This is a Task Assignment Notification Form under Florida Department of Environmental Protection (FDEP) Contract HW553, executed between FDEP and WSP USA, Inc. for environmental consulting services at the Blue Ribbon Cleaners site in Tallahassee, Leon County, Florida (Site ID ERIC_4859). The task assignment was issued on March 8, 2021, with Brandie Stringer serving as the FDEP Contract Manager and Brad Anders representing WSP USA as the project manager. The site is located at 1102 E Lafayette Street, Tallahassee, Leon County, Florida.
The task involves conducting annual groundwater monitoring at the Blue Ribbon Cleaners site, including installation of Passive Diffusion Bags (PDBs) and collection of groundwater samples from eight monitoring wells (MW001 through MW008) for volatile organic compound (VOC) analysis using EPA Method 8260B. Advanced Environmental Laboratories (AEL) was selected as the analytical laboratory. The scope encompasses project management costs calculated at 12.5% of direct labor, field activities including depth-to-water measurements and sample collection, laboratory analysis, and preparation of a comprehensive Annual Groundwater Monitoring Report with GIS/ADaPT updates. The total task assignment value is $8,031.96 on a fixed-price basis, with no retainage. The final deliverable was due May 7, 2021, with a task completion date of May 31, 2021. Negotiations with WSP resulted in labor cost savings of $433.11 to the Department.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW553
D000 N/ADC004L
WSP
Perry Kelso
850-245-8970Brandie Stringer
ERIC_4859
Blue Ribbon Cleaners
1102 E Lafayette St, Tallahassee, Leon Co
Monitoring
WSP will conduct annual groundwater monitoring at Blue Ribbon Cleaners, as detailed in the attached February 16, 2021 WSP cost proposal. Activities to include the installation of Passive Diffusion Bags (PDBs) and subsequent collection of groundwater samples for VOCs analysis via EPA Method 8260. Advanced Environmental Laboratories (AEL) is the selected lab.
Annual Groundwater Monitoring Report; GIS/ADaPT Update
05/07/2021
05/31/2021
$ 8,031.96 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Brandie Stringer Digitally signed by Brandie Stringer Date: 2021.03.08 16:19:21 -05'00'
Brandie Stringer Digitally signed by Brandie Stringer Date: 2021.03.08 16:19:30 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.03.09 13:54:27 -05'00'
Digitally signed by: J. Bradley Anders DN: CN = J. Bradley Anders email = banders@ene.com C = US O = Ecology and Environment Date: 2021.03.10 19:45:31 -05'00'
J. Bradley Anders
$ 8,031.96
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Groundwater Monitoring Report; GIS/ADaPT 05/07/2021
FDEP approval of Annual Groundwater Monitoring Report; GIS/ADaPT; Project Management - Subtasks 1-2 $ 8,031.96
$ 8,031.96
HW553
DC004L
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: Site # ERIC_4859
Blue Ribbon Cleaners Site File
FROM: Brandie Stringer, Contract Manager
SUBJECT: Negotiation Summary
HW553 DC004L
Annual Groundwater Monitoring
DATE: March 8, 2021
WSP will conduct annual groundwater monitoring at Blue Ribbon Cleaners, as detailed in the attached February 16, 2021 WSP cost proposal.
Activities to include the installation of Passive Diffusion Bags (PDBs) and subsequent collection of groundwater samples for VOCs analysis via EPA Method 8260. Samples will be collected from MW001, MW002, MW003, MW004, MW005, MW006, MW007, and MW008 for analyses of VOCs using EPA Method 8260B. Advanced Environmental Laboratories (AEL) will conduct all analyses. Depth-to-water will also be gauged in select monitoring wells to determine groundwater flow direction. WSP will provide an Annual Groundwater Monitoring Report as a final deliverable.
Total task amount is $8,031.96. One revision to the Cost Estimate Form was required prior to processing this task. Negotiations in labor resulted in saving the Department a total of $433.11. WSP’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable is due May 7, 2021. Task completion date is May 31, 2021.
FDEP Contract HW553 Cost Estimate
Contractor:
Date:
Task #: DC004L SubTask 1 Project Managem Site: SubTask 2 Annual Groundwat
Site ID #: ERIC_4859 SubTask 3 Activity/Phase: SubTask 4
Project Manager: SubTask 5
Labor Rate Category Totals 1 2 $47.79 PM 12.5% of direct labor costs 4.7 4.656
Principal $60.47 Kelso 1.0 1.0 $63.94 Brown 0.0 0.0
Chief $45.65 Werth 0.0 0.0 $45.11 Elliott 0.0 0.0 $42.97 Huber 0.0 0.0 $47.50 Harter 0.0 0.0 $48.10 Moore 0.0 0.0
Senior $36.37 Krajewski 0.0 0.0 $34.46 Murak 0.0 0.0 $33.75 Chappell 2.0 2.0 $36.06 Anders 24.0 24.0 $36.54 Hammond 0.0 0.0 $39.09 Dillon 0.0 0.0 $39.09 Eucogno 0.0 0.0 $39.09 Percifull 0.0 0.0
Associate $28.09 Oien 26.0 26.0 $26.92 Kuhn 0.0 0.0 $28.09 Kowal 0.0 0.0 $28.09 Fowler 2.0 2.0 $28.09 Bender 0.0 0.0
Junior $24.47 Laitsch 0.0 0.0 $24.47 Williams 0.0 0.0 $21.00 Heuston 0.0 0.0 $24.47 Cooper 0.0 0.0 $24.47 Balke 0.0 0.0 $24.47 Slabaugh 0.0 0.0
Technician $18.00 Smith 0.0 0.0
Clerical $22.28 Dekle 0.0 0.0 $22.28 Rodriguez 0.0 0.0
Total Hours 59.7 4.7 55.0
1) Direct Labor $2,002.42 $222.49 $1,779.93
2) Fringe (33.44% of Lines 1 ) $669.61 $74.40 $595.21
3) Overhead (49.90% of Lines 1 + 2) $1,333.34 $148.15 $1,185.19
4) Gen & Admin (36.27% of Lines 1 + 2 + 3) $1,452.75 $161.42 $1,291.33
5) Total Labor (Sum Lines 1 thru 4) $5,458.12 $606.46 $4,851.66
6) Other Direct Costs (5.0% of Line 1) $100.12 $11.12 $89.00 Travel
7a) Vehicle Rental $194.00 $0.00 $194.00 7b) Mileage Costs $0.00 $0.00 $0.00 7c) Air Fare $0.00 $0.00 $0.00 7d) Per diem + Hotel $0.00 $0.00 $0.00 7e) Total Travel $194.00 $0.00 $194.00
Subcontractor (Equipment Procurement) 8a) Provider - Task # $0.00 $0.00 $0.00 8b) Provider - Task # $0.00 $0.00 $0.00 8c) Provider - Task # $0.00 $0.00 $0.00 8d) Subcontractor Subtotal $0.00 $0.00 $0.00 8e) Procurement Fee $0.00 $0.00 $0.00 8f) Total Subcontractor Cost $0.00 $0.00 $0.00
Subcontractor (Services Procurement) 9a) Drilling (Conventional) $0.00 $0.00 $0.00 9b) Drilling (Non-conventional) $0.00 $0.00 $0.00 9c) Mobile Laboratory $0.00 $0.00 $0.00 9d) Surveying $0.00 $0.00 $0.00 9e) IDW $0.00 $0.00 $0.00 9f) Utilities $0.00 $0.00 $0.00 9g) Other Sub 1 - Task # $0.00 $0.00 $0.00 9h) Other Sub 2- Task # $0.00 $0.00 $0.00 9i) Other Sub 3 - Task # $0.00 $0.00 $0.00 9j) Subcontractor Subtotal $0.00 $0.00 $0.00 9k) Handling Fee $0.00 $0.00 $0.00 9l) Total Subcontractor Cost $0.00 $0.00 $0.00
Laboratory 10a) Analytical Costs (Fixed Lab) $1,350.00 $0.00 $1,350.00 10b) Fast Turnaround Rate (%) (Fixed Lab) 0% 100% 10c) Fast Turnaround Charges (Fixed Lab) $0.00 $0.00 $0.00 10d) Sample Shipping $35.00 $0.00 $35.00 10e) Total Laboratory $1,385.00 $0.00 $1,385.00
Field Expenses 11a) Personal Protection $0.00 $0.00 $0.00 11b) Expendables $65.00 $0.00 $65.00 11c) Equipment (Drilling Related) $0.00 $0.00 $0.00 11d) Equipment (Analytical Related) $0.00 $0.00 $0.00 11e) Equipment (IDW Related) $0.00 $0.00 $0.00 11f) Equipment (Other) $283.90 $0.00 $283.90 11g) Total Field Expenses $348.90 $0.00 $348.90
Subtotal $7,486.14 $617.58 $6,868.56 Completion Fee 12) (10.0% of Line 5) $545.82 $60.65 $485.17
13) Total Estimated Cost $8,031.96 $678.23 $7,353.73
February 16, 2021
* Equipment Procurement - 10.0% Per Subcontractor, maximum $2,500 per Subcontractor.
** Utilities fees are calculated based on $20 per utility bill per month.
*** Except for utilities fees, 10% of first $50,000, 7% of next $50,000, 5% over $100,000 per Subcontractor.
WSP USA
FDEP: B. Stringer / E & E: B. Anders
Blue Ribbon Cleaners
2021 Annual GWM
DC004L 2021 GWS Cost (003) 3/8/2021 Page 1
SITE: Blue Ribbon Cleaners
SUBTASK NO.: 2 DESCRIPTION:
DATE: February 16, 2021 FACILITY ID NO.: ERIC_4859
TASK NO: DC004L
LABOR HOURS
Labor Category Work Description Hours Principal
Kelso Senior Review 1 Senior
Chappell CAD Figure Development 2
Anders 24
Associate
Oien 26
Fowler Editing/Publication 2 55.00
VEHICLE RENTAL
ITEM RATE UNIT USAGE TOTAL
Equipment Truck/Van $97.00 Day 2 $194.00 $194.00
MILEAGE AND AIRFARE
$0.00
MEALS AND LODGING
$0.00
EQUIPMENT PROCUREMENT
$0.00
SUBCONTRACTOR
$0.00
LABORATORY and SAMPLE SHIPMENTS
ANALYSIS/PARAMETER
FAST TURNAROUND
RATE (%)
No. for Fast
Turnaround Rate RATE Media No. of
Samples No. of
QA/QC
Fast Turn- Around Charges TOTAL
EPA 8260 VOCs 100% 0 $135.00 Water 8 2 $0.00 $1,350.00 *Rate negotiated. Subtotal-Lab Analyses 8 2 $0.00 $1,350.00
SAMPLE SHIPMENTS
CONTAINER SIZE
Shipment Method
24 hr No. of
Containers Shipment Method
2 day No. of
Containers Ice No. of
Containers TOTAL Small (<50 lbs.) $63.00 0 $35.00 1 $5.00 0 $35.00
Subtotal-Sample Shipments $35.00 $1,385.00
FIELD EXPENSES
Personal Protection
SUBTOTAL - PERSONAL PROTECTION $0.00
Expendables
ITEM RATE UNIT USAGE TOTAL ITEM TOTAL
Expendables $32.50 Day 2 $65.00
SUBTOTAL - EXPENDABLES $65.00
Drilling Related Equipment
SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00
Analytical Related Equipment
SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00
IDW Related Equipment
SUBTOTAL - IDW RELATED EQUIPMENT $0.00
Other Equipment
RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM
Water Level Indicator $19.40 day 1 2 $38.80 Passive Diffusion Bags $30.6375 each 1 8 $245.10
*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $283.90
$348.90FIELD EXPENSES
Annual Groundwater Monitoring and Report
TOTAL LABOR HOURS
TOTAL VEHICLE RENTAL
TOTAL MILEAGE AND AIRFARE
TOTAL MEALS AND LODGING
TOTAL LABORATORY and SHIPMENTS
TOTAL EQUIPMENT PROCUREMENT
TOTAL SUBCONTRACTOR
Travel time (TLH to site; 30 mins; 2 RTs); DTW measurements (2 hours), installation of PDBs in 8 wells (3.5 hours), retrievel of PDBs and sample shipment (3.5 hours), warehouse mob/demob (1.5 hours), Document preparation, Hydrogeologic evaluation, Recommendations / Conclusions, PG Sealing
Travel time (TLH to site; 30 mins; 2 RTs); DTW measurements (2 hours), installation of PDBs in 8 wells (3.5 hours), retrievel of PDBs and sample shipment (3.5 hours), warehouse mob/demob (1.5 hours), Table & figure development, GIS data tables, Submittals (12 hours)
DC004L 2021 GWS Cost (003)/2 Page 6
WSP USA
325 John Knox Road, Building F, Suite 140
Tallahassee, Florida 32303
Tel.: 850-523-0954 wsp.com
February 16, 2021
Ms. Brandie Stringer Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Re: Cost Proposal for 2021 Annual Groundwater Monitoring at the Blue Ribbon Cleaners Site, Tallahassee, Leon County, Florida (ERIC_4859; Task Assignment
HW553-DC004L)
Dear Brandie:
WSP USA, Inc. (WSP) is submitting to the Florida Department of Environmental Protection (FDEP) this cost proposal for the 2021 annual groundwater monitoring event at the above-referenced site.
This cost proposal package includes a proposed field work and reporting schedule for the completion of subtasks and cost estimate (attached Excel file). A brief summary of the Scope of Work is provided below:
Task 1: Project Management Costs and hours associated with this subtask consists are calculated based on 12.5% of the direct labor cost.
Task 2: Annual Groundwater Monitoring Event and Report The annual groundwater sampling event will include installation of passive diffusive bags (PDBs) and subsequent collection of groundwater samples as outlined in Table 1 for laboratory analysis.
WSP personnel will mobilize to the site and install the PDBs into the screen intervals of the monitoring wells as indicated on Table 1. Following installation, and due to low aquifer permeability, the passive diffusive bags will be left for approximately one month prior to removal and collection of samples. WSP recommends using the previously acquired passive diffusive bag assemblies (hangers) as they were custom fitted for each well. Costs for passive diffusive bags were requested from ALS Life Sciences Division (ALS), (Attachment A).
The groundwater samples, a duplicate sample, and a trip blank will be delivered to the Advanced Environmental Laboratories Tallahassee, Florida, (AEL Tallahassee) facility and analyzed for volatile organic compounds using United States Environmental Protection Agency (USEPA) Method 8260. Well locations are provided on Figure 1.
Ms. Brandie Stringer January 8, 2021
Prior to the installation of the passive diffusion bags, depth-to-water will be gauged and recorded in the monitoring wells to determine groundwater flow direction(s) across the site and to ensure the passive diffusive bag is placed within the water table.
Upon receipt of the analytical data from AEL Tallahassee for the annual sampling event, WSP will prepare an Annual Groundwater Monitoring Report. The Annual Groundwater Monitoring Report will include a PG certification, analytical results, groundwater contaminant concentration figures, groundwater elevation isopleth maps, summary of the sampling event, conclusions, and recommendations. An electronic copy of the report and updated GIS data tables will be submitted to FDEP via the FDEP FTP site or by e-mail.
Schedule The proposed task schedule is as follows:
Place PDB Bags: March 12, 2021 Completion of Sampling: April 12, 2021 Completion of Annual Groundwater Monitoring Report: May 7, 2021 Task Assignment End Date: May 31, 2021
If you have questions regarding this cost estimate, or other matters pertaining to the project, please call me at (850) 631-2443 or via e-mail at brad.anders@wsp.com.
Sincerely, WSP USA, INC.
Brad Anders, P.G.
Project Manager
Table 1 2021 Annual Groundwater Monitoring Schedule
Blue Ribbon Cleaners Site, Tallahassee, Leon County, Florida ERIC_4859; Task Assignment HW553-DC004L
Sampling Point Method Frequency Justification Groundwater Samples
MW001 USEPA Method
Annual 1,2
MW002 USEPA Method
Annual 1,2
MW003 USEPA Method
Annual 1,2
MW004 USEPA Method
Annual 1,2
MW005 USEPA Method
Annual 1,2
MW006 USEPA Method
Annual 1,2
MW007 USEPA Method
Annual 1,2
MW008 USEPA Method
Annual 1,2
Justification: 1. Required by Rule 62-780;
2. Source area or downgradient well.
8 bags x $28.50 = $228.00 x 7.5% tax $245.10
C U s e r s s l a b a u g h t D e s k t o p B l u e
R i b b o n
B l u e
R i b b o n
D
W G
F I G
P
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p c
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .