This document is a Task Assignment Notification Change Order Form for Contract No. HW554 between the Florida Department of Environmental Protection (FDEP) and APTIM Environmental & Infrastructure, Inc. The task assignment (DC007G, Change Order No. 1) pertains to groundwater monitoring activities at the former Dry Clean USA site (ERIC_4747) located at 12020 Anderson Road, Tampa, Hillsborough County, Florida. The project is managed by FDEP Contract Manager Melissa Walsh and APTIM Contractor Representative Eric Kramer, P.E.

The change order reduces the task assignment value by $6,270.32, from the original amount of $12,540.65 to a revised amount of $6,270.33, based on FDEP's determination that the tasked second quarter of groundwater monitoring is no longer necessary following initial quarterly sampling results. Consequently, Subtask 3 (Quarterly Sampling #2 and reporting, valued at $5,659.21) has been removed, and the site will revert to annual monitoring. The deliverable consists of Quarterly NAM Report #1, GIS tables, ADaPT logs, and project management documentation with a due date of 06/04/2021. The task period has been extended by 30 days to 12/02/2021 to allow sufficient time for invoicing. The invoice is due upon submittal and FDEP approval of the deliverables, with a total cost of $6,270.33. Work is performed under a fixed price arrangement per the attached Scope of Work and Cost Proposal dated July 19, 2021.

View the file

Other files

File Type Posted
CN-370000-HW554-A1.pdf PDF
CN-370000-HW554-A11.pdf PDF
CN-370000-HW554-A4.pdf PDF
CN-370000-HW554-A8.pdf PDF
CN-370000-HW554-A9.pdf PDF
CN-370000-HW554-DC002K.pdf PDF
CN-370000-HW554-DC008G.pdf PDF
CN-370000-HW554-DC010A.pdf PDF
CN-370000-HW554-DC011E.pdf.crdownload CRDOWNLOAD file
CN-370000-HW554-DC011F.pdf PDF
CN-370000-HW554-DC019C.pdf PDF
CN-370000-HW554-DC01ACO1.pdf PDF
CN-370000-HW554-DC01ACO2.pdf PDF
CN-370000-HW554-DC01ACO6.pdf PDF
CN-370000-HW554-DC020C.pdf PDF
CN-370000-HW554-DC02BCO2.pdf PDF
CN-370000-HW554-DC02BCO3.pdf PDF
CN-370000-HW554-DC02BCO4.pdf PDF
CN-370000-HW554-DC02BCO5.pdf PDF
CN-370000-HW554-DC02DCO1.pdf PDF
CN-370000-HW554-DC02ECO3.pdf PDF
CN-370000-HW554-DC02FCO1.pdf PDF
CN-370000-HW554-DC02H.pdf PDF
CN-370000-HW554-DC02iCO1.pdf PDF
CN-370000-HW554-DC03FCO4.pdf PDF
CN-370000-HW554-DC03G.pdf PDF
CN-370000-HW554-DC03I.pdf PDF
CN-370000-HW554-DC03JCO1.pdf PDF
CN-370000-HW554-DC03K.pdf PDF
CN-370000-HW554-DC04B.pdf PDF
CN-370000-HW554-DC04ECO1.pdf PDF
CN-370000-HW554-DC05CCO2.pdf PDF
CN-370000-HW554-DC05H.pdf PDF
CN-370000-HW554-DC05I.pdf PDF
CN-370000-HW554-DC06B.pdf PDF
CN-370000-HW554-DC06C.pdf PDF
CN-370000-HW554-DC06DCO1.pdf PDF
CN-370000-HW554-DC07C.pdf PDF
CN-370000-HW554-DC08B.pdf PDF
CN-370000-HW554-DC08CCO1.pdf PDF
CN-370000-HW554-DC08DCO1.pdf PDF
CN-370000-HW554-DC08HCO2.pdf PDF
CN-370000-HW554-DC08HCO4.pdf PDF
CN-370000-HW554-DC08K.pdf PDF
CN-370000-HW554-DC08L.pdf PDF
CN-370000-HW554-DC09E.pdf PDF
CN-370000-HW554-DC09HCO1.pdf PDF
CN-370000-HW554-DC09I.pdf PDF
CN-370000-HW554-DC09J.pdf PDF
CN-370000-HW554-DC09JCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Change Order No.:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

Site Name:

Site ID / Facility ID::

Description of Change [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverable:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

Cost Reimbursement Fixed Fee

Original Task Amount

Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00

Original Task Completion Date:

Completion Date Prior to this Change:

Net Increase/Decrease in Task Period:

Completion Date with all Change Orders:

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

FIXED PRICE

TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM

ITEM

$0.00

$0.00

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

Final Deliverable Due Date:

$0.00

$0.00

CHANGE IN TASK TIME

FEE SCHEDULE

COST PLUS FIXED FEE

TOTAL

WCP TAFORM 01_18

HW554

1DC007G

APTIM

Eric Kramer, P.E.

850.245.8960Melissa Walsh

Dry Clean USA

ERIC_4747

Based on the findings of the initial quarterly groundwater sampling results, FDEP has determined that the tasked second quarter of monitoring will no longer be necessary. The site will be returned to annual monitoring. The work and costs associated with subtask 3 has been removed. The Task Assignment will be extended by one month to allow sufficient time for invoicing. Work will be done per the attached Scope of Work and Cost Proposal dated July 19, 2021

Quarterly NAM Report #1, GIS tables, ADaPT logs, and Project Management 06/04/2021

$ 12,540.65 $ 0.00 $ 0.00 $ 0.00

$ 12,540.65 $ 0.00 $ 0.00 $ 0.00 $ 12,540.65

($ 6,270.32) $ 0.00 $ 0.00 $ 0.00 ($ 6,270.32)

$ 6,270.33

11/02/2021

11/02/2021

30 days

12/02/2021

Melissa Walsh Digitally signed by Melissa Walsh Date: 2021.11.01 16:53:57 -04'00'

Melissa Walsh Digitally signed by Melissa Walsh Date: 2021.11.01 16:54:05 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.11.02 09:25:43 -04'00'

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2021.11.02 10:38:31 -04'00'

$ 6,270.33 $ 0.00 $ 0.00 $ 0.00

$ 12,540.65

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW554

DC007G

$ 6,270.33

Quarterly NAM report #1, GIS tables, ADaPT logs, and Project Management- Subtasks 2 & 1

Submittal and FDEP approval of Quarterly NAM report #1, GIS tables, ADaPT logs, and Project Management- Subtasks 2 & 1

06/04/2021

$ 6,270.33

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Interim Secretary

Memorandum TO: APTIM Contract File

Contract No. HW554

FROM: Melissa A Walsh, Project Manager

SUBJECT: Dry Clean USA

FAC # ERIC_4747

DATE:

Task Assignment#DC007G, Change Order #1 Monitoring

November 1, 2021

Under this task assignment, APTIM will remove the passive diffusion bag (PDB) samplers and conduct quarterly NAM sampling. This Change Order is for a decrease of $6,270.32 for the removal of quarterly sampling #2 and reporting under subtask 3 and will add a month to the TA expiration date to allow sufficient time for invoicing. Work will be done according to the attached scope of work dated July 19, 2021.

Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate.

Subtask 3: Quarterly Sampling #2 and reporting Based on the findings of the initial quarterly groundwater sampling results, FDEP has determined that the tasked second quarter of monitoring will no longer be necessary. The site will be returned to annual monitoring. The costs associated with this subtask have been removed. This subtask is removed and will decrease by $5,659.21.

The Task Assignment is for the fixed price of $6,270.33. Cost details are included in the attached Cost Estimate Forms, supporting Level-of-Effort subtasks, and the Proposed Scope of Work.

FDEP COST ESTI MATE

Contractor: APTIM Environmental & Infrastructure, Inc.

Date: 7/19/2021

Task #: HW554-DC007G TACO #1 SubTask 1 Project Management SubTask 6

Site: DCUSA Anderson Rd (ERIC_4747) SubTask 2 2-Quarterly Sampling #1 SubTask 7

Activity/Phase: NAM Sampling SubTask 3 3-Quarterly Sampling #2 SubTask 8

Project Manager: Eric Kramer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$63.32 Client Program Manager 1 E. Kramer 3 3.1 $63.32 Engineer/Scientist 5 E. Kramer 2 2 0 0 0 0 0 0 0 0 $60.61 Engineer/Scientist 5 G. Roberts 15 15 0 0 0 0 0 0 0 0 $35.00 Engineering Technician 4 A. Escobar 13 13 0 0 0 0 0 0 0 0 $31.69 Designer 2 S. Ferianc 2 2 0 0 0 0 0 0 0 0 $25.04 Tech Publications Specialist 2 H. Vining 2 2 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Total Hours 37 3 34 0 0 0 0 0 0 0 0

Direct Labor $1,804.78 $200.53 $1,604.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 119.00% $2,147.69 $238.63 $1,909.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 20.90% $377.20 $41.91 $335.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 32.60% $588.36 $65.37 $522.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $4,918.03 $546.44 $4,371.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $90.24 $10.03 $80.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $264.00 $264.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $264.00 $264.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $299.25 $299.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $5,778.52 $556.47 $5,222.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Page 2 of 10 DC007G TACO #1

Date: 7/19/2021

Task #: HW554-DC007G TACO #1 SubTask 1 Project Management SubTask 6

Site: DCUSA Anderson Rd (ERIC_4747) SubTask 2 2-Quarterly Sampling #1 SubTask 7

Activity/Phase: NAM Sampling SubTask 3 3-Quarterly Sampling #2 SubTask 8

Project Manager: Eric Kramer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Completion Fee $491.80 $54.64 $437.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $6,270.32 $611.11 $5,659.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Page 3 of 10 DC007G TACO #1

$6270.33 $0.01 rounding error

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : DCUSA Anderson Rd (ERIC_4747)

SUBTASK:

DATE: May 10, 2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2

Engineer/Scientist 5 G. Roberts

Engineering Technician 4 A. Escobar

Designer 2 S. Ferianc 2 Tech Publications Specialist 2 H. Vining 2

TOTAL LABOR 34

EQUIPMENT ITEM RATE UNIT USAGE

Expendables $32.50 Day 1 $32.50 Shallow GW Sampling Kit $208.55 day 1 $208.55 Water Level Indicator $19.40 Day 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 1 $58.20

TOTAL EQUIPMENT: $299.25

VEHICLE TYPE RATE UNIT USAGE

Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 1 $97.00

TOTAL VEHICLE: $97.00

PER DIEM STAFF RATE UNIT USAGE

Hotel $99.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00

TOTAL PER DIEM: $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Halos Only) $66.00 3 1 $264.00 EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00

TOTAL LAB: $264.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USAGE TOTALS

Erwin Remediation IDW Pickup and Disposal $100.00 Drumm 1 $100.00 Columbia Analytical Protective Mesh Covers $2.00 each 0 $0.00

TOTAL SUB: $100.00

2-Quarterly Sampling #1

Technical Review of Quarterly Report and Recommendations (2 hrs)

Preparation of GW Flow Map and GW Analytical Results Maps (2 hrs). Update of GW Elevation, Analytical Summary Tables gradient Calulations (1 hr) Letter Report Text and Preparation of Recommendations and conclusions (10 hrs). CD/Database Tables Update, Data Check and Upload, ADaPT Laboratory Data Check (1 hr), Complete IDW Manifesting Documentation (1 hr).

Notes: Proposed GW Samples from Monitoring Wells MW001, MW003 and MW004 for VOHs Only (EPA Method 8260).

Travel Preparation and Mobilization (1 hr). Round trip travel to site (2 hrs). Open Wells and Collect Depth to Groundwater Measurements (1 hr). Collection of Groundwater Samples from Monitoring Wells MW001, MW003, MW004 for VOHs by EPA Method 8260 (6 hrs). Sample preparation, Chain of custody preparation, Sample Packaging (1 hr). Site Restoration, Drum Storage and Cleanup (1 hr), Sample Delivery (1 hr).

Drafting GW Flow and Analytical Results Maps Report Document Production

3-Quarterly #2 Page 1 of 10 DC007G TACO #1

SUBTASK:

DATE: July 19, 2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineering Technician 4 A. Escobar Designer 2 S. Ferianc Tech Publications Specialist 2 H. Vining

TOTAL LABOR 0

EQUIPMENT ITEM RATE UNIT USAGE

Expendables $32.50 Day 0 $0.00 Shallow GW Sampling Kit $208.55 day 0 $0.00 Water Level Indicator $19.40 Day 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 0 $0.00

TOTAL EQUIPMENT: $0.00

VEHICLE TYPE RATE UNIT USAGE

Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 0 $0.00

TOTAL VEHICLE: $0.00

PER DIEM STAFF RATE UNIT USAGE

Hotel $99.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00

TOTAL PER DIEM: $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Halos Only) $66.00 0 0 $0.00 EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00

TOTAL LAB: $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USAGE TOTALS

Erwin Remediation IDW Pickup and Disposal $100.00 Drumm 0 $0.00 Columbia Analytical Protective Mesh Covers $2.00 each 0 $0.00

TOTAL SUB: $0.00

3-Quarterly Sampling #2

3-Total Page 4 of 10 DC007G TACO #1

Date: 7/19/2021

Task #: HW554-DC007G TACO #1 delta SubTask 1 Project Management SubTask 6

Site: DCUSA Anderson Rd (ERIC_4747) SubTask 2 2-Quarterly Sampling #1 SubTask 7

Activity/Phase: NAM Sampling SubTask 3 3-Quarterly Sampling #2 SubTask 8

Project Manager: Eric Kramer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$63.32 Client Program Manager 1 E. Kramer -3 -3.2 $63.32 Engineer/Scientist 5 E. Kramer -2 0 -2 0 0 0 0 0 0 0 $60.61 Engineer/Scientist 5 G. Roberts -15 0 -15 0 0 0 0 0 0 0 $35.00 Engineering Technician 4 A. Escobar -13 0 -13 0 0 0 0 0 0 0 $31.69 Designer 2 S. Ferianc -2 0 -2 0 0 0 0 0 0 0 $25.04 Tech Publications Specialist 2 H. Vining -2 0 -2 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Total Hours -37 -3 0 -34 0 0 0 0 0 0 0

Direct Labor ($1,804.78) ($200.53) $0.00 ($1,604.25) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 119.00% ($2,147.69) ($238.63) $0.00 ($1,909.06) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 20.90% ($377.20) ($41.91) $0.00 ($335.29) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 32.60% ($588.36) ($65.37) $0.00 ($522.99) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor ($4,918.03) ($546.44) $0.00 ($4,371.59) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs ($90.24) ($10.03) $0.00 ($80.21) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental ($97.00) $0.00 ($97.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel ($97.00) $0.00 ($97.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW ($100.00) $0.00 ($100.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($100.00) $0.00 ($100.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee ($10.00) $0.00 ($10.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost ($110.00) $0.00 ($110.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs ($264.00) $0.00 ($264.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory ($264.00) $0.00 ($264.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables ($32.50) $0.00 ($32.50) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) ($208.55) $0.00 ($208.55) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) ($58.20) $0.00 ($58.20) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses ($299.25) $0.00 ($299.25) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($5,778.52) ($556.47) $0.00 ($5,222.05) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Delta Page 5 of 10 DC007G TACO #1

Date: 7/19/2021

Task #: HW554-DC007G TACO #1 SubTask 1 Project Management SubTask 6

Site: DCUSA Anderson Rd (ERIC_4747) SubTask 2 2-Quarterly Sampling #1 SubTask 7

Activity/Phase: NAM Sampling SubTask 3 3-Quarterly Sampling #2 SubTask 8

Project Manager: Eric Kramer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Completion Fee ($491.80) ($54.64) $0.00 ($437.16) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($6,270.32) ($611.11) $0.00 ($5,659.21) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Delta Page 6 of 10 DC007G TACO #1

SUBTASK:

DATE: May 10, 2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2

Engineer/Scientist 5 G. Roberts

Engineering Technician 4 A. Escobar

Designer 2 S. Ferianc 2 Tech Publications Specialist 2 H. Vining 2

TOTAL LABOR 34

EQUIPMENT ITEM RATE UNIT USAGE

Expendables $32.50 Day 1 $32.50 Shallow GW Sampling Kit $208.55 day 1 $208.55 Water Level Indicator $19.40 Day 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 1 $58.20

TOTAL EQUIPMENT: $299.25

VEHICLE TYPE RATE UNIT USAGE

Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 1 $97.00

TOTAL VEHICLE: $97.00

PER DIEM STAFF RATE UNIT USAGE

Hotel $99.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00

TOTAL PER DIEM: $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Halos Only) $66.00 3 1 $264.00 EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00

TOTAL LAB: $264.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USAGE TOTALS

Erwin Remediation IDW Pickup and Disposal $100.00 Drumm 1 $100.00 Columbia Analytical Protective Mesh Covers $2.00 each 0 $0.00

TOTAL SUB: $100.00

Travel Preparation and Mobilization (1 hr). Round trip travel to site (2 hrs). Open Wells and Collect Depth to Groundwater Measurements (1 hr). Collection of Groundwater Samples from Monitoring Wells MW001, MW003, MW004 for VOHs by EPA Method 8260 (6 hrs). Sample preparation, Chain of custody preparation, Sample Packaging (1 hr). Site Restoration, Drum Storage and Cleanup (1 hr), Sample Delivery (1 hr).

Drafting GW Flow and Analytical Results Maps

Notes: Proposed GW Samples from Monitoring Wells MW001, MW003 and MW004 for VOHs Only (EPA Method 8260).

2-Quarterly Sampling #1

Technical Review of Quarterly Report and Recommendations (2 hrs)

Preparation of GW Flow Map and GW Analytical Results Maps (2 hrs). Update of GW Elevation, Analytical Summary Tables gradient Calulations (1 hr) Letter Report Text and Preparation of Recommendations and conclusions (10 hrs). CD/Database Tables Update, Data Check and Upload, ADaPT Laboratory Data Check (1 hr), Complete IDW Manifesting Documentation (1 hr).

Report Document Production

2-Quarterly #1 Page 10 of 10 DC007G TACO #1

SUBTASK:

DATE: July 19, 2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer -2

Engineer/Scientist 5 G. Roberts

-15

Engineering Technician 4 A. Escobar

-13

Designer 2 S. Ferianc -2 Tech Publications Specialist 2 H. Vining -2

TOTAL LABOR -34

EQUIPMENT ITEM RATE UNIT USAGE

Expendables $32.50 Day -1 ($32.50) Shallow GW Sampling Kit $208.55 day -1 ($208.55) Water Level Indicator $19.40 Day 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each -1 ($58.20)

TOTAL EQUIPMENT: ($299.25)

VEHICLE TYPE RATE UNIT USAGE

Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day -1 ($97.00)

TOTAL VEHICLE: ($97.00)

PER DIEM STAFF RATE UNIT USAGE

Hotel $99.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00

TOTAL PER DIEM: $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Halos Only) $66.00 -3 -1 ($264.00) EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00

TOTAL LAB: ($264.00)

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USAGE TOTALS

Erwin Remediation IDW Pickup and Disposal $100.00 Drumm -1 ($100.00) Columbia Analytical Protective Mesh Covers $2.00 each 0 $0.00

TOTAL SUB: ($100.00)

Notes: Proposed GW Samples from Monitoring Wells MW001, MW003 and MW004 for VOHs Only (EPA Method 8260).

Remove: Travel Preparation and Mobilization (1 hr). Round trip travel to site (2 hrs). Open Wells and Collect Depth to Groundwater Measurements (1 hr). Collection of Groundwater Samples from Monitoring Wells MW001, MW003, MW004 for VOHs by EPA Method 8260 (6 hrs). Sample preparation, Chain of custody preparation, Sample Packaging (1 hr). Site Restoration, Drum Storage and Cleanup (1 hr), Sample Delivery (1 hr).

Remove: Drafting GW Flow and Analytical Results Maps Remove: Report Document Production

3-Quarterly Sampling #2

Remove: Technical Review of Quarterly Report and Recommendations (2 hrs) Remove: Preparation of GW Flow Map and GW Analytical Results Maps (2 hrs). Update of GW Elevation, Analytical Summary Tables gradient Calulations (1 hr) Letter Report Text and Preparation of Recommendations and conclusions (10 hrs). CD/Database Tables Update, Data Check and Upload, ADaPT Laboratory Data Check (1 hr), Complete IDW Manifesting Documentation (1 hr).

3-Delta Page 7 of 10 DC007G TACO #1

Date: 5/10/2021

Task #: HW554-DC007G SubTask 1 Project Management SubTask 6

Site: DCUSA Anderson Rd (ERIC_4747) SubTask 2 2-Quarterly Sampling #1 SubTask 7

Activity/Phase: NAM Sampling SubTask 3 3-Quarterly Sampling #2 SubTask 8

Project Manager: Eric Kramer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$63.32 Client Program Manager 1 E. Kramer 6 6.3 $63.32 Engineer/Scientist 5 E. Kramer 4 2 2 0 0 0 0 0 0 0 $60.61 Engineer/Scientist 5 G. Roberts 30 15 15 0 0 0 0 0 0 0 $35.00 Engineering Technician 4 A. Escobar 26 13 13 0 0 0 0 0 0 0 $31.69 Designer 2 S. Ferianc 4 2 2 0 0 0 0 0 0 0 $25.04 Tech Publications Specialist 2 H. Vining 4 2 2 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Total Hours 74 6 34 34 0 0 0 0 0 0 0

Direct Labor $3,609.56 $401.06 $1,604.25 $1,604.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 119.00% $4,295.38 $477.26 $1,909.06 $1,909.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Overhead 20.90% $754.40 $83.82 $335.29 $335.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 32.60% $1,176.73 $130.75 $522.99 $522.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $9,836.07 $1,092.89 $4,371.59 $4,371.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $180.47 $20.05 $80.21 $80.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $194.00 $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Equipment Procurement)

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost Estimate Page 8 of 10 DC007G TACO #1

Date: 5/10/2021

Task #: HW554-DC007G SubTask 1 Project Management SubTask 6

Site: DCUSA Anderson Rd (ERIC_4747) SubTask 2 2-Quarterly Sampling #1 SubTask 7

Activity/Phase: NAM Sampling SubTask 3 3-Quarterly Sampling #2 SubTask 8

Project Manager: Eric Kramer SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 (Services Procurement)

Subcontractor Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $200.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $200.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $20.00 $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $220.00 $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $528.00 $264.00 $264.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $528.00 $264.00 $264.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $65.00 $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $417.10 $208.55 $208.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $116.40 $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $598.50 $299.25 $299.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$11,557.04 $1,112.94 $5,222.05 $5,222.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal $983.61 $109.29 $437.16 $437.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee

Total Estimated Cost $12,540.65 $1,222.23 $5,659.21 $5,659.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost Estimate Page 9 of 10 DC007G TACO #1

Proposed Scope of Work Quarterly NAM Sampling Former Dry Clean USA (Anderson Rd) Task Assignment DC007G TACO #1 Site ID No. ERIC_4747 (Former Facility ID No. 299502075) APTIM Environmental & Infrastructure, Inc.

7/19/2021

TACO #1 for the former Anderson Road Dry Clean USA has been prepared as requested by the FDEP.

Based on the findings of the initial quarterly groundwater sampling results the FDEP has determined that the tasked second quarter of monitoring no longer needs to be performed. The site will be returned to annual monitoring. Therefore, the costs associated with the second quarterly groundwater sampling (Subtask 3) have been removed.

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of Environmental Protection No. HW554. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.

If you have any questions, please do not hesitate to call.

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW554

D000 N/ADC007G

APTIM

Eric Kramer, P.E.

(850)-245-8960Melissa A Walsh

ERIC_4747

Dry Clean USA 12020 Anderson Road, Tampa, Hillsborough Monitoring

APTIM will remove the passive diffusion bag samplers and conduct quarterly NAM sampling. Work will be done according to the attached scope of work dated May 10, 2021.

Quarterly #2 NAM Report, GIS tables, ADaPT Logs

09/02/2021

11/02/2021

$ 12,540.65 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Melissa Walsh Digitally signed by Melissa Walsh Date: 2021.05.17 15:45:24 -04'00'

Melissa Walsh Digitally signed by Melissa Walsh Date: 2021.05.17 15:48:35 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.05.18 10:01:38 -04'00'

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2021.05.18 16:49:33 -04'00'

$ 12,540.65

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Quarterly NAM report #1- Subtask 2 06/04/2021

Quarterly NAM report #2, ADaPT Logs, GIS Tables- Subtask 3 09/02/2021

Submittal and FDEP approval of Quarterly NAM report #1- Subtask 2 $ 5,659.21

Submittal and FDEP approval of Quarterly NAM report #2, ADaPT Logs, GIS Tables- Subtasks 1 and 3 $ 6,881.44

$ 12,540.65