About this file
This is a Request for Qualifications (RFQ) issued by the City of Tucson, Arizona for a Construction Manager at Risk (CMAR) to provide pre-construction and construction-phase services for the Morris K. Udall Park Expansion project located at 7200 E. Tanque Verde Road, Tucson, Arizona. The project encompasses comprehensive park improvements including one new inclusive playground, two covered basketball courts, two lighted soccer fields, parking enhancements, baseball and soccer field LED lighting upgrades, two new restrooms, a relocated sand volleyball court, multiuse trail connections forming part of the Pima Street Bicycle Boulevard, and potentially additional amenities if federal Outdoor Recreation Legacy Partnership (ORLP) funding is secured. The CMAR will participate in the design process from early 2027 through 100% completion in November 2027, with construction anticipated to last 12 to 18 months following permit approval. The solicitation due date is December 11, 2026 at 2:00 PM Arizona time, with a non-mandatory pre-submittal meeting scheduled for November 30, 2026 at 11:00 AM via Microsoft Teams. The question submission deadline is December 3, 2026 at 5:00 PM. Submittals are recommended not to exceed twenty standard 8.5" by 11" pages and must include a cover letter, statement of qualifications, signed offer page, and acknowledgement of all RFQ addenda.
The estimated construction cost for the entire project is $14,000,000. The CMAR will establish a Guaranteed Maximum Price (GMP) contract comprising the maximum cost of work, construction fee, general conditions fee, taxes, bonds, insurance costs, and bid contingency. The contract is subject to City of Tucson Small Business Enterprise (SBE) program requirements and, if federally funded, Davis-Bacon Act wage requirements and prevailing wage standards. The CMAR must provide payment and performance bonds equal to 100% of the negotiated construction value and maintain comprehensive insurance coverage including Commercial General Liability of $2,000,000 per occurrence and $4,000,000 general aggregate, Commercial Automobile Liability of $1,000,000 combined single limit, and Workers' Compensation with statutory limits. Evaluation criteria are weighted as follows: Experience and Qualifications of the Firm/Team (45%), Approach to Performing Required Services (30%), General Information (15%), Subcontractor Selection Plan (5%), and Other Criteria (5%). The City reserves the right to enter into negotiations with the top-ranked firm(s) and may reject any or all proposals. The contract is governed by Arizona law and the Tucson Procurement Code.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CMAR_for_Morris_K._Udall_Park_Expansion.pdf | ||
| Offer_and_Acceptance.pdf | ||
| SBE_Provisions_Revised_May_2024_Includes_Subcontractor_Modification_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF TUCSON
REQUEST FOR QUALIFICATIONS
270167
CMAR FOR MORRIS K. UDALL PARK EXPANSION
Due Date: Friday, December 11, 2026
City of Tucson
255 W Alameda St
Tucson, AZ 85701
Procurement portal https://secure.procurenow.com/portal/tucson-az
Public Portal https://secure.procurenow.com/portal/tucson-az/projects/302809
PUBLISH DATE: November 18, 2026 https://secure.procurenow.com/portal/%7Bproject.government.code%7D https://secure.procurenow.com/portal/%7Bproject.government.code%7D/projects/%7Bproject.id%7D https://secure.procurenow.com/portal/%7Bproject.government.code%7D/projects/%7Bproject.id%7D
CITY OF TUCSON REQUEST FOR QUALIFICATIONS NO. 270167
BUSINESS SERVICES DEPARTMENT Page 2 of 85 SHARED SERVICES PROCUREMENT DIVISION RESPONSIBLE CONTRACT OFFICER: Sandra Alcorn
255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PH: (520) 837-4118
Attachments:
A - Offer and Acceptance
BUSINESS SERVICES DEPARTMENT Page 3 of 85
A. NOTICE
A.1. CITY OF TUCSON
NOTICE OF REQUEST FOR QUALIFICATIONS NO 270167
CMAR for Morris K. Udall Park Expansion
Pursuant to ARS Title 34, the City of Tucson is conducting a competitive One-Step Process to select a qualified construction manager/general contractor to provide design phase assistance for complete construction service as the Construction Manager at Risk for construction improvements for CMAR for Morris K. Udall Park Expansion. The estimated construction cost for the entire project is fourteen million dollars ($14,000,000).
The City invites interested firms to submit written Statements of Qualifications (SOQs) relating to this solicitation. A Screening Committee will evaluate firms’ qualifications and experience with similar projects. The top ranked firm(s) will then be invited to enter into negotiations with the City of Tucson.
SUBMITTAL DUE DATE: Friday, December 11, 2026 AT 2:00 pm LOCAL AZ TIME
PRE-SUBMITTAL MEETING DATE: Monday, November 30, 2026
TIME: 11:00 am LOCAL AZ TIME
LOCATION: Microsoft Teams meeting Join:
https://teams.microsoft.com/meet/2546846819126328?p=a5wLZTd2uBqOPoLFUV Meeting ID: 254 684 681 912 632 8 Passcode: xo7Rr6Ev Dial in by phone +1 213-293-2303,,690199085# United States, Los Angeles Phone conference ID: 690 199 085#
QUESTIONS SHALL BE DIRECTED TO: Sandra Alcorn
(520) 837-4118 sandra.alcorn@tucsonaz.gov
Publication Dates: Wednesday, November 18, 2026 and Wednesday, November 25, 2026
Posted Date: Wednesday, November 18, 2026
BUSINESS SERVICES DEPARTMENT Page 4 of 85
B. INTRODUCTION
B.1. Summary
It is the City of Tucson’s intention to initiate an RFQ for a CMAR to provide pre-construction and construction-phase services for improvements at Udall Park, located at 7200 E. Tanque Verde Rd., Tucson, Arizona.
The Morris K. Udall Park – Park Improvements project engages a diversity of departments and stakeholders, and the CMAR team will be required to work closely and collaboratively with all parties involved to ensure the success of the project. The design and construction teams will be responsible for defining, monitoring, and adhering to the project budget and schedule. The CMAR will make sure the team meets the project schedule and will provide repetitive cost and constructability alternatives throughout pre-construction and construction.
The CMAR will provide pre-construction management services during the design phase of the project and may serve as the General Contractor for the construction phase of the project. At some point prior to construction, the CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract.
GMP means the sum of the maximum cost of the Work; the CMAR’s construction fee; general conditions fee; taxes, bonds, insurance costs; and bid contingency as proposed and approved pursuant to the CMAR Standard Terms & Conditions contained herein. The approved GMP will be made part of the contract by executing an amendment or additional amendments for phased construction.
The CMAR will be responsible for construction means and methods and may be required to solicit bids from pre-qualified subcontractors to perform the work.
It is recommended that submittals not exceed twenty (20) standard 8.5” by 11” pages.
B.2. Contact Information
Sandra Alcorn Principal Contract Officer Email: sandra.alcorn@tucsonaz.gov Phone: (520) 837-4118 Department:
Parks and Recreation
B.3. Timeline mailto:sandra.alcorn@tucsonaz.gov tel:(520)837-4118
BUSINESS SERVICES DEPARTMENT Page 5 of 85
Issue Date November 18, 2026
Pre-Submittal Meeting (Non- Mandatory)
November 30, 2026, 11:00am
Microsoft Teams meeting Join:
https://teams.microsoft.com/meet/2546846 819126328?p=a5wLZTd2uBqOPoLFUV Meeting ID: 254 684 681 912 632 8 Passcode: xo7Rr6Ev
Dial in by phone +1 213-293-2303,,690199085# United States, Los Angeles Phone conference ID: 690 199 085#
Question Submission Deadline December 3, 2026, 5:00pm
Submittal Due Date December 11, 2026, 2:00pm https://teams.microsoft.com/meet/2546846819126328?p=a5wLZTd2uBqOPoLFUV https://teams.microsoft.com/meet/2546846819126328?p=a5wLZTd2uBqOPoLFUV
BUSINESS SERVICES DEPARTMENT Page 6 of 85
C. SCOPE OF WORK
C.1. Pre-construction Phase Services
Pre-construction Phase Services by the CMAR may include the following:
• Team building/partnering
• Management plans
• Value analysis/engineering
• Constructability reviews including identification of plan/specification conflicts, errors and omissions
• Cost Modeling/Budgeting
• Phasing Analysis/Sequencing/Construction Schedules
• Estimating/Price/GMP
• Building code/permitting analyses
• Utility coordination with providers and existing infrastructure
• Bid package strategy (subcontracting, SBE compliance)
• Identification of specialized materials and ordering of long lead-time materials
• Integration of means, methods and materials in relation to general, sustainable development
C.2. Construction Services
Construction Phase Services by the CMAR may include the following:
• Team management/coordination
• Underground utility location
• Critical Path Scheduling
• Submittal processes/coordination/management
• Cost controls/change order management
• Subcontract QC
• Field management
• Safety/QC programs
• Special inspections and materials testing coordination
• Project close out/warranty period services
BUSINESS SERVICES DEPARTMENT Page 7 of 85
C.3. Introduction
In 2018, Tucson voters approved Proposition 407, now known as the Tucson Delivers Parks and Connections Bond. The bond includes funding to expand access to enhanced recreational opportunities at Udall Park, as well as funding for the Pima Street Bicycle Boulevard that provides a connection through the park between neighborhoods east of the park to the Chuck Huckelberry Loop (The Loop).
To complement the bond package, the City has applied for Outdoor Recreation Legacy Partnership (ORLP) funding through the Land and Water Conservation Fund (National Park Service). If awarded, the project will expand to include additional amenities requested by the community that are not covered by the bond.
C.4. Background
Morris K. Udall Park (referred to locally as “Udall Park”) is a 172.8-acre City of Tucson metro park located in Ward 2 at the southeast corner of Tanque Verde Road and Sabino Canyon Road. Before the site became a park it was the location of the United States Coast Guard and Geodetic Survey Magnetic Observatory. The park opened in 1982 and developed incrementally over the past four decades to include the Morris K. Udall Regional Center (indoor basketball and volleyball, fitness facilities, an indoor jogging track, and heated outdoor pool), Carol W. West Senior Center, and broader public park featuring multi-use athletic fields, batting cages, tennis courts, pickleball courts, a sand volleyball court, playground, ramadas, bocce courts, horseshoe pits, an amphitheater, splash pad, and paved walking path nestled into a Sonoran Desert landscape. The park facilities are extensively used by residents in northeast Tucson and regionally to recreate, connect with nature, and build community.
In 2011, a master planning process was completed for Morris K. Udall Park to engage neighbors in the creation of a phased redevelopment plan informed by an assessment of existing conditions and community-prioritized needs. The master plan was adopted by the Tucson Mayor and Council by Resolution Number 21770 on June 7, 2011. The scope of the approved Udall Park master plan was reaffirmed in the 2016 Systemwide Parks Master Plan that identified a need for additional play areas, additional soccer fields, covered outdoor basketball courts, a multi-use trail connection to The Loop, a landscape buffer for surrounding neighborhoods, and requisite facilities (e.g. parking, restrooms, path connections) to support new amenities. The Master Plan also suggests eco-efficient techniques for implementation, such as rainwater harvesting, water efficient landscaping, and reclaimed water expansion.
The approval of Proposition 407 in 2018 secured Tucson Parks and Connections Bond funding to advance a suite of park improvements identified in the master plans and build an east-west connection through Udall Park as part of the Pima Street Bicycle Boulevard. This project is part of Great Parks:
Phase 3 and Strong Connections: Phase 2 of the bond which include:
• one (1) new, inclusive playground (combines the 2 playgrounds noted in the bond language into one destination playground);
• two (2) new, covered basketball courts;
• two (2) new, lighted soccer fields;
• parking and circulation enhancements;
• softball fencing renovation;
https://www.nps.gov/subjects/lwcf/orlp.htm https://www.nps.gov/subjects/lwcf/orlp.htm https://www.tucsonaz.gov/files/sharedassets/public/v/1/living-and-working/parks-and-recreation/documents/capital-planning/park-plans/udall_master_plan_final_mc_approved_6-7-11.pdf https://tucsondelivers.tucsonaz.gov/pages/parks-connections#project.
BUSINESS SERVICES DEPARTMENT Page 8 of 85
• baseball field light upgrades to LED lighting;
• soccer field light upgrades to LED lighting;
• 2 new restrooms;
• a relocated sand volleyball court;
• requisite infrastructure to support new amenities (e.g. safety lighting, path connections);
• and a new, multiuse, east-west path connection through Udall Park to form part of the Pima Street Bicycle Boulevard.
During the community and operational engagement process for the bond package, the City learned that residents are also interested in:
• improvements to the outdoor amphitheater;
• a new and expanded dog park;
• a pump track;
• and poolside seating and shade at the aquatic center.
If ORLP funding is secured, the expanded scope will be added to the overall project.
C.5. Additional Coordination
Public Art
The Morris K. Udall Park Improvements project is fortunate to work with the Arts Foundation for Tucson and Southern Arizona (AFTSA) and the Percent for Art program to add public works of art to the park.
AFTSA, the City, and Dig Studio have collaborated with the selected artist, Sasha Primo, to conduct background research and engage residents in a participatory design process to shape the new art. The artist is currently developing preliminary concepts based on findings and inspiration to date and will install their own work. The CMAR team will be expected to coordinate closely with Sasha Primo, AFTSA, and Dig Studio to meaningfully incorporate the art into the overall project and site.
Green Stormwater Infrastructure
Concurrently with this project, Tucson Water’s green stormwater infrastructure program, Storm to Shade, will enhance the existing landscape at Udall Park by incorporating stormwater harvesting basins at key locations throughout the park. The CMAR will be required to coordinate carefully with the Storm to Shade project to promote efficient use of City resources and minimize the duration of park disturbance for residents.
C.6. Design
The design of the Morris K. Udall Park Improvements project is led by Dig Studio with support from Dibble Engineering, Monrad Engineering, Novak Environmental, BDA Design, Ninyo & Moore, Rider Levett Bucknall, and SWCA. The design team has reached 60% construction documents for the park improvements and is pausing to bring the multiuse path and complementary green stormwater infrastructure improvements to 60% while the City completes CMAR procurement and onboarding. It is https://artsfoundtucson.org/ https://artsfoundtucson.org/
BUSINESS SERVICES DEPARTMENT Page 9 of 85 expected that the CMAR will participate in the design process from early 2027 through 100% completion in November 2027.
C.7. Project Timeline
The design and pre-construction phase of the project is underway. It commenced in September 2025 and is estimated to continue through November 2027. The construction duration for this project is anticipated to be 12 to 18 months after permits have been approved.
C.8. Existing Facilities
1) Most existing facilities are to be fully retained as part of the project design. The CMAR shall ensure that all existing facilities, infrastructure, utilities, and plants/ landscape features are properly protected in place during project construction.
2) The project is adjacent to established residential neighborhoods and will be constructed while existing amenities and programs remain fully operational. The CMAR contractor shall coordinate carefully with City staff regarding potential closures, staging, and material hauling and will conduct construction operations in a manner designed to cause as little disruption to park users and neighbors as possible.
C.9. Buildings
1) New buildings and structures will be built as part of this project. Refer to the list above.
C.10. Utilities - New and Existing
1) The project will involve the upgrade and expansion of existing utility connections for electrical service, potable water, and reclaimed water.
2) There will be a strong need for contractor coordination with City staff from Parks and Recreation, Tucson Water, and Facilities Maintenance, as well as all applicable utility providers to upgrade, expand, or install new services.
3) Existing utilities and easements in or around the project are extensive. The CMAR will need to coordinate carefully to protect existing utilities and infrastructure in place.
C.11. Areas of Specialized Construction
1) A variety of specialized construction methods are anticipated for this scope of work. Specialized work includes, but is not limited to:
• Fully inclusive nature play/ adventure play area
• LED sports lighting systems
• Outdoor basketball court installation
• Sand volleyball court installation
• Pump Track
BUSINESS SERVICES DEPARTMENT Page 10 of 85
• Large-scale tensile structures
• Native plant installation and passive rainwater harvesting
• Irrigation systems
BUSINESS SERVICES DEPARTMENT Page 11 of 85
D. INSTRUCTIONS TO OFFERORS
D.1. DEFINITION OF KEY WORDS USED IN THE SOLICITATION:
For purposes of this solicitation and subsequent contract, the following definitions shall apply:
Agency of User Department: Used interchangeably to mean the City department or division responsible for managing the project.
City (COT): The City of Tucson, Arizona
Contract: The legal agreement executed between the City and the Contractor/Contractor.
Contractor/Contractor: The individual, partnership, or corporation who, as a result of the competitive solicitation process, is awarded a contract by the City.
Contract Representative: The City employee or employees who have specifically been designated to act as a contact person or persons to the Contractor, and is responsible for monitoring and overseeing the Contractor's performance under this Contract.
Director of Business Services: The contracting authority for the City, authorized to sign contracts and addenda thereto on behalf of the City.
May: Indicates something that is not mandatory but permissible.
Offeror: The individual, partnership, or corporation who submits a proposal in response to a solicitation.
Shall, Will, Must: Indicates a mandatory requirement. Failure to meet these mandatory requirements, if they constitute a substantive requirement, may, at the City’s sole discretion, result in the rejection of a proposal as non-responsive.
Should: Indicates something that is recommended but not mandatory. If the Offeror fails to provide recommended information, the City may, at its sole option, ask the Offeror to provide the information or evaluate the proposal without the information.
D.2. PRE-SUBMITTAL MEETING
A Pre-Submittal Meeting will be held at the date and time stated on the cover page of this solicitation, if such a date and time is provided. Attendance at this meeting is not mandatory, but written minutes and/or notes regarding the meeting will NOT be provided, so attendance is encouraged. The purpose of this meeting will be to clarify the contents of this solicitation in order to prevent any misunderstanding of the City's position.
D.3. INQUIRIES
Any question related to the Request for Qualifications shall be directed to the Contract Officer whose name appears above. An offeror shall not contact or ask questions of the department for whom the requirement is being procured. The Contract Officer may require any and all questions be submitted in writing. Offerors are encouraged to submit written questions via electronic mail, at least nine days prior to the submittal due date. Any correspondence related to a solicitation should refer to the appropriate Request for Qualifications number, page and paragraph number. Oral interpretations or clarifications
BUSINESS SERVICES DEPARTMENT Page 12 of 85 will be without legal effect. Only questions answered by a formal written addendum to the Request for Qualifications will be binding.
D.4. ADDENDUM OF SOLICITATION
Solicitation Addenda will be posted on the City’s link to the online bidding website. Offeror is responsible for checking the webpage regularly for new solicitation addenda and must acknowledge each addendum to this solicitation in its submittal. Please note that vendors who have registered with the Business Services Department at https://procurement.opengov.com/portal/tucson-az and follow the City of Tucson will receive email notifications of solicitation addenda.
D.5. FAMILIARIZATION OF SCOPE OF WORK
Before submitting a statement of qualifications, each Offeror shall familiarize itself with the Scope of Work, laws, regulations and other factors affecting contract performance. The Offeror shall be responsible for fully understanding the requirements of the subsequent Contract and otherwise satisfy itself as to the expense and difficulties accompanying the fulfillment of contract requirements. The submission of a statement of qualifications will constitute a representation of compliance by the Offeror.
There will be no subsequent financial adjustment, other than that provided by the subsequent Contract, for lack of such familiarization.
D.6. PREPARATION OF STATEMENT OF QUALIFICATIONS
A. All submittals shall be on the forms provided in this Request for Qualifications package. It is permissible to copy these forms as required. Facsimiles or electronic mail proposals shall not be considered.
B. At a minimum, your statement of qualifications should include the signed Offer form, signed copies of any solicitation addenda and your response to all evaluation criteria.
C. The Offer page shall be signed by a person authorized to submit an offer. An authorized signature on the Offer Page, solicitation Addendum(s), or cover letter accompanying the submittal documents shall constitute an irrevocable offer to sell the good and/or service specified herein. Offeror shall submit any additional requested documentation, signifying intent to be bound by the terms of the agreement.
D. The authorized person signing the submittal shall initial erasure, interlineations or other modifications on the submittal.
E. It is the responsibility of all offerors to examine the entire Request for Qualification package and seek clarification of any requirement that may not be clear and to check all responses for accuracy before submitting a response. Negligence in preparing a submittal confers no right of withdrawal after due date and time.
F. The City shall not reimburse the cost of developing, presenting, submitting or providing any response to this solicitation.
G. Offeror must list any subcontractors to be utilized in the performance of the services specified herein. For each subcontractor, details on respective qualifications must be included.
https://procurement.opengov.com/portal/tucson-az
BUSINESS SERVICES DEPARTMENT Page 13 of 85
D.7. SUBMITTAL FORMAT
A statement of qualifications should be submitted on the forms and in the format specified in the solicitation. Any information that the offeror requested to be held as confidential shall be clearly marked as such. The material should be in sequence and related to the solicitation. The sections of the submittal should be organized, clearly identifiable, and should include a minimum of the following sections: the completed Offer Form, all signed addenda and the offeror’s response to the Evaluation Criteria. Failure to include the requested information may have a negative impact on the evaluation of the offeror's submittal.
D.8. EXCEPTIONS TO CONTRACT PROVISIONS
A response to any Request for Qualifications is an offer to contract with the City based upon the contract provisions contained in the City's Request for Qualifications, including but not limited to, the specifications, scope of services and any terms and conditions. Offerors who wish to propose modifications to the contract provisions must clearly identify the proposed deviations and any proposed substitute language in their submittal. However, the provisions of the Request for Qualifications cannot be modified without the express written approval of the Director or his designee. Proposed modifications or exception to the indemnification language herein shall not be considered. If an offer is returned with modifications to the contract provisions that are not expressly approved in writing by the Director or his designee, the contract provisions contained in the City’s Request for Qualifications shall prevail.
D.9. PUBLIC RECORD
All statements of qualifications submitted in response to this Request for Qualifications shall become the property of the City and shall become a matter of public record available for review subsequent to the award notification.
D.10. CONFIDENTIAL INFORMATION
The City of Tucson is obligated to abide by all public information laws. If an Offeror believes that any portion of a submittal, offer, specification, protest or correspondence contains information that should be withheld, a statement advising the Contract Officer of this fact should accompany the submission and the information shall be so identified wherever it appears. The City shall review all requests for confidentiality and may provide a written determination to designate specified documents confidential or the request may be denied. If the confidential request is denied, such information shall be disclosed as public information, unless the offeror submits a formal written objection.
D.11. CERTIFICATION
By signature on the Offer page, solicitation Addendum(s), or cover letter accompanying the submittal documents, Offeror certifies:
A. The submission of the offer did not involve collusion or other anti-competitive practices.
B. The Offeror shall not discriminate against any employee or applicant for employment in violation of Federal or State law.
BUSINESS SERVICES DEPARTMENT Page 14 of 85
C. The Offeror has not given, offered to give, nor intends to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, meal or service to a public servant in connection with the submitted offer.
D. The Offeror hereby certifies that the individual signing the submittal is an authorized agent for the Offeror and has the authority to bind the Offeror to the Contract.
D.12. WHERE TO SUBMIT STATEMENT OF QUALIFICATIONS
In order to be considered, Offeror must, no later than the Offer Submittal Deadline, submit its Offer electronically through the City’s online bidding system, https://procurement.opengov.com/portal/tucson-az
NOTE: THE ENTIRE OFFER MUST BE IN "SUBMITTED" STATUS IN THE CITY’S ONLINE BIDDING
SYSTEM IN ORDER TO BE CONSIDERED. RESPONSES THAT HAVE BEEN CREATED IN THE
SYSTEM, BUT THAT ARE NOT IN "SUBMITTED" STATUS BY THE OFFER SUBMITTAL DEADLINE
WILL NOT BE CONSIDERED.
D.13. LATE SUBMITTALS
Late submittals will be rejected.
D.14. OFFER & ACCEPTANCE
Offerors shall submit the Offer page located in this RFQ with their submittal, acknowledging (i.e.
signature) their intent to enter into negotiations on this solicitation. In addition, Offerors are reminded that if awarded a contract they will be required to agree to the CMAR Terms and Conditions and the General Conditions of the Contract as outlined in the Construction Services Agreement. As such, any exceptions to the Terms and Conditions shall be identified in the Offerors submittal.
D.15. OFFER AND ACCEPTANCE PERIOD
In order to allow for an adequate evaluation, the City requires an offer in response to this solicitation to be valid and irrevocable for ninety (90) days after the submittal due date and time.
D.16. WITHDRAWAL OF SUBMITTAL
At any time prior to the specified solicitation due date and time, an offeror may formally withdraw the submittal by a written letter, facsimile or electronic mail from the Offeror or a designated representative.
Telephonic or oral withdrawals shall not be considered.
D.17. CONTRACT NEGOTIATIONS
At the completion of the evaluation process, the City may enter into negotiations with the top ranked Offeror to determine fees, and to negotiate any other portion of the Contract deemed by the City to be necessary. In the event that the City is not able to negotiate successfully with the top ranked Offeror, the City shall cease negotiations with that Offeror and either begin negotiations with the next ranked Offeror or may choose to cancel the solicitation in its entirety. In the event that the City is not able to negotiate successfully with the next ranked Offeror, the City shall cease negotiations with that Offeror
BUSINESS SERVICES DEPARTMENT Page 15 of 85 and either begin negotiations with the third ranked Offeror or may choose to cancel the solicitation in its entirety. Award shall be made to the Offeror whose submittal and subsequent negotiation is most advantageous to the City
D.18. VENDOR APPLICATION
Prior to the award of a Contract, the successful offeror shall register with the City’s Business Services Department. Registration can be completed at https://procurement.opengov.com/portal/tucson-az Please note that email notifications of newly published solicitations and addenda will be provided to those vendors that select email as their preferred delivery method in their vendor record.
D.19. CITY OF TUCSON BUSINESS LICENSE
It is the responsibility of the Contractor to have a City of Tucson Business License throughout the life of this contract or a written determination from the City's Business License Section that a license is not required. At any time during the contract, the City may request the Contractor to provide a valid copy of the business license or a written determination that a business license is not required. For questions contact the City's Business License Section at (520) 791-4566 or email at license@tucsonaz.gov
D.20. UPON NOTICE OF INTENT TO AWARD
The apparent successful offeror shall sign and file with the City, within five (5) days after Notice of Intent to Award, all documents necessary to the successful execution of the Contract.
D.21. AWARD OF CONTRACT
Notwithstanding any other provision of the Request for Qualifications, the City reserves the right to:
A. waive any immaterial defect or informality; or B. reject any or all proposals, or portions thereof; or C. reissue the Request for Qualifications.
A response to this solicitation is an offer to enter into negotiations and contract with the City based upon the terms, conditions, and specifications contained in the City's solicitation. Submittals do not become contracts unless and until they are executed by the City's Director of Business Services and the City Attorney. All of the terms and conditions of the solicitation shall be incorporated in the Contract, unless any of the terms and conditions are modified by a solicitation addendum, a contract addendum, or by mutually agreed terms and conditions in the final contract documents
D.22. SUBMITTAL RESULTS
The name(s) of the successful offeror(s) will be posted on the Business Services Department’s Internet site at https://procurement.opengov.com/portal/tucson-az upon issuance of a Notice of Intent to Award or upon final contract execution.
https://procurement.opengov.com/portal/tucson-az mailto:license@tucsonaz.gov
BUSINESS SERVICES DEPARTMENT Page 16 of 85
D.23. PROTESTS
A protest shall be in writing and shall be filed with the Director of Business Services. A protest of a Request for Qualifications shall be received at the Business Services Department not less than five (5) working days before the Request for Qualifications due date. A protest of a proposed award or of an award shall be filed within ten (10) days after issuance of notification of award or issuance of a notice of intent to award, as applicable. A protest shall include:
A. The name, address, and telephone number of the protestant;
B. The signature of the protestant or its representative;
C. Identification of the Request for Qualifications or Contract number;
D. A detailed statement of the legal and factual grounds of protest including copies of relevant documents; and E. The form of relief requested.
D.24. EVALUATION PROCESS OVERVIEW
All submittals shall be evaluated in accordance with Arizona Revised Statutes Title 34 Chapter 6 and the evaluation criteria stated herein.
D.25. COMPLIANCE WITH LAWS
The parties will comply with all federal, state and local laws, rules, regulations, standards and Executive Orders including, without limitation, the following:
A. Americans with Disabilities Act. Contractor will comply with all applicable provisions of the Americans with Disabilities Act (Public Law 101-336, 42 U.S.C. 12101, et seq.) and its regulations, including 28 CFR Parts 35 and 36. If Contractor will provide or make available web content or mobile applications, the Contractor must demonstrate that its work product conforms to the DOJ’s April 24, 2024 final rule under Title II of the ADA by providing either (1) a current Accessibility Compliance Report (ACR) based on the latest version of the Voluntary Product Accessibility Template (VPAT) for the Web Content Accessibility Guidelines (WCAG) 2.1, or (2) an independent third-party evaluation from an accessibility consultancy.
1. The Contractor’s indemnification obligations under this Agreement shall include all allegations, demands, proceedings, suits, actions, claims, liability, damages, losses, expenses (including but not limited to attorney fees, court costs, and all claim-adjusting and claim-handling expenses) or disbursements of any kind or nature in any way relating to or arising from the Contractor’s breach of this section or non-compliance with any of the provisions of the ADA.
2. In addition to any other rights and remedies in this Agreement, the City may exercise the following remedies if the Contractor breaches this section or fails to comply with any provision of the ADA:
a. The City may require the Contractor to remediate within 30 days at the Contractor’s expense,
b. The City may terminate the contract without penalty, or
c. The City may perform any necessary testing and/or remediation and deduct the actual cost from any outstanding payments to the Contractor or seek reimbursement for the actual cost from the Contractor.
3. As a courtesy and for convenience, the City is providing this link for the VPAT template:
https://www.itic.org/policy/accessibility/vpat. The most updated template for WCAG compliance must be downloaded, completed, and returned to the City with Contractor submissions.
B. Workers’ Rights Laws. Contractor will comply with all applicable provisions of Federal and State Child Labor and Workers’ Rights laws and agrees if called upon to affirm in writing that they and any subcontractors working under this Contract are in compliance.
https://www.itic.org/policy/accessibility/vpat
BUSINESS SERVICES DEPARTMENT Page 17 of 85
D.26. REQUEST FOR QUALIFICATIONS
A. An appropriately qualified selection committee shall evaluate the statements of qualifications and performance data that are submitted in response to the City’s request for qualifications for the proposed contract.
B. If determined by the City and included by the City in the request for qualifications, conduct discussions with at least the number of persons or firms to be included on the short list as stated in the request for qualifications but not more than the number of persons or firms to be included on the short list plus two as specified in the request for qualifications regarding the contract and the relative methods of approach for furnishing the required professional services or construction services.
C. In order of preference, based on criteria established and published by the selection committee and included in the request for qualifications, select a short list of persons or firms the selection committee deems to be the most qualified to provide the professional services or construction services. The number of persons or firms on the short list shall be the number of persons or firms specified in the request for qualifications. Those firms may then be asked to provide Presentations/Interviews with the selection committee. Criteria for the Presentation/Interviews may be different than those listed in the RFQ with the Interviewees being provided the criteria and weighting prior to the Presentations/Interviews.
D. The City shall enter into negotiations for a contract with the highest qualified person or firm for the professional services or for the construction services. The negotiations shall include consideration of compensation and other contract terms that the City determines to be fair and reasonable to the City. In making this decision, the City shall take into account the estimated value, the scope, the complexity and the nature of the professional services or construction services to be rendered. If the City is not able to negotiate a satisfactory contract with the person or firm considered to be the most qualified at compensation and other contract terms the City determines to be fair and reasonable, the City shall formally terminate negotiations with that person or firm. The City may undertake negotiations with the next most qualified person or firm in sequence until an agreement is reached or a determination is made to reject all persons or firms on the short list. If a contract for construction services is entered into pursuant to this subsection, construction shall not commence until the City and contractor agree in writing on a fixed price or a guaranteed maximum price for the construction to be commenced.
E. The contract file shall contain the basis on which the award is made.
BUSINESS SERVICES DEPARTMENT Page 18 of 85
E. SELECTION PROCESS
E.1. ONE-STEP - STATEMENT OF QUALIFICATIONS (SOQ)
For One-Step solicitations, a qualified committee will evaluate the SOQs submitted and determine the offeror(s) most qualified to enter into negotiations for a contract.
E.2. STATEMENT OF QUALIFICATIONS (SOQ)
All submittals shall include any and all forms provided in this solicitation package. It is permissible to copy these forms as required. The offer form shall be submitted with a signature by the person authorized to sign the submittal. Erasures, interlineations, or other modifications in the submittal shall be initialed by the person authorized to sign the submittal. Periods of time, stated as a number of days, shall be in consecutive calendar days. It is the responsibility of all offerors to examine the entire solicitation package and seek clarification of any requirement that may not be clear and to check all responses for accuracy before sending in a submittal. Negligence in preparing a submittal confers no right of withdrawal after due date and time.
Submittals for the project shall be limited to the items listed below. Firms are advised to follow guidelines and submit only the requested information. It is recommended that submittals not exceed twenty (20) standard 8.5” by 11” pages.
A. Cover Letter B. Statement of Qualification in response to the Evaluation Criteria C. Signed Offer Page D. Acknowledgement of any and all RFQ Addenda
E.3. COVER LETTER
Expressing interest in the project and identifying a single individual as point of contact for any future correspondence. (Suggested 2 Pages maximum)
E.4. EVALUATION CRITERIA
Firms will be screened based on evaluation of the following criteria, which are listed in relative order of importance:
A. Experience and Qualifications of the Firm/Team B. Approach to Performing the Required Services C. General Information D. Subcontractor Selection Plan E. Other Criteria
BUSINESS SERVICES DEPARTMENT Page 19 of 85
E.5. OFFER PAGE
Providing contact information and signed requiring that the selected firm agree to enter into negotiations with the City to provide the material or service in compliance with all terms, scope of work, conditions, specifications, and amendments in the solicitation.
E.6. ADDENDUM OF SOLICITATION
Solicitation Addenda will be posted on the City’s link to the online bidding website. Offeror is responsible for checking the webpage regularly for new solicitation addenda and must acknowledge each addendum to this solicitation in its submittal. Please note that vendors who have registered with the Business Services Department at https://procurement.opengov.com/portal/tucson-az and follow the City of Tucson will receive email notifications of solicitation addenda.
E.7. GENERAL
A. Additional Investigations: The City reserves the right to make such additional investigations as it deems necessary to establish the competency and financial stability of any firm submitting a response to this Request for Qualifications.
B. Prior Experience: Experiences with the City and entities that evaluation committee members represent shall be taken into consideration when evaluating qualifications and experience.
BUSINESS SERVICES DEPARTMENT Page 20 of 85
F. EVALUATION CRITERIA
The Construction Manager at Risk (CMAR) will be selected through a qualifications-based selection process. Firms interested in providing Construction Manager at Risk services must submit a Statement of Qualifications (SOQ) that addresses the following issues:
No. Evaluation Criteria Scoring Method Weight (Points)
BUSINESS SERVICES DEPARTMENT Page 21 of 85
1. Experience and Qualifications of the Firm/Team
1. Identify at least three (3) park (or similar) projects, comparable in size and scope, in which the firm served as either CMAR, Agency CM and/or Prime General Contractor. One (1) of the projects must showcase the team’s experience delivering innovative and inclusive play environments. Particularly include any other projects that involved soccer fields, pump tracks, basketball courts, multiuse trails utilized by the general public, and green stormwater infrastructure. For each project, please provide the following:
- Description of project, including LEED or SITES Certifications, or awards (if applicable)
- Relationship to this project
- Project Team
- Role of the Firm (include pre-construction services provided, if any)
- Project’s intermediate (50%, 60%, etc.) cost projection, final GMP/contract amount and final construction cost
- Approximate value (cost or percentage) of self-performed work
- Construction dates
- Owner
- Two (2) project references with email addresses and telephone numbers.
Points Based 45 (45% of Total)
BUSINESS SERVICES DEPARTMENT Page 22 of 85
2. Provide a listing of the proposed project team and their résumés. Include any proposed consultants and/or subcontractors expected to assist with this project. Identify the role each team member is expected to take, their affiliation, and provide up to three (3) examples of projects (with references) where they assumed that role. Include examples where team members have previously collaborated.
3. Describe your firm’s qualifications and experience with estimating large-scale, complex projects. Include experience with estimating specialized construction, particularly for the work described herein.
4. Describe your firm’s experience coordinating with concurrent projects that are not part of the CMAR scope but will need to be carefully aligned with the project (e.g. public art or other amenities).
5. Describe your firm’s experience with projects that incorporated native plants, green stormwater infrastructure, salvaged and reincorporated existing native plants, or other sustainable landscape practices.
6. Describe your firm’s experience with meeting ADA accessibility requirements on a new multi-use path and/or sidewalk. Cover slopes, widths, landing tolerances, and how you resolved any non-conforming work."
BUSINESS SERVICES DEPARTMENT Page 23 of 85
7. Describe your team’s knowledge and experience related to local (Tucson/ Pima County) and state regulations, codes, and ordinances specific to the services required herein.
8. Describe why your firm is especially qualified to perform the requested services. Include any unique qualifications, experience, equipment and/or resources of the firm/team that would be highly beneficial to this project.
BUSINESS SERVICES DEPARTMENT Page 24 of 85
2. Approach to Performing the Required Services
1. Discuss any problematic issues your firm has identified on this project and how those might be addressed.
2. Describe your firm’s approach to project management and team organization during pre-construction and construction phase services. Include an organizational chart showing key personnel.
3. Describe your firm’s approach to working with LA/A/E firms on evaluating design constructability, value engineering and adherence to budget during pre-construction phase services. Provide contact information for up to three (3) LA/A/E firms that you worked with in this manner.
4. In relation to item 3 above, describe your firm’s successes with innovative and creative problem-solving on previous projects.
5. Describe the firm’s approach to the following:
i. quality control
ii. dispute resolution
iii. safety management
iv. jobsite security
Briefly describe the successes resulting from these measures.
7. Describe your firm’s approach to managing and constructing multi-phased work over an extended period of time.
Points Based 30 (30% of Total)
BUSINESS SERVICES DEPARTMENT Page 25 of 85
3. General Information
1. Provide a listing of the Arizona professional and contractor licenses held by the firm/team.
2. Identify any claims arising from a contract which resulted in litigation, arbitration or administrative hearing within the last three years. Briefly describe the circumstances and outcome.
3. Provide the firm’s safety rating and verification from surety as to the firms bonding capacity.
4. Describe systems used for planning, scheduling, estimating and managing construction.
5. Describe those portions of the project the firm intends to self-perform.
6. Workload – Provide a list of current projects in progress, their size, and estimated time of completion. Include significant projects on hold which may become active during this project. Provide a chart which shows the percentage of the firm’s total work-hour capacity that your current work represents and estimate the percentage of the total work-hour capacity that this project would represent.
Points Based 15 (15% of Total)
BUSINESS SERVICES DEPARTMENT Page 26 of 85
4. Subcontractor Selection Plan
1. Submit a proposed Subcontractor Selection Plan pursuant to ARS 34-603. The plan must describe procedures to be used in selecting subcontractors, and selection shall be based on a combination of qualifications and price.
2. The resultant contract is subject to the City of Tucson's SBE requirements. The plan must describe how the Offeror intends to ensure that established goals will be met.
3. Identify the criteria under which qualifications and price will be evaluated, and describe whether a one-step or two-step selection process will be employed, including detail on the process.
Points Based 5 (5% of Total)
5. Other Criteria Scores to be based on the following criteria – no response is required.
1. Overall completeness and accuracy of the proposal.
2. Overall organization and quality of the proposal.
Points Based 5 (5% of Total)
BUSINESS SERVICES DEPARTMENT Page 27 of 85
G. SPECIAL TERMS AND CONDITIONS
G.1. BONDING
CMAR will be required to provide payment and performance bond equal to 100% of the value of the negotiated value(s) of construction
G.2. SMALL BUSINESS ENTERPRISE (SBE) PROGRAM REQUIREMENTS
The CMAR shall be required to comply with SBE Program requirements, if goals are applicable, on this project. Program requirements are codified in Chapter 28, Article XIII of the Tucson Procurement Code.
(The CMAR shall submit to the City of Tucson Procurement Department, during the GMP negotiation phase(s), either a completed statement of proposed SBE Participation Plan or an Affidavit of Good Faith Efforts indicating whether the request is for a full or partial waiver.
The SBE Plan must include:
A. The names and addresses of the SBE subcontractors/suppliers;
B. The type and scope of work or service each SBE will perform; and, C. The percentage of each SBE’s subcontract of the total contract.
D. The dollar value of work as a percentage of the total contract value.
An approved plan or waiver is required prior to concluding negotiations and awarding a project.
A signed offer in response to this RFQ represents the offerors intent to comply with the SBE program.
Also see Attachment for SBE Program Provisions.
G.3. CONSTITUENT CLAIMS
With regard to claims arising out of or related to this contract that are filed against the Contractor, the Contractor or Contractor’s representative is required to provide notice to the City’s Business Services
- Procurement Division and Risk Manager within 60 calendar days following the date of the receipt by the Contractor of such claim. The notice to the City must include the following information: (1) the date of the incident or occurrence that is the basis of the claim; (2) the damages identified in the claim; (3) the date of the Contractor’s written response to the claim; and (4) a copy of Contractor’s written response to the claim. Notification shall be deemed sufficient if given by (a) registered or certified mail, postage prepaid, return receipt requested, (b) private courier service, or (c) facsimile addressed to the respective addresses of the parties as first above written or at such other addresses as the respective parties may designate by like notice from time to time.
City of Tucson
Procurement Division
255 W. Alameda, 6th floor
Tucson, Arizona 85701
Facsimile: 520-791-4735
BUSINESS SERVICES DEPARTMENT Page 28 of 85
City of Tucson
Risk Management
255 W. Alameda, 5th floor
Tucson, Arizona 85701
Facsimile: 520-624-2061
The Contractor acknowledges that the City may use contract performance, including performance of the requirements of this paragraph, in the City’s consideration of future contract awards; and that in connection with future contracting opportunities with the City, Contractor may be required to provide documentation demonstrating compliance with this paragraph.
G.4. DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM
REQUIREMENTS
The CMAR shall be required to comply with DBE Program requirements, if goals are applicable, on federally funded projects that exceed the Formal Solicitation Threshold established by the Tucson Procurement Code, currently at one hundred thousand dollars ($100,000). Program requirements are codified in Chapter 28, Article XIII of the Tucson Procurement Code. The CMAR shall submit to the Business Services Department, Procurement Division, Business Enterprise & Compliance Program via the city’s Project Manager, after the project proposal phase, either a completed statement of proposed DBE Participation Plan or an Affidavit of Good Faith Efforts indicating whether the request is for a full or partial waiver.
The DBE Plan must include:
A. The names and addresses of the DBE subcontractors/suppliers;
B. The type and scope of work or service each DBE will perform;
C. The dollar value of work as a percentage of the total contract value.
D. If the contract goal is not met, evidence of good faith efforts.
An approved plan or waiver request must be in place prior to issuance of the Notice To Proceed (NTP) for individual project construction as well as a DBE Acknowledgment of Participation which provides signed confirmation from the DBE(s) that they are participating in the contract as provided in the prime contractor’s commitment in their DBE plan.
A signed offer in response to this RFQ represents the offerors’ intent to comply with the DBE program.
Also See - DBE Program Provisions for Alternative Project Delivery Method (APDM) for Construction Services.
G.5. FEDERALLY FUNDED PROJECTS
For projects that are identified as being federally funded, Federal Labor Standards will be applicable to that project. All Federal forms are attached and will be incorporated into any resulting Contract(s). It shall be mandatory upon the Contractor(s) to whom the Contract is awarded, and upon subcontractors working on this project to comply with the following:
A. Davis Bacon Act: (AZ Wage Decision) Minimum wage rate, withholding, payroll, apprentice, subcontracting, and termination provisions.
B. Work Hour and Safety Standards Act: overtime pay and safety.
BUSINESS SERVICES DEPARTMENT Page 29 of 85
C. Mandatory Preconstruction meeting for Prime Contractor and all listed subcontractors
BUSINESS SERVICES DEPARTMENT Page 30 of 85
H. INSURANCE REQUIREMENTS
H.1. The Contractor agrees to:
A. Obtain…