This document is a Task Group Instruction (TGI) for the USS SHOUP (DDG-86), specifically focused on repair and preservation work in the 4-126-0-E compartment. The primary objectives include repairing various equipment and preserving the second platform plating, with work locations spanning multiple tank groups, auxiliary machinery rooms, and waste drain collecting tanks. Key tasks involve:
Specific repair and replacement activities include removing and installing zinc anodes, floor plate supports, cable hangers, pipe hangers for different systems (fresh water, AFFF, GTRB waste drain), and compartment insulation. The work also encompasses addressing mechanical holes in structure stanchions, installing new vibration damping tiles, and preserving second platform plating. The instruction provides detailed specifications for materials, locations, quantities, and job numbers, with a special requirement for cleanliness level III for piping systems and equipment. The work is scheduled for September 2025 and will be conducted by SRF-JRMC (Ship Repair Facility-Japan Maintenance Activity), with various technical codes and engineers involved in planning and execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment VI Warranty Tracking Information.pdf | ||
| Solicitation - N6264926RA008.pdf | ||
| CLN-1_38KC267201_A01_TGI_c0v0.pdf | ||
| Attachment IV GFP_List_V3_USS_SHOUP.xlsx | XLSX spreadsheet | |
| Attachment V Source of Repair Instruction.pdf | ||
| Att III Request for Information Form.pdf | ||
| Attachment II Price Proposal Form N6264926RA008.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: VAR EQPT 4-126-0-E AY A 0 2
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-86 USS SHOUP KC2
CU PHASE TITLE:
F/O – REPAIR VARIOUS EQUIPMENT AND PRESERVE 2ND PLATFORM PLATING IN 4-126-0-E
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
TSUBASA KOSUGE 231A 315-243-4371 13-SEP-2025
APPROVED BY: CODE PHONE DATE
YUUJI NAKAMURA 231A 315-243-6041 13-SEP-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
The reference of 2.12 needed to revise.
CHANGE INSTRUCTIONS:
CH-1: Revise reference of 2.13.
CH-2: Revise reference of 2.12 and identification of 1.3.6.1 through 1.3.6.3.
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: VAR EQPT 4-126-0-E AY A 0
FOUO
SHIP: DDG-86 CHG/VER: 2/2
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-7 Engrg Inst-02 (1-2)
J1-2 Sketch (1-11)
M1-3 Engrg Inst-01 (1-3)
1. SCOPE/PURPOSE
1.1 Title: Repair of Various Equipment and Preservation of Second Platform Plating in 4-126-0-E; accomplish
1.2 Location of Work:
1.2.1 Auxiliary Machinery Room No. One (4-126-0-E)
1.2.2 Fuel Tank Group-1 (5-126-1-F)
1.2.3 Fuel Tank Group-2 (5-126-2-F)
1.2.4 Fuel Receiving Tank Group-2 (4-78-2-F)
1.2.5 Fuel Tank Group-2 (5-78-2-F)
1.2.6 Oily Waste Drain Collecting Tank (5-174-2-F)
1.3 Identification:
1.3.1 Quantity (One Lot), Structure Stanchion from Inner Bottom Deck to Second Platform, Frame 158, Port Base material: ASTM A106, 10 NPS Schedule 40, Pipe Remarks: See Sketch Enclosure-03 for location details
JCN: ES01-NP1A
1.3.2 Quantity (5 EA), Zinc Anode, including studs on Bilge Drain well and Margin Plate JCN: ES01-NP4D and ES01-NP4E
1.3.2.1 Quantity (2 EA), Zinc Anode, including studs on Forward Bilge Drain Well in 4-126-0-E, Frames between 134 and 136, Starboard (Stbd) Type: ZHC-23 Size: 6 Inches x 12 Inches x 1-1/4 Inches Thickness Remarks: See 2.4 through 2.6 for material and detail
JCN: ES01-NP4D
1.3.2.2 Quantity (2 EA), Zinc Anode, including studs on Aft Bilge Drain Well in 4-126-0-E, Frames between 172 and 174, Port Type: ZHC-23 Size: 6 Inches x 12 Inches x 1-1/4 Inches Thickness Remarks: See 2.4 through 2.6 for material and detail
JCN: ES01-NP4D
1.3.2.3 Quantity (One EA), Zinc Anode, including studs on Margin Plate, Frames between 137 and 139, Stbd Type: ZHC-23
FOUO
SHIP: DDG-86 CHG/VER: 2/2
Size: 6 Inches x 12 Inches x 1-1/4 Inches Thickness Remarks: See 2.4 through 2.6 for material and detail
JCN: ES01-NP4E
1.3.3 Quantity (4 EA), Floor Plate Support on Inner Bottom Plate Remarks: See Engrg Inst Enclosure-01 for material and details
JCN: ES01-NP4F
1.3.4 Quantity (One Lot), Floor Plate Support for Flange
Remarks: See Engrg Inst Enclosure-01 for material and details
JCN: ES01-NP4J
1.3.5 Quantity (9 EA), Cable Hanger
JCN: ES01-NP4G
1.3.5.1 Quantity (7 EA), Cable Hanger for Degaussing Cable D-4A-2 Material: Steel Remarks: See Engrg Inst Enclosure-02 for material and details and Sketch Enclosure-03 for location details
1.3.5.2 Quantity (2 EA), Cable Hanger for Degaussing Cable D-3A-2 Material: Steel Remarks: See Engrg Inst Enclosure-02 for material and details and Sketch Enclosure-03 for location details
1.3.6 Quantity (One Lot), Pipe Hanger for Various System Piping
1.3.6.1 Quantity (2 EA), Pipe Hanger for Fresh Water Piping
Material: Steel Size: 3/4 Inch IPS and 1-1/4 Inch IPS Specification: 810-4714432 Type: 38 Remarks: See Sheet 7A (Zone 4-E) and Sheet 11A (Zone 3-C) of 2.9 and Sketch Enclosure-03 for location details.
JCN: ES01-NP4H
1.3.6.2 Quantity (3 EA), Pipe Hanger for AFFF Piping
Material: Steel Size: 3/4 Inch IPS and One Inch IPS Specification: 810-4714432 Type: 38 Remarks: See Sheet 3A (Zone 4-F and 7-E) and Sheet 4 (Zone 6-D) of 2.10 and Sketch Enclosure-03 for location details.
JCN: ES01-NP4H
1.3.6.3 Quantity (One EA), Pipe Hanger for GTRB Waste Drain Piping Material: Steel Size: 3/4 Inch IPS Specification: 810-4714432 Type: 38 Remarks: See Sheet 4B (Zone 7-E) of 2.11 and Sketch Enclosure-03 for location details.
JCN: ES01-NP4I
1.3.7 Quantity (469 SF), Compartment Insulation on Shell Plate and Web, Frames between 126 and 174, Stbd and Port Material: Acoustic, Tuff-skin, Fiber Glass, One inch thickness, MIL-DTL-32585, Type II, Form 2, Facing D (Web, Stbd)
FOUO
SHIP: DDG-86 CHG/VER: 2/2
Acoustic, Tuff-skin, Fiber Glass, 2 inches thickness, MIL-DTL-32585, Type II, Form 2, Facing D (Shell, Stbd)
Thermal, Polyimide, One inch thickness, MIL-DTL-24688, Type II (Shell and Web, Port) Remarks: See Sketch Enclosure-03 for location details
JCN: ES01-NP4A
1.3.8 Quantity (1.6 SF), Vibration Damping Tile on Inner Bottom Plate Type: Vibration Damping Tile, MIL-P-22653, Class-2
Remarks: See Sheet 3 Detail 3A-6A of 2.14 for material and details and Sketch Enclosure-03 for location details
JCN: ES01-NP4B
1.3.8.1 Quantity (1.5 SF), Vibration Damping Tile on Inner Bottom Plate, Frames between 166 and 168, Port
1.3.8.2 Quantity (0.1 SF), Vibration Damping Tile on Inner Bottom Plate, Frames between 150 and 152, Port
1.3.9 Quantity (14 SF), Second Platform Plating
Remarks: See Sketch Enclosure-03 for location details
JCN: ES01-NP18
1.3.10 Quantity (15 SF), Forward Bilge Drain Well in 4-126-0-E, Franes between 134 and 136, Stbd
JCN: ES01-NP4C
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.5.2 Critical Coated Area: CCNY-DDG86-003-26 for the area listed in 1.3.10.
1.6 Contractor work start date: See TGI POP List
1.7 Contractor work completion date: See TGI POP List
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 DWG 100-
7060385
UNIT STRL ARR DWG ASSY UNIT
D Y 5B -2
4 DWG 633-
7058606
INSTALLATION OF CATHODIC
PROTECTION
B Y SE
E N
OT
E
5 DWG 100-
7060384
UNIT STRL ARR DWG ASSY UNIT
C Y SE
E N
OT
E
6 DWG 100-
7060389
UNIT STRL ARR DWG ASSY UNIT
C Y 3,4 ,4 E, FOUO
SHIP: DDG-86 CHG/VER: 2/2
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
7 DWG 321-
7058935
INSTL DEGAUSSING MAIN
CABLEWAY TRANSITS & STFG
TUBES DESIGN ZONE 2120
F Y AL
L
8 DWG
SP001071
ELEC CABLEWAY STANDARD &
NON-STANDARD FAB DETAILS
C Y SE
E N
OT
E
9 DWG 533-
7059289
FRESHWATER SYSTEMS, ZONE
E Y 7A ,11 A
10 DWG 555-
7059282
AFFF SYSTEMS, ZONE 2120 D Y 3A
,4
11 DWG 531-
7059287
DISTILLED WATER SYSTEM,
ZONE 2120
E Y 4B
12 DWG 810-
4714432
STD Pipe Hangers Fabrication
DETS & INSTL
L Y 21
13 DWG 635-
7060687
Thermal & Acoustic Insul Arr & Details Total Ship
G Y 1B ,5 B
14 DWG 636-
7059151
DAMPING SCHEDULE B Y 3A
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Pump out, clean and dry the bilge area located in 1.2.1 free from oil, debris, and other foreign matter.
5.2 Accomplish weld repair of mechanical hole on each existing structure stanchion listed in 1.3.1, using 2.3 for guidance.
5.2.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.3 Remove existing and install new each zinc anode listed in 1.3.2 in accordance with 2.4, using 2.5 and 2.6 for guidance.
5.3.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.4 Remove existing, fabricate and install new each floor plate support listed in 1.3.3 and 1.3.4 in accordance with Enclosure-01.
5.4.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.5 Remove existing, fabricate and install new each cable hanger listed in 1.3.5.1 and 1.3.5.2 in accordance with Enclosure-02, using 2.7 and Section D of 2.8 for guidance.
FOUO
SHIP: DDG-86 CHG/VER: 2/2
5.5.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.6 Remove existing and install new each pipe hanger listed in 1.3.6, using 2.9 through 2.12.
5.6.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.7 Remove each existing compartment insulation listed in 1.3.7.
5.7.1 Accomplish the requirements of 009-011 of 2.1 to install each new compartment insulation listed in 1.3.7 in accordance with 2.13.
5.7.2 Accomplish the requirements of 009-032 of 2.1 for top surface where new insulation is installed.
5.8 Remove existing and install new each vibration damping tile listed in 1.3.8 in accordance with 2.14.
5.8.1 Accomplish the requirements of 009-032 of 2.1 for top surface where new vibration damping tile is installed.
5.9 Accomplish the requirements of 009-032 of 2.1, including Table 3, Line(s) 13, for each area listed in 1.3.9 and 1.3.10.
5.10 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
5.11 Notes:
5.11.1 Planner: Code 231A T. Kosuge, 243-4371
Code 233 M. Yamaguchi, 080-9350-1450 Code 234 S. Yamashita, 070-7787-2035 Code 250 Engineer K. Sei, 243-6564 Code 270 Engineer T. Tsuzuki, 243-0179
5.11.2 This TGI clears DFS DDG-86-1005-2025 in its entirety
5.11.3 WPC will copy the following pages in reference.
Ref. 2.4: 4A, 4B, 10A, and 10B.
Ref. 2.5: 3, 4, 4A, 4C, and 5.
Ref. 2.8: Micro Film Index Sheets 174 through 177.
5.11.4 Dewatering of Fuel Tank GP-1 and GP-2 to open the tank and to adjust ship’s trim and ship’s list will be covered by TGI No. 38KC212323D01 (SRF-JRMC TGI).
5.11.5 Opening, initial cleaning, and closing of each space listed in 1.2.2 through 1.2.6 will be covered by the following TGI No(s).
Fuel Tank Group-1 (5-126-1-F): 38KC212334D01 and 38KC212334R01 (SRF-JRMC TGI).
Fuel Tank Group-2 (5-126-2-F): 38KC212334D02 and 38KC212334R02 (SRF-JRMC TGI).
Fuel Tank Group-2 (5-78-2-F): 38KC212334D03 and 38KC212334R03 (SRF-JRMC TGI).
Oily Waste Drain Collecting Tank (5-174-2-F): 38KC212334D04 and 38KC212334R04 (SRF-JRMC TGI).
Fuel Receiving Tank Group-2 (4-78-2-F): 38KC212334D05 and 38KC212334R05 (SRF-JRMC TGI).
5.11.6 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.11.7 JCNs ES01-NP18, ES01-NP1A, ES01-NP4A, ES01-NP4B, ES01-NP4C, ES01-NP4D, ES01-NP4E, ES01- NP4F, ES01-NP4G, ES01-NP4H, ES01-NP4I, and ES01-NP4J are related to this TGI.
FOUO
SHIP: DDG-86 CHG/VER: 2/2
5.12 Government Furnished Material (GFM)
5.12.1 SRF-JRMC will provide GFM listed in Appendix ”M”.
5.13 SRF-JRMC will provide the following service work: (TGI No. 38KC212334S02).
5.13.1 [C740] Crane and crane rigging service.
5.13.2 [X99E] Utility service, electrical.
5.13.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.13.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.13.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.13.6 [C133] Provide QA inspection for (G) symbol(s) and review coating application data.
FOUO
J-1
SHIP: DDG-86 CHG/VER: 2/2
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
VAR EQPT 4-126-0-E AY A 0 2
CU PHASE TITLE:
F/O – REPAIR VARIOUS EQUIPMENT AND PRESERVE 2ND PLATFORM PLATING IN 4-126-0-E
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
FFW 4-126-0-E PP POL CTL 4-126-0-E PP AFFF 4-126-0-E PP CMPT 4-126-0-E MS CMPT
4-126-0-E WW
ATTACHMENT LIST:
1. ENCLOSURE-01 (38KC212334A01-Engrg Inst-01.pdf) saved on 10-SEP-2025 0000.
2. ENCLOSURE-02 (38KC212334A01-Engrg Inst-02.pdf) saved on 11-SEP-2025 0000.
3. ENCLOSURE-03 (38KC212334-Sketch.pdf) saved on 11-SEP-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
38KC212334 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to repair various equipment and preserve second platform plating in 4-126-0-E
Location of Work:
Auxiliary Machinery Room No. One (4-126-0-E) Fuel Tank Group-1 (5-126-1-F) Fuel Tank Group-2 (5-126-2-F) Fuel Receiving Tank Group-2 (4-78-2-F) Fuel Tank Group-2 (5-78-2-F) Oily Waste Drain Collecting Tank (5-174-2-F)
FOUO
J-2
SHIP: DDG-86 CHG/VER: 2/2
FOUO
M-1
SHIP: DDG-86 CHG/VER: 2/2
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
VAR EQPT 4-126-0-E AY A 0 2
CU PHASE TITLE:
F/O – REPAIR VARIOUS EQUIPMENT AND PRESERVE 2ND PLATFORM PLATING IN 4-126-0-E
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38KC212334 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M ANODE, ORGI: C231A T.
KOSUGE
243-4371
ORDERED FOR KTR
9B 5342 008136058 NA 4 N 52475046 5/EA
002 M STUD, ORIG: C231A T.
KOSUGE
243-4371
ORDERED FOR KTR
9B 5307 012813886 NA 4 N 52475047 20/EA
003 M NUT, ORIG: C231A T. KOSUGE
243-4371
ORDERED FOR KTR
9B 5310 005957421 NA 4 N 52475050 20/EA
004 M WASHER, ORIG: C231A T.
KOSUGE
243-4371
ORDERED FOR KTR
9B 5310 015492705 NA 4 N 52475052 20/EA
005 M PLATE,METAL, ORIG: C231A T.
KOSUGE
243-4371
ORDERED FOR KTR
6' X 6'
9B 9515 002243086 NA 4 N 52475055 6/SF
006 M ANGLE,STRUCTURAL, ORIG:
C231A T. KOSUGE
243-4371
ORDERED FOR KTR
9B 9520 002777318 NA 4 N 52475124 4/FT
NOTES:
FOUO
M-2
SHIP: DDG-86 CHG/VER: 2/2
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
007 M INSULATION, ORIG: C231A T.
KOSUGE
243-4371
ORDERED FOR KTR
9Q 5640 013713263 NA 4 N 52475057 50/SH
008 M INSULATION, ACOUSTI, ORIG:
C231A T. KOSUGE
243-4371
ORDERED FOR KTR
INSULATION, ACOUSTIC, THK:
2", SIZE: 2FT X 3FT, BASE
BOARD: SOLIMIDE TA-301
POLYIMIDE FOAM PER MIL-
DTL-24688 (FORMER SPEC:
DOD-I-24688), 0.4PCF
DENSITY, FACING:
REINFORCED POLYESTER
FILM IAW MIL-DTL-32585 TYPE
2 FORM 2 FACING D (FORMER
SPEC: MIL-I-22023
9Q 5640 LL4558976 NA 4 N 30/SH
009 M ACOUSTIC INSULATION, ORIG:
C231A T. KOSUGE
243-4371
ORDERED FOR KTR
ACOUNSTIC INSULATION,
SIZE: 2FT X 3FT X 1"THK, BASE
BOARD: SOLIMIDE TA-301
POLYIMIDE FOAM PER MIL-
DTL-24688 (FORMER SPEC:
DOD-I-24688), 0.4PCF
DENSITY, FACING:
REINFORCED POLYESTER
FILM IAW MIL-DTL-32585 TYPE
II FORM 2 FACING D (FORMER
SPEC: MIL-I-22023
9Q 5640 LL4558975 NA 4 N 20/SH
010 M PLASTIC, SHEET, ORIG: C231A
T. KOSUGE
243-4371
ORDERED FOR KTR
9B 9330 012533479 NA 4 N 52475060 4/SH
011 M ADHESIVE, ORIG: C231A T.
KOSUGE
243-4371
ORDERED FOR KTR
9B 8040 009035081 NA 4 Y 52475062 1/KT
012 M TUBE,METALLIC, ORGI: C231A
T. KOSUGE
243-4371
ORDERED FOR KTR
9B 4710 010246277 NA 4 N 10/FT
013 M ANGLE,STRUCTURAL, ORIG:
C231A T. KOSUGE
243-4371
ORDERED FOR KTR
9B 9520 002775987 NA 4 N 10/FT
400 M ANGLE,STRUCTURAL, FOR
PIPE HANGER
ORIG: C234 S. YAMASHITA
070-7787-2035
ODERED FOR KTR
9B 9520 002775987 NA 4 N 52475125 10/FT
401 M ANGLE,STRUCTURAL, FOR
PIPE HANGER
ORIG: C234 S. YAMASHITA
070-7787-2035
ODERED FOR KTR
9B 9520 002775983 NA 4 N 52475126 10/FT
FOUO
M-3
SHIP: DDG-86 CHG/VER: 2/2
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
402 M PIPE HANGER, PIPE HANGER.
SIZE: 3/4"IPS X 18" LENGTH,
STEEL, STD DWG: 810-4714432
TYPE 38,
ORIG: C234 S. YAMASHITA
070-7787-2035
ODERED FOR KTR
LL9005142 NA 4 N 4/EA
403 M PIPE HANGER, PIPE HANGER.
SIZE: 1"IPS X 12" LENGTH,
STEEL. LINER MATL: RUBBER
SYNTHETIC, 1/ 8" THK, STD
DWG:810-4714432 TYPE 38.
PREMIER COPPER P/N:
PH438200
ORIG: C234 S. YAMASHITA
070-7787-2035
ODERED FOR KTR
LL9307016 NA 4 N 1/EA
404 M PIPE HANGER, PIPE HANGER
SIZE: 1-1/4"IPS X 18" LENGTH,
MATL: STEEL, DWG: 810-
4714432 TYPE 38 PREMIER
COPPER P/N: 438250
ORIG: C234 S. YAMASHITA
070-7787-2035
ODERED FOR KTR
LL9305743 NA 4 N 1/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-86 VAR EQPT 4-126-0-E AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38KC212334 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-86 VAR EQPT 4-126-0-E AY A 0
38KC212334XXX ENCLOSURE-XX
Tsubasa.Kosuge.ja Text Box
38KC212334A01
Tsubasa.Kosuge.ja_1 Text Box
ENCLOSURE-01
Tsubasa.Kosuge.ja_2 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_3
Tsubasa.Kosuge.ja_4 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_5
38KC212334XXX SHEET 1 OF 2ENCLOSURE-01
Tsubasa.Kosuge.ja_6 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_7
ENCLOSURE-02
38KC212334XXX SHEET 2 OF 2ENCLOSURE-01
Tsubasa.Kosuge.ja_8 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_9
ENCLOSURE-02
Tsubasa.Kosuge.ja_10 Rectangle
Tsubasa.Kosuge.ja_11 Rectangle
Tsubasa.Kosuge.ja_12 Polygon
Tsubasa.Kosuge.ja_13 Polygon
Tsubasa.Kosuge.ja_14 Text Box
MECH HOLE
Tsubasa.Kosuge.ja_15 Text Box
MECH HOLE
Tsubasa.Kosuge.ja_16 Text Box
1/4 DIA
Tsubasa.Kosuge.ja_17 Text Box
1/8 DIA
Tsubasa.Kosuge.ja_18 Line
Tsubasa.Kosuge.ja_19 Line
Tsubasa.Kosuge.ja_20 Line
Tsubasa.Kosuge.ja_21 Line
Tsubasa.Kosuge.ja_22 Text Box
2ND PLATF
Tsubasa.Kosuge.ja_23 Text Box
TRANSV BEAM, FR 158
Tsubasa.Kosuge.ja_24 Rectangle
Tsubasa.Kosuge.ja_25 Rectangle
Tsubasa.Kosuge.ja_26 Text Box L-5 (P)
Tsubasa.Kosuge.ja_27 Text Box
INNER BOTTOM
Tsubasa.Kosuge.ja_28 Rectangle
Tsubasa.Kosuge.ja_29 Line
Tsubasa.Kosuge.ja_30 Line
Tsubasa.Kosuge.ja_31 Line
Tsubasa.Kosuge.ja_32 Line
Tsubasa.Kosuge.ja_33 Line
Tsubasa.Kosuge.ja_34 Line
Tsubasa.Kosuge.ja_35 Line
Tsubasa.Kosuge.ja_36 Line
Tsubasa.Kosuge.ja_37 Line
Tsubasa.Kosuge.ja_38 Line
Tsubasa.Kosuge.ja_39 Text Box L-5 (P)
Tsubasa.Kosuge.ja_40 Text Box Location Detail of Structure Stanchion in 4-126-0-E
Tsubasa.Kosuge.ja_41 Text Box Sheet 1 of 11
Tsubasa.Kosuge.ja_42 Text Box Sketch
Tsubasa.Kosuge.ja_43 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_44 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_45 Line
Tsubasa.Kosuge.ja_46 Text Box
DET 1-A
Tsubasa.Kosuge.ja_47 Text Box
DET 1-B
Tsubasa.Kosuge.ja_48 Text Box
DET 1-A
Tsubasa.Kosuge.ja_49 Text Box
DET 1-B
Tsubasa.Kosuge.ja_50 Line
Tsubasa.Kosuge.ja_51 Line
Tsubasa.Kosuge.ja_52
Location Detail of Cable Support in 4-126-0-E
Tsubasa.Kosuge.ja_53 Text Box DET 1-A and 1-B
Tsubasa.Kosuge.ja_54 Text Box
DET 1-C
Tsubasa.Kosuge.ja_55 Text Box DET 1-D through 1-G
Tsubasa.Kosuge.ja_56 Text Box
DET 1-H
Tsubasa.Kosuge.ja_57 Text Box
DET 1-I
Tsubasa.Kosuge.ja_58 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_59 Text Box Sheet 2 of 11
Tsubasa.Kosuge.ja_60 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_61 Text Box Sketch
Tsubasa.Kosuge.ja_62
Tsubasa.Kosuge.ja_63 Rectangle
Tsubasa.Kosuge.ja_64 Rectangle
Tsubasa.Kosuge.ja_65 Rectangle
Tsubasa.Kosuge.ja_66 Rectangle
Tsubasa.Kosuge.ja_67 Rectangle
Tsubasa.Kosuge.ja_68 Rectangle
Tsubasa.Kosuge.ja_69 Rectangle
Tsubasa.Kosuge.ja_70 Rectangle
Tsubasa.Kosuge.ja_71 Rectangle
Tsubasa.Kosuge.ja_72 Line
Tsubasa.Kosuge.ja_73 Line
Tsubasa.Kosuge.ja_74 Text Box
FR142
Tsubasa.Kosuge.ja_75 Text Box
Tsubasa.Kosuge.ja_76 Line
Tsubasa.Kosuge.ja_77 Line
Tsubasa.Kosuge.ja_78 Text Box L-7(P)
Tsubasa.Kosuge.ja_79 Line
Tsubasa.Kosuge.ja_80 Text Box L-7(P)
Tsubasa.Kosuge.ja_81 Line
Tsubasa.Kosuge.ja_82 Line
Tsubasa.Kosuge.ja_83 Line
Tsubasa.Kosuge.ja_84 Text Box
FR149
Tsubasa.Kosuge.ja_85 Line
Tsubasa.Kosuge.ja_86 Line
Tsubasa.Kosuge.ja_87 Text Box L-5(P)
Tsubasa.Kosuge.ja_88 Line
Tsubasa.Kosuge.ja_89 Text Box
FWD
Tsubasa.Kosuge.ja_90 Line
Tsubasa.Kosuge.ja_91 Text Box
FWD
Tsubasa.Kosuge.ja_92 Line
Tsubasa.Kosuge.ja_93 Line
Tsubasa.Kosuge.ja_94 Text Box
FR168
Tsubasa.Kosuge.ja_95 Line
Tsubasa.Kosuge.ja_96 Text Box
FWD
Tsubasa.Kosuge.ja_97 Text Box
FWD
Tsubasa.Kosuge.ja_98 Line
Tsubasa.Kosuge.ja_99 Line
Tsubasa.Kosuge.ja_100 Line
Tsubasa.Kosuge.ja_101 Text Box L-5(P)
Tsubasa.Kosuge.ja_102 Line
Tsubasa.Kosuge.ja_103 Line
Tsubasa.Kosuge.ja_104 Text Box
FR171
Tsubasa.Kosuge.ja_105 Line
Tsubasa.Kosuge.ja_106 Line
Tsubasa.Kosuge.ja_107 Text Box
FR166
Tsubasa.Kosuge.ja_108 Line
Tsubasa.Kosuge.ja_109 Line
Tsubasa.Kosuge.ja_110 Text Box L-5(S)
Tsubasa.Kosuge.ja_111 Text Box
FWD
Tsubasa.Kosuge.ja_112 Line
Tsubasa.Kosuge.ja_113 Line
Tsubasa.Kosuge.ja_114 Line
Tsubasa.Kosuge.ja_115 Text Box
FR142
Tsubasa.Kosuge.ja_116 Line
Tsubasa.Kosuge.ja_117 Line
Tsubasa.Kosuge.ja_118 Line
Tsubasa.Kosuge.ja_119 Text Box L-7(S)
Tsubasa.Kosuge.ja_120 Line
Tsubasa.Kosuge.ja_121 Text Box
FWD
Tsubasa.Kosuge.ja_122 Text Box DET 1-A and 1-B
Tsubasa.Kosuge.ja_123 Text Box
DET 1-C
Tsubasa.Kosuge.ja_124 Text Box DET 1-D and 1-E
Tsubasa.Kosuge.ja_125 Text Box DET 1-F and 1-G
Tsubasa.Kosuge.ja_126 Text Box
DET 1-H
Tsubasa.Kosuge.ja_127 Text Box
DET 1-I
Tsubasa.Kosuge.ja_128 Text Box
DET 1-A
Tsubasa.Kosuge.ja_129 Text Box
DET 1-B
Tsubasa.Kosuge.ja_130 Text Box
DET 1-C
Tsubasa.Kosuge.ja_131 Text Box
DET 1-D
Tsubasa.Kosuge.ja_132 Text Box
DET 1-E
Tsubasa.Kosuge.ja_133 Text Box
DET 1-G
Tsubasa.Kosuge.ja_134 Text Box
DET 1-F
Tsubasa.Kosuge.ja_135 Text Box
DET 1-H
Tsubasa.Kosuge.ja_136 Text Box
DET 1-I
Tsubasa.Kosuge.ja_137 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_138 Text Box Sheet 3 of 11
Tsubasa.Kosuge.ja_139 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_140 Text Box Sketch
Tsubasa.Kosuge.ja_141
Shun.Yamashita.ja Oval
Shun.Yamashita.ja_1 Oval
Shun.Yamashita.ja_2 Line
Shun.Yamashita.ja_3 Text Box
JCN: ES01-NP4H
Tsubasa.Kosuge.ja_142 Text Box Location Detail of Pipe Hanger for Fresh water Piping in 4-126-0-E
Tsubasa.Kosuge.ja_143 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_144 Text Box Sheet 4 of 11
Tsubasa.Kosuge.ja_145 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_146 Text Box Sketch
Tsubasa.Kosuge.ja_147
Shun.Yamashita.ja_4
Shun.Yamashita.ja_5 Oval
Shun.Yamashita.ja_6 Line
Shun.Yamashita.ja_7 Text Box
JCN: ES01-NP4H
Tsubasa.Kosuge.ja_148 Text Box Location Detail of Pipe Hanger for Fresh water Piping in 4-126-0-E
Tsubasa.Kosuge.ja_149 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_150 Text Box Sheet 5 of 11
Tsubasa.Kosuge.ja_151 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_152 Text Box Sketch
Tsubasa.Kosuge.ja_153
Shun.Yamashita.ja_8
Shun.Yamashita.ja_9 Oval
Shun.Yamashita.ja_10 Oval
Shun.Yamashita.ja_11 Oval
Shun.Yamashita.ja_12 Line
Shun.Yamashita.ja_13 Line
Shun.Yamashita.ja_14 Text Box
JCN: ES01-NP4H
Shun.Yamashita.ja_15 Text Box
JCN: ES01-NP4H
Tsubasa.Kosuge.ja_154 Text Box Location Detail of Pipe Hanger for AFFF Piping in 4-126-0-E
Tsubasa.Kosuge.ja_155 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_156 Text Box Sheet 6 of 11
Tsubasa.Kosuge.ja_157 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_158 Text Box Sketch
Tsubasa.Kosuge.ja_159
Shun.Yamashita.ja_16
Shun.Yamashita.ja_17 Oval
Shun.Yamashita.ja_18 Line
Shun.Yamashita.ja_19 Text Box
JCN: ES01-NP4H
Tsubasa.Kosuge.ja_160 Text Box Location Detail of Pipe Hanger for AFFF Piping in 4-126-0-E
Tsubasa.Kosuge.ja_161 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_162 Text Box Sheet 7 of 11
Tsubasa.Kosuge.ja_163 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_164 Text Box Sketch
Tsubasa.Kosuge.ja_165
Shun.Yamashita.ja_20
Shun.Yamashita.ja_21 Oval
Shun.Yamashita.ja_22 Line
Shun.Yamashita.ja_23 Text Box
JCN: ES01-NP4I
Tsubasa.Kosuge.ja_166 Text Box Location Detail of Pipe Hanger for GTRB Waste Drain Piping in 4-126-0-E
Tsubasa.Kosuge.ja_167 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_168 Text Box Sheet 8 of 11
Tsubasa.Kosuge.ja_169 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_170 Text Box Sketch
Tsubasa.Kosuge.ja_171
30"3
SHELL PLATE STBD
LOOKING PORT
48'
36"
38"
SHELL PLATE PORT
LOOKING PORT
48'
31"
FIGURE-1 / LOCATION MAP FOR DAMAGED INSULATIONS. DDG86 4-126-0-E (BILGE)
INSULATION DAMAGE AREA IN STBD.
SHELL PLT APPROX. 132 SQFT
WEB (FRAME+SHELL STRG) APPROX. 99 SQFT
INSULATION DAMAGE AREA IN PORT.
SHELL PLT APPROX. 138 SQFT
WEB (FRAME+SHELL STRG) APPROX. 100 SQFT
APPROX. IN TOTAL
469 SQFT
Tsubasa.Kosuge.ja_172 Text Box 30"
Tsubasa.Kosuge.ja_173 Text Box Location Detail of Compartment Insulation in 4-126-0-E
Tsubasa.Kosuge.ja_174 Text Box
Tsubasa.Kosuge.ja_175 Text Box
INSULATION DAMAGE AREA ON PORT
SHELL PLT 138 SQFT
WEB (FRAME+SHELL STRG) 100 SQFT
Tsubasa.Kosuge.ja_176 Text Box
INSULATION DAMAGE AREA ON STBD
SHELL PLT 132 SQFT
WEB (FRAME+SHELL STRG) 99 SQFT
Tsubasa.Kosuge.ja_177
Tsubasa.Kosuge.ja_178
Total 469 SQFT
Tsubasa.Kosuge.ja_179 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_180 Text Box Sheet 9 of 11
Tsubasa.Kosuge.ja_181 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_182 Text Box Sketch
Tsubasa.Kosuge.ja_183
FIGURE-2 / LOCATION MAP FOR DAMAGED DAMPING TILES.
DDG86 4-126-0-E (BILGE)
11"
65"
BHD
SIZE: 13" L X 16" W
APPROX 1.5 SQFT
16"13"
FWD
FWD
3"
90"
SIZE: 4" L X 3-1/2" W
APPROX. 0.1 SQFT
Tsubasa.Kosuge.ja_184 Text Box Location Detail of Vibration Damping Tile in 4-126-0-E
Tsubasa.Kosuge.ja_185 Text Box
Tsubasa.Kosuge.ja_186 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_187 Text Box Sheet 10 of 11
Tsubasa.Kosuge.ja_188 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_189 Text Box Sketch
Tsubasa.Kosuge.ja_190
Tsubasa.Kosuge.ja_191
Location Detail of 2ND Platform Plating in 4-126-0-E
Tsubasa.Kosuge.ja_192 Text Box Preservation Area of 2ND Platform Plating
Tsubasa.Kosuge.ja_193 Line
Tsubasa.Kosuge.ja_194 Rectangle
Tsubasa.Kosuge.ja_195 Text Box
38KC212334A01
Tsubasa.Kosuge.ja_196 Text Box Sheet 11 of 11
Tsubasa.Kosuge.ja_197 Text Box
ENCLOSURE-03
Tsubasa.Kosuge.ja_198 Text Box Sketch
Tsubasa.Kosuge.ja_199
File details come from the government source that posted it. Updated .