CLIN 0001 SOW.DOCX

DOCX document 20 KB Posted

Attached to
Install Concrete Pad and Repair Perimeter Fence, Osan AB (Osan IDIQ)
Solicitation number
W90VN6-20-R-0048
Issued by

View the file

Other files

File Type Posted
CLIN 0002 Drawing.pdf PDF
CLIN 0003 Drawing.pdf PDF
CLIN 0003 SOW.DOCX DOCX document
CLIN 0002 SOW.DOCX DOCX document
CLIN 0001 Project Drawings.pdf PDF
W90VN6-20-R-0048.pdf PDF
CLIN 0001 Proposal Schedule.xls XLS spreadsheet
CLIN 0002 Proposal Schedule.xls XLS spreadsheet
CLIN 0003 Proposal Schedule.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NUMBER: W91QVN‐19‐D‐0002/0006/0008/0010

PROJECT NUMBER: SMYU17-1025

DESCRIPTION: CONSTRUCT STORAGE PADS BY B1810

RA POC: 51st CES (MR. YI, UN CHOL, 784‐6815)

STATEMENT OF WORK DATED: 29 JULY 2020

1. GENERAL: The work to be performed for completion of this project shall be in general as described below and executed by the contractor.

1.1 Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed below and in accordance with the drawings, sketches and specifications.

1.2 Work by In‐House Forces: N/A

1.3 Work by Troop labor: N/A

2. TECHNICAL SPECIFICATIONS: Above project shall comply with specifications in awarded original contract package.

3. SCOPE OF WORKS (SOW):

a. Civil Works:

1. Provide concrete pad including base course with access ramp. (12m x 33m x 0.3m thk)

2. Provide concrete bike pad including base course. (3m(W) x 40m x 0.2m thk)

3. Provide concrete sidewalk including base course. (1.8m(W) x 33m)

4. Provide two concrete dumpster pads including base course. (2m x 6m)

5. Remove existing asphalt concrete (AC) pavement and grass area at south parking lot of B1810. (Approx. 260 square meter (SM))

6. Provide base/sub-base course where existing grass area removed. (143 SM)

7. Provide new AC pavement where existing grass and AC removed. (260 SM)

8. Provide control/construction joints for all concrete works.

4. KEY INFORMATION FOR CONSTRUCTION SCHEDULE

Project Site
Airfield Area
Alpha Diamond
Contract Type
General IDIQ
Performance of Period (PoP)
180 Days after Task Order issued
PoP includes offshore material procurement, digging permit, AF Form 3000 approval & contractor mobilization

Temporary Airfield Construction Waiver Required (TACW)

YES
If yes, TACW requires minimum 60 days to be approved
Risk Assessment (RA) Required
YES
If yes, RA requires minimum 60 days to be approved
Phasing Work Required
N/A
Military Training Event Anticipated
YES
Minimum 15 days of Military Training Event anticipated during PoP
Restricted Area Escort Required
YES

5. REMARKS: All documents for drawings, construction schedule and plan shall be approved before construction start. Checking actual dimension, existing conditions, and location of existing structures will be contractor’s responsibility.

5.1. Military Training Events are anticipated to occur during the construction period as indicated in Table above. During Training Event, contractor will not be allowed to access the project site. Contractor shall consider these conditions in their proposal. Contractors will be given 72hours notice of work stoppage without incurring penalty to the Government.

6. SECURITY REQUIRMENTS:

The training IWATCH/EAGLE EYES/AT Level I shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.

ALERTS: During military alerts or special operations, the contractor may not be authorized on base or in the work site. When the contractor is prohibited from access to the base or work site for one (1) day or less per month, no adjustment in the contract time shall be made. When the contractor is prohibited access for more than one (1) day per month, adjustments shall be made in accordance with applicable clauses of the General Provisions.

BASE PASSES: The contractor shall be required to obtain base passes to Osan Air Base to perform the requirements of this contract. The contractor shall be responsible to submit a base pass request no later than five (5) calendar days after award of this contract. It should be noted that it can take up to 30 days or more to process base pass paperwork. It shall be the responsibility of the contractor to prepare the necessary base pass paperwork to include USFK Form 82-E, USFK Form 225EK-E, family history register, local register, etc. for each individual requiring access to Osan Air Base. The contractor shall also be authorized to receive vehicle passes for each of the contractor’s vehicles used in the performance of the requirements of this contract. It shall be the responsibility of the contractor to prepare the necessary paperwork to include USFK Form 195EK-E, vehicle registration, vehicle insurance, certificate of safety inspection and a copy of driver’s license for each vehicle requiring access to Osan Air Base. The contractor shall prepare a cover letter listing each individual, skill, escort privileges, vehicle type, vehicle registration number, etc. The contractor shall also provide the COR with two (2) copies of this request letter, with carbons, to include the top copy with original signatures. Escort privileges will be justified and limited to specific needs for contract completion and at the discretion and approval of the sponsor and requesting authorities identified in Block 13 and Section III of the USFK Form 82-E, Application for Installation/Base Access. The contractor shall not be authorized to perform any portion of the contract requirements until such time that the contractor has processed the necessary base pass paperwork for entry onto Osan Air Base. The COR shall not provide or be responsible to provide the contractor with escorts during performance of any part of this contract. All of the above documents shall be turned in to the COR for processing with the 51st Security Forces.

The contractor and all associated sub-contractors shall practice Operations Security. The contractor shall not talk about work outside of the work area nor discuss the work being performed on social media. Unless absolutely necessary to perform the duties stated in the contract, the contractor shall not take pictures of or inside sensitive locations as determined by the contracting officer representative. It shall be the responsibility of the contractor to safeguard all documents provided. Documents shall be stored away from view when not being used. Documents that are no longer needed shall be shredded in an approved government shredder. Contractor shall contact with 51 FW/IPO office (POC: Mr. CARL W. CARVEN, DSN 784-3094) at Bldg 1097 upon being awarded.