This Request for Qualifications (RFQ) is issued by the County of Sacramento Department of Airports for Construction Manager At-Risk (CMAR) services to reconstruct and rehabilitate Taxiways A, A3, and A13 at Sacramento International Airport. The project encompasses full-depth pavement section reconstruction of approximately 8,600 feet of Taxiway A and connectors, with base bid work including Portland Cement Concrete pavement for taxiways and Asphaltic Concrete for shoulders, LED lighting upgrades, storm drain improvements, and provisions for future centerline and guard lights. The RFQ was released on June 25, 2026, with a deadline for questions by July 17, 2026, final question responses posted by July 24, 2026, and SOQ submissions due by July 30, 2026 at 2:00 PM. An optional pre-proposal conference is scheduled for July 7, 2026 at 1:00 PM at 6705 Lindbergh Drive, Sacramento. The Department anticipates interviews for shortlisted respondents from August 24 to 28, 2026, with notification of intent to award by September 17, 2026, Board approval by November 17, 2026, and anticipated CMAR contract service start on November 24, 2026. Construction is projected to commence by July 2027, with base bid construction estimated to be completed by 2030. The contract includes two phases: Phase 1 provides preconstruction services with a negotiated fee structure, and Phase 2 encompasses construction services under one or more Guaranteed Maximum Price (GMP) agreements with the Department retaining the right to terminate at Phase 1 completion if GMPs are unacceptable.
Respondents must hold a Class A California Contractors License in good standing, be registered with the California Department of Industrial Relations for public works, demonstrate ability to provide performance and payment bonds equal to 100 percent of the contract value, and maintain comprehensive insurance coverage as specified in the sample contract. Strongly preferred qualifications include delivery of at least two CMAR projects of similar size and complexity with GMP management experience and three airfield construction projects within active airfield environments over the past ten years. The project is anticipated to receive partial or full funding through Federal Aviation Administration (FAA) Airport Improvement Program (AIP) grant funds, requiring compliance with all applicable federal laws, regulations, and FAA solicitation provisions. The evaluation process employs a best-value selection method, beginning with SOQ scoring on qualifications and experience (20 points), past project performance (20 points), understanding of project goals (20 points), approach to project goals (20 points), scope approach (10 points), and innovation/sustainability approach (10 points), followed by interviews for the highest-scoring respondents with sealed fee proposals evaluated after ranking completion. State prevailing wages apply to preconstruction services, and federal prevailing wages apply to federally funded work components. The project includes pursuit of Envision Verification through the Institute for Sustainable Infrastructure with a minimum target award level of Silver.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATIONS
Taxiway A, A3, and A13 Pavement Rehabilita!on Project
P a g e | 1
DEPARTMENT OF AIRPORTS
CONSTRUCTION MANAGER AT-RISK SERVICES
SACRAMENTO INTERNATIONAL AIRPORT
TAXIWAY A, A3, AND A13 PAVEMENT
REHABILITATION PROJECT
CONTRACT NO. 4712
RELEASE DATE: JUNE 25, 2026
DEADLINE FOR QUESTIONS: JULY 17, 2026
RESPONSE DEADLINE: JULY 30, 2026
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/saccounty
Dated: 2026-06-25
P a g e | 2
TABLE OF CONTENTS
TABLE OF CONTENTS
1 INTRODUCTION AND GENERAL INSTRUCTIONS
1.1 Minimum Eligibility Requirements
1.2 SOQ Overview
1.3 Questions and Communication
1.4 Addenda
1.5 Department’s Right to Withdraw, Cancel, Suspend and/or Modify RFQ
1.6 SOQs Will Not be Returned
1.7 Department Consultants
1.8 Equal Employment Opportunity and Nondiscrimination
1.9 Labor Policies
1.10 Abbreviations
1.11 Definitions
2 Project Overview
2.1 Project Goals
2.2 Construction Manager Services
2.3 Federal Requirements
3 OPTIONAL PRE-PROPOSAL CONFERENCE
4 STATEMENT OF QUALIFICATIONS REQUIREMENTS
4.1 SOQ Organization and Format
4.1.1 Organization
4.1.2 Page Format
4.2 Required SOQ Content
4.2.1 Cover Page
4.2.2 Cover Letter
4.2.3 Table of Contents
4.2.4 Legal Structure
4.2.5 Proof of Bonding Capacity and Insurance Coverage
4.2.6 Safety Program
P a g e | 3
4.2.7 Respondent and Key Personnel Experience and Past Performance
4.2.8 Respondent’s Key Personnel
4.2.9 Project Understanding and Approach
4.2.10 SOQ Appendix A – Sample Contract Redlines
5 SUBMISSION INSTRUCTIONS
5.1 Submission
5.2 Authority to Verify Respondent’s Information
5.3 Alteration/Modifications to Response
5.4 Responder’s Right to Edit or Cancel SOQ
5.5 No Reimbursement for SOQ Costs
6 PROCUREMENT SCHEDULE
7 EVALUATION AND SELECTION PROCESS
7.1 Step 1: SOQ Evaluation and Scoring
7.2 Step 2: Scored Interview
7.3 Notification of Rankings
8 ADDITIONAL CONDITIONS
8.1 Final Approval and CMAR Validation Process
8.2 Public Disclosure of SOQ Documents
8.3 Disposition and Ownership of Response Documents
9 ATTACHMENTS
EXHIBIT 1: Pre-Proposal Conference Map Location
EXHIBIT 2: Sample Contract
EXHIBIT 3: FAA Solicitations for Construction And/or Acquisition of Equipment
10 APPENDICES
APPENDIX A: Project Scope of Work
APPENDIX B: Initial Screening Questionnaire
APPENDIX C: Scoring Questionnaire
APPENDIX D: A:idavit Indicating Degree of Acceptance of the Sample Contract
APPENDIX E: Forms
APPENDIX F: Envision – The Blueprint for Sustainable Infrastructure
P a g e | 4
1 INTRODUCTION AND GENERAL INSTRUCTIONS
The County of Sacramento (County) owns and operates the Sacramento International
Airport (SMF) through the Department of Airports (Department). SMF is a commercial service airport located 12 miles from downtown Sacramento. SMF opened in 1967 under its previous name, the Sacramento Metropolitan Airport, and in the 1990s it was renamed
Sacramento International Airport. Currently, SMF is best known as the gateway between
Northern California destinations and major cities across the United States and the world.
SMF Taxiway A and its connectors were originally constructed around 1965. Taxiway A is approximately 8,600 feet long and 125 feet wide (i.e., a 75-foot wide taxiway with 25-foot wide paved shoulders on each side). The Taxiway A connectors (A3, A5, A8, A10, A11, and
A13) vary slightly in width throughout the Taxiway A complex, but are approximately the same width as Taxiway A. The Department identified the need to reconstruct the asphalt portions of Taxiways A, A3, and A13 to address current functional and structural issues.
In accordance with California Public Contract Code section 20146, the Department intends to utilize the Construction Manager At Risk (CMAR) method to reconstruct and rehabilitate Taxiways A, A3, and A13 at SMF (Project). The Project is more particularly defined in Section 2 below. The Department intends to award the Project to the successful
Respondent (Construction Manager) using the best value method of selection.
The Department invites all qualified firms interested in providing the CMAR services (each, a Respondent) set forth in this Request for Qualifications (RFQ) to submit Statements of
Qualifications (SOQs) in compliance with the requirements of this RFQ.
Respondents interested in providing CMAR services will partner with the Department’s
Project Manager and Department’s Consultant Designer (RDM International, Inc.) to deliver the Project. As part of the Project team, the Construction Manager will be asked to provide input on schedule, phasing, constructability, cost and estimates, value engineering, and plan review throughout the design process. The Construction Manager will also be required to develop and submit to the Department one or more guaranteed maximum prices (GMPs) for all labor, equipment, and materials to construct the Project.
The Department anticipates entering into a single contract (CMAR Contract) with the
Construction Manager that contains a fee for preconstruction services (Phase 1) and sets forth an agreed-upon process for establishing one or more GMPs for the construction phase (Phase 2). If the Department accepts the GMPs, the Department will issue a Notice to Proceed to commence Phase 2. If the GMPs are not accepted by the Department, the
Department reserves the right to terminate the CMAR Contract at the completion of Phase
1.
P a g e | 5
1.1 Minimum Eligibility Requirements
Respondents that intend to submit an SOQ must meet the following minimum requirements:
• Ability to provide adequate bonds and insurance commensurate with the work to be performed, as more particularly described in the sample CMAR Contract attached as Exhibit 2.
• Hold a Class A California Contractors License which is current, valid, and in good standing with the California Contractors State License Board.
• Be registered with the California Department of Industrial Relations and qualified to perform public work as required by California Labor Code sections 1771.5 and
1725.5.
In addition, the following experience is strongly preferred:
• Have delivered at least two (2) projects using CMAR delivery method of similar size and complexity as this Project and managed work through Guaranteed Maximum
Price (GMP) contracts with proven ability to manage progressive GMPs with defined controls.
• Delivered three (3) airfield construction projects on active airfield environments within the past ten (10) years.
• Have experience working with government agencies and with public works projects, including applicable public contracting and labor compliance requirements.
1.2 SOQ Overview
Firms and entities meeting the minimum eligibility requirements set forth in Section 1.1 and Section 4 of this RFQ and interested in providing CMAR services for the Project are invited to submit an SOQ. Respondents should read this entire RFQ and meet all requirements described herein. SOQs that are deemed incomplete or are submitted past the due date and time shall be rejected. All required forms in the appendices must be completed and signed. Any SOQ not containing information required by this
RFQ will be rejected.
While attendance is not mandatory, all prospective CMARs are strongly encouraged to participate in the Pre-Proposal Conference described in Section 3.
1.3 Questions and Communication
The Department has established an online portal, OpenGov Procurement (OpenGov), for the distribution of RFQ documents, Addenda, and the posting of other documents in the
Department’s discretion at the following website:
https://secure.procurenow.com/portal/saccounty
P a g e | 6
OpenGov is the Department’s sole contact and addressee for receiving all communications about the Project during the RFQ procurement process. Respondents are prohibited from contacting any Department employee, or any of the groups listed in
Section 1.7 regarding the Project or this RFQ. OpenGov will also serve as the submittal portal for Respondent’s deliverables.
Questions regarding the RFQ must be submitted in writing to OpenGov in the Project’s Q&A section by the date stated in Section 6, or as amended by an addendum issued by the
Department.
Questions received via phone or e-mail will not be considered nor responded to. The
Department shall respond only to questions properly submitted as described in this
Section.
The Department may, in its sole discretion, respond to all, some or none of the questions submitted. Any responses to questions submitted per this Section will be in writing and the
Department will make the responses available via Addendum in OpenGov.
All questions submitted prior to the stated due date for questions will be posted on
OpenGov via addenda. It is the sole responsibility of the prospective Respondent to monitor OpenGov for such information. Each Respondent is solely responsible to ensure that it has the appropriate software to view and download the materials from OpenGov.
Registration to the OpenGov website will enable Respondent to receive notifications of any updates or new documents uploaded to OpenGov; however, each Respondent is solely responsible for checking OpenGov frequently for the addition, deletion, or amendment of the materials in OpenGov.
See references throughout this document for OpenGov requirements and uses.
1.4 Addenda
The Department reserves the right to modify this RFQ at any time prior to the SOQ due date.
The Department will modify the RFQ only by written addenda. SOQs should be based on this RFQ document and any formal written addenda issued thereafter by the Department.
Respondents should not rely on oral statements. Addenda will be posted in OpenGov
Procurement. It is the responsibility of each prospective Respondents to assure receipt of all addenda.
Respondents must include a brief statement acknowledging all issued addenda within the cover letter of their SOQ.
P a g e | 7
1.5 Department’s Right to Withdraw, Cancel, Suspend and/or Modify
RFQ
The Department reserves the right to withdraw, cancel, suspend, and/or modify this RFQ for any reason and at any time with no liability to any prospective Respondent for any costs or expenses incurred in connection with the RFQ or otherwise.
1.6 SOQs Will Not be Returned
Upon submission, the SOQs will not be returned to the Respondents.
1.7 Department Consultants
The Department has engaged several consultants to assist and participate in the project development stages and/or assist the Department during the procurement process for the
Project. These consultant firms are prohibited from participating in any of the Respondent organizations relating to this Project; providing technical, legal, or financial advice to
Respondents; or directly discussing any aspect of the RFQ with any Respondent. The consultant firms prohibited from participating include, but are not limited to, the following:
• RDM International, Inc.
• Lean Technology Corporation
• Geometrics Engineering PS, Inc.
• Orion Engineers & Associates
• Kimley-Horn and Associates, Inc.
1.8 Equal Employment Opportunity and Nondiscrimination
Work on the job site shall comply with Labor Code §§ 1727 and 1770-1815 and 8 California
Code of Regulations § 16000 et seq. Attention is directed to the "Nondiscrimination
Clause" that is required by Chapter 5 of Division 4 of Title 2, California Code of Regulations, and to the Standard California Nondiscrimination Construction Contract Specifications under Gov. Code § 12990.
1.9 Labor Policies
State prevailing wages will apply to this Preconstruction Services Contract. For Federal aid contracts, federal prevailing wages will also apply. The applicable prevailing wages will be specified in the CMAR Contract.
P a g e | 8
1.10 Abbreviations
The following abbreviations are used in this document and are defined as shown below:
BOS Sacramento County Board of Supervisors
CEQA California Environmental Quality Act
CMAR Construction Manager At-Risk
FAA Federal Aviation Administration
NEPA National Environmental Policy Act
RFQ Request for Qualifications
SOQ Statement of Qualifications
1.11 Definitions
The following terms are used in this document and are defined as shown below:
Term Definition
Addenda/Addendum Supplemental additions, deletions, and modifications to the provisions of the RFQ issued after the release of the RFQ
Business Day(s) Day that the Department is oMicially open for business.
Calendar Day(s) Every day shown on the calendar, beginning and ending at midnight.
CMAR Contract The written agreement between the Department and the
Construction Manager setting forth the obligations of the parties with respect to all phases of the Project, including performance of the Work, the furnishing of labor and materials, and the basis of payment during Phase 2 – construction phase.
Construction
Manager At-Risk
The project delivery method authorized by Public Contract
Code section 20146 wherein a Construction Manager is procured to provide preconstruction services during the preconstruction phase of the Project and construction services during the construction phase of the Project.
Department Sacramento County Department of Airports.
Evaluation Team Committees that review and assess individual SOQs using the criteria set forth in this RFQ.
Guaranteed
Maximum Price
(GMP)
The total compensation payable to the Construction Manager for construction of the Project, or portions of the Project, as specified in the construction-related requirements of the CMAR
Contract and Contract Documents.
Key Personnel Respondent-identified qualified personnel for key positions with demonstrated experience, expertise, and a record of
P a g e | 9 producing quality work on projects of a similar nature to the
Project. The key positions as determined by the Department are identified in Section 4.2.8.
Major Participant(s) Each of the following entities on the Respondent’s team:
• All partners or joint venture members.
• All individuals, persons, proprietorships, partnerships, limited liability partnerships, corporations, professional corporations, limited liability companies, business associations, or other legal entity however organized, holding (directly or indirectly) a
15 percent or greater equity interest in the Respondent.
All Major Participants shall be jointly and severally liable to the
Department for performance under the CMAR Contract. Any entity on the Respondent’s team which is not jointly and severally liable to the Department for performance under CMAR
Contract, does not constitute a Major Participant.
Preconstruction
Services Cost
Proposal
The rates proposed by Construction Manager for performance of Phase 1 – preconstruction services as indicated in Exhibit 2 sample CMAR Contract.
Request for
Qualifications
This written solicitation seeking Statements of Qualifications to provide CMAR services to the Department for the Project.
Respondent The entity, comprised of an individual, person, proprietorship, firm, partnership, professional corporation, business association, corporation, joint venture, combination thereof, or other legal entity however organized, participating in this RFQ.
SacCountyEbids
(OpenGov
Procurement/Procure
Now)
Department established online portal for posting of RFQ and
Addenda, receiving and responding to Respondent inquiries, receiving Respondent deliverables and/or submittals, and posting of Department’s intent to award.
Statement of
Qualifications
The information prepared and submitted by a Respondent in response to this RFQ.
Subconsultants, Subcontractors
Any person with whom the Construction Manager has entered into any subcontract and any other person with whom any
Subcontractor or Subconsultant has further subcontracted any part of the Work, at any tier.
Work The furnishing of labor, materials, equipment, and other incidentals necessary to, or convenient for the successful completion of, the CMAR services for the Project and the carrying out of the duties and obligations imposed by the CMAR
Contract.
P a g e | 1 0
2 Project Overview
Taxiway A is approximately 8,600 feet long and 125 feet wide (i.e., a 75-foot wide taxiway with 25-foot wide paved shoulders on each side). The taxiway connectors vary slightly in width throughout the Taxiway A complex but are approximately the same width as Taxiway
A. The Taxiway A complex serves Runway 17R/35L. Taxiway A and its connectors were originally constructed in asphaltic concrete pavement around 1965. The Department has performed several projects on the Taxiway A complex throughout the years. In 2006, a major rehabilitation project performed deep milling and repairs. In 2019, several areas received a mill and overlay repair. The Department is currently performing another mill and overlay project with patch repairs on Taxiways A3, A5, A10, A11, and A13.
The Department has identified the need to reconstruct the asphaltic concrete (AC) portions of Taxiways A, A3, and A13 to address current functional and structural issues. Additionally, the Department has identified the need to extend the service life of the Taxiway A3 Hold
Pad, and the connector taxiways A5, A8, A10, and A11. The pavement has deteriorated, increasing the potential for foreign object debris (FOD).
The Department is evaluating potential options for updating the Taxiway A complex with a base bid and bid alternates. The Department is pursuing Envision Verification through the
Institute for Sustainable Infrastructure (ISI) via the Pathway B Post-Construction with a minimum Verification Award level target of Silver (Appendix F).
The Project consists of eight unique work areas: Taxiways A, A3, A3 Hold Pad, A5, A8, A10, A11, and A13. The base project scope includes the full depth pavement section reconstruction of Taxiway A3, A13, and approximately 5,700 feet of Taxiway A. The base bid proposed full depth reconstruction pavement section is P-501 Portland Concrete Cement for the taxiway with P-401 Asphaltic Concrete shoulders. The reconstructed areas will be updated to meet FAA Advisory Circular (AC) 150/5300-13B-Change 1, Airport Design, geometry standards for Taxiway Design Group (TDG) 5. Additionally, the reconstructed areas will receive LED lighting upgrades with new taxiway edge lights and signage. The base bid includes installation of base cans and conduit for future centerline and guard lights.
The base project scope also includes storm drain cleaning and assessment of storm drain pipes within the project area. The Department identified one storm drain structure between
Taxiways B2 and B3 with settlement at the ground surface that needs investigation and repair. There are six proposed in-line check valves to be installed in storm drain outfalls at the west drainage ditch located west of Runway 17R-35L. The west drainage ditch receives the flows from the project area. Additional storm drain scope of work includes reviewing the existing spacing of the manhole structures associated with the storm drain system west of the Taxiway A, documenting inconsistencies with FAA suggested manhole spacing guidelines, and making recommendations for adding new manholes, if required. The
P a g e | 1 1
Department will evaluate the recommendations and may include the installation of additional manholes in the base project scope.
The following bid alternates include the base bid work:
• Alternate 1: Taxiways A5 and A11 connectors will be enhanced with TDG 5 geometry, taxiway lighting improvements, and a mill and overlay of the main taxiway surface.
• Alternate 2: Taxiways A5 and A11 connectors will receive full reconstruction with
TDG 5 geometry with the same pavement section as the Base Bid, and taxiway lighting improvements.
• Alternate 3: Full installation of additional electrical improvements for Surface
Movement Guidance and Control Systems (SMGCS) with installation of the centerline light fixtures, guard light fixtures, conductors, and the Constant Current
Regulators (CCRs).
Respondents are directed to Appendix A for more information regarding the project scope.
2.1 Project Goals
The Department’s goals for the Project are:
a) Safety: No lost time injuries for the Department, SMF tenants, and Construction
Manager employees, and no accidents involving public and/or SMF tenants during construction of the Project.
b) Continuity of Operations: Minimize planned impacts to the traveling public, aircraft, SMF tenants, businesses, security, and emergency services; no unplanned events that adversely aMect the public; mitigate operational risk throughout construction;
maintain access for all modes of transportation; maintain proper signs and delineation during construction; complete transparency on phasing while actively managing up to date phasing document(s); maintain operational capacity during infrastructure transitions. Coordinate taxiway closures, phasing, haul routes, and gate access with adjacent projects.
c) Communication: Maintain real-time situational awareness; ensure safety-critical information is immediate, redundant, and universally understood; coordinate seamlessly with Department Operations and stakeholders; provide transparent, timely reporting of progress and risks; streamline decision-making with clear escalation pathways; use consistent, standardized tools (e.g. phasing plans, FAA
Form 7460 Notice of Proposed Construction or Alteration, Special Activity Notices
(SAN), safety briefings, schedule updates); minimize operational disruptions through proactive notice and coordination; foster a culture of continuous, bi-
P a g e | 1 2 directional communication; support multi-project coordination with centralized information management; protect Department’s brand and passenger experience.
d) Quality: Deliver a completed project using high quality materials and workmanship.
e) Environmental Compliance: Meet or exceed all environmental commitments identified in the relevant environmental documents.
f) Sustainability: Participate, support, and contribute to the Department’s goal of
Envision Verification with a minimum award level of Silver.
g) Project Schedule: Participate and complete the Project Design with initial GMP by
January 25, 2027, and final GMP by March 9, 2027. The final GMP is required to submit the final grant application to the FAA in the application window of mid-
January through mid-April 2027. Project construction is anticipated to start by July
2027. The base bid construction duration is estimated to be completed in 2030.
h) Innovation: Use the expertise of the Project team to continually evaluate the design and construction methods to reduce costs, shorten schedule, and deliver a quality
Project.
i) Proactiveness/Risk Management: Work collaboratively with the Project team to continually re-evaluate Project risks, through all phases of the Project. Strive to minimize risks through careful mitigation measures.
j) Development and Maintenance of Partnerships: Work cooperatively with the Project team and, at the direction of and in coordination with Department staM, and external stakeholders. Communicate eMectively with all partners and strive to understand diMerent perspectives and shared goals.
k) Governmental Requirements: Work with Project team to incorporate and meet
County, State, and Federal requirements.
l) Budget: Collaboratively manage scope, risk and cost to maximize value, reduce change orders, and maintain the project within the established budget and GMP.
2.2 Construction Manager Services
The successful Respondent will be responsible for furnishing all labor, equipment, services, and support facilities for Project elements described in the CMAR Contract, including those elements identified below.
Design-Related Preconstruction Services
a) Validate Department/consultant design: Evaluates the design as originally intended and compares it to the Scope of Work with both the required budget and schedule to determine if the scope can be executed within those constraints. A validated design is one that can be constructed within the budget and schedule constraints of the Project.
P a g e | 1 3
b) Assist/input to Department/consultant design: OMers ideas/cost information to the designer to be evaluated during the preconstruction phase. Ultimately, the designer is still responsible for the design.
c) Design reviews: Reviews the plans and documents to identify errors, omissions, and ambiguities to improve the constructability and economy of the design submittal.
d) Design charrettes: Participates in structured brain-storming sessions with the
Department to generate ideas to solve design problems associated with the Project.
e) Constructability reviews: Reviews the plans and specifications to determine if the required level of tools, methods, techniques, and technology are available to permit a competent and qualified construction contractor to build the Project feature in question to the level of quality required by the Contract.
f) Operability reviews: Meets with the Department’s operations and maintenance personnel and provides them with an opportunity to make suggestions that will improve the operations and maintenance of the completed Project.
g) Regulatory reviews: Verifies that the design complies with current codes and will not have diMiculty obtaining the necessary approvals or permits.
h) Market surveys for design decisions: Furnishes designers with alternative materials or equipment along with current pricing data and availability to assist them in making informed design decisions early in the process to reduce the need to change the design late in the process resulting from budget or schedule considerations.
i) Verify/take-oM quantities: Verifies the quantities generated by the designer for the engineer’s estimate.
j) Assistance in shaping the scope of Work: Generates priced alternatives for the
Department to ensure that the scope of Work collates to the constraints dictated by the budget and/or schedule.
k) Feasibility studies: Investigates the feasibility of possible solutions to resolve design issues on the Project.
l) Risk identification and mitigation: Identifies risks associated with the Project and proposes response strategies.
m) Maintenance of Operations: Reviews, validates, and/or proposes alternative traMic handling concepts for the project during any taxiway, taxilane, apron or roadway closures.
n) Phasing needs: Reviews, validates, and/or proposes alternative phase construction concepts for the Project.
P a g e | 1 4
Cost-Related Preconstruction Services
a) Validate Department/Consultant Estimates: Evaluates the estimate as originally intended and determines if the scope can be executed with the constraints of the budget.
b) Prepare Project estimates: Provides real-time cost information on the Project but at diMerent points in the design process to ensure that the Project is within budget.
c) Cost/benefit engineering reviews: Reviews cost to include not only the aspects of pricing but also focuses on the aspect that “time equals money” in construction projects.
d) Early award of critical bid packages: Recommends which design packages should be completed first to ensure that pricing can be locked in on the packages.
e) Life-cycle cost analysis: Provides input for design decisions that impact the performance of the Project over its lifespan.
f) Value analysis/engineering: Identifies aspects of the design that either do not add value or whose value may be enhanced by changing them in some form or fashion.
The change does not necessarily reduce the cost; it may decrease the life-cycle costs.
g) Material selection and cost forecasting: Utilizes its contacts within the industry to develop estimates of construction material escalation to assist the Department in making decisions regarding material selection and early construction packages.
h) Cost risk analysis: Furnishes the Department with information regarding cost items that have the greatest probability of being exceeded.
i) Cash flow projections/cost control: Conducts earned value analysis to provide the
Department with information on how Project financing must be made available to avoid delaying Project progress. This also may include an estimate of construction carrying costs to aid the Department in determining projected cash flow decisions.
Schedule-Related Preconstruction Services
a) Validate Department/consultant schedules: Evaluates if the current scope of Work can be executed within the constraints of the schedule.
b) Prepare and manage Project schedules: Prepares and maintains schedules throughout the preconstruction phase to ensure that dates will be met and notifies the Department when issues arise.
c) Develop sequence of design Work: Recommends the sequences of the design Work to mirror the construction Work, so early Work packages can be developed.
P a g e | 1 5
d) Construction phasing: Develops a construction phasing plan to facilitate construction progress and ensure continuity of operations. This includes aircraft parking and utility impacts.
e) Schedule risk analysis/control: Evaluates the risks inherent to design decisions regarding the schedule and oMers alternative materials, means, and/or methods to mitigate those risks.
Administrative-Related Preconstruction Services
a) Third-party impact avoidance and reduction strategies: Reviews agreements, permits and work around (commitments) made to third parties: adjacent cities, adjacent counties, adjacent construction contracts, utilities, property owners, and regulatory agencies and determine and/or identify feasibility of commitment.
Advises the Department of impacts and alternative solutions to comply.
b) Prepare document control: Implements a document control process and software solution, as agreed upon by the Department, that will allow for the eMicient transmittal, sharing, tracking, approval, and filing of all Project related documents.
c) Coordinate contract documents: Evaluates each component to the construction-related requirements in the CMAR Contract against all other components and identifies conflicts that can be resolved before award of subcontractor construction contracts.
d) Coordinate with third-party stakeholders: Communicates with third parties involved in the Project, including utilities, and the general public.
e) Attend public meetings: Assists the Department in organizing and/or attends public meetings to answer questions from the public and/or stakeholders about the construction of the Project.
f) Biddability reviews: Reviews the design documents to ensure that Subcontractor
Work packages can be bid out consistent with requirements of Public Contract
Code section 20146 and receive competitive pricing. This action reduces the risk to the subcontractors because they are given the specific design product they need for their bids; not just told to find their work inside the full set of construction documents.
g) Subcontractor bid packaging: Coordinates the design Work packaging to directly correlate with Subcontractor Work packages so that early packages can be easily bid out and awarded.
h) Study labor availability/conditions: Furnishes advice during design regarding the availability of specialty trade subcontractors and the impact of that availability on the Project budget and schedule constraints.
P a g e | 1 6
i) Material availability: Furnishes advice during design regarding the availability of construction materials and the impact of that availability on the Project budget and schedule constraints.
2.3 Federal Requirements
Respondents are advised that this RFQ is issued with the expectation that the Project will be funded, in whole or in part, with federal grant funds administered by the FAA under the
Airport Improvement Program (AIP). Accordingly, this procurement and any resulting agreements shall comply with all applicable federal laws, regulations, and policies. These requirements include, but are not limited to, the FAA’s solicitation provisions for construction projects attached hereto and incorporated herein as Exhibit 3.
3 OPTIONAL PRE-PROPOSAL CONFERENCE
The Department strongly encourages interested Respondents to attend the Pre-Proposal
Conference although attendance is not mandatory.
The date for the Pre-Proposal Conference will be held on:
Date/Time: July 7, 2026, at 1:00 pm
Address: 6705 Lindbergh Dr., Sacramento, CA, 95837
(Map included in Exhibit 1: Pre-Proposal Conference Map Location) or as such date may be amended by Addendum.
The purpose of this conference is to review the RFQ package and SOQ requirements, schedule of events, evaluation process, submission requirements, and forms to be completed.
Questions asked during the Pre-Proposal Conference may be answered informally;
however, no oral statements made or responses provided by Department staM during the pre-proposal conference shall be binding on the County. All questions for which
Respondents desire a formal response from the Department must be submitted in writing in accordance with Section 1.3. The Department will issue written responses via Addenda in accordance with Section 1.4. For the last day to submit questions, please refer to
Section 6 (or the deadline as amended by Addendum). The Pre-Proposal Conference will be held in person.
Department staM and the Project team will be available to answer questions regarding the
RFQ, scope of work, and other related matters. Information received at the Pre-Proposal
Conference may aid prospective Respondents in deciding whether to submit an SOQ. The
P a g e | 1 7
Pre-Proposal Conference may also provide a forum for networking with other entities that may be interested in collaborating on an SOQ.
4 STATEMENT OF QUALIFICATIONS REQUIREMENTS
This Section describes the specific information that shall be included in the SOQ.
Respondents shall provide brief, concise information that addresses the requirements of the Project consistent with the evaluation criteria described in this RFQ. Failure of a
Respondent to submit a complete SOQ may result in the SOQ submittal being determined non-responsive. Respondents shall only submit the information requested. Details pertaining to the organization and format of the SOQ are outlined below.
4.1 SOQ Organization and Format
4.1.1 Organization
The SOQ shall be organized as follows:
1. Cover Page
2. Cover Letter
3. Table of Contents
4. Statement of Qualifications text sections
Section 1 – Legal Structure
Section 2 – Proof of Bonding Capacity and Insurance Coverage
Section 3 – Safety Program
Section 4 – Respondent and Key Personnel Experience and Past Performance
Section 5 – Respondent's Key Personnel
Section 6 – Project Understanding and Approach
5. One Appendix
Appendix A: Department Contract
4.1.2 Page Format
The SOQ sections and appendices shall consist of 8 ½-by-11-inch pages, except for charts, exhibits, and other illustrative and graphical information, which may be submitted on a 11-by-17-inch page. The 11-by-17-inch page will count as two (2) 8 ½-by-11-inch pages.
Margins for the document must be at least 1-inch on all sides.
Text shall be in a standard font that is a minimum of 12-point font, single-spaced. A minimum 10-point font is acceptable for captions, tables, charts, and graphical elements.
Each page shall be numbered consecutively within each section (i.e., 1-1, 1-2...; 2-1, 2-2...;
3-1, 3-2..., etc.), and the page numbers shall be centered at the bottom of each page.
P a g e | 1 8
4.2 Required SOQ Content
This section describes the required content and page limitation for the SOQ.
4.2.1 Cover Page
The SOQ cover page shall include the following information:
• The full legal name of the legal entity that will enter into contract with the
Department (i.e., the Respondent).
• The Project title: “Statement of Qualifications for Construction Manager At-Risk
Services for Sacramento International Airport - Taxiway A, A3, and A13
Rehabilitation Project”
• “Sacramento County Department of Airports”
• “Contract Number 4712”
• Date Submitted
4.2.2 Cover Letter
The Cover Letter shall not exceed two (2) pages, and shall include the following information:
• Respondent O:icial Letterhead: Cover letter must be written on the Respondent’s oMicial letterhead containing the legal name of the Respondent, address, telephone number, and email address.
• Statement of SOQ Validity Period: Confirm that the SOQ is valid and binding for one hundred and eighty (180) days or until the CMAR Contract execution, whichever occurs later.
• Statement of Agreement with the CMAR Contract Template: Confirm that the
Respondent has reviewed and agrees to be bound by the Department’s standard contract template in Exhibit 2, including insurance provisions; or confirm agreement to all provisions except those specifically redlined for negotiations. If the
Respondent proposes redlines to the Sample Contract, the Cover Letter must state that such proposed changes are included in SOQ Appendix A.
o Proposed provision redlines will be submitted in SOQ Appendix A.
• Conflict of Interest Statement: Provide a brief statement that the Respondent does not have any actual or perceived conflicts of interest relating to this RFQ or a brief explanation of any such conflicts and proposed mitigation/neutralization measures.
P a g e | 1 9 o Respondents must attach the conflict of interest disclosure in the SOQ
Section 1.
• Acknowledgement of Addenda: Provide a statement acknowledging all RFQ addenda issued and the date of the last addendum received.
• Authorized Signature: Name, title, and signature (in non-black ink or acceptable digital signature) of the representative(s) duly authorized to sign on behalf of the
Respondent.
4.2.3 Table of Contents
The SOQ is required to have a Table of Contents listing the associated sections, titles, and page numbers.
4.2.4 Legal Structure
Respondents must demonstrate that their organization, legal structure, team composition, and history are suMiciently stable and capable of performing the CMAR Contract. The narrative submitted under SOQ Section 1 is limited to two (2) pages. Additionally, Respondents must attach the required forms and legal documents described below that are not counted towards the narrative page limits.
Respondents shall include the following information:
• Respondent Profile: Provide a brief profile including size, organizational structure, and Respondent history.
• Major Participants: Identify and describe all Major Participants, as defined in RFQ
Section 1.11. Summaries should include organizational roles, expertise, and contributions to Respondent’s overall capabilities.
• Conflict of Interest Disclosure: Identify any actual or potential conflicts of interest.
If any exist, describe the nature of the conflict, and the measures the Respondent proposes to avoid, mitigate, or neutralize it.
o If Major Participants representing diMerent Respondent organizations are owned by the same parent company, describe the measures that will be taken to avoid conflicts throughout the procurement process. The
Department may disqualify a Respondent if any of its Major Participants belong to more than one Respondent organization.
• SOQ Supporting Documents (not counted towards page limits): The following documents are considered supporting information and are not counted towards the narrative page limits. These documents must be attached, or the SOQ will be deemed non-responsive.
P a g e | 2 0 o Initial Screening Questionnaire (RFQ Appendix B): Respondent must submit a completed Initial Screening Questionnaire attached in RFQ
Appendix B. The Department may request additional documentation supporting any response provided. The questionnaire is a pass/fail qualifier for the SOQ response.
The Respondent will be removed from further consideration if the response to any question is “not eligible.”
o Scoring Questionnaire (RFQ Appendix C): Respondent must submit a completed Scoring Questionnaire attached in RFQ Appendix C. The
Respondent must provide a separate page(s) listing explanations by question reference number for any question marked “yes” on the Questionnaire. An authorized representative must sign and date the explanation in non-black ink or appropriate digital signature. The questionnaire is a pass/fail qualifier for the SOQ response.
o Form B – Respondent’s Organization Information (RFQ Appendix E):
Provide the organization contact information for the Respondent and all
Major Participants on Form B attached in the RFQ Appendix E.
o Legal Structure Documentation: Provide executed organizational documents, or if not yet formed, a description of the proposed legal structure with draft agreements or letters of agreement.
If the Respondent organization is already formed:
i. Provide complete organizational documents demonstrating the ability of the Respondent and all Major Participants to conduct business in the State of California at the time of CMAR Contract award.
ii. Provide copies of executed agreements between the Respondent and any Major Participant demonstrating compliance with the definition of
Major Participant in Section 1.11.
If the Respondent organization is not yet formed:
i. Provide a brief description of the proposed legal structure and proposed underlying agreements.
ii. Submit letters of agreement, signed by an authorized oMicer of each
Major Participant, identifying:
a. The form of the proposed relationship (e.g., joint venture, partnership); and
P a g e | 2 1
b. The commitment to finalize organizational documents prior to execution of the CMAR Contract.
iii. For partnerships, joint ventures, or associations, identify the percentage equity interest of each member.
4.2.5 Proof of Bonding Capacity and Insurance Coverage
Respondents must provide proof of bonding capacity and insurance coverage per the requirements of the Department standard contract in Exhibit 2. There is no page limit for this SOQ section.
• Proof of Bonding Capacity: Verify Respondent’s ability to secure Performance
Bond and Payment Bond as described in the CMAR Contract.
• Proof of Insurance Coverage: Verify Respondent’s ability to meet the minimum insurance requirements described in the CMAR Contract.
4.2.6 Safety Program
Respondents must provide the following information about their safety program. This SOQ section has no overall page limit.
• Safety Record: For the most recent three (3) year period, provide the Respondent’s safety record including an average experience modification rate, an average total recordable injury/illness rate, and average lost work rate.
o The Safety record shall also indicate whether Respondent is a party to an alternative dispute resolution system as provided for in Labor Code section
3201.5.
• Workers’ Compensation Experience History: Provide information on the
Respondent’s workers’ compensation experience history.
• Worker Safety Program: Provide a summary of the Respondent’s worker safety program. Include a description of how the Respondent will provide protection to prevent damage, injury, or loss to employees of the Respondent and its subconsultants, subcontractors, and others who are on the Project site and will minimize lost or restricted workdays due to injuries.
• Cal-OSHA or FOSHA Citations and Assessed Penalties: For the past five (5) years, the Respondent shall include information on any California Occupational Safety and Health Administration (Cal-OSHA) or Federal Occupational Safety and Health
Administration (FOSHA) citations and assessed penalties against the respondent for any serious, willful, or repeat violations of its safety or health regulations.
P a g e | 2 2
4.2.7 Respondent and Key Personnel Experience and Past Performance
Respondents shall demonstrate experience, expertise, and capacity to successfully perform the Project by submitting five (5) reference projects that collectively demonstrate the Respondent’s qualifications.
Respondents must provide the following information with the page limits described below:
• Respondent’s Qualifications (maximum one (1) page): Provide a brief narrative of the Respondent’s qualifications, any specialized expertise, and capability to perform the Project.
• Key Personnel Summary (maximum one (1) page per firm): Provide a summary of the Key Personnel’s capability, capacity, and experience with similar services for government clients.
• Project Experience Summary (maximum three (3) pages): Provide five (5) reference projects.
o At least two (2) projects must utilize the CMAR delivery method of similar size and complexity and include management through a GMP contract, demonstrating experience with progressive GMP development and controls.
o At least three (3) projects must be airfield construction projects performed within an active airfield environment within the past ten (10) years.
o A single project may satisfy both the CMAR and airfield requirements, if applicable.
o For each project provide the following information (as available):
Project name, contract or project number, the owner’s contact information (name, phone number, e-mail address), and alternative owner contact, if necessary.
Dates of construction and warranty periods.
Narrative description of the project scope, complexity, and key features.
Description of the work performed, and the percentage of work completed by each Major Participant(s).
Scheduled completion milestones and actual completion dates.
Description of teaming history, including how Major Participants have worked together on similar projects delivered via CMAR, design-bid-build, or other project delivery methods.
P a g e | 2 3
Initial construction bid price, final construction value, number and dollar value of contract modifications, and explanation of change causes.
Record of cost and schedule growth or reduction, including strategies used to minimize impacts and avoid claims.
Claims history, including number, nature, dollar values, and final disposition.
• Client References (maximum one (1) page): Provide three (3) client references related to services similar to this RFQ, including name, address, contact information, contract dates, and brief description of services
Required Areas of Demonstrated Experience
Respondents must demonstrate experience in the following areas through their selected projects and accompanying narratives:
I. Construction within the secure Airfield Operations Area (AOA) of medium or large hub commercial airport, including:
a. Construction Safety and Phasing Plan (CSPP) implementation
b. Airfield closures, aircraft routing, and airfield access control.
c. Maintaining safe aircraft and vehicle movement areas.
d. Notice to Airmen (NOTAM) coordination
e. Coordination with adjacent construction projects.
II. Working knowledge of FAA Advisory Circulars (AC) and specifications, particularly AC 150/5370-10 Standard Specifications for Construction of
Airports, airfield pavement construction, materials, and quality control requirements.
III. Delivery of projects with accelerated construction schedules.
IV. Coordination of complex public utility relocation and municipal utility construction (storm drain, electrical, FAA facilities).
V. Collaborative, integrated teaming with Owners, Designers, other Contractors, stakeholders, and adjacent project teams.
VI. Use of innovative designs, methods, and materials to improve safety, performance, and economy.
P a g e | 2 4
VII. Construction of FAA specification P-401 Asphalt Mix Pavement and P-501
Cement Concrete Pavement projects.
VIII. Construction or modification of airfield lighting systems including in-pavement lighting, base cans, conduits, cabling, and fixtures for taxiway edge lights, centerline lights, and guard lights.
IX. Development and implementation of Contractor Quality Control Programs consistent with FAA specification Item C-100 Contractor Quality Control
Program (CQCP).
X. Compliance with environmental regulations and restrictive permit requirements.
XI. Experience with sustainable and Envision-aligned projects, including integrated sustainability planning and documentation.
XII. Delivery of sensitive public projects requiring coordination with multiple regulatory agencies (local, State, and Federal).
XIII. Coordination and construction of utility connections including electrical, communications, drainage, and other airport infrastructure.
4.2.8 Respondent’s Key Personnel
Respondents shall identify qualified Key Personnel with demonstrated experience and capability to deliver the Project. The following provides a brief job description and duties of the Key Personnel functions assigned to the Project. The job descriptions and reporting structure below are suggested only, however all functions identified shall be met by the
Respondent in the titles and reporting structure provided. An individual may fill more than one functional position.
a) Project Manager: Overall responsibility for management of CMAR preconstruction and construction services, resource allocation, contractual matters, quality, schedule, and communication with the Project team.
b) Project Construction Manager: Responsible for ensuring that construction is executed in accordance with the design and Project requirements. Shall be dedicated full-time during active construction operations.
c) Lead Estimator: Responsible for milestone cost estimates, open cost modeling, and cost reporting. Must have FAA-funded airfield construction project estimating experience on projects of comparable size and complexity.
d) Lead Scheduler: Responsible for developing and maintaining project schedules that outline all project phases, task dependencies, and durations utilizing Critical
Path Method (CPM) and the latest version of Primavera P6 software per Sacramento
P a g e | 2 5
County Standard Construction Specification Section 7-5.02 CPM Schedule – Major
Projects. Coordinate project schedule with stakeholders and adjacent projects.
Monitor and track actual work against the schedule, identifying delays or bottlenecks, and adjusting plans as needed. Provide regular progress and schedule status reports. Must demonstrate five (5) years of experience with Critical Path
Method (CPM) scheduling.
e) Airport Specialist: Responsible for reviewing airfield plans for constructability, phasing, staging, traMic management, aircraft routing, regulatory compliance, and operational safety. Coordinate with Owner and relevant airport stakeholders to support construction phasing and operational planning consistent with the Airport’s
Emergency Response (ERP) and applicable regulatory requirements of the FAA.
Must demonstrate ten (10) years of…