This is a Request for Proposal (RFP) issued by Clintondale Community Schools in Clinton Township, Michigan, for a data network and wireless upgrade project. The project encompasses replacement of local area network equipment, wireless access points, and structured cabling across six school facilities: Clintondale High School, Clintondale Middle School, Parker Elementary, Rainbow Elementary, McGlinnen Elementary, and Clintondale Continuing Education. The primary products specified are Meraki-based equipment, including 120 MR42 wireless access points, multiple MS120 and MS220 network switches, and associated enterprise licenses and support packages for five-year periods. The RFP was released on January 7, 2020, with questions due by January 21, 2020, and sealed bid proposals due by 10:00 AM on February 6, 2020. A public bid opening would occur immediately following the proposal deadline, with interviews scheduled for February 12, 2020, contract award targeted for February 24, 2020, project start on April 4, 2020, and completion by August 30, 2020. The project qualifies for Year 23 E-Rate funding, though implementation is contingent upon E-Rate approval and Board of Education authorization. Three copies of sealed proposals must be submitted to Jill Gerhardt, Technology Director, at the school district's main office.

Pricing shall be submitted as lump-sum base bids with detailed cost analysis worksheets broken down by building location, along with unit pricing for individual components and optional alternates. All prices must be inclusive of taxes, permits, fees, delivery, installation, training, and one-year warranty services. Bidders must submit bid security equal to 5% of the total proposal amount in the form of a certified check or bid bond, along with mandatory affidavits regarding familial disclosure and Iran Economic Sanctions Act compliance. The RFP requires 100% performance and labor/material payment bonds upon contract award. Contractors must be factory-authorized distributors with proven experience installing medium to large data networking systems for at least five years and must demonstrate direct manufacturer support relationships. The contractor is responsible for pre- and post-installation wireless surveys, comprehensive testing and documentation, employee training, and ongoing maintenance and support during the warranty period, with optional one-year post-warranty maintenance contracts available for additional cost.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

January 7, 2020

Request for Proposal

DATA NETWORK AND WIRELESS UPGRADE

For

Clintondale Community Schools 35100 Little Mack Ave.

Clinton Twp., MI 48035

Prepared by

Convergent Technology Partners, LLC 6197 Miller Rd, Suite 4

Swartz Creek, MI 48473 810.720.3820 www.ctpartners.net http://www.ctpartners.net/

CLINTONDALE COMMUNITY SCHOOLS DATA NETWORK AND WIRELESS UPGRADE

TABLE OF CONTENTS 00 01 00 - 1

SECTION 00 01 00 – TABLE OF CONTENTS

SECTION TITLE PAGES

DIVISION 00 - BIDDING REQUIREMENTS, BID FORMS

SECTION 00 01 00 – TABLE OF CONTENTS

SECTION 00 30 00 – INSTRUCTIONS TO BIDDERS

SECTION 00 30 10 – SCHEDULE OF EVENTS

SECTION 00 40 10 – BID PROPOSAL FORM

SUPPLEMENTAL A – COST ANALYSIS WORKSHEET

SUPPLEMENTAL B – UNIT PRICING

SUPPLEMENTAL C – MANDATORY ALTERNATES

SUPPLEMENTAL D – VOLUNTARY ALTERNATES

SUPPLEMENTAL E – FAMILIAL DISCLOSURE AFFIDAVIT

SUPPLEMENTAL F – IRAN ECONOMIC SANCTIONS ACT AFFIDAVIT

DIVISION 27 – TECHNOLOGY SPECIFICATIONS

SECTION 27 00 00 – PROJECT SUMMARY

SECTION 27 10 00 – COMMUNICATIONS CABLING

SECTION 27 20 00 – NETWORK EQUIPMENT

APPENDIX A – LOCATIONS

APPENDIX B – ITEM LIST AND QUANTITIES

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 1

SECTION 00 30 00 – BIDDING REQUIREMENTS – INSTRUCTION TO BIDDERS

PART 1 - GENERAL

A. Clintondale Community Schools is seeking proposals in conjunction with the Federal Universal E-Rate Program for new Category 2 services including:

1. Local Area Network Equipment

2. Wireless Network Equipment

3. Structured Cabling to support wireless access points and data devices

B. A complete list of the buildings (“Sites”) and equipment requirements are provided in Attachment A and incorporated herein by reference.

C. Due on or before 10:00 A.M. (local time) on February 6, 2020 (“Due Date”), the Owner will receive bid proposals for the project. The Owner will not consider or accept a bid proposal received after the due date for bid proposal submission. All bid proposals received after the due date will be returned by making them available to the respective Bidder, unopened, for said Bidder to pick-up at their sole cost and expense. Bid proposals shall be submitted to:

Jill Gerhardt, Technology Director Clintondale Community Schools

35100 Little Mack Ave.

Clinton Twp, MI 48035

D. Proposals/Quotes

1. Three (3) copies of the proposals are to be submitted in sealed envelopes, clearly marked: “DATA NETWORK AND WIRELESS SEALED BID” for Clintondale Community Schools and shall be identified with the Bidder’s name and address and the date and time of the bid proposal opening. The Owner is not responsible for any postal or delivery delays. No email, facsimile or other electronic bid proposals will be accepted.

2. Proposals will be opened publicly immediately following the due date of the proposals

E. Security

1. Each bid proposal must be accompanied by bid security in the form of a certified check or bid bond in the amount not less than 5% of the bid proposal amount, made payable to Clintondale Community Schools or naming Clintondale Community Schools as the obligee. Bid bonds shall be issued by a company licensed to do business in the State of Michigan

F. Familial Disclosure Affidavit

1. Each bid proposal must be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the Bidder and any member of the Board of Education or the Superintendent of Clintondale

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 2

Community Schools. The Board of Education will not accept a bid proposal that does not include this sworn and notarized disclosure statement.

G. Affidavit of Compliance – Iran Economic Sanctions

1. Each bid proposal must be accompanied by the Iran Economic Sanctions Affidavit of Compliance in compliance with Michigan Public Act No. 517 of 2012. The Board of Education will not accept a bid proposal that does not include this sworn and notarized disclosure statement.

H. Reservation of Rights

1. The Owner reserves the right, in its sole and absolute discretion (for this provision and all other provisions contained in this RFP), to accept or reject, in whole or in part, any or all bid proposal with or without cause, to waive any irregularities or informalities in this RFP process or any bid proposal, and to award the contract to other than the low bidder, when in the opinion of the Owner, such action will best serve the Owner's interests.

I. Withdrawal of Bid Proposals/Quotes

1. All bid proposals submitted shall not be withdrawn and shall be irrevocable for a minimum period of ninety (90) calendar days following the due date for receipt of bid proposals set forth above.

J. Requests for clarification

1. Bidders may request that the Owner clarify information contained in this RFP. All such requests must be made in writing via email to Mr. John Foster, Convergent Technology Partners, at jfoster@ctpartners.net. Requests for clarifications and inquiries may only be made via email.

K. Restriction on communication

1. From the issue date of this RFP until a Contractor is selected and the contract is awarded a prospective Contractor shall not communicate about the subject of this RFP or a Contractor’s bid proposal with the Owner, its Board of Education, or any individual member, administrators, faculty, staff, students, or employees, except for additional requests for clarification in accordance with the paragraph above.

L. Universal Service Fund Schools Conditions (E-Rate) and Board of Education Approval

1. The service provider’s USF Service Provider Identification Number (SPIN) must be included in the Bid Proposal Form. Direct all questions regarding the USF require-ments in this IFB to the Universal Service Administrative Company (USAC), Schools and Library Division (SLD) at (888) 203-8100.

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 3

2. The specified products and/or services are to be provided for FY2020 (July 1, 2020-June 30, 2021) and must qualify for universal service discounts under the FY2020 universal service support mechanism, E-Rate.

3. YEAR 23 FUNDING - This project qualifies for Year 23 USF funding. Construction may begin as early as April 1, 2020; however, no invoices can be dated prior to July 1, 2020.

4. DISCOUNT IMPLEMENTATION - The District reserves the unrestricted right to specify the reimbursement filing option for implementing the USF E-rate discounts; Billed Entity Ap-plicant Reimbursement (BEAR) or Service Provider Invoice (SPI).

5. The USF eligible products and/or services identified on the USAC FY2020 Eligible Services List, which is incorporated herein by reference, must be identified separately from all “ineligible” products and/or services in the Bid.

6. Implementation of the proposed project is fully contingent on E-Rate funding approval and approval of the Clintondale Community Schools Board of Education.

A. Release of claims

1. Each Bidder by submitting its Proposal releases the Owner from any and all claims arising out of, and related to, this RFP process and selection of a Contractor.

B. Proposal Cost

1. Respondents of this RFP are responsible for any and all costs incurred by them or others acting on their behalf in preparing or submitting a bid proposal, or otherwise responding to this RFP, or any negotiations incidental to its bid proposal or this RFP.

C. Collusive bidding

1. All Bidders certify that its bid proposal is made without any previous understanding, agreement or connection with any person, firm or corporation making a bid proposal for the same project and is in all respects fair, without outside control, collusion, fraud or otherwise illegal action.

1.2 DEFINITIONS

A. Bid Documents are defined as the Instructions to Bidders, Schedule of Events, this RFP, including all Supplementals, Appendices, Specifications, Drawings and Addenda and the Contract.

B. Addenda are written or graphic instruments issued prior to the due date of bid proposals which modify or interpret the Bid Documents by additions, deletions, clarifications or corrections. All Addenda issued to Bidders prior to the due date of bid proposals shall become part of the Bid Documents and all bid proposals are to include the Project/Work therein described. Each Bid Proposal submitted shall list all Addenda that have been received prior to the due date of bid proposals.

C. As used in these Instructions to Bidders, the term "Bid Proposal" means a bid proposal prepared and submitted in response to this RFP.

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 4

D. As used in these Instructions to Bidders, the term "PSC" refers to the Professional Service Contractor and means Convergent Technology Partners and its assigned representative.

E. Throughout this RFP and Contract, the “Owner” or “District” will be used to refer to Clintondale Community Schools and bidders submitting bid proposals will be referred to as "Bidders" or "Vendors" and a successful Bidder or Vendor will be referred to as a “Contractor”.

1.3 BIDDER'S REPRESENTATION

A. Each Bidder, by submitting a Bid Proposal, represents that the Bidder has read and understands the Bid Documents and is familiar with the local conditions under which the project is to be performed. Bidders will be held to have compared the Sites with Bid Documents and have satisfied themselves to all conditions affecting the execution of the Work/Project.

1.4 EXAMINATION OF BID DOCUMENTS

A. Before submitting a Bid Proposal, each Bidder shall examine the RFP documents carefully and shall read the Specifications and the Bid Documents. Each Bidder shall gather complete information prior to bidding as to existing conditions and limitations under which the Work/Project is to be performed, and shall include in its Bid Proposal a sum to cover the cost of items necessary to perform the Work/Project as set forth in the Bid Documents.

B. No allowance or additional fees will be made to a Bidder because of lack of such examination or knowledge. The submission of a Bid Proposal will be considered as conclusive evidence that the Bidder has made such examination. Vendors may use subcontractors in connection with the Work/Project performed under this RFP provided the Owner has approved the subcontractors. In using subcontractors, the Vendor agrees to be responsible for all their acts and omissions to the same extent as if the subcontractors were employees of the Vendor.

C. Bidders may make written request to the PSC for interpretation or correction of any ambiguity, inconsistency or error in the Bid Documents that are discovered. These questions shall be submitted to the PSC no later than 5:00 P.M., January 21, 2020. Only a written interpretation or correction by Addendum shall be binding on Bidders. No explanations or interpretations requested or made orally will be considered binding. All questions will be responded to in writing.

1.5 SUBSTITUTIONS

A. Each Bid Proposal shall be based upon the materials and equipment described in the Bid Documents.

B. Voluntary alternates as substitutions for materials and equipment will be considered and evaluated if the Base Bid includes specified materials and equipment. In addition to the Base Bid, the submission of voluntary alternates is acceptable. If a voluntary alternate is submitted for consideration, it shall be expressed on the Bid Form as an “add” or “deduct” amount from the Base Bid. If a voluntary alternate is submitted, the Bidder shall also submit sufficient information in the form of drawings, specifications, a complete description of the proposed

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 5

substitute, the cost savings or advantages, the name of the material or equipment for which it is substituted, drawings, cuts, performance and test data and any other data or information necessary for a complete evaluation, sufficient for analysis of the alternate. The Owner reserves the right to unilaterally accept or reject, in whole or in part, any voluntary alternates.

1.6 BIDDING PROCEDURES

A. All Bids Proposal must be submitted, in triplicate, on the Bid Proposal Forms provided as part of the Bid Documents and in accordance with the Advertisement to Bid and Instructions to Bidders. Bidders must provide a complete list of proposed subcontractors (one per discipline) as indicated on the Bid Forms. Listing two or more subcontractors per discipline will be grounds for disqualification.

B. All Bidders must provide a proposal for the Base Bid that meets or exceeds the specifications set forth in this RFP. However, all Bidders may suggest Alternates if it is felt that the alternate proposal better suits the intent of this RFP. Any Alternate must be listed as such with separate pricing sheets. Any variance of the feature/functionality of the Base Bid must be identified in any Alternates proposed.

C. Prior to the due date for bid proposals, any Addenda will be available for inspection wherever the Bid Documents are kept available for that purpose. No Addendum will be issued later than three (3) days prior to the due date for bid proposals. It is each Bidders responsibility to ascertain prior to submitting a Bid Proposal that he/she has received all Addenda issued and shall acknowledge their receipt in their Bid Proposal Form.

D. All Bids must be signed as follows:

1. Corporations: Signature of an officer of the firm who is authorized to bind the corporation.

2. Partnerships: Signature of one partner who is authorized to bind the firm and all of its Partners.

3. Bids submitted by Joint Ventures shall be signed by one of the Joint Ventures and shall be accompanied by a certified copy of the Power of Attorney authorizing the individual signing to bind all the Joint Ventures. If a certified copy of the Joint Venture's certificate submitted with the Bid Proposal indicates that all Joint Ventures have signed, no authorization is required.

4. Individuals signing on own behalf: No authorization is required.

5. Individual signing on behalf of another: Power of Attorney or comparable evidence of authority shall accompany Bid.

E. Bid proposals shall be prepared on unaltered Bid Forms which are a part of this RFP. Bidders shall make no additional stipulations on the Bid Form nor qualify the Bid Proposal in any other manner. Unauthorized conditions, limitations, or provisions attached to the Bid Proposal will be cause for rejection of the Bid Proposal. If alterations by erasure or interlineations are made for any reason, explain over such erasure or interlineations with a signed statement from the

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 6

Bidder. No additional charges, other than those listed on the Bid Proposal Form and Bid Supplemental Forms, shall be made. Prices quoted will include verification/coordination of order, all costs for shipping, delivery to all Sites, insurance, payment and performance bonds, unpacking, setup, installation, operation, testing, cleanup, training and all other requirements contained in the bid documents.

F. Bids shall be submitted in a sealed envelope. Identified on the face of the envelope:

1. Project name

2. Name and address of Bidder

3. Notation “DATA NETWORK AND WIRELESS SEALED BID”

G. No responsibility shall attach to the PSC, the Owner, or the authorized representatives of either one, for the premature opening of any Bid Proposal which is not properly addressed, delivered and/or identified. In such event, that Bid Proposal will not be considered, and the Bidder will be automatically disqualified from consideration.

H. Negligence in preparation, improper preparation, errors in and/or omissions in the Bid Proposal shall not relieve the Bidder from fulfillment of any and all applicable obligations and requirements of contained in the Bid Documents.

I. The Owner or PSC in making copies available of the Bid Documents to Bidders do so only for the purpose of obtaining bid proposals on the project and do not confer a license or grant of use to a Bidder for any other purpose.

J. All Bidders must complete, sign and return the attached “FAMILIAL DISCLOSURE AFFIDAVIT” with their Bid Proposal.

K. Bidders must include a Bill of Material (BOM), along with line item pricing for all components proposed, including, but not limited to, access points, electronics, peripherals, maintenance and support with the total listed where indicated in the Bid Proposal Forms. Failure to provide the BOM with line item pricing will result in disqualification of the Bid proposal. This does not preclude filling out the unit pricing Form Attachment B.

L. The Owner considers this RFP legally binding and will require that this Request for Proposal and the Bid Proposal be incorporated by reference into any subsequent Contract between the Contractor and the Owner. It should be understood by the Bidder that this means that the Owner expects the Bidder to satisfy all of the requirements and specifications contained in the RFP. Any exceptions to the RFP must be explicitly noted in the Bid Proposal. Lack of listing all exceptions will be considered acceptance of all of the specifications as presented in this RFP

1.7 CONSIDERATION OF BIDS

A. The Bidder acknowledges the right of the Owner to accept or reject any or all Bid proposals, in whole or in part, with or without cause, to waive any irregularities or informalities in this RFP process or any Bid Proposal, and to award the contract to other than the low bidder. In addition, the Bidder recognizes the right of the Owner to reject a Bid Proposal:

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 7

1. If the Bidder fails to furnish any required Bid Security, or to submit the data required by the Bid Documents; or

2. If the Bid Proposal is in any way incomplete or irregular; or

3. If the Bidder's performance was unsatisfactory under a prior contract for the construction, repair, modification, or demolition of a facility with the Owner, or a contractor in privacy of contract with the Owner, which was funded, directly or indirectly, by the Owner;

4. If the Bidder was an employer of construction mechanics working on the construction of facilities funded, directly or indirectly, by the Owner through contracts under 1984 PA 431, MCL 18.1101 et seq; MSA 3.516 (101) et seq, and was determined by the Michigan Department of Labor to have failed to comply with a contractual provision requiring the payment of Department of Labor's prevailing wage or the maintenance of Department of Labor's prevailing wage or the maintenance of Department of Labor's apprentice-journeyperson ratio determinations for construction mechanics for that facility.

B. The Owner shall have the right to accept alternates in any order or combination and to determine the lowest responsible Bidder on the basis of the sum of the base bid and the alternates accepted.

C. Once the contract is awarded to the Contractor, the contract is contingent upon Clintondale Community Schools Board of Education and E-Rate funding approval and the Contractor providing the Owner with any and all documents required by the RFP prior to commencement of the Work/Project (i.e. insurance Certificates, Labor and Material Payment Bond and Performance Bond, etc.). Further, the Owner reserves the unrestricted right to reduce the contract amount by reducing the scope of Work/project and/or components. Any such action will be taken before specific work on a building or on a project component has commenced.

Contract amount shall be reduced or increased based on the unit pricing values.

D. Bidders to whom an award of a contract is under consideration shall submit to the Owner upon his/her request a properly executed Contractor's Qualification Statement, AIA Document A305 or other information format specified by the Owner.

1.8 BID EVALUATIONS

A. Considerations for awarding contracts will include price, product quality, service, delivery, and maintenance of products and/or services, adherence to specifications, past performance to the District, vendor/contractor reliability, warranties and familiarity with the projects and the facilities of the District.

1. It is the intent of the District to award the contract to the Bidder submitting the “best” cost effective Bid for the project.

2. Price being the primary factor, consideration, other than price alone, shall be used in determining the most successful Bid; technical experience, local service and support, and experience in educational environments are used to perform the District’s Bid evaluations.

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 8

1.9 BID SECURITY

A. The Bid Proposal shall be accompanied by a Bid Security of a certified check or cashier's check payable to the Owner or by a satisfactory Bid Bond Entity naming the Owner as the obligee and executed by the Bidder and a surety company authorized to do business in the State of Michigan, in an amount identified in the Instructions To Bidders. The check or amount of Bid Bond shall be forfeited to the Owner upon failure of the Contractor to enter into the Contract.

The Contractor's Bid security will be retained until the Contractor has signed the contract and has furnished the required Certificates of Insurance and other required Bonds and documents required by the RFP. Bonds signed by an Attorney-In-Fact must be accompanied by a certified and effectively dated copy of their Power of Attorney.

B. The Owner reserves the right to retain the Bid security of all Bidders until the Contractor enters into the contract or until ninety (90) days after bid opening, whichever is later. If the Contractor refuses to enter into the Contract, the Owner may retain their Bid Security as liquidated damages but not as a penalty.

1.10 PERFORMANCE AND LABOR AND MATERIAL PAYMENT BONDS

A. At or prior to delivery of the signed Contract, the Owner will require the Contractor to secure and post a Labor and Material Payment Bond and a Performance Bond including bonding for all subcontractors, each in the amount of 100% of the Contract Sum including bonding for all subcontractors. Surety shall be a company incorporated in the United States and must appear on the U.S. Treasury Departments approved surety list and be adaptable to the Owner. The Contractor shall obtain such bonds in a manner consistent with Michigan law.

1.11 TAXES

A. Installation services for the tangible personal property purchased by the Owner is not subject to sales taxation. Moreover, the Owner is exempt from taxation on all tangible personal property purchased by the Owner for its use and consumption; however this exemption would not apply to any materials required under the Bid Documents that are deemed to be a component of a construction/improvement project to the Owner's Sites/Facilities. All prices submitted on the Bid proposal Form shall be inclusive of any and all applicable taxes.

1.12 PERMITS AND FEES

A. All prices submitted on the Bid proposal Form shall be inclusive of any and all applicable/required permits and fees.

1.13 MICHIGAN RIGHT-TO-KNOW LAW

A. All Contractors must conform to the provisions of the Michigan Right-To-Know Law, 1986 PA 80, which requires employers to:

1. Develop a communication program designed to safeguard the handling of hazardous chemicals through labeling of chemical containers, and development and availability of Material Safety Data Sheets.

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 9

2. Provide training for employees who work with these chemicals; and

3. Develop a written hazard communications program.

B. The law also provides for specific employee rights. These include:

1. The right to be notified (by employer or Contractor posting) of the location of Material Safety Data Sheet (MSDS);

2. The right to be notified (by employer or Contractor posting) of new or revised MSDS no later than five working days after receipt; and

3. The right to request copies of MSDS from their employers or Contractors.

C. Provisions of Michigan's Right-to-Know Law may be found in those sections of the Michigan Occupational Safety and Health Act (MIOSHA) which contain Right-to-Know provisions, and the Federal Hazard Community Standard, which is part of the MIOSHA Right-to-Know Law through adoption.

1.14 WITHDRAWAL OF BIDS

A. A Bidder may withdraw its Bid Proposal by written request from an authorized Bidder representative, at any time prior to the due date of bid proposals.

B. No Bidder may withdraw a Bid Proposal for a period of ninety (90) calendar days, following the due date for receipt of bid proposals, and all bid proposals shall be subject to acceptance by the Owner during this ninety (90) day period.

1.15 EXECUTION OF CONTRACT

A. The Contractor to whom the contract is awarded shall, within ten (10) calendar days after Notice of Award and receipt of the contract from the Owner, execute and deliver required copies to the Owner.

B. At or prior to delivery of the executed Contract, the Contractor to whom the contract is awarded shall deliver to the Owner those Certificates of Insurance required by the Bid Documents and such Labor and Materials Payment Bonds and Performance Bond as are required by Owner and any other documents required by this RFP.

C. The Owner shall approve the provided Bonds and Certificates of Insurance before the Contractor may proceed with the Work/Project. Failure or refusal to provide Bonds, Certificates of Insurance or any other documents required by this RFP in a form(s) satisfactory to the Owner shall subject the Contractor to loss of time from the allowable construction period equal to the time of delay in furnishing the required material.

1.16 POST BID INFORMATION

A. Bid Form(s) shall be submitted as indicated in the Bid Documents. The Bid Form(s) requires all proposed subcontractors for the project to be named; no more than one per discipline.

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 10

1.17 TIME OF COMPLETION

A. The Bidder agrees to complete the Work within the timeframes listed in the Schedule of Events.

1.18 EQUAL OPPORTUNITY

A. The Contractor and all of its subcontractors shall not discriminate against any employee or applicant for employment because of race, religion, color, sex or national origin.

PART 2 - EXECUTION

2.1 SITE REQUIREMENTS

A. The Owner Sites are both instructional and administrative facilities that provide year-round services to their students, staff and the community. As such, activities in all buildings are critical to the provisioning of services to the students, staff and the community and shall not be interrupted by the Contractor's Work activities.

B. The computer and telephone systems associated with this Work will not be taken off-line or removed from service during normal working hours without coordination of the Owner’s IT department and the staff of affected buildings. Arrangements must be made by the Contractor to coordinate any such activities.

C. The Contractor will be required to work around all of the conditions listed above, as well as working with the Owner’s staff to minimize disruptions to normal Owner activities.

D. Installation Guidelines

1. All Work performed on this Project will be installed in accordance with the current edition of the National Electrical Code®, the current edition of the National Electrical Safety Code®, the current edition of the BICSI Telecommunications Distribution Methods Manual, the current edition of the BICSI Cabling Installation Manual, the latest issue of the ANSI/TIA/EIA Standards as published by Global Engineering Documents as TIA/EIA Commercial Building Telecommunications Standard, and all local codes and ordinances.

2.2 QUALITY ASSURANCE

A. Project Manager

1. The Contractor will provide a full-time Project Manager who will act as a single point of contact for all activities regarding this Project.

2. The Project Manager is required to attend necessary technology meetings for coordination before Work is started and status meetings once Work is in progress.

3. The Project Manager will be required to make on-site decisions regarding the scope of the Work and any changes required by the Work.

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 11

4. The Project Manager will be totally responsible for all aspects of the Work and shall have the authority to make immediate decisions regarding implementation or changes to the Work.

B. Compliance with Laws and Regulations

1. The Contractor performance of the Work shall comply with all applicable federal, state, and local laws, rules, and regulations and Owner policies, procedure, rules and regulations. The Contractor shall give required notices, shall procure necessary governmental licenses and inspections, and shall pay without burden to the Owner, all fees and charges in connection therewith unless specifically provided otherwise. In the event of violation, the Contractor shall pay all fines and penalties; including attorney's fees and other defense costs and expenses in connection therewith.

C. Federal Communications Commission

1. Equipment requiring FCC registration or approval shall have received such approval and shall be appropriately identified.

D. Codes, Standards, and Ordinances

1. All Work shall conform to the latest edition of the National Electrical Code®, the Building Code, and all local codes and ordinances, as applicable. ANSI/TIA/EIA-568-B and ANSI/TIA/EIA-569-A shall be adhered to during all installation activities. Methodologies outlined in the latest edition of the BICSI Telecommunications Distribution Methods Manual shall also be used during all installation activities. Should conflicts exist with the foregoing, the authority having jurisdiction for enforcement will have responsibility for making interpretation. The Contractor is wholly responsible to meet or exceed all codes, standards, regulation, manufacturer installation standards and industry best practices.

2.3 Safety

A. The Contractor shall take the necessary precautions and bear the sole responsibility for the safety of the methods employed in performing the Work. The Contractor shall at all times comply with the regulations set forth by federal, state, and local laws, rules, and regulations concerning "OSHA" and all applicable state labor laws, regulations, and standards. The Contractor shall indemnify and hold harmless the Owner from and against all liabilities, suits, damages, costs, and expenses (including attorney's fees and court costs) that may be imposed on the Owner because of the Contractor, or its subcontractor, or supplier’s failure to comply with the regulations stated herein.

2.4 Inspection, Acceptance, and Title

A. Inspection and Acceptance will be upon successful installation unless otherwise provided. Title to/or risk of loss or damage to all items shall be the responsibility of the Contractor until acceptance by the Owner, unless loss or damage results from negligence by the Owner. If the materials or services supplied to the Owner are found to be defective or do not conform to the specifications, the Owner reserves the right to cancel the Contract upon written notice to and return products at the Contractor's expense, based upon the terms of the Contract.

BIDDING REQUIREMENTS - INSTRUCTIONS TO BIDDERS 00 30 00 - 12

B. The Owner shall at all times have access to the Work wherever it is in preparation or progress, and shall provide proper facilities for such access and for inspection.

C. The Contractor shall not close up any Work until the Owner has inspected the Work. Should the Contractor close up the work prior to inspection by The Owner, the Contractor shall uncover the Work for inspection by the Owner at no cost to the Owner, and then recover the Work according to the specifications contained herein. The Contractor shall notify the Owner in writing when the Work is ready for inspection. The Owner will inspect the Work as expeditiously as possible after receipt of notification from the Contractor.

2.5 Status Reports, Meetings and Construction Coordination

A. It shall be the Contractor’s responsibility to provide the Owner with written weekly project status reports while actively engaged in craft work and a summary report at the beginning of periods of inactivity between phases or construction delays noting status at that time and expected date of return to work in addition to the requirements listed below. These reports are required and shall include, but not be limited to:

B. Project completion percentage.

C. Any and all problems that were encountered.

D. Any foreseeable problems that may arise.

E. The Owner reserves the right to hold additional status meetings on a regular basis with the Contractor’s Project Manager.

TABLE OF CONTENTS 00 30 10 - 1

SECTION 00 30 10 - SCHEDULE OF EVENTS

The following is a projected schedule of events for this project. The schedule may change depending upon the results of the responses and USF approval. A final schedule will be established prior to contracting with the Vendor.

EVENT DATE

Bid Release January 7, 2020

Due Date for Questions January 21, 2020

Bid Due Date at 10:00 AM February 6, 2020

Interviews (if necessary) February 12, 2020

Contract Award February 24, 2020

Project Start Date April 4, 2020

Project Completion August 30, 2020

BID PROPOSAL FORM 00 40 10 - 1

SECTION 00 40 10 - BID PROPOSAL FORM

OWNER: Clintondale Community Schools 35100 Little Mack Ave.

PROJECT: CLINTONDALE COMMUINTY SCHOOLS DATA NETWORK AND WIRELESS UPGRADE

NAME OF BIDDER:

BASE BID:

Lump sum bid for all work specified and shown on the drawings as indicated for base bid in the amount of:

_________________________________________________ Dollars ($ )

The Bid Proposal amount shall be shown in both words and figures. In the case of discrepancy, the amount shown is words shall govern.

BASE BID: The undersigned, having examined the Bid Documents and examined the conditions affecting the Work/Project, hereby proposes and agrees to furnish all of the labor, materials, and equipment and perform all work necessary to complete the Work/Project as required by the Bid Documents for the stipulated sum identified above and detailed in Attachment A (Cost Analysis Worksheet). The Bid Documents set forth the terms and conditions upon which the Bidder will provide a "turnkey" solution for the installation and operation of the project for use by the Owner and represents and warrants that the design, operation and functionality of the project are in accordance with the Bid Documents. All prices provided by the Bidder on this Bid Proposal Form must include all cables, connectors, equipment etc. that are necessary to the make the project fully operational for the intent and purpose stated in the Bid Documents

BID SECURITY

Enclosed herewith find (Certified Check)/ (Bid Bond) in the amount of $ ______ being five percent (5%) of the maximum Bid Proposal herein, made payable to Clintondale Community Schools or naming Clintondale Community Schools as obligee. The proceeds of which are to remain the property of Clintondale Community, if the Bidder does not, within ten (10) days after notice of the acceptance of Bid Proposal, enter into the Contract.

BID PROPOSAL FORM 00 40 10 - 2

TAXES

Please identify the amount, if any, of this Bid Proposal that has been attributed to sales or use tax. If an amount has been attributed to such tax, please identify which components of the Bid to which the tax has been attributed.

SUBCONTRACTORS

Bidders must provide attach complete list of proposed subcontractors (one per discipline), if any are proposed to be utilized on the project. Listing two or more subcontractors per discipline will be grounds for disqualification.

EXCEPTIONS

Any Exceptions to the terms and conditions contained in the RFP or contract are identified below:

ADDENDA

This RFP incorporates the following Addenda:

Addendum No. Dated ____________ Addendum No. Dated ______________

Addendum No. Dated ____________ Addendum No. Dated ______________

Addendum No. Dated ____________ Addendum No. Dated ______________

BID PROPOSAL FORM SUPPLEMENTS:

The following Bid Form Proposal Supplements are attached hereto and are considered an integral part of this Bid Proposal Form:

BID PROPOSAL FORM 00 40 10 - 3

• SUPPLEMENTAL A – Cost Analysis Worksheet

• SUPPLEMENTAL B – Unit Pricing

• SUPPLEMENTAL C – Mandatory Alternates

• SUPPLEMENTAL D – Voluntary Alternates

• SUPPLEMENTAL E – Familial Disclosure Affidavit

• SUPPLEMENTAL F – Iran Economic Sanctions Act Compliance Affidavit

BIDDER NAME:

ADDRESS:

DATE:

TELEPHONE:

EMAIL ADDRESS: ______________________

ERATE SERVICE

PROVIDER NO. (SPIN)

If award is made to our firm based upon our Bid Proposal, we agree to enter into the form of Contract with the School District in accordance with this Request for Proposal, the contract and our Bid Proposal.

My signature certifies that the Bid Proposal as submitted complies with all terms and conditions as set forth in this Request For Proposal, unless specifically enumerated as an exception as part of this Bid Proposal Form.

I hereby certify that I am authorized to sign as a Representative for the Firm:

(Authorized Signature) (Title)

SUPPLEMENTAL A – COST ANALYSIS WORKSHEET 1

SUPPLEMENTAL A - COST ANALYSIS WORKSHEET

BASE BID BREAKDOWN

High School

Part No. Description Qty Unit Price Ext. Price

Total

Middle School

SUPPLEMENTAL A – COST ANALYSIS WORKSHEET 2

Parker Elementary

Rainbow Elementary

SUPPLEMENTAL A – COST ANALYSIS WORKSHEET 3

McGlinnen Elementary

Continuing Education

SUPPLEMENTAL A – COST ANALYSIS WORKSHEET 4

Performance Bond

Base Bid Total

SUPPLEMENTAL B – UNIT PRICING 1

SUPPLEMENTAL B - UNIT PRICING

All bid proposals shall include a detailed Bill of Materials that notes each item, part number, and unit price.

Provide this Bill of Materials, attached to and submitted with the Bid Proposal. These unit costs, which shall be considered firm pricing during the contract period and not subject to change, will be used to determine costs for additions and deletions during the contract period. The Owner reserves the right to adjust any or all quantities at any time.

In additional to the required Bill of Materials, include the following Unit Prices.

Section 27 10 00 – COMMUNICATIONS CABLING

UP1 Cost to provide and install (1) Category 6 data drop including cable, jacks, terminations, testing and labeling

UP2 Cost to provide and install (2) Category 6 data drops including cable, jacks, terminations, testing and labeling

UP3 Cost to provide and install (1) 48 port Category 6 patch panel

Section 27 20 00 – NETWORK EQUIPMENT

UP4 Cost to provide, install and program an MR42 wireless access point. Do not include Category 6 cabling price.

UP5 Cost for the Meraki MR Enterprise License, 5 year

SUPPLEMENTAL C – MANDATORY ALTERNATES 1

SUPPLEMENTAL C - MANDATORY ALTERNATES

Mandatory Alternate 1: None at this time

Add/Deduct Dollars ($ )

Mandatory Alternate 2:

Mandatory Alternate 3:

Mandatory Alternate 4:

Mandatory Alternate 5:

SUPPLEMENTAL D – VOLUNTARY ALTERNATES 1

SUPPLEMENTAL D - VOLUNTARY ALTERNATES

VOLUNTARY ALTERNATE 1:

Add/Deduct/No Change

Dollars ($ )

VOLUNTARY ALTERNATE 2:

VOLUNTARY ALTERNATE 3:

SUPPLEMENTAL E – FAMILIAL DISCLOSURE AFFIDAVIT 1

SUPPLEMENTAL E - FAMILIAL DISCLOSURE AFFIDAVIT

The undersigned, the owner or authorized officer of ________________________ (the

“Bidder”), pursuant to the familial disclosure requirement provided in the Clintondale Community Schools (the “School District”) Request For Proposals, hereby represents and warrants that, except as provided below, no familial relationships exist between the owner or any employee of the Bidder, and any member of the Board of Education of the School District or the Superintendent of the School District.

List any Familial Relationships:

BIDDER:

By:

Title:

STATE OF MICHIGAN

COUNTY OF ____________

This instrument was acknowledged before me on the _____ day of ____________, 2016, by

, Notary Public

______________ County, Michigan

My Commission Expires: ___________

Acting in the County of: ___________

SUPPLEMENTAL F – IRAN ECONOMICS SANCTION AFFIDAVIT OF COMPLIANCE 1

SUPPLEMENTAL F - AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT

Michigan Public Act No. 517 of 2012

The undersigned, the owner or authorized officer of the below named applicant (the “Applicant”), pursuant to the compliance certification requirement provided in the Clintondale Community Schools (the “School District”) Request For Proposals for Data Network and Wireless Upgrades (the “RFP”), hereby certifies, represents and warrants that the Applicant (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Applicant is awarded a contract as a result of the aforementioned RFP, the Applicant will not become an “Iran linked business” at any time during the course of performing the Work or any services under the contract.

The Applicant further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School District’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three

(3) years from the date it is determined that the person has submitted the false certification.

APPLICANT:

Name of Applicant

By:

Title:

Date:

STATE OF Michigan

COUNTY OF ____________ )

This instrument was acknowledged before me on the _____ day of ____________, 2016, by

____________________________________, Notary Public ______________ County, __________

My Commission Expires: ___________

Acting in the County of: ___________

PROJECT SUMMARY 27 00 00 - 1

SECTION 27 00 00 – PROJECT SUMMARY

PART 1 - GENERAL

1.1 CURRENT ENVIRONMENT

A. The Owner has an existing data and wireless network that provides access to faculty, staff and students throughout the buildings/Sites.

B. The current wireless network consists of all Meraki components.

C. The Owner has an existing IP scheme deployed throughout the network. It shall be the Contractor’s responsibility to configure the new network devices to integrate seamlessly with the existing network including the existing Meraki.

1.2 SUMMARY OF WORK

A. Replacement of the existing local area network equipment and wireless access points as specified in Section 27 21 00.

1. The awarded Vendor will be required to perform a pre-installation wireless survey to assist the District in quantity and location of access points

2. The quantity of access points being requested in the RFP is intended to be the maximum required. This number may be less based on the pre-survey and the vendor is required to give full credit for the components that will not be required if the numbers are reduced.

3. The awarded Vendor must provide a post-installation wireless survey to document the coverage, density and anticipated speeds of the installed product.

4. The new data switching hardware shall be an add on to the existing switching network.

B. Installation of data cabling as specified in Section 27 10 00.

C. The Contractor shall be required to work with Clintondale Community Schools and the SRESD to configure any additional switch settings requested, including but not limited to, device passwords, IP addresses, VLANs, SSIDs and information in support of the data and wireless networks.

D. Network electronics shall follow equipment manufacturer’s recommendations, the requirements of the Specifications and all current edition or revisions of all applicable codes and standards as previously listed.

E. Owner provided asset tags must be placed in a visible area on all equipment if requested by the Owner.

F. With input from the Owner’s personnel, review and recommend VLAN configurations and develop and implement a plan best suited to both meet the Owner’s needs, and work with the existing data network.

PROJECT SUMMARY 27 00 00 - 2

1.3 QUALITY ASSURANCE

A. Awarded Contractor will provide a detailed testing methodology used to ensure the system/project is functioning to manufacture specifications with its response. Other tests, specific to installed equipment, may be required to ensure functionality.

B. See also individual section quality assurance and test requirements.

PART 2 - PRODUCTS

2.1 GENERAL

A. Provide products as indicated in individual sections.

PART 3 - EXECUTION

3.1 GENERAL

A. As indicated in individual sections.

COMMUNICATIONS CABLING 27 10 00 - 1

SECTION 27 10 00 - COMMUNICATIONS CABLING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

B. Related Sections:

1. Division 27 Section “Project Summary”

2. Division 27 Section “Data Network”

3. Appendix B – Item and Quantity List

1.2 SUMMARY

A. Section Includes:

1. All hardware, enclosures, racks, equipment and other equipment as indicated herein and on project drawings and documents, and as required for a complete installation per industry norms, standards and best practices

2. Category 6 UTP horizontal cabling for data outlets and wireless access as indicated herein and on project documents

1.3 REFERENCES

A. The contractor shall comply with the latest edition or revision of all codes, standards and regulations.

B. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. Regardless of the date shown for each reference below, the latest edition shall apply.

1. ASTM INTERNATIONAL (ASTM)

a. ASTM D709 Laminated Thermosetting Materials

2. ELECTRONIC COMPONENTS INDUSTRY ASSOCIATION (ECIA)

a. ECIA EIA/ECA 310-E Cabinets, Racks, Panels, and Associated Equipment

3. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

a. IEEE 100 The Authoritative Dictionary of IEEE Standards Terms

Communications Cabling 271000 - 2

4. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)

a. ICEA S-83-596 Indoor Optical Fiber Cables

b. ICEA S-90-661 Individually Unshielded Twisted Pair Indoor Cables for Use in General Purpose and LAN Communications Wiring Systems Technical Requirements

5. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)

a. NECA/BICSI 568 Standard for Installing Building Telecommunications Cabling

6. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

a. ANSI/NEMA WC 66 Performance Standard for Category 6 100 Ohm Shielded and Unshielded Twisted Pairs

7. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

a. NFPA 70 National Electrical Code

8. TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA) - LATEST EDITION

a. TIA-1152 Requirements for Field Test Instruments and Measurements for Balanced Twisted-Pair Cabling

b. TIA-568-D-0 Generic Telecommunications Cabling for Customer Premises

c. TIA-568-D-1 Commercial Building Telecommunications Cabling Standard

d. TIA-568-C.2 Balanced Twisted-Pair Telecommunications Cabling and Components Standards

e. TIA-569 Commercial Building Standard for Telecommunications Pathways and Spaces

f. TIA-606 Administration Standard for the Telecommunications Infrastructure

g. TIA-607 Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises

9. U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)

a. FCC Part 68 Connection of Terminal Equipment to the Telephone Network (47

CFR 68)

10. UNDERWRITERS LABORATORIES (UL)

a. UL 1286 Office Furnishings

Communications Cabling 271000 - 3

b. UL 1666 Test for Flame Propagation Height of Electrical and Optical-Fiber Cables Installed Vertically in Shafts

c. UL 1863 Communication Circuit Accessories

d. UL 444 Communications Cables

e. UL 467 Grounding and Bonding Equipment

f. UL 514C Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers

g. UL 723 Test for Surface Burning Characteristics of Building Materials

h. UL 969 Standard for Marking and Labeling Systems

1.4 DEFINITIONS

A. Unless otherwise specified or indicated herein, electrical and electronics terms used in this specification shall be as defined in TIA-568, TIA-569, TIA-606 and IEEE 100 and herein.

B. BICSI: Building Industry Consulting Service International.

C. Cross-Connect: A facility enabling the termination of cable elements and their interconnection or cross-connection.

D. EMI: Electromagnetic interference.

E. IDC: Insulation displacement connector.

F. Outlet/Connectors: A connecting device in the work area on which horizontal cable or outlet cable terminates.

G. RCDD: Registered Communications Distribution Designer.

H. TDMM (BICSI): Telecommunications Design Methods Manual

I. UTP: Unshielded twisted pair.

J. LAN: Local area network.

K. Basket tray: A fabricated structure consisting of sides and bottom constructed of wire mesh not exceeding 2” x 4” (50mm x 100mm) spacing.

1.5 TELECOMMUNICATION SPACES DESCRIPTION

A. Telecommunications spaces are the rooms and areas were telecommunications cabling systems are terminated, cross connected, and interconnected installed telecommunications equipment.

Bonding and grounding (earthing), fire stopping in labeling of telecommunications infrastructure also occur in telecommunications spaces.

Communications Cabling 271000 - 4

1.6 BACKBONE CABLING DESCRIPTION

A. Backbone cabling system shall provide interconnections between telecommunications equipment rooms, main terminal space, and entrance facilities in the telecommunications cabling system infrastructure. Cabling system consists of backbone cables, intermediate and main cross-connects, terminations, and patch cords or jumpers used for backbone-to-backbone cross-connection.

B. Backbone cabling cross-connects may be located in telecommunications equipment rooms or at entrance facilities. Bridged taps and splitters shall not be used as part of backbone cabling.

C. General Performance: Backbone cabling system shall comply with transmission standards in TIA-568, when tested according to test procedures of this standard.

1.7 HORIZONTAL CABLING DESCRIPTION

A. Horizontal cable and its connecting hardware provide the means of transporting signals between the telecommunications outlet/connector and the horizontal cross-connect located in the telecommunications equipment…