This is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract No. HW554, issued to contractor APTIM Environmental & Infrastructure, Inc. The task assignment pertains to monitoring activities at the Altamonte Springs Dry Cleaners facility (FDEP Site #ERIC_5459) located at 478 East Altamonte Avenue, Suite 112, Altamonte Springs, Seminole County, Florida. The task manager is Melissa A Walsh, with Eric Kramer, P.E., serving as the contractor representative. The work is performed under the authority of the Florida Department of Environmental Protection.
APTIM will conduct biennial groundwater sampling and submit a Biennial Groundwater Monitoring Report as the final deliverable, with work performed according to the scope of work dated May 24, 2021. The scope includes collection and sampling of five passive diffusion bag samplers from five monitoring wells, depth-to-groundwater measurements from 19 monitoring wells, and laboratory analysis by EPA Method 8260. The task assignment carries a fixed price value of $6,760.53, with no cost reimbursement or other fees. The final deliverable is due September 30, 2021, with the period of performance extending through January 13, 2022. Invoice payment is contingent upon submittal and FDEP approval of the Biennial Groundwater Monitoring Report. Cost estimates detail labor allocations across five staff members totaling 40 hours, travel expenses of $97.00, laboratory analytical costs of $525.00, field expenses of $221.85, and subcontractor costs including IDW transportation and disposal at $110.00.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW554
D000 N/ADC004F
APTIM
Eric Kramer, P.E.
(850)-245-8960Melissa A Walsh
ERIC_5459
Altamonte Springs Dry Cleaners
478 East Altamonte Avenue, Suite 112, Altamonte Springs, Seminole
Monitoring
APTIM will conduct biennial groundwater sampling and submit a Biennial Groundwater Monitoring Report as the final deliverable. Work will be done according to the attached scope of work dated May 24, 2021.
Biennial Groundwater Monitoring Report
09/30/2021
01/13/2022
$ 6,760.53 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Melissa Walsh Digitally signed by Melissa Walsh Date: 2021.08.05 12:17:25 -04'00'
Melissa Walsh Digitally signed by Melissa Walsh Date: 2021.08.05 12:17:33 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.08.05 13:11:20 -04'00'
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2021.08.05 14:50:13 -04'00'
$ 6,760.53
Walsh_M Highlight
Walsh_M Highlight
Walsh_M Highlight
Walsh_M Highlight
Walsh_M Highlight
Walsh_M Highlight
Walsh_M Highlight
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Biennial Groundwater Monitoring Report 09/30/2021
Submittal and FDEP approval of Biennial Groundwater Monitoring Report $ 6,760.53
$ 6,760.53
HW554
DC004F
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: APTIM Contract File Contract No. HW554
FROM: Melissa A Walsh, Project Manager
SUBJECT: Altamonte Springs Dry Cleaners
FAC # ERIC_5459
Task Assignment #DC004F Monitoring
DATE: August 4, 2021
Under this Task Assignment, APTIM will collect samples for groundwater as required for closure of the site. Work will be done according to the attached scope of work dated May 24, 2021.
Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate.
Subtask 2: Annual Groundwater Sampling Report APTIM and DEP agreed to the proposed scope of work and level of effort. This is task allows for groundwater sampling for a Biennial Groundwater Monitoring Report.
The Final Task Assignment value is for the fixed price $6,760.53.
FDEP COST ESTIMATE
Contractor: APTIM Environmental & Infrastructure, Inc
Date: 5/24/2021
Task #: HW554-DC004F ERIC_5459 SubTask 1 Project Management
Site: Altamonte Springs Dry Cleaner SubTask 2 2-Biennial Sampling
Activity/Phase: Biennial Sampling SubTask 3
Project Manager: Eric Kramer SubTask 4
SubTask 5
Totals 1 2 3 4 5 6 Labor Rate Category
$63.32 Client Program Manager E. Kramer 3 3.3 $63.32 Engineer/Scientist 5 E. Kramer 2 2 0 0 0 0 $60.61 Engineer/Scientist 5 G. Roberts 16 16 0 0 0 0 $32.77 Engineer/Scientist 2 K. Howard 14 14 0 0 0 0 $31.69 Designer 2 S. Ferianc 2 2 0 0 0 0 $25.04 Tech Publications Specialis H. Vining 3 3 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 0 0
Total Hours 40 3 37 0 0 0 0
Direct Labor $1,905.39 $211.71 $1,693.68 $0.00 $0.00 $0.00 $0.00
Fringe 119.00% $2,267.41 $251.93 $2,015.48 $0.00 $0.00 $0.00 $0.00 Overhead 20.90% $398.23 $44.25 $353.98 $0.00 $0.00 $0.00 $0.00 Gen & Admin 32.60% $621.16 $69.02 $552.14 $0.00 $0.00 $0.00 $0.00
Total Labor $5,192.19 $576.91 $4,615.28 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $95.27 $10.59 $84.68 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 (Equipment Procurement)
Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Services Procurement)
Subcontractor Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $462.00 $462.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $525.00 $525.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $131.15 $131.15 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $221.85 $221.85 $0.00 $0.00 $0.00 $0.00
$6,241.31 $587.50 $5,653.81 $0.00 $0.00 $0.00 $0.00 Subtotal $519.22 $57.69 $461.53 $0.00 $0.00 $0.00 $0.00 Completion Fee
Total Estimated Cost $6,760.53 $645.19 $6,115.34 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 2 DC004F est
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Altamonte Springs Dry Cleaner
SUBTASK:
DATE: May 24, 2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 2 K. Howard
Designer 2 S. Feriac 2 Tech Pub. Specialist 3 H. Vining 3
TOTAL LABOR 37
EQUIPMENT ITEM RATE UNIT USAGE
Expendables $32.50 Day 1 $32.50 Shallow GW Sampling Kit $208.55 day 0 $0.00 Deep Groundwater Sampling Kit $349.20 Day 0 $0.00 Water Level Indicator $19.40 Day 1 $19.40 Diffusion Sampler (2" well) $22.35 each 5 $111.75 Diffusion Sampler Kit $28.15 each 0 $0.00 Diffusion Sampler Well Cap $12.65 each 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 1 $58.20
TOTAL EQUIPMENT: $221.85
VEHICLE TYPE RATE UNIT USAGE
Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 1 $97.00
TOTAL VEHICLE: $97.00
PER DIEM STAFF RATE UNIT USAGE
Hotel $99.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00
TOTAL PER DIEM: $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Halos Only) $66.00 5 1 $396.00 EPA Method 8260 (Halos Only) $66.00 1 0 $66.00 Sample Shipping (Small cooler) $63.00 1 $63.00 Sample Shipping (large cooler) $104.00 0 $0.00
TOTAL LAB: $525.00
SUBCONTRACTOR COSTS
NAME PURPOSE Rate UNIT USAGE TOTALS
Erwin Remediation IDW Transporation and Disposal $100.00 Drum 1 $100.00 Columbia Analytical Protective Mesh Covers $2.00 each 0 $0.00
TOTAL SUB: $100.00
Report Document Production Drafting GW Flow and Analytical Results Maps
Notes: Proposed GW Samples and PDB Deployment into Monitoring Wells MW002, MW009, MW016R, MW017 and MW019.
2-Biennial Sampling
Technical Review of Biennial Report, Update Recommendations (2 hrs)
Ordering Replacement Passive Sampling Bags (1 hr), Preparation of Upper and Lower GW Flow Maps and GW Analytical Results Maps (2 hrs). Update of GW Elevation, Analytical Summary Tables gradient Calulations (3 hrs) Letter Report Text and Preparation of Recommendations and conclusions (9 hrs). CD/Database Tables Update, Data Check and Upload, ADaPT Laboratory Data Check (1 hr).
Travel Preparation and Mobilization (1 hr). Round trip travel to site (2 hrs). Open Wells and Collect Depth to Groundwater Measurements from All Wells (2 hrs). Harvest PDB's and collection of Groundwater Samples from PDBs located within Monitoring Wells MW002, MW009, MW016R, MW017 and MW019 for VOHs by EPA Method 8260 (5 hrs). IDW Sample Collection and IDW Handling (1 hr) Sample preparation, Chain of custody preparation, Sample Packaging (1 hr). Site Restoration and Cleanup (1 hr), Sample Delivery (1 hr).
2-BiennialGW Page 2 of 2 DC004F est
Item Description Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total
Amount Transporation Disposal (soil) 0 $0.00 0 $0.00 0 $0.00 Disposal (liquid) 1 $90.00 $90.00 1 $380.00 $380.00 1 $100.00 $100.00 Additional Costs/Fees 1 $50.00 $50.00 1 $100.00 $100.00
Total $140.00 $480.00 $100.00
Clark Environmental Safety-Kleen
May 20, 2021
Included in Disposal
None
Erwin Remediation
Included in Disposal
IDW Pickup and Disposal Bid Summary Former Altamonte Springs Dry Cleaners.
478 East Altamonte Drive Altamonte Springs, Florida 32701
FDEP Site No. ERIC_5459 (Former FAC ID #599500541)
Included in Disposal
Roberts, Gregg
From: Bright, Thomas Gary <Thomas.Bright@safety-kleen.com> Sent: Wednesday, May 19, 2021 7:38 AM To: Roberts, Gregg Subject: RE: Request for Quotation for Non-Hazardous IDW T&D – Altamonte Springs Dry Cleaner
EXTERNAL SENDER
Good morning Greg. All of the locations you sent me would be handled out of the Sanford branch except the Jupiter location. But in all the cases this will cover them. This quote is just an estimate pending analysis and profile approval.
Profile fee ‐ $100.00 Per location Non haz disposal‐ $380.00 per drum
Again this is just an estimate pending analysis.
Thanks Thomas
Please visit our online store: www.store.safety‐kleen.com
Thomas Bright / Account Manager | Safety‐Kleen | Sanford Florida| A Clean Harbors Company| thomas.bright@safety‐kleen.com Direct Cell‐ 407‐212‐5152 |(f) 407‐321‐0065
Safety Starts with Me: Live It 3‐6‐5
From: Roberts, Gregg <Gregg.Roberts@aptim.com> Sent: Tuesday, May 18, 2021 7:29 PM To: Bright, Thomas Gary <Thomas.Bright@safety‐kleen.com> Subject: FW: Request for Quotation for Non‐Hazardous IDW T&D – Altamonte Springs Dry Cleaner
Hello Thomas, the below email is being forwarded to you based on Nicole’s email response.
GREGG ROBERTS, PG
Project Manager
APTIM | ENVIRONMENT & SUSTAINABILITY
O 813 612 3687 M 863 670 0215 E gregg.roberts@aptim.com
From: Roberts, Gregg Sent: Monday, May 17, 2021 7:13 PM To: Vitale, Nicole M <Nicole.Vitale@safety‐kleen.com> Subject: Request for Quotation for Non‐Hazardous IDW T&D – Altamonte Springs Dry Cleaner
Roberts, Gregg
From: Erwin Remediation <erwinremediation@gmail.com> Sent: Tuesday, May 18, 2021 8:03 AM To: Roberts, Gregg Subject: Re: Request for Quotation for Non-Hazardous IDW T&D – Altamonte Springs Dry Cleaner
EXTERNAL SENDER
Gregg, This will be $100.00 per drum.
If possible, please take a composite sample of the entire drum.
Thank you, Jonathan Erwin Erwin Remediation, Inc.
Office: (850) 292‐6511|Email: ErwinRemediation@Gmail.com Erwin Remediation, Inc.|408 Ditmar Street Pensacola, FL 32503
On Mon, May 17, 2021 at 6:13 PM Roberts, Gregg <Gregg.Roberts@aptim.com> wrote:
Hello Jonathan:
I need an estimate to include in a proposal to pick‐up and dispose of non‐hazardous liquid which will be generated during upcoming groundwater sampling activities at the following site:
Here are the site specifics:
Altamonte Springs Dry Cleaners (Former)
478 East Altamonte Drive
Altamonte Springs, Florida 32701
ERIC_5459 (Former FAC ID# 599500541)
Proposed Scope of Work Biennial Sampling Altamonte Springs Dry Cleaners Task Assignment DC004F Facility ID No. 599500541 (ERIC_5459) APTIM Environmental and Infrastructure, LLC 05/24/21
The former Altamonte Springs Dry Cleaner (DC004E) facility is sampled on a biennial basis.
The following proposed scope of work for Task Assignment DC004F is collection and sampling of five passive diffusion bag (PDB) samplers from five (5) monitoring wells. Retrieval, sampling and replacement of the PDBs is currently due and will be scheduled upon approval of the Task Assignment in June or July 2021.
This proposed scope of work includes the collection of depth-to-groundwater measurements from the 19 site monitor wells (MW001 through MW019). Samples will be collected from the five existing monitoring wells containing the PDB bags for analysis by EPA Method 8260 for volatile organic halocarbons (VOHs).
Five replacement PDBs will be obtained from ALS Environmental (ALS), a licensed manufacturer of passive diffusion samplers and will be constructed and placed within the wells similar to the existing samplers. Specifically, the selected PDB samplers for the selected wells are 24” long and 1 ¼” in diameter. The samplers will be ordered pre-filled with approximately 220 milliliters of certified, laboratory-grade, analyte-free, deionized water. The PDB bags will be deployed the same as the current bags.
1. MW002, (2” well) total depth of approx. 50 ft bls (placement from 46.5 to 48.5 ft bls)
2. MW009, (2” well) total depth of approx. 84 ft bls (placement from 80.5 to 82.5 ft bls)
3. MW016R, (2” well) total depth of approx. 60 ft bls (placement from 54 to 56 ft bls)
4. MW017, (2” well) total depth of approx. 85.5 ft bls (placement from 82 to 84 ft bls)
5. MW019, (2” well) total depth of approx. 85.5 ft bls (placement from 82 to 84 ft bls)
Remaining water will be placed into a drum for storage onsite and future pickup and disposal.
Erwin Remediation has been selected to provide IDW transportation and disposal, based on bids included in the bid summary documents. The IDW characterization sample will be analyzed for the presence of VOHs by EPA Method 8260, as requested by the disposal subcontractor.
A Biennial Sampling Report will be provided summarizing the collected groundwater measurements and analytical results in Tables, Figures and Text including conclusions and recommendations. APTIM recommends the following schedule:
Description Due Date
Collection of GW Samples and Deployment of PDBs 07/02/2021
Submit Letter Report 08/06/2021
Submit GIS/Data Base Update 08/6/2021
Task Expiration Date 09/24/2021
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC. and Florida Department of Environmental Protection No. HW554. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please do not hesitate to call.
File details come from the government source that posted it. Updated .