This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Contract CN217, Task Assignment No. 67. The task involves JGP Structural Group, Inc., serving as the consultant with Jeffrey G. Parzych, PE, as the consultant representative. FDEP's project manager is Joel Pollock, and the contract manager is Ralph Perkins. The project is located at Stephen Foster Folk Culture Center State Park and concerns modifications to the Carillon Tower Light Fixture.
The task assignment requires JGP Structural Group, Inc., in coordination with subcontractor Applied Research & Design and Southern Earth Sciences, Inc., to investigate, review, and propose a system allowing the FAA light at the top of the Carillon Tower to be lowered to the existing platform for servicing and then raised back into position, with the work anticipated to involve a pulley-type system. The project is divided into six subtasks: initial site review and 30% documents ($3,682.00), asbestos survey and lead paint testing ($2,882.50), 60% design documents ($3,298.00), final design documents ($3,108.00), bidding support ($389.00), and construction administration services ($5,230.00). The total fixed-price cost is $18,589.50 with no cost reimbursement component, payable upon FDEP approval of deliverables for each subtask. The project schedule extends from March 3, 2025, to upon completion, with subtasks scheduled for completion within 3 to 4 weeks of their respective phases.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN217 67 FDEP 61558
Stephen Foster Folk Culture Center State Park Carillon Tower Light Fixture Modifications
JGP Structural Group, Inc.
Jeffrey G. Parzych, PE 850-574-2888 jeff@jgpstructural.com
Ralph Perkins 850-245-2460 ralph.perkins@floridadep.gov
Investigate, review and propose a system that will include mechanisms to lower the light to the existing platform within the tower, allow changing or servicing and then raising the light back into position, per the attached proposal dated March 28th, 2024.
Joel Pollock
Upon Completion $ 18,589.50 03/03/2025 $ 0.00
$ 18,589.50
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2024.04.30 13:05:12 -04'00'
Joel Pollock Joel Pollock Digitally signed by Joel Pollock Date: 2024.05.01 07:45:12 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2024.05.01 09:36:14 -04'00'
Jeffrey G. Parzych, P.E. Jeffrey Parzych Digitally signed by Jeffrey Parzych Date: 2024.05.03 09:56:23 -04'00'
Micahel W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2024.05.07 10:27:20 -04'00'
6155861558 37502000137 080039/22 408001 U3200 131500 PF $ 18,589.50
$ 18,589.50