CLIN 0002 SOW.DOCX
DOCX document 20 KB Posted
- Solicitation number
- W90VN6-20-R-0048
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLIN 0002 Drawing.pdf | ||
| CLIN 0003 Drawing.pdf | ||
| CLIN 0003 SOW.DOCX | DOCX document | |
| CLIN 0001 Project Drawings.pdf | ||
| W90VN6-20-R-0048.pdf | ||
| CLIN 0001 Proposal Schedule.xls | XLS spreadsheet | |
| CLIN 0002 Proposal Schedule.xls | XLS spreadsheet | |
| CLIN 0001 SOW.DOCX | DOCX document | |
| CLIN 0003 Proposal Schedule.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER: W91QVN‐19‐D‐0002/0006/0008/0010
PROJECT NUMBER: SMYU 20-1056
DESCRIPTION: REPAIR PERIMETER FENCE ON PARCEL B
RA POC: 51st CES (MR. YI, UN CHOL, 784‐6815)
STATEMENT OF WORK DATED: 16 JULY 2020
1. GENERAL: The work to be performed for completion of this project shall be in general as described below and executed by the contractor.
1.1 Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed below and in accordance with the drawings, sketches and specifications.
1.2 Work by In‐House Forces: N/A
1.3 Work by Troop labor: N/A
2. TECHNICAL SPECIFICATIONS: Above project shall comply with specifications in awarded original contract package.
3. SCOPE OF WORKS (SOW):
a. Civil Works:
1. Provide temporary fence for whole length of fence line during construction period. (Approx. 620 LM)
2. Replace existing perimeter chain link fence with new including double arms outriggers, barbed wires, and concertina wires. (Same height and route with existing one, Approx. 620 LM)
3. Provide concrete continuous footing for perimeter fence. (0.9 meter depth at minimum, Approx. 205 CM)
4. Provide hydro seeding. (Approx. 1,040 SM)
5. Restore all disturbed areas by removal and installation work.
6. Dispose existing concrete footings and fences.
4. KEY INFORMATION FOR CONSTRUCTION SCHEDULE
| Project Site |
| Airfield Area |
| Parcel B |
| Contract Type |
| General IDIQ |
| Performance of Period (PoP) |
| 180 Days after Task Order issued |
| PoP includes offshore material procurement, digging permit, AF Form 3000 approval & contractor mobilization |
Temporary Airfield Construction Waiver Required (TACW)
| Yes |
| If yes, TACW requires minimum 60 days to be approved |
| Risk Assessment (RA) Required |
| N/A |
| Phasing Work Required |
| N/A |
| Military Training Event Anticipated |
| Yes |
| Minimum 15 days of Military Training Event anticipated during PoP |
| Restricted Area Escort Required |
| Yes |
5. REMARKS: All documents for drawings, construction schedule and plan shall be approved before construction start. Checking actual dimension, existing conditions, and location of existing structures will be contractor’s responsibility.
5.1. Military Training Events are anticipated to occur during the construction period as indicated in Table above. During Training Event, contractor will not be allowed to access the project site. Contractor shall consider these conditions in their proposal. Contractors will be given 72hours notice of work stoppage without incurring penalty to the Government.
5.2. Detail drawings for chain link fence shall be referenced OMA standard drawing 2015.
6. SECURITY REQUIRMENTS:
The training IWATCH/EAGLE EYES/AT Level I shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.
ALERTS: During military alerts or special operations, the contractor may not be authorized on base or in the work site. When the contractor is prohibited from access to the base or work site for one (1) day or less per month, no adjustment in the contract time shall be made. When the contractor is prohibited access for more than one (1) day per month, adjustments shall be made in accordance with applicable clauses of the General Provisions.
BASE PASSES: The contractor shall be required to obtain base passes to Osan Air Base to perform the requirements of this contract. The contractor shall be responsible to submit a base pass request no later than five (5) calendar days after award of this contract. It should be noted that it can take up to 30 days or more to process base pass paperwork. It shall be the responsibility of the contractor to prepare the necessary base pass paperwork to include USFK Form 82-E, USFK Form 225EK-E, family history register, local register, etc. for each individual requiring access to Osan Air Base. The contractor shall also be authorized to receive vehicle passes for each of the contractor’s vehicles used in the performance of the requirements of this contract. It shall be the responsibility of the contractor to prepare the necessary paperwork to include USFK Form 195EK-E, vehicle registration, vehicle insurance, certificate of safety inspection and a copy of driver’s license for each vehicle requiring access to Osan Air Base. The contractor shall prepare a cover letter listing each individual, skill, escort privileges, vehicle type, vehicle registration number, etc. The contractor shall also provide the COR with two (2) copies of this request letter, with carbons, to include the top copy with original signatures. Escort privileges will be justified and limited to specific needs for contract completion and at the discretion and approval of the sponsor and requesting authorities identified in Block 13 and Section III of the USFK Form 82-E, Application for Installation/Base Access. The contractor shall not be authorized to perform any portion of the contract requirements until such time that the contractor has processed the necessary base pass paperwork for entry onto Osan Air Base. The COR shall not provide or be responsible to provide the contractor with escorts during performance of any part of this contract. All of the above documents shall be turned in to the COR for processing with the 51st Security Forces.
The contractor and all associated sub-contractors shall practice Operations Security. The contractor shall not talk about work outside of the work area nor discuss the work being performed on social media. Unless absolutely necessary to perform the duties stated in the contract, the contractor shall not take pictures of or inside sensitive locations as determined by the contracting officer representative. It shall be the responsibility of the contractor to safeguard all documents provided. Documents shall be stored away from view when not being used. Documents that are no longer needed shall be shredded in an approved government shredder. Contractor shall contact with 51 FW/IPO office (POC: Mr. CARL W. CARVEN, DSN 784-3094) at Bldg 1097 upon being awarded.