CN-370000-HW554-DC01i.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW554|b8491b6aee5cca18e2fd02a5beae48f4
Contract number
HW554
Issued by
Florida

About this file

This is a Task Assignment Notification Form and supporting documentation for DEP Contract No. HW554, issued by the Florida Department of Environmental Protection (FDEP). The primary contractor is APTIM Environmental & Infrastructure, Inc., with Eric Kramer, PE serving as the contractor representative. John Sykes III serves as the DEP Contract Manager, and the task assignment is designated as DC001i under Module D000 with no associated grant funding. The task involves site review meetings at various locations under the department's indefinite delivery contract vehicle.

Task Assignment DC001i is a fixed-price engagement valued at $3,536.01 with no retainage, covering the preparation and presentation of site review meetings for interim project management and FDEP technical personnel. The deliverable consists of meeting minutes and a plan of action, with a final delivery date of June 19, 2020 and task completion by August 28, 2020. The scope requires 19 total labor hours, consisting of 9 hours from Engineer/Scientist 5 E. Kramer and 8 hours from Engineer/Scientist 5 G. Roberts, including preparation of PowerPoint presentation materials, logistical coordination, meeting attendance, and documentation of notes and action items. The cost estimate reflects direct labor of $1,160.30, fringe benefits at 119 percent ($1,380.75), overhead at 20.9 percent ($242.50), and general and administrative costs at 32.6 percent ($378.26), with other direct costs of $58.02. Invoice payment of the full $3,536.01 is due upon DEP approval of the meeting minutes and plan of action.

View the file

Other files

File Type Posted
CN-370000-HW554-DC002M.pdf PDF
CN-370000-HW554-DC003H.pdf PDF
CN-370000-HW554-DC004E.pdf PDF
CN-370000-HW554-DC011E.pdf PDF
CN-370000-HW554-DC012F.pdf PDF
CN-370000-HW554-DC017B.pdf PDF
CN-370000-HW554-DC01ACO3.pdf PDF
CN-370000-HW554-DC01E.pdf PDF
CN-370000-HW554-DC01J.pdf PDF
CN-370000-HW554-DC02B.pdf PDF
CN-370000-HW554-DC02BCO6.pdf PDF
CN-370000-HW554-DC02C.pdf PDF
CN-370000-HW554-DC02E.pdf PDF
CN-370000-HW554-DC02ECO1.pdf PDF
CN-370000-HW554-DC02ECO2.pdf PDF
CN-370000-HW554-DC02G.pdf PDF
CN-370000-HW554-DC02GCO1.pdf PDF
CN-370000-HW554-DC02I.pdf PDF
CN-370000-HW554-DC02N.pdf PDF
CN-370000-HW554-DC03B.pdf PDF
CN-370000-HW554-DC03C.pdf PDF
CN-370000-HW554-DC03ECO1.pdf PDF
CN-370000-HW554-DC03F.pdf PDF
CN-370000-HW554-DC03GCO1.pdf PDF
CN-370000-HW554-DC05CCO5.pdf PDF
CN-370000-HW554-DC05D.pdf PDF
CN-370000-HW554-DC05G.pdf PDF
CN-370000-HW554-DC05GCO1.pdf PDF
CN-370000-HW554-DC06D.pdf PDF
CN-370000-HW554-DC07GCO1.pdf PDF
CN-370000-HW554-DC08BCO1.pdf PDF
CN-370000-HW554-DC08BCO4.pdf PDF
CN-370000-HW554-DC08D.pdf PDF
CN-370000-HW554-DC08ECO1.pdf PDF
CN-370000-HW554-DC08ICO1.pdf PDF
CN-370000-HW554-DC08KCO1.pdf PDF
CN-370000-HW554-DC08KCO2.pdf PDF
CN-370000-HW554-DC08LCO1.pdf PDF
CN-370000-HW554-DC09CCO1.pdf PDF
CN-370000-HW554-DC10ACO1.pdf PDF
CN-370000-HW554-DC10FCO2.pdf PDF
CN-370000-HW554-DC10JCO1.pdf PDF
CN-370000-HW554-DC11ACO3.pdf PDF
CN-370000-HW554-DC11BCO1.pdf PDF
CN-370000-HW554-DC11CCO2.pdf PDF
CN-370000-HW554-DC11DCO1.pdf PDF
CN-370000-HW554-DC11GCO1.pdf PDF
CN-370000-HW554-DC12ECO1.pdf PDF
CN-370000-HW554-DC12H.pdf PDF
CN-370000-HW554-DC12JCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW554

D000 NADC001i

APTIM

Eric Kramer, PE

245-8960John Sykes III

Various

Site Review Meeting

Various

Various

Prepare and present site reviews for interim project manager & DEP technical personnel.

Meeting minutes & plan of action

06/19/2020

08/28/2020

$ 3,536.01 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Digitally signed by John Sykes III Date: 2020.05.28 15:42:52 -04'00'

Digitally signed by John Sykes III Date: 2020.05.28 15:43:08 -04'00'

Digitally signed by Jennifer Farrell Date: 2020.05.29 11:34:19 -04'00'

Digitally signed by Eric K. Kramer Date: 2020.05.29 13:36:07 -04'00'

$ 3,536.01

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Meeting minutes & plan of action - ST 2 06/19/2020

DEP approval of meeting minutes and plan of action - ST 1 & 2 $ 3,536.01

$ 3,536.01

HW554

DC001i

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

Memorandum

TO: DSCP Site File FROM: John Sykes III, Project Manager SUBJECT: Negotiation Summary, HW554, TA DC001i DATE: May 28, 2020

APTIM will prepare a presentation for a teleconference meeting to review all the active sites assigned to APTIM, per the May 28, 2020 scope, schedule, level of effort (LOE) and cost estimate (CE).

Subtask 2 & Summary:

APTIM project manager will prepare PowerPoint slides, arrange logistical support and coordinate with other APTIM personnel who will attend meeting (Gregg Roberts, PG), and prepare the meeting notes and plan of action. Proposed meeting date is June 4, 2020.

Final LOE and CE for this TA are 19 hours and $3,536.01, respectively. This LOE and CE are reasonable for the associated scope.

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, Inc.

Date: 5/27/2020

Task #: HW554-DC001I SubTask 1 Project Management

Site: HW554 Sites SubTask 2 Site Review Meeting (Virtual)

Activity/Phase: Site Review Meeting SubTask 3

Project Manager: Eric Kramer SubTask 4

SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$61.78 Client Program Manager E. Kramer 2 2.1 $61.78 Engineer/Scientist 5 E. Kramer 9 9 0 0 0 $59.42 Engineer/Scientist 4 G. Roberts 8 8 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 19 2 17 0 0 0

Direct Labor $1,160.30 $128.92 $1,031.38 $0.00 $0.00 $0.00

Fringe 119.00% $1,380.75 $153.41 $1,227.34 $0.00 $0.00 $0.00 Overhead 20.90% $242.50 $26.94 $215.56 $0.00 $0.00 $0.00 Gen & Admin 32.60% $378.26 $42.03 $336.23 $0.00 $0.00 $0.00

Total Labor $3,161.81 $351.30 $2,810.51 $0.00 $0.00 $0.00

Other Direct Costs $58.02 $6.45 $51.57 $0.00 $0.00 $0.00

Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 (Equipment Procurement)

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 (Services Procurement)

Subcontractor Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00

$3,219.83 $357.75 $2,862.08 $0.00 $0.00 $0.00 Subtotal $316.18 $35.13 $281.05 $0.00 $0.00 $0.00 Completion Fee

Total Estimated Cost $3,536.01 $392.88 $3,143.13 $0.00 $0.00 $0.00

Cost Estimate Page 1 of 2 DC001I est.xlsx

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : HW554 Sites

SUBTASK:

DATE: May 27, 2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 9

Engineer/Scientist 5 G. Roberts

TOTAL LABOR 17

EQUIPMENT ITEM RATE UNIT USAGE

Expendables $32.50 Day 0 $0.00 Shallow GW Sampling Kit $208.55 day 0 $0.00 Water Level Indicator $19.40 Day 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 0 $0.00

TOTAL EQUIPMENT: $0.00

VEHICLE TYPE RATE UNIT USAGE

Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 0 $0.00

TOTAL VEHICLE: $0.00

PER DIEM STAFF RATE UNIT USAGE

Hotel $110.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00

TOTAL PER DIEM: $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Halos Only) $66.00 0 0 $0.00 EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00

TOTAL LAB: $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USAGE Tax TOTALS

Misc. Supplies $50.00 Lump 0 $0.00 $0.00

TOTAL SUB: $0.00

Site Review Meeting (Virtual)

Preparation of Meeting Presentation (6 hrs) Attend Program/Project Review Meeting (2 hrs), Review Meeting Notes (1 hr)

Preparation of Meeting Presentation (4 hrs) Attend Program/Project Review Meeting (2 hrs), Preparation of Summary Notes for Deliverable (2 hrs)

2-Meeting Page 2 of 2 DC001I est.xlsx

Proposed Scope of Work APTIM Environmental Project Meeting Task Assignment DC001I APTIM Environmental & Infrastructure, Inc.

5/27/2020

Task Assignment (TA) H has been prepared for the requested project review meeting to be held virtually online on June 4th. The LOE includes preparation of project review materials. The deliverable will include a list of action items identified during the meeting for each site and will be submitted approximately two weeks following the meeting.

A task completion date of August 28, 2020 is recommended. Please do not hesitate to call should you have any questions.

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
DC001I est.pdf
Cost Estimate
2-Meeting

File details come from the government source that posted it. Updated .