This document is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract No. HW554, issued to APTIM Environmental & Infrastructure, Inc. The task assignment covers groundwater sampling services at the House of Lorraine Valet Services facility (ERIC_4075) located at 500 E. Hallandale Beach Boulevard, Hallandale, Florida. The contractual framework is established under a master contract dated February 16, 2011, between FDEP and APTIM. Key personnel include Eric Kramer (APTIM Contractor Representative) and John Sykes III (FDEP Contract Manager, 245-8960).
Task Assignment DC009J is valued at $6,745.56 on a fixed price basis with no retainage. The scope requires conventional groundwater sampling of five monitoring wells (MW001, MW003, MW008, MW016, and RW001) with results analyzed by EPA Method 8260 for volatile organic halocarbons. The deliverable is a Groundwater Sampling Report with DEP Electronic Data Deliverables (EDDs) and final Investigative Derived Waste (IDW) manifest, due by May 22, 2020, with task completion by August 22, 2020. The cost estimate totals 43 labor hours distributed across project management (3 hours at $649.27) and groundwater sampling (40 hours at $6,096.29), plus other direct costs including $396.00 for laboratory analytical services, $299.25 for field equipment and expendables, $110.00 for IDW disposal handling, and $97.00 for vehicle rental. Erwin Remediation was selected for IDW transportation and disposal services at $100.00, chosen from competitive bids obtained in January 2020.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW554
D000 NADC009J
APTIM
Eric Kramer, PE
245-8960John Sykes III
ERIC_4075
House of Lorraine
500 E. Hallandale Beach Blvd., Hallandale, FL
MON
Last groundwater event with PDBs was clean. APTIM will resample 5 wells with conventional technique to meet the rule (62-780), per the APTIM 3/23/2020 scope, schedule, level of effort and cost estimate.
Groundwater Sampling Report w/DEP EDDs and final IDW manifest
05/22/2020
08/22/2020
$ 6,745.56 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Digitally signed by John Sykes III Date: 2020.03.26 11:52:29 -04'00'
Digitally signed by John Sykes III Date: 2020.03.26 11:52:46 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.03.26 12:42:17 -04'00'
Digitally signed by Kramer, Eric K Date: 2020.03.26 14:47:36 -04'00'
$ 6,745.56
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Sampling Report w/DEP EDDs & final IDW manifest - ST 2 05/22/2020
DEP approval of Groundwater Sampling Report w/DEP EDDs & final IDW manifest -
ST 1 & 2 $ 6,745.56
$ 6,745.56
HW554
DC009J
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: House of Lorraine DSCP Site File FROM: John Sykes III, Project Manager SUBJECT: Negotiation Summary, HW554, TA DC009J DATE: March 26, 2020
Last groundwater event with PDBs was clean. APTIM will resample 5 wells with conventional technique to meet the rule (62-780), per the APTIM March 23, 2020 scope, schedule, level of effort (LOE) and cost estimate (CE).
Subtask 2:
In addition to the 3 wells sampled during the last event, the DEP geologist requested that APTIM also sample MW001 and MW003, for a total of 5 wells.
Summary:
Final LOE and CE for this TA are 43 hours and $6,745.56, respectively. This LOE and CE are reasonable for the associated scope.
FDEP COST ESTIMATE
Contractor: APTIM Environmental & Infrastructure, Inc
Date: 3/23/2020
Task #: HW554-DC009J SubTask 1 Project Management
Site: House of Lorraine Valet Services SubTask 2 2-Groundwater Sampling
Activity/Phase: Annual Sampling SubTask 3
Project Manager: Eric Kramer SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$61.78 Client Program Manager E. Kramer 3 3.4 $61.78 Engineer/Scientist 5 E. Kramer 2 2 0 0 0 $59.42 Engineer/Scientist 5 G. Roberts 18 18 0 0 0 $25.03 Engineering Technician 2 J. Bell 15 15 0 0 0 $31.07 Designer 2 S. Ferianc 2 2 0 0 0 $24.55 Tech Publications Specialis H. Vining 3 3 0 0 0
0 0 0 0 0 Total Hours 43 3 40 0 0 0
Direct Labor $1,917.41 $213.05 $1,704.36 $0.00 $0.00 $0.00
Fringe 119.00% $2,281.72 $253.53 $2,028.19 $0.00 $0.00 $0.00 Overhead 20.90% $400.74 $44.53 $356.21 $0.00 $0.00 $0.00 Gen & Admin 32.60% $625.07 $69.45 $555.62 $0.00 $0.00 $0.00
Total Labor $5,224.94 $580.56 $4,644.38 $0.00 $0.00 $0.00
Other Direct Costs $95.87 $10.65 $85.22 $0.00 $0.00 $0.00
Travel Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 (Equipment Procurement)
Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 (Services Procurement)
Subcontractor Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $396.00 $396.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $396.00 $396.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $32.50 $32.50 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $266.75 $266.75 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $299.25 $299.25 $0.00 $0.00 $0.00
$6,223.06 $591.21 $5,631.85 $0.00 $0.00 $0.00 Subtotal $522.50 $58.06 $464.44 $0.00 $0.00 $0.00 Completion Fee
Total Estimated Cost $6,745.56 $649.27 $6,096.29 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 2 DC009J est.xlsx
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : House of Lorraine Valet Services
SUBTASK:
DATE: March 23, 2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts
Engineering Technician 2 J. Bell
Designer 2 S. Ferianc 2 Tech Publications Specialist 3 H. Vining 3
TOTAL LABOR 40
EQUIPMENT ITEM RATE UNIT USAGE
Expendables $32.50 Day 1 $32.50 Shallow GW Sampling Kit $208.55 day 1 $208.55 Deep Groundwater Sampling Kit $349.20 Day 0 $0.00 Water Level Indicator $19.40 Day 0 $0.00 Diffusion Sampler (2" well) $22.35 each 0 $0.00 Diffusion Sampler Kit $28.15 each 0 $0.00 Diffusion Sampler Well Cap $12.65 each 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 1 $58.20
TOTAL EQUIPMENT: $299.25
VEHICLE TYPE RATE UNIT USAGE
Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 1 $97.00
TOTAL VEHICLE: $97.00
PER DIEM STAFF RATE UNIT USAGE
Hotel $99.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00
TOTAL PER DIEM: $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Halos Only) $66.00 5 1 $396.00 EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00
TOTAL LAB: $396.00
SUBCONTRACTOR COSTS
NAME PURPOSE Rate UNIT USAGE TOTALS
Misc. Supplies Home Depot/Lowes/Equivilent $50.00 Lump 0 $0.00 Columbia Analytical Protective Mesh Covers $2.00 each 0 $0.00 Erwin Remediation IDW Drum Disposal $100.00 Each 1 $100.00
TOTAL SUB: $100.00
Notes: Conventionally sample MW001, MW003, MW008, MW016 and RW001.
2-Groundwater Sampling
Technical Review of Groundwater Sampling Report, Update Recommendations (2 hrs)
Notification of Owners and Tenants (2 hrs), Preparation of GW Flow Maps and GW Analytical Results Maps (2 hrs). Review data and update of GW Elevation, Analytical Summary Tables (2 hrs), Letter Report Text and Preparation of Recommendations and conclusions (9 hrs). Preparation of IDW manifest and profile (1 hr), CD/Database Tables Update, ADaPT Laboratory Data Check, Build Deliverables Submittal for Invoicing (2 hr).
Drafting GW Flow and Analytical Results Maps Report Document Production
Travel Preparation and Mobilization (1 hr). Round trip travel to site (2 hrs). Open Wells and Collect Depth to Groundwater Measurements from All Wells, including interior wells (3 hrs), Collection of Groundwater Samples from Monitoring Wells MW001, MW003, MW008, MW016 and RW001 for VOHs by EPA Method 8260 (6 hrs)., Sample preparation, Chain of custody preparation, Sample Packaging (1 hr). Site Restoration and Cleanup (1 hr), Sample Delivery (1 hr).
2-GWSampling Page 2 of 2 DC009J est.xlsx
Proposed Scope of Work Groundwater Sampling House of Lorraine Valet Services Inc.
Task Assignment DC009J ERIC_4075 (Former Facility ID #069500422) APTIM Environmental & Infrastructure, Inc.
3/23/20
The following proposed scope of work for Task Assignment DC009J is for the conventional sampling of three (3) monitoring wells, including shallow recovery well RW001, intermediate well MW008 and deeper monitoring well MW016 as recommended in the January 17, 2020 Annual Groundwater Sampling Report.
In addition, based on a FDEP review of the report, two additional wells were added to the sampling scope of work including onsite deep well MW001 and intermediate well MW003. The wells are being scheduled for conventional sampling based on the most recent results being below the GCTLs for the target analytes.
As recommended in the Annual Groundwater Sampling Report, Onsite deep monitoring well MW009 has been eliminated from the NAM groundwater sampling. PDBs were not initially used at the site until July 10, 2013. Prior to that sampling date the onsite deep well was sampled conventionally a total of seven times over 6 years and did not display a GCTL exceedance. Additionally, the PDB analysis performed since that time included six sampling events with no detection of a target analyte exceeding the laboratory method detection limits.
Downgradient intermediate monitoring well MW015 has also been eliminated from the NAM groundwater sampling, as this well was conventionally sampled during the 2018 and 2019 groundwater sampling events and did not display the detection of a target analyte above the laboratory detection limits.
Additional groundwater sampling from MW009 and MW015 should not be necessary to qualify for NFA status.
This proposed scope of work includes the collection of depth-to-groundwater measurements from the 15 remaining House of Lorraine monitoring wells (MW001 through MW011 and MW015 through MW018), the recovery well RW001, and if accessible Mobil Station wells MW01M, MW1AM, MW08M, MW10M, MW11M. Monitoring wells MW012, MW013 and MW014 have reportedly been destroyed due to development of the former offsite parking area.
At the time of the last site visit (December 17, 2019), PDB samplers were installed in five (5) monitoring wells, including MW008, MW009, MW015, MW016, and recovery well RW001. These PDBs will not be disturbed. Conventional sampling will be performed by placement of the tubing as close to or within the placement depth of the PDB, as possible. Samples will be analyzed by EPA Method 8260 for volatile organic halocarbons (VOHs).
Purge water will be placed into a drum for storage onsite and future pickup and disposal. Erwin Remediation has been selected to provide IDW transportation and disposal, based on bids procured in January 2020 for another program site. The analytical results from the monitoring wells will be used for characterization of the waste.
A Groundwater Sampling Report will be provided summarizing the collected groundwater elevation and analytical results in Tables, Figures and Text including conclusions and recommendations. APTIM recommends the following schedule:
Description Due Date
Collection of Groundwater Samples 4/24/2020
Submit Letter Report 5/22/2020
Submit GIS/Data Base Update 5/22/2020
Task Expiration Date 7/24/2020
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the Contract between the Florida Department of Environmental Protection and APTIM dated February 16, 2011 (DEP Contract No. HW554). APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please do not hesitate to call.
Item Description Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total
Amount Units Unit Price Total
Amount Transporation 1 $25.00 $25.00 1 $30.00 $30.00 Disposal (soil) 0 $70.00 $0.00 0 $80.00 $0.00 0 $180.00 $0.00 0 $100.00 $0.00 Disposal (liquid) 1 $70.00 $70.00 1 $60.00 $60.00 1 $150.00 $150.00 1 $100.00 $100.00 Additional Drum Costs 1 Lump $220.00 1 $80.00 $80.00 Additional Costs/Fees 1 13% $9.10 Low Volume Fee $50.00 1 6.5% $9.75
Total $324.10 $140.00 $239.75 $100.00
IDW Pickup and Disposal Bid Summary House of Lorraine Valet Services
500 East Hallandale Beach Boulevard Hallandale Beach, Florida 33009
FDEP Site No. ERIC_4075
None
US Ecology Clark Environmental Safety-Kleen
January 27, 2019
None None
Included in Disposal
Erwin Remediation
Included in Disposal
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .