- Contract number
- HW554
- Issued by
- Florida
About this file
This is a Task Assignment Notification Change Order Form (Change Order No. 4) for FDEP Contract No. HW554, Task Assignment DC002B, between the Florida Department of Environmental Protection (FDEP) and Shaw Environmental, Inc. The contract pertains to the Dry Clean USA facility (Site ID 509502008) located in Wellington, Florida. The change order is authorized by FDEP Project Manager Walsta Jean-Baptiste and is managed by Contractor Representative Edward Vehling. The document includes supporting deliverables and invoice schedules, as well as a detailed memorandum and cost estimate justifying the scope modifications.
This change order authorizes additional costs and labor associated with obtaining necessary permits for SVE (Soil Vapor Extraction) system construction and securing access from the new property owner. The net increase in task costs is $4,185.93, bringing the total task amount with all change orders to $82,851.89. The additional work includes 547 hours of labor for permitting activities, with costs distributed across project management ($359.05 increase), SVE permitting labor (20 hours at $750.00), equipment ($32.50), vehicles ($97.00), and subcontractor costs ($1,750.00 for permit fees with City of Wellington & PBS). The deliverables include a Substantial Construction Completion Report (due 24-Sep-12), Property Reporting Forms (due 19-Oct-12), and SVE Startup Report (due 12-Nov-12). Invoicing is structured in subtasks with total projected costs of $82,851.89, with the original task completion date extended from 12/31/2011 to 12/31/2012.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .