This is a Task Assignment Notification Form and associated cost proposal for Florida Department of Environmental Protection (FDEP) Contract HW553, a state environmental remediation indefinite delivery vehicle. The contractor is Ecology and Environment, Inc. (E&E), with principal contacts including Richard Stephens (Program Manager) and Carrie Kruchell (FDEP Contract Manager). The work is being performed for Don's Auto Recycling, Inc., located at 3141 Sharpe Road, Apopka, Orange County, Florida, with COMET Site ID COM_196708 and Hazardous Waste Site ID FLR000085878.

The task assignment (CSS-15A) involves preparation of a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Site Inspection work plan package, comprising three subtasks: (1) program management and site reconnaissance with file review of historical photographs; (2) file review and site reconnaissance; and (3) preparation of a work plan incorporating a Quality Assurance Project Plan and health and safety plan for field work. The fixed-price contract value is $5,615.15, with invoicing upon submittal of preliminary draft work plan at 90 percent completion ($2,832.75) and final work plan at 100 percent completion ($2,832.75, pending FDEP acceptance). The period of performance extends through January 30, 2018, with a final deliverable due date of November 30, 2017. Labor includes 50.4 total hours allocated across Chief-level staff (34 hours), Associates (10 hours), and Principal-level QA/QC review (1 hour), supplemented by vehicle rental ($136.00) and meals and lodging expenses ($205.00).

View the file

Other files

File Type Posted
CN-370000-HW553-A11.pdf PDF
CN-370000-HW553-A9.pdf PDF
CN-370000-HW553-BF005A.pdf PDF
CN-370000-HW553-BF005B.pdf PDF
CN-370000-HW553-BF03A.pdf PDF
CN-370000-HW553-BF03ACO1.pdf PDF
CN-370000-HW553-CO2.pdf PDF
CN-370000-HW553-CO3.pdf PDF
CN-370000-HW553-CO4.pdf PDF
CN-370000-HW553-CSS-17A.pdf PDF
CN-370000-HW553-CSS003C.pdf PDF
CN-370000-HW553-CSS09A.pdf PDF
CN-370000-HW553-CSS11B.pdf PDF
CN-370000-HW553-CSS11C.pdf PDF
CN-370000-HW553-CSS11E.pdf PDF
CN-370000-HW553-DC002G.pdf PDF
CN-370000-HW553-DC004I.pdf PDF
CN-370000-HW553-DC006G.pdf PDF
CN-370000-HW553-DC008F.pdf PDF
CN-370000-HW553-DC016E.pdf PDF
CN-370000-HW553-DC01A.pdf PDF
CN-370000-HW553-DC01ACO2.pdf PDF
CN-370000-HW553-DC01ACO5.pdf PDF
CN-370000-HW553-DC01D.pdf PDF
CN-370000-HW553-DC02B.pdf PDF
CN-370000-HW553-DC02C.pdf PDF
CN-370000-HW553-DC02CCO1.pdf PDF
CN-370000-HW553-DC02CCO5.pdf PDF
CN-370000-HW553-DC02ECO3.pdf PDF
CN-370000-HW553-DC02GCO1.pdf PDF
CN-370000-HW553-DC02I.pdf PDF
CN-370000-HW553-DC02ICO4.pdf PDF
CN-370000-HW553-DC03B.pdf PDF
CN-370000-HW553-DC03BCO1.pdf PDF
CN-370000-HW553-DC04BCO2.pdf PDF
CN-370000-HW553-DC04DCO1.pdf PDF
CN-370000-HW553-DC04F.pdf PDF
CN-370000-HW553-DC04G.pdf PDF
CN-370000-HW553-DC05ECO4.pdf PDF
CN-370000-HW553-DC05F.pdf PDF
CN-370000-HW553-DC05FCO1.pdf PDF
CN-370000-HW553-DC06ACO3.pdf PDF
CN-370000-HW553-DC06BCO1.pdf PDF
CN-370000-HW553-DC06E.pdf PDF
CN-370000-HW553-DC06FCO3.pdf PDF
CN-370000-HW553-DC06M.pdf PDF
CN-370000-HW553-DC07DCO1.pdf PDF
CN-370000-HW553-DC07DCO2.pdf PDF
CN-370000-HW553-DC07E.pdf PDF
CN-370000-HW553-DC08B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

September 25, 2017

Padraic Conner Environmental Specialist III Bureau of Waste Cleanup CERCLA Site Screening Section Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Re: Cost Proposal to Prepare a CERCLA Site Inspection Work Plan for Don’s Auto Recycling, Apopka, Orange County, Florida (COMET Site ID # COM_196708, and Hazardous Waste Site ID # FLR000085878)

Dear Padraic:

As requested by the Florida Department of Environmental Protection (FDEP), Ecology and Environment, Inc. (E & E) has prepared this cost proposal to develop a site inspection (SI) work plan package for the above-referenced site. The package will be developed under two tasks, which will include:

Performance of a site reconnaissance (Task 1);

Review of the site file and available historical photographs (Task 1);

Preparation of a work plan using the template provided by FDEP (Task 2). This work plan incorporates the information in a standard work plan as well as the Quality Assurance Project Plan (QAPP); and

Preparation of a health and safety plan for the SI field work (Task2).

E & E’s cost estimate is based on the following assumptions:

An electronic copy of the preliminary draft work plan (pdf and Word) will be uploaded to the FDEP File Transfer Protocol (FTP) site for internal department review; and

An electronic copy of the final draft work plan (pdf and Word) will be uploaded to the FDEP FTP for distribution;

E & E is prepared to begin work on this project upon receipt of FDEP’s notice to proceed. The total cost estimate to prepare the work plan is $5,615.15.

Attachment A presents a breakdown of the cost proposal. E & E will complete the work plan development on a fixed-price basis. An invoice will be submitted upon submittal of the final draft work plan (90% completion) and the final work plan (100% completion), with payment terms net 30 days.

If you have any questions or comments concerning the proposed costs or costing assumptions, please call me at 523-0954 Ext 3915.

Sincerely, ECOLOGY AND ENVIRONMENT, INC.

Richard A. Stephens Program Manager

RAS/ras

Attachments cc: Carrie Kruchell , FDEP –Site File

FDEP Contract HW553 Cost Estimate

Contractor:

Date:

Task #: CSS_15A SubTask 1 PROGRAM MANAGEMENT Site: SubTask 2 File Review and Site Recon

Site ID #: FLR000085878 SubTask 3 Work Plan Development Activity/Phase: SubTask 4

Project Manager: SubTask 5

10OHBOA.3077.C9

Labor Rate Category Totals 1 2 3 4 5

$35.62 Project Manager - Richard Stephens 5.4 5.397 Principal

$45.95 Kelso 1.0 0.0 1.0 0.0 0.0 $58.85 Brown 0.0 0.0 0.0 0.0 0.0

Chief $35.62 Stephens 34.0 14.0 20.0 0.0 0.0 $36.78 Werth 0.0 0.0 0.0 0.0 0.0 $37.74 Moore 0.0 0.0 0.0 0.0 0.0 $41.84 Kennedy 0.0 0.0 0.0 0.0 0.0 $48.10 Xie 0.0 0.0 0.0 0.0 0.0

Senior $32.03 Krajewski 0.0 0.0 0.0 0.0 0.0 $35.21 Ramberg 0.0 0.0 0.0 0.0 0.0 $36.00 Huber 0.0 0.0 0.0 0.0 0.0 $36.54 Elliott 0.0 0.0 0.0 0.0 0.0 $37.00 Taravella 0.0 0.0 0.0 0.0 0.0 $37.10 Casey 0.0 0.0 0.0 0.0 0.0

Associate $21.91 Jacobs 0.0 0.0 0.0 0.0 0.0 $24.76 Percifull 0.0 0.0 0.0 0.0 0.0 $28.09 Fowler 4.0 0.0 4.0 0.0 0.0 $28.09 Vaughan 0.0 0.0 0.0 0.0 0.0 $28.09 Eucogco 6.0 0.0 6.0 0.0 0.0

Junior $21.19 Bender 0.0 0.0 0.0 0.0 0.0 $21.29 Oien 0.0 0.0 0.0 0.0 0.0 $22.28 Marks 0.0 0.0 0.0 0.0 0.0

Technician $18.72 N/A 0.0 0.0 0.0 0.0 0.0

Clerical $15.71 Benson 0.0 0.0 0.0 0.0 0.0

Total Hours 50.4 5.4 14.0 31.0 0.0 0.0

1) Direct Labor $1,730.17 $192.24 $498.68 $1,039.25 $0.00 $0.00

2) Fringe (33.44% of Lines 1 ) $578.58 $64.29 $166.76 $347.53 $0.00 $0.00

3) Overhead (49.90% of Lines 1 + 2) $1,152.06 $128.01 $332.05 $692.00 $0.00 $0.00

4) Gen & Admin (36.27% of Lines 1 + 2 + 3) $1,255.23 $139.47 $361.79 $753.97 $0.00 $0.00

5) Total Labor (Sum Lines 1 thru 4) $4,716.04 $524.01 $1,359.28 $2,832.75 $0.00 $0.00

6) Other Direct Costs (5.0% of Line 1) $86.50 $9.61 $24.93 $51.96 $0.00 $0.00 Travel

7a) Vehicle Rental $136.00 $0.00 $136.00 $0.00 $0.00 $0.00 7b) Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7c) Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 7d) Per diem + Hotel $205.00 $0.00 $205.00 $0.00 $0.00 $0.00 7e) Total Travel $341.00 $0.00 $341.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) 8a) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8b) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8c) Provider - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8d) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8e) Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 8f) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) 9a) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9b) Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9c) Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9d) Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9e) IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9f) Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9g) Other Sub 1 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9h) Other Sub 2- Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9i) Other Sub 3 - Task # $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9j) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9k) Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 9l) Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory 10a) Analytical Costs (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10b) Fast Turnaround Rate (%) (Fixed Lab) 0% 100% 0% 0% 0% 10c) Fast Turnaround Charges (Fixed Lab) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10d) Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 10e) Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses 11a) Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11b) Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11c) Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11d) Equipment (Analytical Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11e) Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11f) Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11g) Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $5,143.54 $533.62 $1,725.21 $2,884.71 $0.00 $0.00 Completion Fee 12) (10.0% of Line 5) $471.61 $52.40 $135.93 $283.28 $0.00 $0.00

September 25, 2017 Ecology and Environment, Inc.

FDEP: P. Conner / E & E: R. Stephens

Don's Auto Recycling

Work Plan

Copy of CSS15A_Dons Auto Recycling Work Plan 10/11/2017 Page 1

FDEP Contract HW553 Cost Estimate

13) Total Estimated Cost $5,615.15 $586.02 $1,861.14 $3,167.99 $0.00 $0.00

* Equipment Procurement - 10.0% Per Subcontractor, maximum $2,500 per Subcontractor.

** Utilities fees are calculated based on $20 per utility bill per month.

*** Except for utilities fees, 10% of first $50,000, 7% of next $50,000, 5% over $100,000 per Subcontractor.

Copy of CSS15A_Dons Auto Recycling Work Plan 10/11/2017 Page 2

FDEP COST ESTIMATE

DSUMs for LABOR Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Task 9 Task 10 Task 11 Task 12 Task 13 Task 14

Kelso 0 0 1 0 0 0 0 0 0 0 0 0 0 0

Brown 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Stephens 0 14 20 0 0 0 0 0 0 0 0 0 0 0

Werth 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Moore 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kennedy 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Xie 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Krajewski 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Ramberg 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Huber 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Elliott 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Taravella 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Casey 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Jacobs 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Percifull 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Fowler 0 0 4 0 0 0 0 0 0 0 0 0 0 0

Vaughan 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Eucogco 0 0 6 0 0 0 0 0 0 0 0 0 0 0

Bender 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Oien 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Marks 0 0 0 0 0 0 0 0 0 0 0 0 0 0

N/A 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Mead 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Benson 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 14 31 0 0 0 0 0 0 0 0 0 0 0

CRITERIA RANGES FOR LOOKUPS FOR LABOR SUMS

Labor Category Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Labor Category

Kelso Brown Stephens Werth Moore Kennedy Xie Krajewski Ramberg Huber Elliott Taravella Casey Jacobs Percifull Fowler Vaughan

PRINCPAL PRINCPAL CHIEF CHIEF CHIEF CHIEF CHIEF SENIOR SENIOR SENIOR SENIOR SENIOR SENIOR ASSOCIATE ASSOCIATE ASSOCIATE ASSOCIATE

COSTPROJ.XLS Page 1

SITE: Don's Auto Recycling

SUBTASK NO.: 1 DESCRIPTION:

DATE: September 25, 2017 FACILITY ID NO.: FLR000085878

TASK NO: CSS_15A FOR PM ONLY….HOURS CALC AUTOMATICALLY ON COST EST SHEET

LABOR HOURS

Labor Category Work Description Hours Principal 0 Chief 0 Senior 0 Associate 0 Junior 0 Technician 0 Clerical 0

0.00

PROGRAM MANAGEMENT

TOTAL LABOR HOURS

Copy of CSS15A_Dons Auto Recycling Work Plan/1 Page 5

SUBTASK NO.: 2 DESCRIPTION:

DATE: September 25, 2017 FACILITY ID NO.: FLR000085878

TASK NO: CSS_15A

LABOR HOURS

Labor Category Work Description Hours Chief

Stephens 14 14.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 2 $136.00

$136.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

Stephens Chief $36.00 Day 2 $72.00

Subtotal - Meals 0 $72.00

LODGING RATE* UNIT USAGE

Stephens Chief $133.00 Day 1 $133.00

Subtotal - Lodging $133.00 $205.00

FIELD EXPENSES

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Hand Held GPS $25.25 day 0 0 $0.00

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00

File Review and Site Recon

TOTAL LABOR HOURS

TOTAL VEHICLE RENTAL

*Rate may be higher based on geographical location or special events.

TOTAL MEALS AND LODGING

Copy of CSS15A_Dons Auto Recycling Work Plan/2 Page 6

SUBTASK NO.: 3 DESCRIPTION:

DATE: September 25, 2017 FACILITY ID NO.: FLR000085878

TASK NO: CSS_15A

LABOR HOURS

Labor Category Work Description Hours Principal

Kelso QA/QC Review 1 Brown

Chief Stephens 20

Associate Fowler Technical Editor and Production 4 Eucogco GIS maps, graphics, and aerials 6

31.00

VEHICLE RENTAL

ITEM RATE UNIT USAGE TOTAL

Automobile $68.00 Day 0 $0.00 Equipment Truck/Van $97.00 Day 0 $0.00 Equipment Truck/Van $420.00 Week 0 $0.00

$0.00

MILEAGE AND AIRFARE

ITEM RATE UNIT USAGE TOTAL

Mileage INCLUDED IN VEHICLE RENTAL RATE $0.00 Airfare $0.00

$0.00

MEALS AND LODGING

ITEM Labor Category RATE UNIT USAGE TOTAL

MEALS

$36.00 Day 0 $0.00 $36.00 Day 0 $0.00 $36.00 Day 0 $0.00 $36.00 Day 0 $0.00

Subtotal - Meals 0 $0.00

LODGING RATE* UNIT USAGE

$77.00 Day 0 $0.00 $77.00 Day 0 $0.00 $77.00 Day 0 $0.00 $77.00 Day 0 $0.00

Subtotal - Lodging $0.00 $0.00

EQUIPMENT PROCUREMENT

Provider List of Equipment RATE UNIT USAGE TOTAL Provider - Task # $0.00 0 $0.00 Provider - Task # $0.00 0 $0.00 Provider - Task # $0.00 0 $0.00

$0.00

SUBCONTRACTOR

Provider Name of Sub Description of Work RATE UNIT USAGE TOTAL Drilling (Conventional) $0.00 Lump Sum 0 $0.00 Drilling (Non-conventional) $0.00 Lump Sum 0 $0.00 Mobile Laboratory $0.00 Lump Sum 0 $0.00 Surveying $0.00 0 $0.00

IDW $0.00 0 $0.00

Utilities $0.00 0 $0.00 Other Sub 1- Task # $0.00 0 $0.00 Other Sub 2- Task # $0.00 0 $0.00 Other Sub 3 - Task # $0.00 0 $0.00

$0.00 LABORATORY and SAMPLE SHIPMENTS

ANALYSIS/PARAMETER

FAST TURNAROUND

RATE (%)

No. for Fast

Turnaround Rate RATE Media No. of

Samples No. of

QA/QC

Fast Turn- Around Charges TOTAL

EPA 8021 B VOCs - Hall/PID Series $100 Water/Soil 0 $0.00 $0.00 EPA 8260B VOCs $135 Water/Soil 0 $0.00 $0.00 TO-15 VOCs $200 Air 0 $0.00 $0.00 TCLP/SPLP Bottle extraction $40 Soil 0 $0.00 $0.00 EPA 8270 BNAs $220 Water/Soil 0 $0.00 $0.00 EPA 8270/8310 PAHs - Low Level $100 Water/Soil 0 $0.00 $0.00 FL-PRO TRPH $84 Water/Soil 0 $0.00 $0.00 Digestion $6.00 Water/Soil 0 $0.00 $0.00

*Rate negotiated. Subtotal-Lab Analyses 0 0 $0.00 $0.00

SAMPLE SHIPMENTS

CONTAINER SIZE

Shipment Method

24 hr No. of

Containers Shipment Method

No. of Containers Ice

No. of Containers TOTAL

Small (<50 lbs.) $63.00 0 $35.00 0 $5.00 0 $0.00 Large (>50 lbs. < 70 lbs.) $104.00 0 $60.00 0 $5.00 0 $0.00

Subtotal-Sample Shipments $0.00 $0.00

FIELD EXPENSES

Personal Protection

ITEM RATE UNIT USAGE TOTAL

Level B $172.50 Per Man Day 0 $0.00 Level C $110.00 Per Man Day 0 $0.00 Level D $28.00 Per Man Day 0 $0.00

TOTAL LABOR HOURS

TOTAL VEHICLE RENTAL

Work plan package development

*Rate may be higher based on geographical location or special events.

TOTAL LABORATORY and SHIPMENTS

TOTAL EQUIPMENT PROCUREMENT

TOTAL SUBCONTRACTOR

TOTAL MILEAGE AND AIRFARE

TOTAL MEALS AND LODGING

Work Plan Development

Copy of CSS15A_Dons Auto Recycling Work Plan/3 Page 7

SUBTOTAL - PERSONAL PROTECTION $0.00

Expendables

ITEM RATE UNIT USAGE TOTAL ITEM TOTAL

Expendables $32.50 Day 0 $0.00

SUBTOTAL - EXPENDABLES $0.00

Drilling Related Equipment

RATE UNIT USAGE

Well Locks $3.40 ea 0 $0.00 2" Well Caps $10.20 ea 0 $0.00 4" Well Caps $14.55 ea 0 $0.00

SUBTOTAL - DRILLING RELATED EQUIPMENT $0.00

Analytical Related Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Soil Sampling Kit (Corer, generator, auger, WL ind.) $208.55 day 0 0 $0.00 FID/PID Combination OVA $106.70 day 0 0 $0.00 Multiprobe 9000 (ph, cond, temp, do, redox) $126.10 day 0 0 $0.00 Multiprobe 9000 (ph, cond, temp, do, redox) $504.40 week 0 0 $0.00

$208.55 day 0 0 $0.00 Construction/O&M Supplies (Various items for work/repair) $63.05 day 0 0 $0.00 Turbidity Meter $24.25 day 0 0 $0.00

SUBTOTAL - ANALYTICAL RELATED EQUIPMENT $0.00

IDW Related Equipment

55-Gal Drum $58.20 0 $0.00

SUBTOTAL - IDW RELATED EQUIPMENT $0.00

Other Equipment

RATE ITEM UNIT NO OF ITEMS USAGE TOTAL ITEM

Tedlar Bag $14.55 ea 0 0 $0.00 Peristaltic Tubing (Silicon 3/8 x 5/8) $3.20 ft 0 0 $0.00 Disposable Bailers (HDPE) $4.85 ea 0 0 $0.00 Peristaltic Pump $29.10 day 0 0 $0.00 Water Level Indicator $19.40 day 0 0 $0.00 Color-Tec Kit $19.40 day 0 0 $0.00 PCE Detection Tubes $67.90 10 pack 0 0 $0.00 Vacuum Gauges $19.40 ea 0 0 $0.00 Teflon Tubing (1/4 inch OD) $1.95 ft 0 0 $0.00 HDPE Poly tubing (1/4 inch OD) $0.25 ft 0 0 $0.00 Total Survey Station $41.75 day 0 0 $0.00 Water level indicator $19.40 day 0 0 $0.00 Hand Held GPS $25.25 day 0 0 $0.00

*Rate negotiated. SUBTOTAL - OTHER EQUIPMENT $0.00

$0.00FIELD EXPENSES

Shallow GW Sampling Kit (WL ind., Per Pump, Multiprobe, turb meter, and

Copy of CSS15A_Dons Auto Recycling Work Plan/3 Page 7