Response: 800.839.3975 Customer Service: 800.592.5489

US Ecology | Unequaled service. Solutions you can trust.

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.

https://www.usecology.com/images/email_signature/usecology_signature.jpg

From: Roberts, Gregg [mailto:Gregg.Roberts@aptim.com] Sent: Thursday, May 14, 2020 11:30 AM To: Ross Harvey Subject: Request for Quotation for Non‐Hazardous IDW Drums T&D – Oasis Cleaners, Bradenton

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.

Hello Ross:

I need an estimate to include in a proposal to pick‐up and dispose of non‐hazardous soil and liquid which will be generated during upcoming soil and groundwater assessment at the following site:

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Gregg Roberts, PG

Aptim

725 US Hwy 301 South

Tampa, FL 33619

May 14, 2020

Re: Drum Disposal – Oasis Cleaners - Bradenton, FL

Mr. Roberts:

The price for disposal of drums of non-hazardous soil or groundwater located in Bradenton, FL will be $100.00 per drum. This price is a flat-rate that includes all profiling, manifesting, transportation and disposal costs.

Please feel free to contact me on my direct line at 850-292-6511 if you have any questions. We look forward to working with you in the future.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

Proposed Scope of Work Quarterly NAM Sampling Former Dry Clean USA (Anderson Rd) Task Assignment DC007G Site ID No. ERIC_4747 (Former Facility ID No. 299502075) APTIM Environmental & Infrastructure, Inc.

5/10/2021

Based on the findings and FDEP review of the recent Biennial Groundwater Sampling Report dated March 19, 2021, it was recommended that conventional groundwater sampling be initiated at the site to determine if groundwater concentrations have achieved No Further Action conditions under Natural Attenuation Monitoring. As recommended by the FDEP, the three passive diffusion bag (PDB) samplers and associated harnesses installed within monitoring wells MW001, MW003 and MW004 will be removed and each well will be sampled conventionally.

The proposed Task Assignment includes two (2) quarterly groundwater sampling events. Each sampling event will include opening the wells to equilibrate for the collection of depth-to-groundwater measurements (MW001 through MW005) and the collection of groundwater samples (conventionally) from monitoring wells MW001, MW003 and MW004, as recommended in the recent biennial report and stipulated in the October 17, 2011 FDEP Deliverable Review. The samples will be submitted for analysis by EPA Method 8260 for volatile organic halocarbons (VOHs).

Quarterly Sampling Reports will be provided summarizing the groundwater measurements and analytical results in Tables, Figures and Text including conclusions and recommendations. In addition, in the event both groundwater sampling events are reported below NFA criteria, Subtask 4 will allow for conversion of the Quarterly #2 report to include the requirements of a SRCR. Although an effort will be made to describe previous remedial actions to address soil closure of the site, please note that a MAGS survey performed in 2007 indicated a possible unsaturated contaminant source remains in an organic layer between 3 and 5 ft bls. Therefore, it is possible that, based on the review, soil samples may be necessary to demonstrate that SCTLs have been achieved or that any remaining VOHs do not constitute a source of groundwater contamination by direct leachability testing by the Synthetic Precipitation Leaching Procedure (SPLP), as noted in the recent Biennial Report.

APTIM recommends the following schedule:

Description Due Date Quarterly #1 Report Submittal 6/4/2021 Quarterly #2 Report Submittal 9/2/2022 Submit GIS/Data Base Update 9/2/2021

Task Expiration Date 9/28/2021

Note that the recommended task completion date extends past to the current contract completion date of August 15, 2021, however, it is understood that an extension to contract end date is anticipated.

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of Environmental Protection No. HW554. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.

If you have any questions, please do not hesitate to call.

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
DC007G.pdf
Copy of DC007G est.pdf
Cost Estimate
2-Quarterly #1
2-Quarterly #2
3-SRCR Rpt
Bid Quotes IDW (002).pdf
IDW Bid Summary
EQ
Clark Quote
ER Quote

File details come from the government source that posted it. Updated .